You can copy from here when filling out the rest of the page.
POA-2012-516_Tongass Narrows - Marble Island LLC's, stated purpose is to create additional
POA-2012-516_Tongass Narrows- Marble Island LLC's, stated purpose is to create additional residential view lots for the local real estate market by developing the subdivision to maximum allowable zone density in a practicable way and to be able to market the subdivision as having lots that have already been permitted with the Army Corps of Engineers and are ready to build. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at heather.l.boyer@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 27, 2012
EXPIRATION DATE:
January 28, 2013
REFERENCE NUMBER:
POA-2012-516
WATERWAY:
Tongass Narrows
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Heather Boyer at (907)
753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at heather.l.boyer@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
Marble Island LLC, 355 Carlanna Lake Road, Ketchikan, Alaska 99901
AGENT:
Bret Hiatt, R&M Engineering-Ketchikan Inc., 355 Carlanna Lake Road,
Ketchikan, Alaska 99901, 907-225-7917
LOCATION:
The project site is located within Section 29, T. 74 S., R. 90 E.,
Copper River Meridian; USGS Quad Map Ketchikan B-6; Latitude 55.4284° N.,
Longitude 131.7740° W.; Marble D1 Subdivision, current Lot 4B, future Lots 5-19;
from the airport ferry parking lot turn left onto Tongass Avenue which becomes
North Tongass Highway, go 7 miles and turn right onto D-1 Loop Road, project area
is about 0.62 miles up the road on the right, in Ketchikan, Alaska.
PURPOSE:
The applicant's stated purpose is to create additional residential view
lots for the local real estate market by developing the subdivision to maximum
allowable zone density in a practicable way and to be able to market the
subdivision as having lots that have already been permitted with the Army Corps of
Engineers and are ready to build.
PROPOSED WORK:
The applicant proposes to place approximately 4,952 cubic yards of
clean fill into 1.51 acre of wetland for a road and building pads for a new
subdivision.
A detailed project description is provided in the enclosed plan. All work would be
performed in accordance with the enclosed plan (sheets 1-12), dated November 2012.
APPLICANT PROPOSED MITIGATION:
The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The applicant avoided wetlands to the maximum extent
practicable given the constraints of the existing topography and developing the
most reasonable approach that would require the minimum site disturbance and most
efficient layout of road and lots within the parcel of land owned by the applicant.
Further details on avoidance are on sheet 11 of 12 on the enclosed plans dated
November 2012.
b. Minimization:
Development pads were designed to be efficiently sized to
accommodate single family home development and were placed to minimize impacts to
wetland areas. The subdivision was also designed to have a no net loss to creek
channels through the process of rerouting and consolidating some of the drainage
paths through the site as well as enhancing an existing drainage channel to
accommodate the increased flow.
For further details see sheet 12 of the enclosed
plans dated November 2012.
c. Compensatory Mitigation:
The applicant proposed compensatory mitigation
at a 1:1 ratio via in-lieu-fee payment to the Southeast Alaska Land Trust.
For
further details see sheet 12 of the enclosed plans dated November 2012.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places.
There are no listed or eligible properties in the
vicinity of the worksite.
Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources.
This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES:
No threatened or endangered species are known to use the
project arect. We have determined the described activity would have no effect on
any listed or proposed threatened or endangered species, and would have no effect
on any designated or proposed critical habitat, under the Endangered Species Act of
1973 (87 Stat. 844).
Therefore, no consultation with the U.S. Fish and Wildlife
Service or the National Marine Fisheries Service is required.
However, any
comments they may have concerning endangered or threatened wildlife or plants or
their critical habitat will be considered in our final assessment of the described
work.
-2-
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
No EFH species are known to use the project area.
Therefore, we
have determined the described activity would not adversely affect EFH.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application.
Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION:
The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal.
To make this
-3-
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above.
Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344).
Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws.
By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2012-516, Tongass
Narrows, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws.
The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
33
'WardcCov~.
MilES
1000
1ooo
3o_oo
4ooo
sooo
sooo
1ooo
9000
1000(!
fEET
CONTOUR INTERVAL 20 METERS
SHOREUNE SHOWN REPRESENTS lHE APPROXIMAIT UNE OF MEP.N HIGH WATER
THE MEAN RANGE OF TIDE ·1s APPROXIMATELY 4.0 METERS
CONTROL ELEVI)TIONS SHOWN TO lliE NEAREST 0.1 METER
OlliER ELEVATIONS SHOWN TO THE. NEAREST MEITR
To convert rneh!rs to feet multiply by 3.2808
To conv'!rt f~et to meters multiply b<} .3048
MARBLE D1 SUBDIVISION
LOCATION & VICINITY MAP
SCALE: AS .NOTED
Juneau
~c\:odiak
y-
. \'@), Petersburg
S1tkB.Q~~'!r~gell
"
~,~.Ketchikan
'1"
Project Location
tt
'!})
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 1 of 12
z0
~
lf1
~
>
~
~
co
TRACT K
uss
.pg'"'t"'
~"l
I
Qf,j< " I
LOT 4A
I
I
I
I
I
I
I
~
I .·
4'.5: Op
''
""'.{...
0>a6'o6'~6'~~
·f~~'"
··~~ "'.tltQ
.{(J·.,
ve·"'ir
~~~rn
~
co
~
<
'vf!>
1,...
I
I
,,I
~
...
q
q
q
q
,,q
I!
§lz
~~8~
~t!l ..
~~
rnu
.04~./~
~
~I
~~~~
lf1 E~
815
Jf'ETLANDS
21604 S.F.
0.496 ACRES:J:
/...
...
...
/
- ...' '
~
~
"
.fNTERMI1TENT CREEK (<1.5')
,U
en
.....J
:S:N
.....Jcoo..--o..--t:oN
clOroN..-ro0Jz,_.._
en ..-- Q) o
-o~..cN
IDNroE_.
..c <(' 0> Q) Q)
'c>ID
roooo..c
:2:0..!--ZCI)
LOT 4B.. · /
.:./
t~...
_
. .__.__
. .___
. ... . ._..._:/ IY ... ../
rp/
.
PERENIAL CREEK
g
.
Mg:
· d
.·
/
... ...
+
+
../---------~EXisTING
RO.
...
+
...
w
+
...
..,
...
...
...
...
+
...
...
+
...
...
+
...
--
11)1
TRACT E
uss
813
0
75 150
~"""'"''"
300
.
/
I
1,'
/
/\\
,'
\
,I/
,I'
.~----------------
,/
---~...-.-·~-----
/'
~---------------------------------------------------------__,''
/_,
I
-.......,
s 'j'
\
........
~
"i
~
- . . v,
) /
I
/
,1
,/
,
-,:
,I
,1'
,
y'
....
co
0
+
f
f
-..1
C}l
.......
C}l
0
I
,,I
,,
f
s
"i
....
l\)
MARBLE D 1 SUBDIVISION
EXISTING CONDITIONS WITH PROPOSED LOT LINES
SCALE: AS NOTED
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 3 of 12
,.1
/I
,.
·/ ,, .r
:,
I
,·
/
/
I
! ... -\·'
v \ ·,
.-1
I
t::rj
·
.· .·
I
I
I
l
,/
I
I
~
~
~
l
I
I
l
,
/..,;j
~\)1""
.;,;A-·'
~
·
l
,,, _.·
...L..--------~-1
:
I
·
,
.
· · _":-"--____
.,,, t--
~
. \l~j\
--·
,·'
I
·
' · .......:.._
pl I:"'
L ..':-
~ ~
\)\l'6
··
1 ···.,'
I
I
.-...
1·. ', .··- 0I:"'
I
··
I
II>
ill
8 "'-l
C)
I
·· ,CJi
I
·
···
....
·
---
<'
I
I
·
j
·. /
0
.<4·<1:)
,.
...............·t
~\)""'
1
I
'
,1,'
. .
I
. ll
,
.· ; '
,·''/'
·i
j,l
:' 1'
, / 1/
NlI
,.,
go
.
'
0>
o ~--·· ...
·
.
:,.
·.'I
~~
·
··c.n
. . . . "'...
~u
. · ...
:'
p"'.l
1/ .·· .· ..,
I
·
/;....._,: :'
,_Q ......
··
"''-'
u·:r : . .
·
.·
··
X s:J11
,·'
·
ar·
/
')I ..
1,'
..
·.
.;··I
,·1
..·· I I
.·
.....
/: : b5 .---· / ')
11 .---- _g_"jl·
\)"'-~,-.....:'-.... .:1·. ~"-~.-·
I .
..§·~
. --)'.. -··.i~-- .. /'~>. . . . -; ~ ·
01'
·;
I
····
...... -··
Cll,....
·
,
...
·
'y{
.-·
I
co
.'
c+
/
_7__,._ . ,
. . . . --- I ,.
.~
l\:)
.··
~0> ·· :
II,.··______-..,~...,.... -·
.;··
j,l
'
Oc-<\l
0,0
r---.--- , ··.I
'
N
.,
.
.
.
..
I
I
/~~).
, .. ..,
. . . ,:
·/ :
I I ,. ,- : . . .
1'--.l····
:·· ..-....
: Jl o
.: ~.-· ;/
ro':
llo'O
I lI
: ·--~~~ ~ .---- 1 1,' .--··· ~-5
.. :
··~
·-..: : II.· ·I
H
.. . .
· ...
·5 ·. ~,
·· ;/ -·
·.o·
~II:J'I. 1 /
8"'-l _... ·· ")il_: //'.;.'' -'co-.(;;:
_,~.·
V
t·
I
.-··"oo·._. ... ·:. ·.. / ' ;/---·-:
:::l!-. : /4
.fl
· ··-:, \ /.,I
:
'.,·'"'""'.,..,. ·.·
···,
·
··
/-··-;:-'~----~--7
#"-- _.
Ql .--··f-····.'1 '',i;)_~'6
ur1i)
li.' ;/ N.· .......... _.··t
_.,....,
.. · ·
·
_..
.·· I_,, ·"' .-·
.·· .··
,,
~
----;l.···
{\)___ .--~I
~-~···
1/ j,4v.:/.·/
.-·~ 5
.. ···~,'
0> "'3
.··
: Jl-,2
'"'3
'·
,' P'i:'"'
....
I
t'!' .
$
h
.!"
....
.N
.Di<;f!·1,'
.--·
o
0
0
>·.
'
/··'
·.~
I
..
-.
,'··-..'
.··
,'i:j
I
.
:
II ..,
.
,
·
·
.··-
.-----~----- ,~:~
~
,·
...,.
.. ----
.··
···
·
"'-
I
,
.· .·
.
.., :
.... :·1
.....,_.-·
01 · ·
1
---·
.... ,
.·I
"-
.:;-
:
.,/''.:.:..·:
,·'I
'-,
:"
-:--,,
1
L'
:~
'- · " '
~
,
·
.--
--;--~,_:~.l
- /
..m-·0>
~'
'··.
;
~ o.~-.
I
-·
~~~-
I
I
I
-;.:-..-,.,._··.;.;.;.;,:~:::.:.:,~~:~---~:~---::_:_ _____j_ ___/,,
..·
c.'l.
·
.
--~
. I.--~~:..__-......_
_.--.r, I .. ..:
1
1
1
/ /
. ----
~·
I
0
0
I
'
I .., · ·"
I
,,.
~
,
, ··
/'1.
·
/
.··',
·I
,·
:
:
·
·· .
. .,Q
·
..
'
A
4
/
'I
,·
"\.... · ·
:
:::l!
·.--·
:
~--· ···· ~, ·;···
(Jlt-'4 ....
'-t
/
:'0 o··
·
:
.-·· ··. ,.. -. ./
~
.-··
1
···i}~:·.
~ :··;·:.) ./
1._ .:_ _ . ----· ....----··i<_·_.-)(.::::·~-->-~
1-- J. ':'... ~;-·-fl ·. II ·---.:.
-r1 :
_.. ···
l
·-.: ~,
-/
.-·
.,
4 1
. .
::~!···\
·. ,. .
j
~~·""-··::;;··-' ·.,
·"
......
.. .
.. - ...I' . ~," . -~-r-t
0 0
.
-;,'.. . -. .
.....I-··
.. ·ll /;/ .-----.8 "'3 .: -~1> II -·
'I
__ : I ... _..J..."'......_:
.,-~-- ...
_, ....
---- / ' ' .,~-. ~ . ,,
I... _.J / /.1., .. "'~·:·~....-:·<-:..:. ~ -. ·-: ~c,C. I
I
I
1
·. ......
/,.'
l\:)
,'
·
:
.·"I
f .
·- J· / .
0
···
·
. . · · · ··
· ....
.--·
.·
!
-
-··
--·1
.·
~
.·
. ..
i----?·s·
I
....
,.
···
..0
I
..0
N
~
:-··
·
~
Q
, .. ./···--1..··· 9"-'b
__ .. ,1
·· ··
.. ·
...
:yl
\"'i""',
.··
_.--- _.·:··
· --·- .
'
MARBLE Dl SUBDIVISION
.··I ..
'I ...
... ,' .·.. ·,
.. ·
_.· /'
I
. . .-1
TOPOGRAPHIC DATA wrrH LOT LUNES
SCALE: AS NOTED
~-c..:>
0
0
:
.-
;' ....·.
··\·----,·~
.·
'
·
··
..···\
qi.·,.::
,.··(a
··
' :...,
. -..
'.--r:-.-·
,
~"'3.·····
:'1
,. I
__ . ,
........
/.·
>:~~---.
·~
,"
I:"'
·...._.···l_..____ ........
-~----- ~ ~....
----~-c:;
: _.-. .....
01
0
~
I
/
',
. ./
~
'-···ta:·
..... ·· ...............
~
:·.
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 4 of 12
;'
!/
J/
I
z
0
~
ifl
~
.... ....
>
~
0
"....
o:l~Cil
~. ~~
ifl
E-<0
~z
Cll
~~<:.!><
oc~~
:;;! t,)
-::SCil
~1 fi:l
-
o:l
I
..,
"" ..,
I
,
I
....
N
-l"O'"""t:ON
cLO roN'"""
rnNz 1/)
-ow
:::g
~(§§~1?
~
'>--..
1/)
3:
~
I"'V
/
0
-l
1/) '\""""
Q)~Cil~Q)
~0...1-Z(f.)
....
....
..,
...
+
-===-- ~ . . .. .. ...'ttl.:_ -.._..:......:- -= __..__ .: -
·
TRACT E
uss
813
'ENHANCED 8'
WIDE PERENNIAL CREEK
1'., EXISTING
UNDISTURBED JYETLANDS
0
.,
75
150
L()
300
1----------
40' - - - - - - - , . - - - - - - - 1
1 - - - - - - 28'
-------1
I
+---2%
2'
1.5'--
i
GRADE
0'
-1'
-
2' DITCHLINE
-3'
'------_j - - 4' DITCHLINE
SECTION OF ROAD "B"
HORIZONTAL 1"=10'
2X VERTICAL SCALE
340
340
320
320
.... .
300
;~~~~--~~r~.
300
.
/
· · · · /-<-~~-c-~---~-~rs=~~r::~1
:/
280
260
240
.
.
.
.
. GRADE
280
260
240
.
220
220
200
200
180
180
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
CENTER LINE PROFILE OF NEW ROAD
MARBLE D 1 SUBDIVISION
ROAD PROFILE & SECTION
SCALE: AS NOTED
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 6 of 12
z
0
~
lfl,
'
~
~II
0
~
~
350 I
lfl.
~
........t~
0~
Z;;: ()
~
. .,
~
I"Y"''
~
5: C\1
....Jc.oo.."0
t: 0 C\1
cl.()roC\1..-T"""
Cl]
-
'+-
0
~
-e~~
roooo..c
:2:0..1--Z(f.)
-
HORIZONTAL 1"=50'
1X VERTICAL SCALE
z '-())
~~c; ~.o""
~
TYP., SECTION A-A
~I
'"
~
4+00
(/)
'"'I _J
Block 18, Nature of Activity
The project includes the subdivision ofLot 4B ofTract J ASLS 81-39 White Rock
Estates Subdivision Phase III. This subdivision will include the creation of 15 residential
homesite lots within the current Future Development (FD) zone that calls for a minimum
lot size of25,000 sf per lot. Each subdivided lot will have access platted and developed
along the planned subdivision road right-of-ways. The roads will be gravel surfaced
roads. In conjunction with the subdivision will be the diversion consolidation and
containment of some of the small stream channels that transfer rain runoff down the steep
hillsides behind the subdivision. This collection of storm water runoff will not generally
reduce the area of stream channel present, it will simply reroute it to accommodate the
individual subdivision lots and protect potential erosion points of individual development
pads. The main perennial creek will be rerouted to follow an enhanced existing drainage
channel. Each lot will have a defined building pad developed. Hillside Lots on uphill
slopes from the roadway will be cut into the hillside and Lots down slope of the roadway
will have fill pads. (See Plan Sheets attached).
Road development is 980 feet long 28 foot wide gravel access road accessing all but two
of the proposed subdivision Lots and will include culvert at creek crossings and driveway
crossings over the diversion runoff stream.
Development pad construction will consist of six fill lots and nine cut and fill lots.
A wetlands delineation was performed in 2011 and the 2012 approved ACOE JD is
attached.
Block 21 Types of Materials Being Discharged and tlh.e Amount of Each Type
Roadway:
Total Excavation for Road
Shot Rock Embankment for Road
Crushed Aggregate Surfacing
Disturbed Area
Storm Water Collection System
24" Culvert Pipe
48" Culvert Pipe
Building Sites
Excavation for Pads
Shot Rock Fill for Pad
Disturbed Area
980' x 28' finished width, average disturbed width
is 43 feet with ditching
Project Total
1,500 cy
1,500 cy
300 cy
42,680 sf, (0.97 acre)
Within Wetlands
838 cy
240 cy
60 cy
14,665 sf, (0.33 acre)
Project Total
Within Wetlands
40 Feet
40 Feet
120 Feet
100 Feet
Project Total
Within Wetlands
11,111 cy
9,200 cy
2,000 cy
1,800 cy
442,903 sf(l0.2 acres)
51,060 sf, (1.18 acre)
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 8 of 12
Impacts to Streams
8' wide streams impacted
(Perennial)
3' wide streams impacted
(Perennial)
1.5' wide streams impacted
(Intermittent)
Total Fill in Streams
Project Total
Within Wetlands
774 Feet
0 Feet
356 Feet
51 Feet
1,317 Feet
741 Feet
2,242 cy
14 cy
One intermittent creek of 378 linear feet that is 1.5 feet wide will not be disturbed. 191
linear feet ofwhich are located within one of the wetland areas not impacted. However,
0.21 acres of the 0.23 total acres of stream channels will be impacted prior to quantifying
the efforts in the plan to manage drainage and mitigate overall impacts. Offsets to those
impacts are detailed below:
Intermittent creek flows are generally either rerouted or enhanced to provide capacity for
larger perennial flows. The intermittent creeks within Lot 19 are consolidated and
rerouted down the east property line into one 175 linear foot channel. The redirection of
the largest perennial creek will eliminate a 353 linear foot intermittent creek that
originated from that drainage, the existing flow combined with the rerouted perennial
channel. The intermittent creek flowing through Lot 15 will also be redirected into a 175
linear foot channel above the road and the remaining channel below the road will be
enhanced to accommodate the redirection perennial flows.
The perennial creek flowing through Lot 17 on the west side will be rerouted to a new 3
foot wide 175 linear foot long channel. This flow and the flow from the intermittent
diversion on Lot 19 will collect into a new 4 foot ditch line following the subdivision
road providing a 4 foot wide 266 linear foot drainage channel redirecting this flow to an
existing drainage ditch. The flow removed from an ephemeral seep and intermittent
creek located between Lots 15 and 14 are rerouted into another 4 foot wide ditch that will
collect this consolidated flow discharge it into a rerouted perennial flow passing through
Lot 11. The 8 foot wide perennial creek will be rerouted through Lot 15&16 property
line across the roadway within a Culvert and follow the enhanced 386 linear foot portion
of a channel of an existing intermittent creek.
Based on the above rerouted or enhanced channels relieving or offsetting impacts the
amount of area impacted is estimated to be reduced from 0.21 acres to 0. 02 acres
In addition there will be 660 lineal feet or 7,320 square feet of channel area that will be
enhanced along the western property line along the existing open ditch line.
Based on the re-routing of creek channels and the enhancement anticipated there would
be no net loss of the creek channel area transferring upslope runoff through the site
essentially eliminating any functional or actual losses potentially contributable to the
impacts to these property features. The only impacts that are anticipated to be realized
are to the minimal wetland areas not inclusive of the CJeek~.
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 9 of 12
All creek channels will have revegetated side slopes to protect against bank erosion.
Block 22 Wetlands Impacted
Roads
14,665 square feet (0.33 acres)
Lot Development
51,060 square feet (1.18 acres)
Total Wetlands Impacted: 1.51 acres
Marble Island LLC
POA-20 12-516
Tongass Narrows
November 2012
Sheet 10 of 12
Applicant Proposed Mitigation Statements
Background:
The U.S. Army Corps of Engineers (Corps) and the Environmental Protection Agency issued regulations
that govern national compensatory mitigation policy for activities in waters of the U.S., including
wetlands, authorized by Corps permits. The final mitigation rule was published in the federal register on
AprillO, 2008, and became effective on June 9, 2008. The final rule establishes standards and criteria for
the use of appropriate and practicable compensatory mitigation for unavoidable functional losses of
aquatic resources authorized by Corps permits (33 CFR Part 332). Additionally, the rule requires new
information to be included in Corps permit applications and public notices to enable meaningful
comments on applicant proposed mitigation. In accordance with 33 CFR Part 325.1 (d)(7), "For activities
involving discharges of dredged or fill material into waters of the U.S., the application must include a
statement describing how impacts to waters ofthe United States are to be avoided and minimized. The
application must also include either a statement describing how impacts to waters of the United States are
to be compensated for or a statement explaining why compensatory mitigation should not be required for
the proposed impacts." For additional information, the final mitigation rule can be viewed at:
http://www. usace.army .millcw/cecwo/reg/news/final_mitig_rule.pdf
Mitigation is a sequential process of avoidance, minimization, and compensation. Compensatory
mitigation is not considered until after all appropriate and practicable steps have been taken to first avoid
and then minimize adverse impacts to the aquatic ecosystem. Please provide your proposed avoidance,
minimization, and compensatory mitigation below:
Applicant's Proposed Mitigation (attach additional sheets as necessary):
1. Avoidance of impacts to waters of the U.S., including wetlands:
Please describe how, in your project planning process, you avoided impacts to waters of the U.S.,
including wetlands, to the maximum extent practicable. Examples of avoidance measures include site
selection, routes, design configurations, etc ...
Site selection was based on the applicants ownership of the parcel. The design of the subdivision was
planned for the maximum utility of each Lot within the subdivision. This process included the most efficient
layout of roads, Lots, and building pads by working within the constraints of the existing topography and
developing the most reasonable approach that would require the minimum site disturbance. This
approach not only cuts down on the impacts in the wetlands, but also cuts down on construction costs as
well.
The roadway follows a natural bench that traverses the larger original parcel. Pad design for the individual
Lots were designed to be the smallest practicable size to accommodate a reasonable building envelope
with the least site disturbance and wetland impacts. Creek rerouting was designed to establish a "no net
loss" to the channel area to efficiently direct surface run off from the steep upper hillsides through the site
in a way to eliminate potential erosion dangers while still maintaining the down gradient flow and
increasing the perennial flow which in-turn will improve function.
-
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 11 of 12
Applicant Proposed Mitigation Statements
2. Minimization of unavoidable impacts to waters of the U.S., including wetlands:
Please describe how your project design incorporates measures that minimize the unavoidable impacts to
waters ofthe U.S., including wetlands, by limitingfill discharges to the minimum amount/size necessary
to achieve the project purpose.
Development pads were designed to be efficiently sized to accommodate single family home development
and were placed to minimize impacts to wetland areas. In addition, as stated above the subdivision was
designed to have "no net loss" to creek channel area through the process cif rerouting and consolidating
some of the drainage paths that pass through the site as well as enhancing an existing drainage channel
to accommodate the increased flow. The western property ditch line will also be enhanced to
accommodate the increased flow including seeding the cut banks to control erosion.
Moreover, an appropriate Storm Water Pollution Prevention Plan will be implemented during site work at
this location to ensure the minimization of any potential related temporary impacts during construction.
3. Compensation for unavoidable impacts to waters of the U.S., including wetlands:
Please describe your proposed compensatory mitigation to offiet unavoidable impacts to waters of the
U.S., or, alternatively, why compensatory mitigation is not appropriate or practicable for your project.
Compensatory mitigation involves actions taken to offset unavoidable adverse impacts to waters of the
U.S., including wetlands, streams and other aquatic resources (aquatic sites) authorized by Corps
permits. Compensatory mitigation may involve the restoration, enhancement, establishment (creation),
and/or the preservation of aquatic sites. The three mechanisms for providing compensatory mitigation
are mitigation banks, in-lieu fee of mitigation, and permittee-responsible mitigation. Please see the
attached definitions for additional information.
This project is not located within an area containing rare, difficult to replace, or threatened wetland areas.
Nor is it a large scale project. There will be no functional losses to the down gradient drainage of surface
water run off associated with the existing small creek channels, as the newly created stream channel will
establish the improved volume and stream bed capacity to enhance the size of what is existing. Rerouting
contributing intermittent creeks to add volume to a higher functioning perennial stream channel will
become beneficial. In addition, the project is located within a large watershed that above the subject site
will not see development aside from rotational resource extraction of the timber. In fact, within the overall
Ketchikan Gateway Borough there is approximately 4,900 square miles of land area and only 0.005
percent is privately owned according to the Ketchikan Gateway Borough GIS. Therefore, private
development will generally have a very minimal almost unmeasurable cumulative impact.
The subject site impacts are to PF04Bn Forested wetlands along a moderate to steep sloping hillside as
identified with the attached Jurisdictional Determination POA -2012-516. Following the "Wetlands
Functions And Services" form would indicate that the subject wetlands would be Class Ill wetlands of
moderate to low function.
Marble Island LLC proposes to conserve impacted wetlands at a 1:1 ratio. This ratio is reasonable for the
class of wetlands impacted and the steepness of the terrain in this primarily upland parcel. There are no
local conservation sources and the closest "in lieu fee" program that serves this area is the Southeast
Alaska Land Trust. Therefore the applicant will work with the SEAL Trust for compensatory mitigation.
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 12 of 12
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 27, 2012
EXPIRATION DATE:
January 28, 2013
REFERENCE NUMBER:
POA-2012-516
WATERWAY:
Tongass Narrows
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Heather Boyer at (907)
753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at heather.l.boyer@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
Marble Island LLC, 355 Carlanna Lake Road, Ketchikan, Alaska 99901
AGENT:
Bret Hiatt, R&M Engineering-Ketchikan Inc., 355 Carlanna Lake Road,
Ketchikan, Alaska 99901, 907-225-7917
LOCATION:
The project site is located within Section 29, T. 74 S., R. 90 E.,
Copper River Meridian; USGS Quad Map Ketchikan B-6; Latitude 55.4284° N.,
Longitude 131.7740° W.; Marble D1 Subdivision, current Lot 4B, future Lots 5-19;
from the airport ferry parking lot turn left onto Tongass Avenue which becomes
North Tongass Highway, go 7 miles and turn right onto D-1 Loop Road, project area
is about 0.62 miles up the road on the right, in Ketchikan, Alaska.
PURPOSE:
The applicant's stated purpose is to create additional residential view
lots for the local real estate market by developing the subdivision to maximum
allowable zone density in a practicable way and to be able to market the
subdivision as having lots that have already been permitted with the Army Corps of
Engineers and are ready to build.
PROPOSED WORK:
The applicant proposes to place approximately 4,952 cubic yards of
clean fill into 1.51 acre of wetland for a road and building pads for a new
subdivision.
A detailed project description is provided in the enclosed plan. All work would be
performed in accordance with the enclosed plan (sheets 1-12), dated November 2012.
APPLICANT PROPOSED MITIGATION:
The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The applicant avoided wetlands to the maximum extent
practicable given the constraints of the existing topography and developing the
most reasonable approach that would require the minimum site disturbance and most
efficient layout of road and lots within the parcel of land owned by the applicant.
Further details on avoidance are on sheet 11 of 12 on the enclosed plans dated
November 2012.
b. Minimization:
Development pads were designed to be efficiently sized to
accommodate single family home development and were placed to minimize impacts to
wetland areas. The subdivision was also designed to have a no net loss to creek
channels through the process of rerouting and consolidating some of the drainage
paths through the site as well as enhancing an existing drainage channel to
accommodate the increased flow.
For further details see sheet 12 of the enclosed
plans dated November 2012.
c. Compensatory Mitigation:
The applicant proposed compensatory mitigation
at a 1:1 ratio via in-lieu-fee payment to the Southeast Alaska Land Trust.
For
further details see sheet 12 of the enclosed plans dated November 2012.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places.
There are no listed or eligible properties in the
vicinity of the worksite.
Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources.
This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES:
No threatened or endangered species are known to use the
project arect. We have determined the described activity would have no effect on
any listed or proposed threatened or endangered species, and would have no effect
on any designated or proposed critical habitat, under the Endangered Species Act of
1973 (87 Stat. 844).
Therefore, no consultation with the U.S. Fish and Wildlife
Service or the National Marine Fisheries Service is required.
However, any
comments they may have concerning endangered or threatened wildlife or plants or
their critical habitat will be considered in our final assessment of the described
work.
-2-
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
No EFH species are known to use the project area.
Therefore, we
have determined the described activity would not adversely affect EFH.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application.
Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION:
The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal.
To make this
-3-
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above.
Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344).
Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws.
By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2012-516, Tongass
Narrows, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws.
The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
33
'WardcCov~.
MilES
1000
1ooo
3o_oo
4ooo
sooo
sooo
1ooo
9000
1000(!
fEET
CONTOUR INTERVAL 20 METERS
SHOREUNE SHOWN REPRESENTS lHE APPROXIMAIT UNE OF MEP.N HIGH WATER
THE MEAN RANGE OF TIDE ·1s APPROXIMATELY 4.0 METERS
CONTROL ELEVI)TIONS SHOWN TO lliE NEAREST 0.1 METER
OlliER ELEVATIONS SHOWN TO THE. NEAREST MEITR
To convert rneh!rs to feet multiply by 3.2808
To conv'!rt f~et to meters multiply b<} .3048
MARBLE D1 SUBDIVISION
LOCATION & VICINITY MAP
SCALE: AS .NOTED
Juneau
~c\:odiak
y-
. \'@), Petersburg
S1tkB.Q~~'!r~gell
"
~,~.Ketchikan
'1"
Project Location
tt
'!})
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 1 of 12
z0
~
lf1
~
>
~
~
co
TRACT K
uss
.pg'"'t"'
~"l
I
Qf,j< " I
LOT 4A
I
I
I
I
I
I
I
~
I .·
4'.5: Op
''
""'.{...
0>a6'o6'~6'~~
·f~~'"
··~~ "'.tltQ
.{(J·.,
ve·"'ir
~~~rn
~
co
~
<
'vf!>
1,...
I
I
,,I
~
...
q
q
q
q
,,q
I!
§lz
~~8~
~t!l ..
~~
rnu
.04~./~
~
~I
~~~~
lf1 E~
815
Jf'ETLANDS
21604 S.F.
0.496 ACRES:J:
/...
...
...
/
- ...' '
~
~
"
.fNTERMI1TENT CREEK (<1.5')
,U
en
.....J
:S:N
.....Jcoo..--o..--t:oN
clOroN..-ro0Jz,_.._
en ..-- Q) o
-o~..cN
IDNroE_.
..c <(' 0> Q) Q)
'c>ID
roooo..c
:2:0..!--ZCI)
LOT 4B.. · /
.:./
t~...
_
. .__.__
. .___
. ... . ._..._:/ IY ... ../
rp/
.
PERENIAL CREEK
g
.
Mg:
· d
.·
/
... ...
+
+
../---------~EXisTING
RO.
...
+
...
w
+
...
..,
...
...
...
...
+
...
...
+
...
...
+
...
--
11)1
TRACT E
uss
813
0
75 150
~"""'"''"
300
.
/
I
1,'
/
/\\
,'
\
,I/
,I'
.~----------------
,/
---~...-.-·~-----
/'
~---------------------------------------------------------__,''
/_,
I
-.......,
s 'j'
\
........
~
"i
~
- . . v,
) /
I
/
,1
,/
,
-,:
,I
,1'
,
y'
....
co
0
+
f
f
-..1
C}l
.......
C}l
0
I
,,I
,,
f
s
"i
....
l\)
MARBLE D 1 SUBDIVISION
EXISTING CONDITIONS WITH PROPOSED LOT LINES
SCALE: AS NOTED
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 3 of 12
,.1
/I
,.
·/ ,, .r
:,
I
,·
/
/
I
! ... -\·'
v \ ·,
.-1
I
t::rj
·
.· .·
I
I
I
l
,/
I
I
~
~
~
l
I
I
l
,
/..,;j
~\)1""
.;,;A-·'
~
·
l
,,, _.·
...L..--------~-1
:
I
·
,
.
· · _":-"--____
.,,, t--
~
. \l~j\
--·
,·'
I
·
' · .......:.._
pl I:"'
L ..':-
~ ~
\)\l'6
··
1 ···.,'
I
I
.-...
1·. ', .··- 0I:"'
I
··
I
II>
ill
8 "'-l
C)
I
·· ,CJi
I
·
···
....
·
---
<'
I
I
·
j
·. /
0
.<4·<1:)
,.
...............·t
~\)""'
1
I
'
,1,'
. .
I
. ll
,
.· ; '
,·''/'
·i
j,l
:' 1'
, / 1/
NlI
,.,
go
.
'
0>
o ~--·· ...
·
.
:,.
·.'I
~~
·
··c.n
. . . . "'...
~u
. · ...
:'
p"'.l
1/ .·· .· ..,
I
·
/;....._,: :'
,_Q ......
··
"''-'
u·:r : . .
·
.·
··
X s:J11
,·'
·
ar·
/
')I ..
1,'
..
·.
.;··I
,·1
..·· I I
.·
.....
/: : b5 .---· / ')
11 .---- _g_"jl·
\)"'-~,-.....:'-.... .:1·. ~"-~.-·
I .
..§·~
. --)'.. -··.i~-- .. /'~>. . . . -; ~ ·
01'
·;
I
····
...... -··
Cll,....
·
,
...
·
'y{
.-·
I
co
.'
c+
/
_7__,._ . ,
. . . . --- I ,.
.~
l\:)
.··
~0> ·· :
II,.··______-..,~...,.... -·
.;··
j,l
'
Oc-<\l
0,0
r---.--- , ··.I
'
N
.,
.
.
.
..
I
I
/~~).
, .. ..,
. . . ,:
·/ :
I I ,. ,- : . . .
1'--.l····
:·· ..-....
: Jl o
.: ~.-· ;/
ro':
llo'O
I lI
: ·--~~~ ~ .---- 1 1,' .--··· ~-5
.. :
··~
·-..: : II.· ·I
H
.. . .
· ...
·5 ·. ~,
·· ;/ -·
·.o·
~II:J'I. 1 /
8"'-l _... ·· ")il_: //'.;.'' -'co-.(;;:
_,~.·
V
t·
I
.-··"oo·._. ... ·:. ·.. / ' ;/---·-:
:::l!-. : /4
.fl
· ··-:, \ /.,I
:
'.,·'"'""'.,..,. ·.·
···,
·
··
/-··-;:-'~----~--7
#"-- _.
Ql .--··f-····.'1 '',i;)_~'6
ur1i)
li.' ;/ N.· .......... _.··t
_.,....,
.. · ·
·
_..
.·· I_,, ·"' .-·
.·· .··
,,
~
----;l.···
{\)___ .--~I
~-~···
1/ j,4v.:/.·/
.-·~ 5
.. ···~,'
0> "'3
.··
: Jl-,2
'"'3
'·
,' P'i:'"'
....
I
t'!' .
$
h
.!"
....
.N
.Di<;f!·1,'
.--·
o
0
0
>·.
'
/··'
·.~
I
..
-.
,'··-..'
.··
,'i:j
I
.
:
II ..,
.
,
·
·
.··-
.-----~----- ,~:~
~
,·
...,.
.. ----
.··
···
·
"'-
I
,
.· .·
.
.., :
.... :·1
.....,_.-·
01 · ·
1
---·
.... ,
.·I
"-
.:;-
:
.,/''.:.:..·:
,·'I
'-,
:"
-:--,,
1
L'
:~
'- · " '
~
,
·
.--
--;--~,_:~.l
- /
..m-·0>
~'
'··.
;
~ o.~-.
I
-·
~~~-
I
I
I
-;.:-..-,.,._··.;.;.;.;,:~:::.:.:,~~:~---~:~---::_:_ _____j_ ___/,,
..·
c.'l.
·
.
--~
. I.--~~:..__-......_
_.--.r, I .. ..:
1
1
1
/ /
. ----
~·
I
0
0
I
'
I .., · ·"
I
,,.
~
,
, ··
/'1.
·
/
.··',
·I
,·
:
:
·
·· .
. .,Q
·
..
'
A
4
/
'I
,·
"\.... · ·
:
:::l!
·.--·
:
~--· ···· ~, ·;···
(Jlt-'4 ....
'-t
/
:'0 o··
·
:
.-·· ··. ,.. -. ./
~
.-··
1
···i}~:·.
~ :··;·:.) ./
1._ .:_ _ . ----· ....----··i<_·_.-)(.::::·~-->-~
1-- J. ':'... ~;-·-fl ·. II ·---.:.
-r1 :
_.. ···
l
·-.: ~,
-/
.-·
.,
4 1
. .
::~!···\
·. ,. .
j
~~·""-··::;;··-' ·.,
·"
......
.. .
.. - ...I' . ~," . -~-r-t
0 0
.
-;,'.. . -. .
.....I-··
.. ·ll /;/ .-----.8 "'3 .: -~1> II -·
'I
__ : I ... _..J..."'......_:
.,-~-- ...
_, ....
---- / ' ' .,~-. ~ . ,,
I... _.J / /.1., .. "'~·:·~....-:·<-:..:. ~ -. ·-: ~c,C. I
I
I
1
·. ......
/,.'
l\:)
,'
·
:
.·"I
f .
·- J· / .
0
···
·
. . · · · ··
· ....
.--·
.·
!
-
-··
--·1
.·
~
.·
. ..
i----?·s·
I
....
,.
···
..0
I
..0
N
~
:-··
·
~
Q
, .. ./···--1..··· 9"-'b
__ .. ,1
·· ··
.. ·
...
:yl
\"'i""',
.··
_.--- _.·:··
· --·- .
'
MARBLE Dl SUBDIVISION
.··I ..
'I ...
... ,' .·.. ·,
.. ·
_.· /'
I
. . .-1
TOPOGRAPHIC DATA wrrH LOT LUNES
SCALE: AS NOTED
~-c..:>
0
0
:
.-
;' ....·.
··\·----,·~
.·
'
·
··
..···\
qi.·,.::
,.··(a
··
' :...,
. -..
'.--r:-.-·
,
~"'3.·····
:'1
,. I
__ . ,
........
/.·
>:~~---.
·~
,"
I:"'
·...._.···l_..____ ........
-~----- ~ ~....
----~-c:;
: _.-. .....
01
0
~
I
/
',
. ./
~
'-···ta:·
..... ·· ...............
~
:·.
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 4 of 12
;'
!/
J/
I
z
0
~
ifl
~
.... ....
>
~
0
"....
o:l~Cil
~. ~~
ifl
E-<0
~z
Cll
~~<:.!><
oc~~
:;;! t,)
-::SCil
~1 fi:l
-
o:l
I
..,
"" ..,
I
,
I
....
N
-l"O'"""t:ON
cLO roN'"""
rnNz 1/)
-ow
:::g
~(§§~1?
~
'>--..
1/)
3:
~
I"'V
/
0
-l
1/) '\""""
Q)~Cil~Q)
~0...1-Z(f.)
....
....
..,
...
+
-===-- ~ . . .. .. ...'ttl.:_ -.._..:......:- -= __..__ .: -
·
TRACT E
uss
813
'ENHANCED 8'
WIDE PERENNIAL CREEK
1'., EXISTING
UNDISTURBED JYETLANDS
0
.,
75
150
L()
300
1----------
40' - - - - - - - , . - - - - - - - 1
1 - - - - - - 28'
-------1
I
+---2%
2'
1.5'--
i
GRADE
0'
-1'
-
2' DITCHLINE
-3'
'------_j - - 4' DITCHLINE
SECTION OF ROAD "B"
HORIZONTAL 1"=10'
2X VERTICAL SCALE
340
340
320
320
.... .
300
;~~~~--~~r~.
300
.
/
· · · · /-<-~~-c-~---~-~rs=~~r::~1
:/
280
260
240
.
.
.
.
. GRADE
280
260
240
.
220
220
200
200
180
180
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
CENTER LINE PROFILE OF NEW ROAD
MARBLE D 1 SUBDIVISION
ROAD PROFILE & SECTION
SCALE: AS NOTED
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 6 of 12
z
0
~
lfl,
'
~
~II
0
~
~
350 I
lfl.
~
........t~
0~
Z;;: ()
~
. .,
~
I"Y"''
~
5: C\1
....Jc.oo.."0
t: 0 C\1
cl.()roC\1..-T"""
Cl]
-
'+-
0
~
-e~~
roooo..c
:2:0..1--Z(f.)
-
HORIZONTAL 1"=50'
1X VERTICAL SCALE
z '-())
~~c; ~.o""
~
TYP., SECTION A-A
~I
'"
~
4+00
(/)
'"'I _J
Block 18, Nature of Activity
The project includes the subdivision ofLot 4B ofTract J ASLS 81-39 White Rock
Estates Subdivision Phase III. This subdivision will include the creation of 15 residential
homesite lots within the current Future Development (FD) zone that calls for a minimum
lot size of25,000 sf per lot. Each subdivided lot will have access platted and developed
along the planned subdivision road right-of-ways. The roads will be gravel surfaced
roads. In conjunction with the subdivision will be the diversion consolidation and
containment of some of the small stream channels that transfer rain runoff down the steep
hillsides behind the subdivision. This collection of storm water runoff will not generally
reduce the area of stream channel present, it will simply reroute it to accommodate the
individual subdivision lots and protect potential erosion points of individual development
pads. The main perennial creek will be rerouted to follow an enhanced existing drainage
channel. Each lot will have a defined building pad developed. Hillside Lots on uphill
slopes from the roadway will be cut into the hillside and Lots down slope of the roadway
will have fill pads. (See Plan Sheets attached).
Road development is 980 feet long 28 foot wide gravel access road accessing all but two
of the proposed subdivision Lots and will include culvert at creek crossings and driveway
crossings over the diversion runoff stream.
Development pad construction will consist of six fill lots and nine cut and fill lots.
A wetlands delineation was performed in 2011 and the 2012 approved ACOE JD is
attached.
Block 21 Types of Materials Being Discharged and tlh.e Amount of Each Type
Roadway:
Total Excavation for Road
Shot Rock Embankment for Road
Crushed Aggregate Surfacing
Disturbed Area
Storm Water Collection System
24" Culvert Pipe
48" Culvert Pipe
Building Sites
Excavation for Pads
Shot Rock Fill for Pad
Disturbed Area
980' x 28' finished width, average disturbed width
is 43 feet with ditching
Project Total
1,500 cy
1,500 cy
300 cy
42,680 sf, (0.97 acre)
Within Wetlands
838 cy
240 cy
60 cy
14,665 sf, (0.33 acre)
Project Total
Within Wetlands
40 Feet
40 Feet
120 Feet
100 Feet
Project Total
Within Wetlands
11,111 cy
9,200 cy
2,000 cy
1,800 cy
442,903 sf(l0.2 acres)
51,060 sf, (1.18 acre)
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 8 of 12
Impacts to Streams
8' wide streams impacted
(Perennial)
3' wide streams impacted
(Perennial)
1.5' wide streams impacted
(Intermittent)
Total Fill in Streams
Project Total
Within Wetlands
774 Feet
0 Feet
356 Feet
51 Feet
1,317 Feet
741 Feet
2,242 cy
14 cy
One intermittent creek of 378 linear feet that is 1.5 feet wide will not be disturbed. 191
linear feet ofwhich are located within one of the wetland areas not impacted. However,
0.21 acres of the 0.23 total acres of stream channels will be impacted prior to quantifying
the efforts in the plan to manage drainage and mitigate overall impacts. Offsets to those
impacts are detailed below:
Intermittent creek flows are generally either rerouted or enhanced to provide capacity for
larger perennial flows. The intermittent creeks within Lot 19 are consolidated and
rerouted down the east property line into one 175 linear foot channel. The redirection of
the largest perennial creek will eliminate a 353 linear foot intermittent creek that
originated from that drainage, the existing flow combined with the rerouted perennial
channel. The intermittent creek flowing through Lot 15 will also be redirected into a 175
linear foot channel above the road and the remaining channel below the road will be
enhanced to accommodate the redirection perennial flows.
The perennial creek flowing through Lot 17 on the west side will be rerouted to a new 3
foot wide 175 linear foot long channel. This flow and the flow from the intermittent
diversion on Lot 19 will collect into a new 4 foot ditch line following the subdivision
road providing a 4 foot wide 266 linear foot drainage channel redirecting this flow to an
existing drainage ditch. The flow removed from an ephemeral seep and intermittent
creek located between Lots 15 and 14 are rerouted into another 4 foot wide ditch that will
collect this consolidated flow discharge it into a rerouted perennial flow passing through
Lot 11. The 8 foot wide perennial creek will be rerouted through Lot 15&16 property
line across the roadway within a Culvert and follow the enhanced 386 linear foot portion
of a channel of an existing intermittent creek.
Based on the above rerouted or enhanced channels relieving or offsetting impacts the
amount of area impacted is estimated to be reduced from 0.21 acres to 0. 02 acres
In addition there will be 660 lineal feet or 7,320 square feet of channel area that will be
enhanced along the western property line along the existing open ditch line.
Based on the re-routing of creek channels and the enhancement anticipated there would
be no net loss of the creek channel area transferring upslope runoff through the site
essentially eliminating any functional or actual losses potentially contributable to the
impacts to these property features. The only impacts that are anticipated to be realized
are to the minimal wetland areas not inclusive of the CJeek~.
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 9 of 12
All creek channels will have revegetated side slopes to protect against bank erosion.
Block 22 Wetlands Impacted
Roads
14,665 square feet (0.33 acres)
Lot Development
51,060 square feet (1.18 acres)
Total Wetlands Impacted: 1.51 acres
Marble Island LLC
POA-20 12-516
Tongass Narrows
November 2012
Sheet 10 of 12
Applicant Proposed Mitigation Statements
Background:
The U.S. Army Corps of Engineers (Corps) and the Environmental Protection Agency issued regulations
that govern national compensatory mitigation policy for activities in waters of the U.S., including
wetlands, authorized by Corps permits. The final mitigation rule was published in the federal register on
AprillO, 2008, and became effective on June 9, 2008. The final rule establishes standards and criteria for
the use of appropriate and practicable compensatory mitigation for unavoidable functional losses of
aquatic resources authorized by Corps permits (33 CFR Part 332). Additionally, the rule requires new
information to be included in Corps permit applications and public notices to enable meaningful
comments on applicant proposed mitigation. In accordance with 33 CFR Part 325.1 (d)(7), "For activities
involving discharges of dredged or fill material into waters of the U.S., the application must include a
statement describing how impacts to waters ofthe United States are to be avoided and minimized. The
application must also include either a statement describing how impacts to waters of the United States are
to be compensated for or a statement explaining why compensatory mitigation should not be required for
the proposed impacts." For additional information, the final mitigation rule can be viewed at:
http://www. usace.army .millcw/cecwo/reg/news/final_mitig_rule.pdf
Mitigation is a sequential process of avoidance, minimization, and compensation. Compensatory
mitigation is not considered until after all appropriate and practicable steps have been taken to first avoid
and then minimize adverse impacts to the aquatic ecosystem. Please provide your proposed avoidance,
minimization, and compensatory mitigation below:
Applicant's Proposed Mitigation (attach additional sheets as necessary):
1. Avoidance of impacts to waters of the U.S., including wetlands:
Please describe how, in your project planning process, you avoided impacts to waters of the U.S.,
including wetlands, to the maximum extent practicable. Examples of avoidance measures include site
selection, routes, design configurations, etc ...
Site selection was based on the applicants ownership of the parcel. The design of the subdivision was
planned for the maximum utility of each Lot within the subdivision. This process included the most efficient
layout of roads, Lots, and building pads by working within the constraints of the existing topography and
developing the most reasonable approach that would require the minimum site disturbance. This
approach not only cuts down on the impacts in the wetlands, but also cuts down on construction costs as
well.
The roadway follows a natural bench that traverses the larger original parcel. Pad design for the individual
Lots were designed to be the smallest practicable size to accommodate a reasonable building envelope
with the least site disturbance and wetland impacts. Creek rerouting was designed to establish a "no net
loss" to the channel area to efficiently direct surface run off from the steep upper hillsides through the site
in a way to eliminate potential erosion dangers while still maintaining the down gradient flow and
increasing the perennial flow which in-turn will improve function.
-
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 11 of 12
Applicant Proposed Mitigation Statements
2. Minimization of unavoidable impacts to waters of the U.S., including wetlands:
Please describe how your project design incorporates measures that minimize the unavoidable impacts to
waters ofthe U.S., including wetlands, by limitingfill discharges to the minimum amount/size necessary
to achieve the project purpose.
Development pads were designed to be efficiently sized to accommodate single family home development
and were placed to minimize impacts to wetland areas. In addition, as stated above the subdivision was
designed to have "no net loss" to creek channel area through the process cif rerouting and consolidating
some of the drainage paths that pass through the site as well as enhancing an existing drainage channel
to accommodate the increased flow. The western property ditch line will also be enhanced to
accommodate the increased flow including seeding the cut banks to control erosion.
Moreover, an appropriate Storm Water Pollution Prevention Plan will be implemented during site work at
this location to ensure the minimization of any potential related temporary impacts during construction.
3. Compensation for unavoidable impacts to waters of the U.S., including wetlands:
Please describe your proposed compensatory mitigation to offiet unavoidable impacts to waters of the
U.S., or, alternatively, why compensatory mitigation is not appropriate or practicable for your project.
Compensatory mitigation involves actions taken to offset unavoidable adverse impacts to waters of the
U.S., including wetlands, streams and other aquatic resources (aquatic sites) authorized by Corps
permits. Compensatory mitigation may involve the restoration, enhancement, establishment (creation),
and/or the preservation of aquatic sites. The three mechanisms for providing compensatory mitigation
are mitigation banks, in-lieu fee of mitigation, and permittee-responsible mitigation. Please see the
attached definitions for additional information.
This project is not located within an area containing rare, difficult to replace, or threatened wetland areas.
Nor is it a large scale project. There will be no functional losses to the down gradient drainage of surface
water run off associated with the existing small creek channels, as the newly created stream channel will
establish the improved volume and stream bed capacity to enhance the size of what is existing. Rerouting
contributing intermittent creeks to add volume to a higher functioning perennial stream channel will
become beneficial. In addition, the project is located within a large watershed that above the subject site
will not see development aside from rotational resource extraction of the timber. In fact, within the overall
Ketchikan Gateway Borough there is approximately 4,900 square miles of land area and only 0.005
percent is privately owned according to the Ketchikan Gateway Borough GIS. Therefore, private
development will generally have a very minimal almost unmeasurable cumulative impact.
The subject site impacts are to PF04Bn Forested wetlands along a moderate to steep sloping hillside as
identified with the attached Jurisdictional Determination POA -2012-516. Following the "Wetlands
Functions And Services" form would indicate that the subject wetlands would be Class Ill wetlands of
moderate to low function.
Marble Island LLC proposes to conserve impacted wetlands at a 1:1 ratio. This ratio is reasonable for the
class of wetlands impacted and the steepness of the terrain in this primarily upland parcel. There are no
local conservation sources and the closest "in lieu fee" program that serves this area is the Southeast
Alaska Land Trust. Therefore the applicant will work with the SEAL Trust for compensatory mitigation.
Marble Island LLC
POA-2012-516
Tongass Narrows
November 2012
Sheet 12 of 12