ASRC SKW Eskimos' stated purpose is to construct a building pad for a three story, pre-fabricated modular hotel structure with a single story common lobby and restaurant.
The proposed project would require placement of approximately 6,700 cubic yards of fill material in approximately 1.30 acres of palustrine wetlands. Earth work activities will consist of geo-textile, fill and insulation board placement. The bulk of fill will be placed under frozen conditions in 2013. Final surfacing and grading will occur in thawed conditions (fall of 2013 or summer 2015). Foundation work will include drilling, setting and sand/water slurry installation of approximately 150 timber pilings. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated January 9, 2013.
Please contact Estrella Campellone at (907) 753-2518, or by email at Estrella.F.Campellone@usace.army.mil if further information is desired concerning this notice.
POA-2011-693, Chukchi Sea_PN
POA-2011-693, Chukchi Sea_PN Drawings
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
January 31, 2013
EXPIRATION DATE:
March 4, 2013
REFERENCE NUMBER:
POA-2011-693
WATERWAY:
Chukchi Sea
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Estrella Campellone at
(907) 753-2518, or by email at Estrella.f.campellone@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: Mr. Paul Kari, ASRC SKW Eskimos, 1211 E. 80th Avenue, Anchorage, Alaska
99518; Telephone: (907) 339-3649.
AGENT: Dr. Edmond C. Packee Jr., Travis/Peterson Environmental Consulting, Inc.,
329 2nd Street, Fairbanks, Alaska 99701; Telephone: (907) 339-455-7225.
LOCATION: The project site is located within Section 32, T. 23 N., R. 18 W.,
Umiat; USGS Quad Barrow B-4; Latitude 71.2978º N., Longitude -156.7714º W.; Block
22, Lot 1; intersection of Laura Madison Street and Simmonds Street, in Barrow,
Alaska.
SPECIAL AREA DESIGNATION:
area.
The project is not located within a special designation
PURPOSE: The applicant's stated purpose is to construct a building pad for a three
story, pre-fabricated modular hotel structure with a single story common lobby and
restaurant.
PROPOSED WORK: The proposed project would require placement of approximately 6,700
cubic yards of fill material in approximately 1.30 acres of palustrine wetlands.
Earth work activities will consist of geo-textile, fill and insulation board
placement. The bulk of fill will be placed under frozen conditions in 2013. Final
surfacing and grading will occur in thawed conditions (fall of 2013 or summer
2015). Foundation work will include drilling, setting and sand/water slurry
installation of approximately 150 timber pilings. All work would be performed in
accordance with the enclosed plan (sheets 1-6), dated January 9, 2013.
ADDITIONAL INFORMATION:
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: From the sites available, the applicant chose the proposed site
over one that contained larger acreage of wetlands. To reduce the footprint, the
applicant also designed the hotel to have three stories instead of the planned
initially of two stories, and reduced the area of parking space. Farther
impacts on wetlands are also avoided by using an existing approved site
disposal.
b. Minimization: Through site selection and design of the proposed hotel
facility the applicant has minimized impacts to the extent possible.
Minimization of the impacts to the areas outside the project footprint will be
accomplished by adhering to the Alaska Pollutant Discharge Elimination System
General permit for Discharges from Large and Small Construction Activities
(ACGP). Best Management Practices will be installed in accordance with the ACGP
to minimize adverse effects to the adjoining or surrounding properties.
c. Compensatory Mitigation:
mitigation.
The applicant did not propose compensatory
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There is a registered or eligible property in the
vicinity of the worksite. It has been designated BAR-0016, BAR-00074 and BAR00060. Because t has been determined to be outside the project area, the Corps has
determined the proposed action would have no effect to historical properties.
ENDANGERED SPECIES: The project area is within the known or historic range of the
distribution for polar bear (Ursus maritimus). No other threatened or endangered
species are known to use the project area. We have determined the described
activity would have no effect on polar bear, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of 1973
(87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife Service
or the National Marine Fisheries Service is required. However, any comments they
may have concerning endangered or threatened wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
-2-
No EFH species are known to use the project area. We have determined the described
activity would not adversely affect EFH in the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
-3-
AUTHORITY:
This permit will be issued or denied under the following authority:
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2011-693, Chukcki Sea,
serves as application for State Water Quality Certification from the Department of
Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
January 31, 2013
EXPIRATION DATE:
March 4, 2013
REFERENCE NUMBER:
POA-2011-693
WATERWAY:
Chukchi Sea
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Estrella Campellone at
(907) 753-2518, or by email at Estrella.f.campellone@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: Mr. Paul Kari, ASRC SKW Eskimos, 1211 E. 80th Avenue, Anchorage, Alaska
99518; Telephone: (907) 339-3649.
AGENT: Dr. Edmond C. Packee Jr., Travis/Peterson Environmental Consulting, Inc.,
329 2nd Street, Fairbanks, Alaska 99701; Telephone: (907) 339-455-7225.
LOCATION: The project site is located within Section 32, T. 23 N., R. 18 W.,
Umiat; USGS Quad Barrow B-4; Latitude 71.2978º N., Longitude -156.7714º W.; Block
22, Lot 1; intersection of Laura Madison Street and Simmonds Street, in Barrow,
Alaska.
SPECIAL AREA DESIGNATION:
area.
The project is not located within a special designation
PURPOSE: The applicant's stated purpose is to construct a building pad for a three
story, pre-fabricated modular hotel structure with a single story common lobby and
restaurant.
PROPOSED WORK: The proposed project would require placement of approximately 6,700
cubic yards of fill material in approximately 1.30 acres of palustrine wetlands.
Earth work activities will consist of geo-textile, fill and insulation board
placement. The bulk of fill will be placed under frozen conditions in 2013. Final
surfacing and grading will occur in thawed conditions (fall of 2013 or summer
2015). Foundation work will include drilling, setting and sand/water slurry
installation of approximately 150 timber pilings. All work would be performed in
accordance with the enclosed plan (sheets 1-6), dated January 9, 2013.
ADDITIONAL INFORMATION:
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: From the sites available, the applicant chose the proposed site
over one that contained larger acreage of wetlands. To reduce the footprint, the
applicant also designed the hotel to have three stories instead of the planned
initially of two stories, and reduced the area of parking space. Farther
impacts on wetlands are also avoided by using an existing approved site
disposal.
b. Minimization: Through site selection and design of the proposed hotel
facility the applicant has minimized impacts to the extent possible.
Minimization of the impacts to the areas outside the project footprint will be
accomplished by adhering to the Alaska Pollutant Discharge Elimination System
General permit for Discharges from Large and Small Construction Activities
(ACGP). Best Management Practices will be installed in accordance with the ACGP
to minimize adverse effects to the adjoining or surrounding properties.
c. Compensatory Mitigation:
mitigation.
The applicant did not propose compensatory
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There is a registered or eligible property in the
vicinity of the worksite. It has been designated BAR-0016, BAR-00074 and BAR00060. Because t has been determined to be outside the project area, the Corps has
determined the proposed action would have no effect to historical properties.
ENDANGERED SPECIES: The project area is within the known or historic range of the
distribution for polar bear (Ursus maritimus). No other threatened or endangered
species are known to use the project area. We have determined the described
activity would have no effect on polar bear, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of 1973
(87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife Service
or the National Marine Fisheries Service is required. However, any comments they
may have concerning endangered or threatened wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
-2-
No EFH species are known to use the project area. We have determined the described
activity would not adversely affect EFH in the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
-3-
AUTHORITY:
This permit will be issued or denied under the following authority:
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2011-693, Chukcki Sea,
serves as application for State Water Quality Certification from the Department of
Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
GRAPHIC SCALE
3ml
0
''"""
Plat 93--8 MU
\
\.
/
\
\
\
\
/
/
-r_,~- _,~_·
/
"
/
SUBJECT
PROPERTY
GRAPHIC SCALE
0
102.2ft
'fRAVISIPETERSO."lENVIRON.\IENfAl,CO~UGfJNG,lliC
JJ:91NOSIR£EI'
FMRBANKS,AL:\SK.\99701
PROJECI' NO: 1084-28
ASRC Barrow Hotel
Applicant: Paul Karl, ASRC SKW Esklmos, Inc.
COE File No.: POA-2011-693
lf\bterway: Chukchi Sea
Purpose: Construct ASRC Barrow Hotel
Sec. 32
T. 23N
R. 18W
M. Umiat
Lal.: 71"17'52.24"
Lon(J.: 156'46'16.36"
Sheet 1 of 6
ReVIsed Date 01/09/2013
FILE: S:\Pmjects\1084\28\Figure.s\Sheetl of6.SKF D_·ITE: Ol/09/JOl3
SCALE: AS SHOWN
1 D
Uplands
2 G
PEM1/SS1B
-''L
Property Boundary
~___g._
-·-
~-
· .111-
0.16ml
Chukchi Sea
.>lL
~~!U?
.>lL
.&W.M-
-"L
-"L
..
_._
.il.
JL
.@./M-
_
JlL
~.k-
~ljJg.
-""
-''L
~.&
&~
-"-
*W£-
_._
~.4-
-·4\Ut6.
-"-
-"-
-·-
-"-
-''L
~
&.WE.A
-''L
~w_g..
_._
JlL
GRAPHIC SCALE
.>lL
-'"-
-''L
-&_tgg_
~____g.
-"-
-&..\!1.1?-
-"J'L
-&.\.!1.!6.
-~ltk-
-·-
~1&-
_._
_,_
J!L
-"L
0
57.5 It
~IU?
-"-
0.11 mi
lsatkoak Lagoon
J)L
.>lL
.,)\}J!f?.
-·-
-"-''L
~
-'-
-''L
..:L
-''L
4-t!ilf-
_._
-""
~.14-
-"'~M-
3L
-'"-
-:Milk-
_._
.tiL
-''L
.&..\!1.4-
-"'-
_._
-""
.&..\!&..
.atUU-
.w.
·"-
J!L
-''L
~!M:.
...
-"L
~
-"-
...
ASRC Barrow Hotel
IJQlg
No RPD or TNWwere Identified on tho PfoJed site.
1R<\.V1SJI'ETI:RSO~ EN\'IRO..'\'MlliWALCO.~UJ!fJl'\G, INC
J:NlM'lSIRFEf
t~IREJ.IJ\h'S,AIA'iKA9'J~l
PROJECfNO: 1084-2l!
Applicant: Paul Kari, ASRC SIFILE: S:\Projects\1084128\Figurts\Sheet2of6.SKI7
DATE: 01/09/2013
SCALE: AS SHOWN
W
11111
1 [ _)
2 ~
Fill Material
Structure
Uplands
PEM1/SS1B
Property Boundary
0.16mi
Chukchi Sea
GRAPHIC SCALE
0
57.5 ft
0.11 mi
lsatkoak Lagoon
ASRC Barrow Hotel
No!es
1. A!l fill n1atertal\·llll oosandsand gravels,vllth a range of
1}.15% passing the #200 sieve.
2, ·No RPD orTN\NvJere ldentlfted on the pro,)ed srte.
Applicant: Paul Kari, ASRC SKW Eskimos, Inc.
COE File No.: POAWaterway: Chukchi Sea
Purpose: Construct ASRC Barrow Hotel
Sec. 32
T. 23N
R. 18W
M. Umiat
Lat.: 71'17'52.24"
Lon~.: 156'46'16.36"
Sheet 3 of 6
ReVIsed Date 01/09/2013
PROJECf NO: 1084-28 FILE: S:\Ptujecls\!084\28\Figmos\SIIect3 of6.SKF
DATE: 01/09/1013
sCALE: AS SHOWN
·
·
':[,7.~'J.'j::.-:-.:-:::~
A
..
.. -fi ~~:~:--;1:1:::-~ ':-::'!);;:.~ ---l
....
.h'.~ ~.-:m-;,; :·--;;._~_,.'~1---- 7:
·:r::.
-:~~,.
-·-
;r
~'.oft
A'
PI¢
A
Horizontal Graphic Scale
Notes
1. Excavation wm be limited to underground utility work and pole holes.
2. 150 cubic yards of native materials (including organic overburden and
high silts) will be removed.
3. All excavation will take place in winter comfrtions.
4. Imported iill material will be sands and gravels, with a.range of 5-15%
passing #200 sieve.
5. 6,700 cubic yards of fill material wiii be used on the project area.
1
2
GRAPHIC SCALE
-
D
D
Strudure
-
Property Boundary
PEM1/SS18
125.4 ft
TRAVISIPE"IERSONENVIRONMENll\LCONSULTING, INC
""'l'S"IREEr
FADmi.NKS.ALASIV\?..17PROJECTNO: 1084-28
0
192ft
ASRC Barrow Hotel
UplandS
~
0
48ft
Vertical Graphic Scale
0
Applicant Paul Karl, ASRC S'IW Eskimos, Inc.
COE File No.: POA-2011-693
Waterway: Chukchi Sea
Purpose: Construct ASRC Barrow Hotel
Sec. 32
T. 23N
R 18W
M. Umiat
Lat.: 71.1752.24"
Lon\!.: 156°46'16.36"
Sheet 4 of 6
ReVIsed Date 01/09/2013
I ID.,E: S:\I'rojccts\1084128\FJgareS\Sheet4of6SKF I
DAlE: 01109/2013
I SCALE:ASSHOVIN
-
-~-~:-··".
,,
~i
:\·l
~.s·
',i
S.IY
wt!O<~Of
PW Om:! li..:!J
"~ ~.Q,..C!Oiv
'
/,_.,,.,,..
OOARO
8'
8
Horizontal Graphic Scale
Horizontal Graphic Scale
8'
+
GRAPHIC SCALE
106.2 ft
""'""'"
TMVISIPE:tERSONENVlRONMENTALCONsULTING.INC
FAIRBANtG.Al.ASK99701.
"''"'"""""'"
-
Structure
-
Property Boundaly
1 D
2 ~
8
0
Note:
1. Excavation will be limited to underground utility work and pole holes.
2. 150 cubic yards of native materials Oncluding organic overburden and
high sllts) will be removed.
3. All excavation wm take place in winter conUplands
PEM1/SS1B
0
23.5ft
Vertical Graphic Scale
0
12ft
ASRC Barrow Hotel
Applicant
Paul Kari, ASRC S'r<:!/11 Eskimos, Inc.
COE Ale No.: POA-2011-693
VV!!ti.ervv
PROJECTNO: 1084-28 I FILE:S:\Projeds\1084\28\Figure;\ShtetSof(llil
1 D
2 t:-::~ :~1
-
GRAPHIC SCALE
0
266ft
'l'RAVJSIPE'rnRSONENVIROc'iMEN'J'AT,COi''\SULTING1 11\C
.un.'IDR'JREIIT
PAIRil.W\S,AIASKr\99701
Structure
Up~nds
PEM11SS1B
property Bound"')'
ASRC Barrow Hotel
Applicant: Paul Kari,ASRCSKWEskimos,lno.
COE File No.: POA-201Hl93
W!terway; Chukchi Sea
Purpose: Construct ASRC Barrow Hotel
Sec. 32
T. 23N
R. 18W
M. Umiat
Lat.: 71.17'52.24"
Long.: 156.46'16.36"
Sheet 6 of 6
Date 01/09/2013
PROJECT NO: 1084-28 FILE: S:\l'oDATE: OJ/G9120J3