You can copy from here when filling out the rest of the page.
King Island Native Community's stated purpose is to improve safety along the road and create better access to traditional subsistence use areas for communities in the Bering Straits Region. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice.
POA-2012-627_Woolley Lagoon- King Island Native Community's stated purpose is to improve safety along the road and create better access to traditional subsistence use areas for communities in the Bering Straits Region. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 5, 2013
EXPIRATION DATE:
March 5, 2013
REFERENCE NUMBER:
POA-2012-627
WATERWAY:
Woolley Lagoon (Bering Sea)
Interested parties are hereby notified that a Department of the Army permit
application has been receive~ for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Mary Leykom at
(907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at Mary.F.Leykom@usac e .army.mil if further information
is desired concerning this notice.
APPLICANT: King Island Native Community, Post Office Box 682, Nome, Alaska 99762;
contact Mr. Benjamin Payenna at 907 443-2209.
AGENT: Bristol Engineering Services Corporation, 111 W. 16th Avenue, Anchorage,
Alaska 99501; contact Ms. Susan Luetters at 907 743-9316.
LOCATION:
The project site is located 36 miles northwest of Nome, Alaska, within
sections 15, 16, 19, 20, 21, T. 7 S., R. 37 W., and sections 22, 23, 24, 27, 28,
29, T. 7 S., R. 38 W., Kateel River Meridian. East end of the road (at the NomeTeller Highway) is at Latitude 64.878° N., Longitude -166.148° W.; west end of the
road (at Woolley Lagoon) is at Latitude 64.856° N., Longitude -166.400° W.
PURPOSE:
The applicant's stated purpose is to improve safety along the road and
create better access to traditional subsistence use are as for communities in the
Bering Straits Region.
PROPOSED WORK: Rehabilitate and resurface the 8-mile Woolley Road. The road would
be graded and material added to create a uniform 14-foot wide driving surface.
Vehicle turn-outs would be sited every 5,000 feet. The 44,000 cubic yards (cy) of
required fill material would be mined from an existing borrow pit 2 miles north on
the Nome-Tell e r Highway. New fill, extending beyond the existing road footprint,
would impact an additional 3.62 acres of wetland. Existing culverts would be
replaced and/or extended, and additional culverts would be added to improve
drainage near the road. All work would be performed in accordance with the enclosed
plan (sheets 1-10), dated January 2013.
APPLICANT PROPOSED MITIGATION:
The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance:
Improving the existing road
than any alternative alignment.
i~pacted
fewer new wetland acres
b. Minimization:
The road was minimized from two-lanes to a one-lane road
with pull-outs, to reduce new wetland impact. New culverts and directional ditches
and dikes would be added to correct drainage issues.
c. Compensatory Mitigation:
The applicant proposes an in-lieu fee to the
Conservation Fund at a 2:1 ratio for the permanent loss of 3.6 acres of wetland.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. · There are six known archaeological or historical sites
in the vicinity of the Woolley Road project. An archaeological survey of the
project area was conducted in August 2009 and a report prepared: "2009
Archaeological Survey of the Woolley Lagoon Road Improvement Project". Based upon
the findings in the report, the Alaska State Historic Preservation Officer
concurred with a "No Historic Properties Affected" determination on April 30, 2010.
This application is being coordinated with the State Historic Preservation Office
(SHPO). Any comments SHPO may have concerning presently unknown archeological or
historic data that may be lost or destroyed by work under the requested permit will
be considered in our final assessment of the described work.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
following threatened or endangered species: spectacled eider (Somateria fischeri),
Steller's eider (Polysticta stelleri), and polar bear (Ursus maritimus).
The applicant conducted an informal consultation with the. U.S. Fish and Wildlife
Service (USFWS) in 2012 regarding the above-listed species. The USFWS made the
determination that proposed project activities are "not likely to adversely affect"
either eider species or polar bears. USFWS provided a "Human-Polar Bear Interaction
Plan" for the project, providing guidelines to ensure Woolley Road construction
activities are conducted in such a way as to avoid conflicts between bears and
humans. The applicant has agreed to adopt the Plan. Any further comments they may
have concerning endangered or threatened wildlife or critical habitat will be
considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
-2-
The project area is within the known range of arctic char (Salvelinus alpinus).
Specifically, Crete Creek, which lies near the proposed Woolley Road project,
supports rearing of arctic char. Because the project avoids direct impacts to the
creek, and protects against secondary impacts by replacing drainage culverts and
eliminating erosion and sedimentation towards the creek, we have determined the
described activity would not adversely affect EFH in the project area.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon written
request to the District Commander during the public comment period.
PUBLIC HEARING:
Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION:
The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect the
national concern for both protection and utilization of important resources.
All
factors, which may be relevant to the proposal, must be considered including the
cumulative effects thereof. Among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, cultural values, fish and wildlife
values, flood hazards, floodplain values, land use, navigation, shore erosion and
accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property
ownership, and, in general, the needs and welfare of the people. For activities
involving 404 discharges, a permit will be denied if the discharge that would be
authorized by such permit would not comply with the Environmental Protection
Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and any other
applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be
granted unless the District Commander determines that it would be contrary to the
public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and the other public interest factors
-3-
listed above. Comments are used in the preparation of an
and/or an Environmental Impact Statement pursuant to the
Policy Act. Comments are also used to determine the need
to determine the overall public interest of the proposed
AUTHORITY:
Environmental Assessment
National Environmental
for a public hearing and
activity.
This permit will be issued or denied under the following authority:
(X)
Discharge fill material into waters of the United States - Section 404 Clean
Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the
guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2012-627, Woolley Lagoon
Road, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
Drawing: K:\JOBS\3212001 9 WOOLLEY ROAD\ACAD-ENV1RO\CORPS\3212001 9_SCOPING FlGS1-5.DWG - Layout: FlGURE 1
User: TLAYLAND Nov 08, 2012- 4:20pm Xrefs : COE__85X11LDWG COE__85X11P.DWG- lmcqos: ALASKA...MAP_E.TIF NOME__C2.TIF NOME__C3.TIF NOME__D2.TIF NOME__D3.TIF
Oc~~.J:J
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Location maps
Sheet 1 of 10
January 2013
co
~a
,
:l:t
0
=o~
~?.'
~~
(/)
0
)>
111
;;:
s:
0
u,
~
1;;
I~ c:
Zw
~~
'l::l
ON
· 0
"'~
~"'
(/)
"'"
18
<'-r
ii;~
" :u
3g
~f
il'
81
r~
CD;>;
xo
~/
-o
ro
~ill
C) I/)
0~
r;;;
l)l8
X~
::liD
-,::!1
/
~fJ
<>~
,,~,
-a
3:E
.ll"
~I
~~
~ihill
..,::1"'
z
0
~I""'
::1
~.
z0
r""
l:l
..,'=!
r\
1
z
0
r"'
0
I"
..,
::1
z
0
;c
r
,"''=::!
0
r.....
Ill
:::1
c::
Ill
-0__..
w
~
0
Q.
ro
'<
r
Ill
co
0
0
:::1
'-"
ONE-LANE TWO-WAY ROAD TURNOUT
SCALE: NTS
It
I
10'
14'
CLEAR ZONE
LANE WIDTH
FINISHED GRADE
(lYP)
TURF ESTABLISHMENT
(lYP)
/PROFILE GRADE POINT
·
6" MIN
CRUSHED AGGREGATE
SURFACE COURSE
--- -
BORROW MATERIAL
ED
10
CLEAR ZONE
ONE-LANE TWO-WAY ROAD SECTION
SCALE: NTS
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Typical Sections for road and turn-outs
Sheet 3 of 10
January 2013
50'
ONE-LANE TWO-WAY ROAD TURNOUT PLAN
SCALE: NTS
NOTES:
1.
THIS TURNOlJT MAY ALSO BE USED ON STRAIGHT
AREAS ALONG THE ROAD CORRIDOR.
t
I
14'
LANE WIDTH
CULVERT
ED
TYPICAL CULVERT SECTION
SCALE: NTS
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Vehicle turn-out plan and culvert section
Sheet 4 of 10
January 2013
DITCH BOTIOM
(lYP)
~I
PLAN YIEW
tt.
I/
(CULVERT
DIAMETER = D
TOP OF DIKE
(BEYOND)
I
I
I
SECTION A-A
Q)
TYPICAL DIKE
-
--7
EXISTING GROUND
~a.:':..
1.5'
(MIN.)
PROFILE
GRADE POINT
3%
'\
~
CD
-
SCALE: NTS
-
SELECT BORROW
TYPICAL DITCH SECTION
SCALE: NTS
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Typical ditch and dike sections
Sheet 5 of 10
January 2013
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COE_BSX11LPLANVIEWS.DWG- lmaoes:
I
Layout: S7
----.
0
h
50
100
I
.....l
SCALE IN FEET
'CCI
- --1-oo
\0
~ -~.
t:i
- .....
~
en
-.:--~:;:;::.. ~
:::1:
BOP ;
i
'
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSITION
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
',~-----~,
,
>-------<:
POA-20n-627
Woolley Lagoon
Ki.ng Island Native Community
W~olley Lagoon Road Rehabilitation Project
Beginning of project at Nome-Teller Hwy.
Plan view
Sheet 6 of 10
January2013
Drawing: C:\USERS\ IPEARSDN\ APPDATA\ LOCAL\ TEMP\ ACPU8USH_5324\ 32120019_F1GS 6-49_PLAN VIE\'L9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COL85X11LPLANVIEWS.DWG- lmaoes:
I
Layout: S11
----,
0
50
h
100
-'
I
SCALE IN FEET
--
:
.
.v ·..·.·. Z i i y p
~
%
·
.
I
~
.......·. ·.·. ·. ·.·~ :·: ':·······:,.; =.:~. !
,-
. .z~.
~
z
,~
:z:
u
li
..
1-
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSmON
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
'>-------~'
"
'
:>-------<:
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Plan view typical tum-out
Sheet 7 of 10
January 2013
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN ~EW_9JAN2013.DWG User: !PEARSON Jan 11, 2013 - 10:43am Xrefs: 32120019_8ASE.DWG COE_85X11LPLA~EWS . DWG - lmaoes:
I-
Layout: S14
0
70+oo
-.....,
h
...~... :.:.:.t:·.·:.:··
50
--
100
I
-...
(TYP)
I I)
ti
lo.l
ti
lo.l
::c
en
::c
en
lo.l
lo.l
en
lo.l
z
::J
::c
(.)
~
:::E
Iz
I
I
.. ""~~~s~~;-~~-;~o. ""~7~ ~
lo.l
I
-= ·--
....
;c
:::E
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSITION
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERLINE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
:)1-------c:
:>----- ---<:
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Dike and culvert, plan view typical
Sheet 8 of 10
January 2013
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPU8USH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User. !PEARSON Jan 11. 2013- 10:44om Xrefs: 32120019_8ASE.DWG COE_85X11LPLANVIEWS.DWG- lmaaes:
I-
Layout: 517
0
!--!
50
M
100
I
SCALE IN FEET
'GO'
ti
.....
%
en
·..:... ·-···:··:::~~~;,~~·;··:·:·~::· ;:;··:·:·:-:·;::·:"· :·:··. ·.-: · ·;·:·:·:·::·:·::·:;:··· : ·· ..·: '···~:.;.:·.':··~-.~
..e
"
····· ·
%
'
-
-. ~
· -~- ;·m::=
.
..... :. :. :.-:.:.: ... ·:·· ::-~· :.~: .. :~...
~
z
::J
. .I :c
~
--··· ··
'C
::IE
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FlU.
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/ FILL TRANSmON
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
::>-------c:
:>-------<:
POA-2012-627
Woolley Lagoon
King lsland-Natfve Cof!lmunity
Woolley Lagoon Road Rehabilitation Project
Culvert and dike, plan view typical
Sheet 9 of 10
January 2013
I
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBUSH_5324\3212001 9_FlGS 6-49_PLAN VIEV1_9JAN2013.0WG - Layout: S49
User. !PEARSON Jon 11, 2013- 10:46om Xrefs: 32120019_BASE.DWG COE_85X11LPLANVIEWS.DWG- lmooes:
----,
WATCH UNE (SEE SHEET -48)
D
h
50
.....!
100
I
SCALE IN FEET
· .:<.. :.,. . .,
·..
(SAME
won:'~D WDENING···~···-x:~
.
S TURNOUT)_/ · ···,· ··
··.:
PARKING
AREA
~
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSITION
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOUUDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
:>-----~~:
'>-------<:
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
End of project, Woolley Lagoon, plan view
Sheet 10 of 10
January 2013
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 5, 2013
EXPIRATION DATE:
March 5, 2013
REFERENCE NUMBER:
POA-2012-627
WATERWAY:
Woolley Lagoon (Bering Sea)
Interested parties are hereby notified that a Department of the Army permit
application has been receive~ for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Mary Leykom at
(907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at Mary.F.Leykom@usac e .army.mil if further information
is desired concerning this notice.
APPLICANT: King Island Native Community, Post Office Box 682, Nome, Alaska 99762;
contact Mr. Benjamin Payenna at 907 443-2209.
AGENT: Bristol Engineering Services Corporation, 111 W. 16th Avenue, Anchorage,
Alaska 99501; contact Ms. Susan Luetters at 907 743-9316.
LOCATION:
The project site is located 36 miles northwest of Nome, Alaska, within
sections 15, 16, 19, 20, 21, T. 7 S., R. 37 W., and sections 22, 23, 24, 27, 28,
29, T. 7 S., R. 38 W., Kateel River Meridian. East end of the road (at the NomeTeller Highway) is at Latitude 64.878° N., Longitude -166.148° W.; west end of the
road (at Woolley Lagoon) is at Latitude 64.856° N., Longitude -166.400° W.
PURPOSE:
The applicant's stated purpose is to improve safety along the road and
create better access to traditional subsistence use are as for communities in the
Bering Straits Region.
PROPOSED WORK: Rehabilitate and resurface the 8-mile Woolley Road. The road would
be graded and material added to create a uniform 14-foot wide driving surface.
Vehicle turn-outs would be sited every 5,000 feet. The 44,000 cubic yards (cy) of
required fill material would be mined from an existing borrow pit 2 miles north on
the Nome-Tell e r Highway. New fill, extending beyond the existing road footprint,
would impact an additional 3.62 acres of wetland. Existing culverts would be
replaced and/or extended, and additional culverts would be added to improve
drainage near the road. All work would be performed in accordance with the enclosed
plan (sheets 1-10), dated January 2013.
APPLICANT PROPOSED MITIGATION:
The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance:
Improving the existing road
than any alternative alignment.
i~pacted
fewer new wetland acres
b. Minimization:
The road was minimized from two-lanes to a one-lane road
with pull-outs, to reduce new wetland impact. New culverts and directional ditches
and dikes would be added to correct drainage issues.
c. Compensatory Mitigation:
The applicant proposes an in-lieu fee to the
Conservation Fund at a 2:1 ratio for the permanent loss of 3.6 acres of wetland.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. · There are six known archaeological or historical sites
in the vicinity of the Woolley Road project. An archaeological survey of the
project area was conducted in August 2009 and a report prepared: "2009
Archaeological Survey of the Woolley Lagoon Road Improvement Project". Based upon
the findings in the report, the Alaska State Historic Preservation Officer
concurred with a "No Historic Properties Affected" determination on April 30, 2010.
This application is being coordinated with the State Historic Preservation Office
(SHPO). Any comments SHPO may have concerning presently unknown archeological or
historic data that may be lost or destroyed by work under the requested permit will
be considered in our final assessment of the described work.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
following threatened or endangered species: spectacled eider (Somateria fischeri),
Steller's eider (Polysticta stelleri), and polar bear (Ursus maritimus).
The applicant conducted an informal consultation with the. U.S. Fish and Wildlife
Service (USFWS) in 2012 regarding the above-listed species. The USFWS made the
determination that proposed project activities are "not likely to adversely affect"
either eider species or polar bears. USFWS provided a "Human-Polar Bear Interaction
Plan" for the project, providing guidelines to ensure Woolley Road construction
activities are conducted in such a way as to avoid conflicts between bears and
humans. The applicant has agreed to adopt the Plan. Any further comments they may
have concerning endangered or threatened wildlife or critical habitat will be
considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
-2-
The project area is within the known range of arctic char (Salvelinus alpinus).
Specifically, Crete Creek, which lies near the proposed Woolley Road project,
supports rearing of arctic char. Because the project avoids direct impacts to the
creek, and protects against secondary impacts by replacing drainage culverts and
eliminating erosion and sedimentation towards the creek, we have determined the
described activity would not adversely affect EFH in the project area.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon written
request to the District Commander during the public comment period.
PUBLIC HEARING:
Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION:
The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect the
national concern for both protection and utilization of important resources.
All
factors, which may be relevant to the proposal, must be considered including the
cumulative effects thereof. Among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, cultural values, fish and wildlife
values, flood hazards, floodplain values, land use, navigation, shore erosion and
accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property
ownership, and, in general, the needs and welfare of the people. For activities
involving 404 discharges, a permit will be denied if the discharge that would be
authorized by such permit would not comply with the Environmental Protection
Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and any other
applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be
granted unless the District Commander determines that it would be contrary to the
public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and the other public interest factors
-3-
listed above. Comments are used in the preparation of an
and/or an Environmental Impact Statement pursuant to the
Policy Act. Comments are also used to determine the need
to determine the overall public interest of the proposed
AUTHORITY:
Environmental Assessment
National Environmental
for a public hearing and
activity.
This permit will be issued or denied under the following authority:
(X)
Discharge fill material into waters of the United States - Section 404 Clean
Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the
guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2012-627, Woolley Lagoon
Road, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
Drawing: K:\JOBS\3212001 9 WOOLLEY ROAD\ACAD-ENV1RO\CORPS\3212001 9_SCOPING FlGS1-5.DWG - Layout: FlGURE 1
User: TLAYLAND Nov 08, 2012- 4:20pm Xrefs : COE__85X11LDWG COE__85X11P.DWG- lmcqos: ALASKA...MAP_E.TIF NOME__C2.TIF NOME__C3.TIF NOME__D2.TIF NOME__D3.TIF
Oc~~.J:J
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Location maps
Sheet 1 of 10
January 2013
co
~a
,
:l:t
0
=o~
~?.'
~~
(/)
0
)>
111
;;:
s:
0
u,
~
1;;
I~ c:
Zw
~~
'l::l
ON
· 0
"'~
~"'
(/)
"'"
18
<'-r
ii;~
" :u
3g
~f
il'
81
r~
CD;>;
xo
~/
-o
ro
~ill
C) I/)
0~
r;;;
l)l8
X~
::liD
-,::!1
/
~fJ
<>~
,,~,
-a
3:E
.ll"
~I
~~
~ihill
..,::1"'
z
0
~I""'
::1
~.
z0
r""
l:l
..,'=!
r\
1
z
0
r"'
0
I"
..,
::1
z
0
;c
r
,"''=::!
0
r.....
Ill
:::1
c::
Ill
-0__..
w
~
0
Q.
ro
'<
r
Ill
co
0
0
:::1
'-"
ONE-LANE TWO-WAY ROAD TURNOUT
SCALE: NTS
It
I
10'
14'
CLEAR ZONE
LANE WIDTH
FINISHED GRADE
(lYP)
TURF ESTABLISHMENT
(lYP)
/PROFILE GRADE POINT
·
6" MIN
CRUSHED AGGREGATE
SURFACE COURSE
--- -
BORROW MATERIAL
ED
10
CLEAR ZONE
ONE-LANE TWO-WAY ROAD SECTION
SCALE: NTS
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Typical Sections for road and turn-outs
Sheet 3 of 10
January 2013
50'
ONE-LANE TWO-WAY ROAD TURNOUT PLAN
SCALE: NTS
NOTES:
1.
THIS TURNOlJT MAY ALSO BE USED ON STRAIGHT
AREAS ALONG THE ROAD CORRIDOR.
t
I
14'
LANE WIDTH
CULVERT
ED
TYPICAL CULVERT SECTION
SCALE: NTS
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Vehicle turn-out plan and culvert section
Sheet 4 of 10
January 2013
DITCH BOTIOM
(lYP)
~I
PLAN YIEW
tt.
I/
(CULVERT
DIAMETER = D
TOP OF DIKE
(BEYOND)
I
I
I
SECTION A-A
Q)
TYPICAL DIKE
-
--7
EXISTING GROUND
~a.:':..
1.5'
(MIN.)
PROFILE
GRADE POINT
3%
'\
~
CD
-
SCALE: NTS
-
SELECT BORROW
TYPICAL DITCH SECTION
SCALE: NTS
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Typical ditch and dike sections
Sheet 5 of 10
January 2013
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COE_BSX11LPLANVIEWS.DWG- lmaoes:
I
Layout: S7
----.
0
h
50
100
I
.....l
SCALE IN FEET
'CCI
- --1-oo
\0
~ -~.
t:i
- .....
~
en
-.:--~:;:;::.. ~
:::1:
BOP ;
i
'
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSITION
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
',~-----~,
,
>-------<:
POA-20n-627
Woolley Lagoon
Ki.ng Island Native Community
W~olley Lagoon Road Rehabilitation Project
Beginning of project at Nome-Teller Hwy.
Plan view
Sheet 6 of 10
January2013
Drawing: C:\USERS\ IPEARSDN\ APPDATA\ LOCAL\ TEMP\ ACPU8USH_5324\ 32120019_F1GS 6-49_PLAN VIE\'L9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COL85X11LPLANVIEWS.DWG- lmaoes:
I
Layout: S11
----,
0
50
h
100
-'
I
SCALE IN FEET
--
:
.
.v ·..·.·. Z i i y p
~
%
·
.
I
~
.......·. ·.·. ·. ·.·~ :·: ':·······:,.; =.:~. !
,-
. .z~.
~
z
,~
:z:
u
li
..
1-
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSmON
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
'>-------~'
"
'
:>-------<:
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Plan view typical tum-out
Sheet 7 of 10
January 2013
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN ~EW_9JAN2013.DWG User: !PEARSON Jan 11, 2013 - 10:43am Xrefs: 32120019_8ASE.DWG COE_85X11LPLA~EWS . DWG - lmaoes:
I-
Layout: S14
0
70+oo
-.....,
h
...~... :.:.:.t:·.·:.:··
50
--
100
I
-...
(TYP)
I I)
ti
lo.l
ti
lo.l
::c
en
::c
en
lo.l
lo.l
en
lo.l
z
::J
::c
(.)
~
:::E
Iz
I
I
.. ""~~~s~~;-~~-;~o. ""~7~ ~
lo.l
I
-= ·--
....
;c
:::E
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSITION
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERLINE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
:)1-------c:
:>----- ---<:
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
Dike and culvert, plan view typical
Sheet 8 of 10
January 2013
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPU8USH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User. !PEARSON Jan 11. 2013- 10:44om Xrefs: 32120019_8ASE.DWG COE_85X11LPLANVIEWS.DWG- lmaaes:
I-
Layout: 517
0
!--!
50
M
100
I
SCALE IN FEET
'GO'
ti
.....
%
en
·..:... ·-···:··:::~~~;,~~·;··:·:·~::· ;:;··:·:·:-:·;::·:"· :·:··. ·.-: · ·;·:·:·:·::·:·::·:;:··· : ·· ..·: '···~:.;.:·.':··~-.~
..e
"
····· ·
%
'
-
-. ~
· -~- ;·m::=
.
..... :. :. :.-:.:.: ... ·:·· ::-~· :.~: .. :~...
~
z
::J
. .I :c
~
--··· ··
'C
::IE
LEGEND
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FlU.
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/ FILL TRANSmON
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOULDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
::>-------c:
:>-------<:
POA-2012-627
Woolley Lagoon
King lsland-Natfve Cof!lmunity
Woolley Lagoon Road Rehabilitation Project
Culvert and dike, plan view typical
Sheet 9 of 10
January 2013
I
Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBUSH_5324\3212001 9_FlGS 6-49_PLAN VIEV1_9JAN2013.0WG - Layout: S49
User. !PEARSON Jon 11, 2013- 10:46om Xrefs: 32120019_BASE.DWG COE_85X11LPLANVIEWS.DWG- lmooes:
----,
WATCH UNE (SEE SHEET -48)
D
h
50
.....!
100
I
SCALE IN FEET
· .:<.. :.,. . .,
·..
(SAME
won:'~D WDENING···~···-x:~
.
S TURNOUT)_/ · ···,· ··
··.:
PARKING
AREA
~
PROPOSED ROAD TOE OF FILL
EXISTING ROAD TOE OF FILL
PROPOSED ROAD TOE OF CUT
EXISTING ROAD SHOULDER
PROPOSED ROAD DITCH BOTIOM
PROPOSED CUT/FILL TRANSITION
PROPOSED DIKE TOP
PROPOSED CMP
PROPOSED ROAD SHOUUDER
LENGTHEN EXISTING CMP
PROPOSED ROAD CENTERUNE
EXISTING CMP TO REMAIN IN PLACE
WETLANDS
>
<
:>-----~~:
'>-------<:
POA-2012-627
Woolley Lagoon
King Island Native Community
Woolley Lagoon Road Rehabilitation Project
End of project, Woolley Lagoon, plan view
Sheet 10 of 10
January 2013