Home

Alaska District

Run scraper

King Island Native Community

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

King Island Native Community's stated purpose is to improve safety along the road and create better access to traditional subsistence use areas for communities in the Bering Straits Region. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice.

POA-2012-627_Woolley Lagoon- King Island Native Community's stated purpose is to improve safety along the road and create better access to traditional subsistence use areas for communities in the Bering Straits Region. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice.

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

February 5, 2013

EXPIRATION DATE:

March 5, 2013

REFERENCE NUMBER:

POA-2012-627

WATERWAY:

Woolley Lagoon (Bering Sea)

Interested parties are hereby notified that a Department of the Army permit application has been receive~ for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usac e .army.mil if further information is desired concerning this notice. APPLICANT: King Island Native Community, Post Office Box 682, Nome, Alaska 99762; contact Mr. Benjamin Payenna at 907 443-2209. AGENT: Bristol Engineering Services Corporation, 111 W. 16th Avenue, Anchorage, Alaska 99501; contact Ms. Susan Luetters at 907 743-9316. LOCATION: The project site is located 36 miles northwest of Nome, Alaska, within sections 15, 16, 19, 20, 21, T. 7 S., R. 37 W., and sections 22, 23, 24, 27, 28, 29, T. 7 S., R. 38 W., Kateel River Meridian. East end of the road (at the NomeTeller Highway) is at Latitude 64.878° N., Longitude -166.148° W.; west end of the road (at Woolley Lagoon) is at Latitude 64.856° N., Longitude -166.400° W. PURPOSE: The applicant's stated purpose is to improve safety along the road and create better access to traditional subsistence use are as for communities in the Bering Straits Region. PROPOSED WORK: Rehabilitate and resurface the 8-mile Woolley Road. The road would be graded and material added to create a uniform 14-foot wide driving surface. Vehicle turn-outs would be sited every 5,000 feet. The 44,000 cubic yards (cy) of required fill material would be mined from an existing borrow pit 2 miles north on the Nome-Tell e r Highway. New fill, extending beyond the existing road footprint, would impact an additional 3.62 acres of wetland. Existing culverts would be replaced and/or extended, and additional culverts would be added to improve

drainage near the road. All work would be performed in accordance with the enclosed plan (sheets 1-10), dated January 2013. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: Improving the existing road than any alternative alignment.

i~pacted

fewer new wetland acres

b. Minimization: The road was minimized from two-lanes to a one-lane road with pull-outs, to reduce new wetland impact. New culverts and directional ditches and dikes would be added to correct drainage issues. c. Compensatory Mitigation: The applicant proposes an in-lieu fee to the Conservation Fund at a 2:1 ratio for the permanent loss of 3.6 acres of wetland. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. · There are six known archaeological or historical sites in the vicinity of the Woolley Road project. An archaeological survey of the project area was conducted in August 2009 and a report prepared: "2009 Archaeological Survey of the Woolley Lagoon Road Improvement Project". Based upon the findings in the report, the Alaska State Historic Preservation Officer concurred with a "No Historic Properties Affected" determination on April 30, 2010. This application is being coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: The project area is within the known or historic range of the following threatened or endangered species: spectacled eider (Somateria fischeri), Steller's eider (Polysticta stelleri), and polar bear (Ursus maritimus). The applicant conducted an informal consultation with the. U.S. Fish and Wildlife Service (USFWS) in 2012 regarding the above-listed species. The USFWS made the determination that proposed project activities are "not likely to adversely affect" either eider species or polar bears. USFWS provided a "Human-Polar Bear Interaction Plan" for the project, providing guidelines to ensure Woolley Road construction activities are conducted in such a way as to avoid conflicts between bears and humans. The applicant has agreed to adopt the Plan. Any further comments they may have concerning endangered or threatened wildlife or critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). -2-

The project area is within the known range of arctic char (Salvelinus alpinus). Specifically, Crete Creek, which lies near the proposed Woolley Road project, supports rearing of arctic char. Because the project avoids direct impacts to the creek, and protects against secondary impacts by replacing drainage culverts and eliminating erosion and sedimentation towards the creek, we have determined the described activity would not adversely affect EFH in the project area. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b) (1) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors -3-

listed above. Comments are used in the preparation of an and/or an Environmental Impact Statement pursuant to the Policy Act. Comments are also used to determine the need to determine the overall public interest of the proposed AUTHORITY:

Environmental Assessment National Environmental for a public hearing and activity.

This permit will be issued or denied under the following authority:

(X) Discharge fill material into waters of the United States - Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230). Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-627, Woolley Lagoon Road, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

Drawing: K:\JOBS\3212001 9 WOOLLEY ROAD\ACAD-ENV1RO\CORPS\3212001 9_SCOPING FlGS1-5.DWG - Layout: FlGURE 1 User: TLAYLAND Nov 08, 2012- 4:20pm Xrefs : COE__85X11LDWG COE__85X11P.DWG- lmcqos: ALASKA...MAP_E.TIF NOME__C2.TIF NOME__C3.TIF NOME__D2.TIF NOME__D3.TIF

Oc~~.J:J

Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Location maps Sheet 1 of 10 January 2013

co ~a

,

:l:t

0

=o~

~?.' ~~

(/)

0

)>

111

;;: s:

0

u,

~

1;;

I~ c:

Zw

~~

'l::l ON · 0 "'~ ~"'

(/)

"'" 18 <'-r

ii;~

" :u

3g

~f

il'

81

r~ CD;>;

xo ~/

-o

ro

~ill C) I/)

0~ r;;; l)l8 X~

::liD -,::!1

/

~fJ

<>~ ,,~,

-a 3:E

.ll" ~I

~~

~ihill ..,::1"' z

0

~I""' ::1

~.

z0

r""

l:l

..,'=! r\ 1

z

0

r"' 0

I"

..,

::1

z

0

;c

r ,"''=::! 0

r.....

Ill :::1

c::

Ill

-

0__..

w

~

0

Q.

ro

'<

r

Ill

co 0 0

:::1

'-"

ONE-LANE TWO-WAY ROAD TURNOUT SCALE: NTS

It

I

10'

14'

CLEAR ZONE

LANE WIDTH

FINISHED GRADE (lYP) TURF ESTABLISHMENT (lYP)

/PROFILE GRADE POINT

·

6" MIN CRUSHED AGGREGATE SURFACE COURSE

--- -

BORROW MATERIAL

ED

10

CLEAR ZONE

ONE-LANE TWO-WAY ROAD SECTION SCALE: NTS

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Typical Sections for road and turn-outs Sheet 3 of 10 January 2013

50'

ONE-LANE TWO-WAY ROAD TURNOUT PLAN SCALE: NTS NOTES: 1.

THIS TURNOlJT MAY ALSO BE USED ON STRAIGHT AREAS ALONG THE ROAD CORRIDOR.

t

I

14' LANE WIDTH

CULVERT

ED

TYPICAL CULVERT SECTION SCALE: NTS

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Vehicle turn-out plan and culvert section Sheet 4 of 10 January 2013

DITCH BOTIOM (lYP)

~I PLAN YIEW

tt.

I/

(CULVERT DIAMETER = D

TOP OF DIKE (BEYOND)

I I

I

SECTION A-A

Q)

TYPICAL DIKE

-

--7

EXISTING GROUND

~a.:':..

1.5' (MIN.)

PROFILE GRADE POINT

3%

'\

~

CD -

SCALE: NTS

-

SELECT BORROW

TYPICAL DITCH SECTION SCALE: NTS

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Typical ditch and dike sections Sheet 5 of 10 January 2013

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COE_BSX11LPLANVIEWS.DWG- lmaoes:

I

Layout: S7

----.

0

h

50

100

I

.....l

SCALE IN FEET

'CCI - --1-oo \0 ~ -~.

t:i - ..... ~

en

-.:--~:;:;::.. ~

:::1:

BOP ;

i

'

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSITION

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

',~-----~, , >-------<:

POA-20n-627 Woolley Lagoon Ki.ng Island Native Community W~olley Lagoon Road Rehabilitation Project Beginning of project at Nome-Teller Hwy. Plan view Sheet 6 of 10 January2013

Drawing: C:\USERS\ IPEARSDN\ APPDATA\ LOCAL\ TEMP\ ACPU8USH_5324\ 32120019_F1GS 6-49_PLAN VIE\'L9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COL85X11LPLANVIEWS.DWG- lmaoes:

I

Layout: S11

----,

0

50

h

100

-'

I

SCALE IN FEET

--

:

.

.v ·..·.·. Z i i y p

~ %

·

.

I

~

.......·. ·.·. ·. ·.·~ :·: ':·······:,.; =.:~. !

,-

. .z~.

~

z

,~

:z: u

li .. 1-

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSmON

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

'>-------~'

" ' :>-------<:

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Plan view typical tum-out Sheet 7 of 10 January 2013

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN ~EW_9JAN2013.DWG User: !PEARSON Jan 11, 2013 - 10:43am Xrefs: 32120019_8ASE.DWG COE_85X11LPLA~EWS . DWG - lmaoes:

I-

Layout: S14

0

70+oo

-.....,

h

...~... :.:.:.t:·.·:.:··

50

--

100

I

-...

(TYP)

I I)

ti lo.l

ti

lo.l

::c en

::c en

lo.l lo.l

en

lo.l

z

::J

::c (.)

~

:::E

Iz

I I

.. ""~~~s~~;-~~-;~o. ""~7~ ~

lo.l

I

-= ·--

....

;c :::E

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSITION

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERLINE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

:)1-------c: :>----- ---<:

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Dike and culvert, plan view typical Sheet 8 of 10 January 2013

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPU8USH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User. !PEARSON Jan 11. 2013- 10:44om Xrefs: 32120019_8ASE.DWG COE_85X11LPLANVIEWS.DWG- lmaaes:

I-

Layout: 517

0

!--!

50

M

100

I

SCALE IN FEET

'GO'

ti .....

%

en

·..:... ·-···:··:::~~~;,~~·;··:·:·~::· ;:;··:·:·:-:·;::·:"· :·:··. ·.-: · ·;·:·:·:·::·:·::·:;:··· : ·· ..·: '···~:.;.:·.':··~-.~

..e "

····· ·

%

'

-

-. ~

· -~- ;·m::= .

..... :. :. :.-:.:.: ... ·:·· ::-~· :.~: .. :~...

~ z

::J . .I :c

~

--··· ··

'C

::IE

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FlU.

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/ FILL TRANSmON

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

> < ::>-------c: :>-------<:

POA-2012-627 Woolley Lagoon King lsland-Natfve Cof!lmunity Woolley Lagoon Road Rehabilitation Project Culvert and dike, plan view typical Sheet 9 of 10 January 2013

I

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBUSH_5324\3212001 9_FlGS 6-49_PLAN VIEV1_9JAN2013.0WG - Layout: S49 User. !PEARSON Jon 11, 2013- 10:46om Xrefs: 32120019_BASE.DWG COE_85X11LPLANVIEWS.DWG- lmooes:

----,

WATCH UNE (SEE SHEET -48)

D

h

50

.....!

100

I

SCALE IN FEET

· .:<.. :.,. . ., ·..

(SAME

won:'~D WDENING···~···-x:~

.

S TURNOUT)_/ · ···,· ··

··.:

PARKING

AREA

~ PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSITION

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOUUDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

:>-----~~:

'>-------<:

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project End of project, Woolley Lagoon, plan view Sheet 10 of 10 January 2013

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

February 5, 2013

EXPIRATION DATE:

March 5, 2013

REFERENCE NUMBER:

POA-2012-627

WATERWAY:

Woolley Lagoon (Bering Sea)

Interested parties are hereby notified that a Department of the Army permit application has been receive~ for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usac e .army.mil if further information is desired concerning this notice. APPLICANT: King Island Native Community, Post Office Box 682, Nome, Alaska 99762; contact Mr. Benjamin Payenna at 907 443-2209. AGENT: Bristol Engineering Services Corporation, 111 W. 16th Avenue, Anchorage, Alaska 99501; contact Ms. Susan Luetters at 907 743-9316. LOCATION: The project site is located 36 miles northwest of Nome, Alaska, within sections 15, 16, 19, 20, 21, T. 7 S., R. 37 W., and sections 22, 23, 24, 27, 28, 29, T. 7 S., R. 38 W., Kateel River Meridian. East end of the road (at the NomeTeller Highway) is at Latitude 64.878° N., Longitude -166.148° W.; west end of the road (at Woolley Lagoon) is at Latitude 64.856° N., Longitude -166.400° W. PURPOSE: The applicant's stated purpose is to improve safety along the road and create better access to traditional subsistence use are as for communities in the Bering Straits Region. PROPOSED WORK: Rehabilitate and resurface the 8-mile Woolley Road. The road would be graded and material added to create a uniform 14-foot wide driving surface. Vehicle turn-outs would be sited every 5,000 feet. The 44,000 cubic yards (cy) of required fill material would be mined from an existing borrow pit 2 miles north on the Nome-Tell e r Highway. New fill, extending beyond the existing road footprint, would impact an additional 3.62 acres of wetland. Existing culverts would be replaced and/or extended, and additional culverts would be added to improve

drainage near the road. All work would be performed in accordance with the enclosed plan (sheets 1-10), dated January 2013. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: Improving the existing road than any alternative alignment.

i~pacted

fewer new wetland acres

b. Minimization: The road was minimized from two-lanes to a one-lane road with pull-outs, to reduce new wetland impact. New culverts and directional ditches and dikes would be added to correct drainage issues. c. Compensatory Mitigation: The applicant proposes an in-lieu fee to the Conservation Fund at a 2:1 ratio for the permanent loss of 3.6 acres of wetland. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. · There are six known archaeological or historical sites in the vicinity of the Woolley Road project. An archaeological survey of the project area was conducted in August 2009 and a report prepared: "2009 Archaeological Survey of the Woolley Lagoon Road Improvement Project". Based upon the findings in the report, the Alaska State Historic Preservation Officer concurred with a "No Historic Properties Affected" determination on April 30, 2010. This application is being coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: The project area is within the known or historic range of the following threatened or endangered species: spectacled eider (Somateria fischeri), Steller's eider (Polysticta stelleri), and polar bear (Ursus maritimus). The applicant conducted an informal consultation with the. U.S. Fish and Wildlife Service (USFWS) in 2012 regarding the above-listed species. The USFWS made the determination that proposed project activities are "not likely to adversely affect" either eider species or polar bears. USFWS provided a "Human-Polar Bear Interaction Plan" for the project, providing guidelines to ensure Woolley Road construction activities are conducted in such a way as to avoid conflicts between bears and humans. The applicant has agreed to adopt the Plan. Any further comments they may have concerning endangered or threatened wildlife or critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). -2-

The project area is within the known range of arctic char (Salvelinus alpinus). Specifically, Crete Creek, which lies near the proposed Woolley Road project, supports rearing of arctic char. Because the project avoids direct impacts to the creek, and protects against secondary impacts by replacing drainage culverts and eliminating erosion and sedimentation towards the creek, we have determined the described activity would not adversely affect EFH in the project area. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b) (1) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors -3-

listed above. Comments are used in the preparation of an and/or an Environmental Impact Statement pursuant to the Policy Act. Comments are also used to determine the need to determine the overall public interest of the proposed AUTHORITY:

Environmental Assessment National Environmental for a public hearing and activity.

This permit will be issued or denied under the following authority:

(X) Discharge fill material into waters of the United States - Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230). Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-627, Woolley Lagoon Road, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

Drawing: K:\JOBS\3212001 9 WOOLLEY ROAD\ACAD-ENV1RO\CORPS\3212001 9_SCOPING FlGS1-5.DWG - Layout: FlGURE 1 User: TLAYLAND Nov 08, 2012- 4:20pm Xrefs : COE__85X11LDWG COE__85X11P.DWG- lmcqos: ALASKA...MAP_E.TIF NOME__C2.TIF NOME__C3.TIF NOME__D2.TIF NOME__D3.TIF

Oc~~.J:J

Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Location maps Sheet 1 of 10 January 2013

co ~a

,

:l:t

0

=o~

~?.' ~~

(/)

0

)>

111

;;: s:

0

u,

~

1;;

I~ c:

Zw

~~

'l::l ON · 0 "'~ ~"'

(/)

"'" 18 <'-r

ii;~

" :u

3g

~f

il'

81

r~ CD;>;

xo ~/

-o

ro

~ill C) I/)

0~ r;;; l)l8 X~

::liD -,::!1

/

~fJ

<>~ ,,~,

-a 3:E

.ll" ~I

~~

~ihill ..,::1"' z

0

~I""' ::1

~.

z0

r""

l:l

..,'=! r\ 1

z

0

r"' 0

I"

..,

::1

z

0

;c

r ,"''=::! 0

r.....

Ill :::1

c::

Ill

-

0__..

w

~

0

Q.

ro

'<

r

Ill

co 0 0

:::1

'-"

ONE-LANE TWO-WAY ROAD TURNOUT SCALE: NTS

It

I

10'

14'

CLEAR ZONE

LANE WIDTH

FINISHED GRADE (lYP) TURF ESTABLISHMENT (lYP)

/PROFILE GRADE POINT

·

6" MIN CRUSHED AGGREGATE SURFACE COURSE

--- -

BORROW MATERIAL

ED

10

CLEAR ZONE

ONE-LANE TWO-WAY ROAD SECTION SCALE: NTS

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Typical Sections for road and turn-outs Sheet 3 of 10 January 2013

50'

ONE-LANE TWO-WAY ROAD TURNOUT PLAN SCALE: NTS NOTES: 1.

THIS TURNOlJT MAY ALSO BE USED ON STRAIGHT AREAS ALONG THE ROAD CORRIDOR.

t

I

14' LANE WIDTH

CULVERT

ED

TYPICAL CULVERT SECTION SCALE: NTS

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Vehicle turn-out plan and culvert section Sheet 4 of 10 January 2013

DITCH BOTIOM (lYP)

~I PLAN YIEW

tt.

I/

(CULVERT DIAMETER = D

TOP OF DIKE (BEYOND)

I I

I

SECTION A-A

Q)

TYPICAL DIKE

-

--7

EXISTING GROUND

~a.:':..

1.5' (MIN.)

PROFILE GRADE POINT

3%

'\

~

CD -

SCALE: NTS

-

SELECT BORROW

TYPICAL DITCH SECTION SCALE: NTS

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Typical ditch and dike sections Sheet 5 of 10 January 2013

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COE_BSX11LPLANVIEWS.DWG- lmaoes:

I

Layout: S7

----.

0

h

50

100

I

.....l

SCALE IN FEET

'CCI - --1-oo \0 ~ -~.

t:i - ..... ~

en

-.:--~:;:;::.. ~

:::1:

BOP ;

i

'

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSITION

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

',~-----~, , >-------<:

POA-20n-627 Woolley Lagoon Ki.ng Island Native Community W~olley Lagoon Road Rehabilitation Project Beginning of project at Nome-Teller Hwy. Plan view Sheet 6 of 10 January2013

Drawing: C:\USERS\ IPEARSDN\ APPDATA\ LOCAL\ TEMP\ ACPU8USH_5324\ 32120019_F1GS 6-49_PLAN VIE\'L9JAN2013.DWG User: !PEARSON Jan 11, 2013- 10:43am Xrefs: 32120019_8ASE.DWG COL85X11LPLANVIEWS.DWG- lmaoes:

I

Layout: S11

----,

0

50

h

100

-'

I

SCALE IN FEET

--

:

.

.v ·..·.·. Z i i y p

~ %

·

.

I

~

.......·. ·.·. ·. ·.·~ :·: ':·······:,.; =.:~. !

,-

. .z~.

~

z

,~

:z: u

li .. 1-

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSmON

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

'>-------~'

" ' :>-------<:

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Plan view typical tum-out Sheet 7 of 10 January 2013

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBLISH_5324\32120019_FIGS 6-49_PLAN ~EW_9JAN2013.DWG User: !PEARSON Jan 11, 2013 - 10:43am Xrefs: 32120019_8ASE.DWG COE_85X11LPLA~EWS . DWG - lmaoes:

I-

Layout: S14

0

70+oo

-.....,

h

...~... :.:.:.t:·.·:.:··

50

--

100

I

-...

(TYP)

I I)

ti lo.l

ti

lo.l

::c en

::c en

lo.l lo.l

en

lo.l

z

::J

::c (.)

~

:::E

Iz

I I

.. ""~~~s~~;-~~-;~o. ""~7~ ~

lo.l

I

-= ·--

....

;c :::E

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSITION

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERLINE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

:)1-------c: :>----- ---<:

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project Dike and culvert, plan view typical Sheet 8 of 10 January 2013

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPU8USH_5324\32120019_FIGS 6-49_PLAN VIEW_9JAN2013.DWG User. !PEARSON Jan 11. 2013- 10:44om Xrefs: 32120019_8ASE.DWG COE_85X11LPLANVIEWS.DWG- lmaaes:

I-

Layout: 517

0

!--!

50

M

100

I

SCALE IN FEET

'GO'

ti .....

%

en

·..:... ·-···:··:::~~~;,~~·;··:·:·~::· ;:;··:·:·:-:·;::·:"· :·:··. ·.-: · ·;·:·:·:·::·:·::·:;:··· : ·· ..·: '···~:.;.:·.':··~-.~

..e "

····· ·

%

'

-

-. ~

· -~- ;·m::= .

..... :. :. :.-:.:.: ... ·:·· ::-~· :.~: .. :~...

~ z

::J . .I :c

~

--··· ··

'C

::IE

LEGEND PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FlU.

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/ FILL TRANSmON

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOULDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

> < ::>-------c: :>-------<:

POA-2012-627 Woolley Lagoon King lsland-Natfve Cof!lmunity Woolley Lagoon Road Rehabilitation Project Culvert and dike, plan view typical Sheet 9 of 10 January 2013

I

Drawing: C:\USERS\IPEARSON\APPDATA\LOCAL\TEMP\ACPUBUSH_5324\3212001 9_FlGS 6-49_PLAN VIEV1_9JAN2013.0WG - Layout: S49 User. !PEARSON Jon 11, 2013- 10:46om Xrefs: 32120019_BASE.DWG COE_85X11LPLANVIEWS.DWG- lmooes:

----,

WATCH UNE (SEE SHEET -48)

D

h

50

.....!

100

I

SCALE IN FEET

· .:<.. :.,. . ., ·..

(SAME

won:'~D WDENING···~···-x:~

.

S TURNOUT)_/ · ···,· ··

··.:

PARKING

AREA

~ PROPOSED ROAD TOE OF FILL

EXISTING ROAD TOE OF FILL

PROPOSED ROAD TOE OF CUT

EXISTING ROAD SHOULDER

PROPOSED ROAD DITCH BOTIOM

PROPOSED CUT/FILL TRANSITION

PROPOSED DIKE TOP

PROPOSED CMP

PROPOSED ROAD SHOUUDER

LENGTHEN EXISTING CMP

PROPOSED ROAD CENTERUNE

EXISTING CMP TO REMAIN IN PLACE WETLANDS

>

<

:>-----~~:

'>-------<:

POA-2012-627 Woolley Lagoon King Island Native Community Woolley Lagoon Road Rehabilitation Project End of project, Woolley Lagoon, plan view Sheet 10 of 10 January 2013

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas