You can copy from here when filling out the rest of the page.
Trident Seafoods Corporation's stated purpose is to allow extension of existing processing facility and extension of existing dock face seaward for vessel delivery of seafood products. Please contact Jack Hewitt at (907) 753-2708, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at jack.j.hewitt@usace.army.mil if further information is desired concerning this notice.
POA-1981-65-M8_Akutan Harbor- Trident Seafoods Corporation's stated purpose is to allow extension of existing processing facility and extension of existing dock face seaward for vessel delivery of seafood products. Please contact Jack Hewitt at (907) 753-2708, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at jack.j.hewitt@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 8, 2013
EXPIRATION DATE:
March 11, 2013
REFERENCE NUMBER:
POA-1981-65-M8
WATERWAY:
Akutan Harbor
Interested parties are hereby notified that a Department of the Army permit
application has been received for \·10rk in \Vaters of the United States as described
belm·1 and sh01.-m on the enclosed project drawings.
Comments on the described \·mrk, vlith the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Jack Hewitt at (907) 7532708, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or
by email at jack.j.hewitt@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
Washington
Trident Seafoods Corporation, 5303 Shilshole Avenue NW, Seattle,
97117.
LOCATION:
The project site is located within Section 11, T. 70s., T. 112 W.,
Seward Meridian, USGS Quad Map Unimak A-6, Latitude 54.1331° N., Longitude
165.7907° vi., in Akutan, Alaska.
PURPOSE:
The applicant 1 s stated purpose is to allm·1 extension of existing
processing facility and extension of existing dock face seaward for vessel delivery
of seafood products.
PROPOSED WORK:
Extend the existing sheet pile bulkhead by installing an additional
775 linear feet of sheet pile and discharging 55,000 cubic yards of clean shot rock
into 1. 57 acres of marine \·mter.
All Nork \·muld be performed in accordance \"lith
the enclosed plan, 3 sheets, dated December 2012.
ADDITIONAL INFORMATION:
The proposed sheet pile bulkhead extension would be
located at the west end of the Trident Akutan seafood processing facility, on
Trident ADL leases 218826, 226062, and 207033,
The project footprint would cross a
steeply sloped inter-tidal and sub-tidal area composed of heavily scoured rock and
cobble.
The benthos at the project site consists of sparse quantities of
barnacles, limpets, kelp, and rockweed.
Subtidal sediments in the area generally
consist of volcanic silt and mud overlaying dense black volcanic sand.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance:
To avoid impacts to Akutan Harbor the project Nould utilize
clean fill material, upland silt curtains at the quarry site, and follow best
management construction practices.
b. Minimization:
To minimize impacts to Akutan Harbor the project has been
designed to the minimum size required to support an extension of Processing
Building No. 1, and satisfy the minimum requirement of a -30' elevation bulkhead
face, to provide adequate draft for delivery vessels.
c.
Compensatory Mitigation:
Compensatory mitigation \·lOUld be provided
through an in-lieu fee to the Alaska Conservation Fund.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or ·t-~aiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Envirorimental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources.
This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final aSsessment of the described work.
ENDANGERED SPECIES:
The project area is within the kno·m or historic range of the
Steller sea lion, (Eurnetopias jubatus), Steller's eider (Polysticta stelleri), and
northern sea otter (Enhydra lutris). We have determined the described activity may
affect these threatened species, and designated critical habitat for northern sea
otter. We will initiate the appropriate consultation procedures under section 7 of
the Endangered Species Act with the U.S. Fish and Wildlife Service and the National
Marine Fisheries Service. Any comments they may have concerning endangered or
threatened \'lildlife, plants, or designate critical habitat, vlill be considered in
our final assessment of the described ~·10rk.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult \·lith the NMFS on all actions, or proposed actions, perrnitted 1
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
We have determined the described activity may adversely affect EFH in the project
area for the follo\~ing species: pink salmon (Oncorhynchus gorbuscha), chum salmon
(Oncorhynchus keta), coho salmon {Oncorhynchus kisutch), sockeye salmon
{Oncorhynchus nerka), chinook salmon {Oncorhynchus tshawytscha), and \·leathervane
scallop {Patinopecten caurinus),
This Public Notice initiates EFH consultation
with the NMFS. Any comments or recommendations they may have concerning EFH will
be considered in our final assessment of the described work.
vdth the NMFS.
Any comments or reconunendations they may have concerning EFH \·lill
be considered in our final assessment of the described v1ork.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations bett·leen Federally recognized Tribes and the
Federal government. Tribes Nith protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
Nritten request to the District Commander during the public comment period.
PUBLIC HEARING:
Any person may request, in writing, vlithin the comment period
specified in this notice, that a public hearing be held to consider this
application.
Requests for public hearings shall state, \·lith particularity, reasons
for holding a public hearing.
EVALUATION:
The decision \·lhether to issue a permit vlill be bas~d on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process \·muld determine Nhether to authorize a proposal, and if so, the
conditions under which it \·lill be allm·led to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, \·lhich may be relevant to the proposal, must be c.onsidered including
the cumulative effects thereof.
Among those are conservation, economics,
aesthetics, general environmental concerns, \·letlands, cultural values 1 fish and
wildlife values, flood hazards, floodplain values 1 land use, navigation 1 shore
erosion and accretion, recreation, water supply and conservation 1 \·later quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property m·mership, and, in general, the needs and v1elfare of the people.
For
activities involving 404 discharges, a permit \Vill be denied if the discharge that
\·lOuld be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and
any other applicable guidelines or criteria {see Sections 320.2 and 320.3), a
permit Nill be granted unless the District Commander determines that it \·mulct be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the publici Federal, State, and
local agencies and officialsi Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity.
Any comments
received vdll be considered by the Corps of Engineers to determine v1hether to
issue, modify, condition or deny a permit for this proposal.
To make this
decision, comments are used to assess impacts on endangered species, historic
properties, vmter quality, general environmental effects, and the other public
interest factors listed above.
Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
-3-
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit
t-~ill
be issued or denied under the follm·ling authorities:
(X)
Perform work in or affecting navigable Naters of the United States Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344).
Therefore, our public interest
review \·lill consider the guidelines set forth under Section 404 (b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed \·dth this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable Naters 1 in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply 1·1ith the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws.
By agreement betl;een the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Nater
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-1961-65-MB, Akutan
Harbor, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After revie\·ling the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, \'lill comply \·lith the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
la\;rs.
The Department also may deny or Naive certification.
Any person desiring to comment on the project, Nith respect to Vlater Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
Page1of3
,.
\~.
VICiNITY MAP
Purpose: !Extend Existing
Seafood Processing Building &
Vessel Delivery Btslrchead
Upland Property Owner:
Trident Seafoods Corporation
Akutan FiU Project 2013
Vicinity Map and .Site View
.Trident 5eafoods·Corporation
5303 Shilshole Avenue 1\lW
Seattle, \1\l:llshington 98117
!Project: 1.57 Leased Tideland
FilL& Sheetpile Bulkhead
Project locatioC'l:
,~n Harbor, Alaska
POA-1981-65-M&
! K.lVI:.~'t'
-~t:J""';'v, · ...)
·--
,,-... '"' ' ' ' "· """ ·
BOOK 40, PAGE 295, AL2u"TTA:--l
ISlAND 'RECORDiNG DISTRICT
r---··-··-1
-...
·--
'''l'
. :r ,__
--~·~'
·-'i:
l \ ./
l
\
L \
' 175' \
L<
''-....
-....:~
:~.-
---·
pR(lPt:RTi
·r:;\0
-
---
- -- -- -- -- --
1?.\U~'"
--
- - .._..... ~·l
--- '··-·--.
\_4
-........
- .
-.....
Page2of3
_::·-~--:--~-------··---------------·
~3
R>prop
·
__.-Exi.'rlinu :r.."C:~o por fl~k 35, 1
?t:!:in 7S'J,~~~':__I::'ontls ~
----
%
.
.
~
!
-=~Go:_'=>-l..CMP'):-""'--
\
MHHW 3.9'
MHW
3.7' I
2.5'
MTl
o;o·
'MU.W
'1.£4-.- ...
.·
--..-..... .
Pump~,ouse.
-----
.
__
600'
~---~--------
,_,.
\ '?
Processing
-·-·
'
(Scale 1" =100'
1
.
·\
I
\
~
p,
.,..-~~
~
=:: :~!c.
-~: ~c
,-~v..,.
\
,
Upland Property OWner:
Trident Seafoe>d Corporation
No. 1
''
\
.....
Purpose: Extend IEldsting
Seafood Processing Building &
Vessel Delivery Bu~ltl'oead
Buildin-g
\
Akutan Rll Project 2013
Site and Bulkhead Plan
Project: 1.57leased Tidel::md
Fill &Sheetpi!e Bulkhead
Trident Seafoods Corporation iProject Location:
5303 51-oilshole Avenue.NW
Akutan Harbor
I POA-1981-65-MS
Seattle, Washington 98117
----
~""'""
Page.3of3
-JII!oftill
,.,
IPOA-1981-65-M7
I
·
IExisting Fill to -12' I 1:
120'·
/
!SheetpileBulkhead
INewFill to -30' I
lsc
~
MHHW 3.9'
MHW
3.7'
MTL
2.5'
MLLW
0.0'
Purpose: IEll'"..encl Existing
Seafood Processing Building &
Vessel Delivery Bulld1ead
Upland Property Owner.
Trident Seafood· Corporation
fo.kutan !'i!l Project 2013
Cross Secl:ion
Trident Seafood Corporation
5303 Shifshole Avenue NW
Seattle, Washington 98117
Project: 1.57 leased Tideland
Fin & Sheetpi~e Bu~khead
Project Location:
Akutan Harbor
POA-1981-65-MS
-~---
-
1
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 8, 2013
EXPIRATION DATE:
March 11, 2013
REFERENCE NUMBER:
POA-1981-65-M8
WATERWAY:
Akutan Harbor
Interested parties are hereby notified that a Department of the Army permit
application has been received for \·10rk in \Vaters of the United States as described
belm·1 and sh01.-m on the enclosed project drawings.
Comments on the described \·mrk, vlith the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Jack Hewitt at (907) 7532708, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or
by email at jack.j.hewitt@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
Washington
Trident Seafoods Corporation, 5303 Shilshole Avenue NW, Seattle,
97117.
LOCATION:
The project site is located within Section 11, T. 70s., T. 112 W.,
Seward Meridian, USGS Quad Map Unimak A-6, Latitude 54.1331° N., Longitude
165.7907° vi., in Akutan, Alaska.
PURPOSE:
The applicant 1 s stated purpose is to allm·1 extension of existing
processing facility and extension of existing dock face seaward for vessel delivery
of seafood products.
PROPOSED WORK:
Extend the existing sheet pile bulkhead by installing an additional
775 linear feet of sheet pile and discharging 55,000 cubic yards of clean shot rock
into 1. 57 acres of marine \·mter.
All Nork \·muld be performed in accordance \"lith
the enclosed plan, 3 sheets, dated December 2012.
ADDITIONAL INFORMATION:
The proposed sheet pile bulkhead extension would be
located at the west end of the Trident Akutan seafood processing facility, on
Trident ADL leases 218826, 226062, and 207033,
The project footprint would cross a
steeply sloped inter-tidal and sub-tidal area composed of heavily scoured rock and
cobble.
The benthos at the project site consists of sparse quantities of
barnacles, limpets, kelp, and rockweed.
Subtidal sediments in the area generally
consist of volcanic silt and mud overlaying dense black volcanic sand.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance:
To avoid impacts to Akutan Harbor the project Nould utilize
clean fill material, upland silt curtains at the quarry site, and follow best
management construction practices.
b. Minimization:
To minimize impacts to Akutan Harbor the project has been
designed to the minimum size required to support an extension of Processing
Building No. 1, and satisfy the minimum requirement of a -30' elevation bulkhead
face, to provide adequate draft for delivery vessels.
c.
Compensatory Mitigation:
Compensatory mitigation \·lOUld be provided
through an in-lieu fee to the Alaska Conservation Fund.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or ·t-~aiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Envirorimental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources.
This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final aSsessment of the described work.
ENDANGERED SPECIES:
The project area is within the kno·m or historic range of the
Steller sea lion, (Eurnetopias jubatus), Steller's eider (Polysticta stelleri), and
northern sea otter (Enhydra lutris). We have determined the described activity may
affect these threatened species, and designated critical habitat for northern sea
otter. We will initiate the appropriate consultation procedures under section 7 of
the Endangered Species Act with the U.S. Fish and Wildlife Service and the National
Marine Fisheries Service. Any comments they may have concerning endangered or
threatened \'lildlife, plants, or designate critical habitat, vlill be considered in
our final assessment of the described ~·10rk.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult \·lith the NMFS on all actions, or proposed actions, perrnitted 1
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
We have determined the described activity may adversely affect EFH in the project
area for the follo\~ing species: pink salmon (Oncorhynchus gorbuscha), chum salmon
(Oncorhynchus keta), coho salmon {Oncorhynchus kisutch), sockeye salmon
{Oncorhynchus nerka), chinook salmon {Oncorhynchus tshawytscha), and \·leathervane
scallop {Patinopecten caurinus),
This Public Notice initiates EFH consultation
with the NMFS. Any comments or recommendations they may have concerning EFH will
be considered in our final assessment of the described work.
vdth the NMFS.
Any comments or reconunendations they may have concerning EFH \·lill
be considered in our final assessment of the described v1ork.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations bett·leen Federally recognized Tribes and the
Federal government. Tribes Nith protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
Nritten request to the District Commander during the public comment period.
PUBLIC HEARING:
Any person may request, in writing, vlithin the comment period
specified in this notice, that a public hearing be held to consider this
application.
Requests for public hearings shall state, \·lith particularity, reasons
for holding a public hearing.
EVALUATION:
The decision \·lhether to issue a permit vlill be bas~d on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process \·muld determine Nhether to authorize a proposal, and if so, the
conditions under which it \·lill be allm·led to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, \·lhich may be relevant to the proposal, must be c.onsidered including
the cumulative effects thereof.
Among those are conservation, economics,
aesthetics, general environmental concerns, \·letlands, cultural values 1 fish and
wildlife values, flood hazards, floodplain values 1 land use, navigation 1 shore
erosion and accretion, recreation, water supply and conservation 1 \·later quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property m·mership, and, in general, the needs and v1elfare of the people.
For
activities involving 404 discharges, a permit \Vill be denied if the discharge that
\·lOuld be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and
any other applicable guidelines or criteria {see Sections 320.2 and 320.3), a
permit Nill be granted unless the District Commander determines that it \·mulct be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the publici Federal, State, and
local agencies and officialsi Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity.
Any comments
received vdll be considered by the Corps of Engineers to determine v1hether to
issue, modify, condition or deny a permit for this proposal.
To make this
decision, comments are used to assess impacts on endangered species, historic
properties, vmter quality, general environmental effects, and the other public
interest factors listed above.
Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
-3-
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit
t-~ill
be issued or denied under the follm·ling authorities:
(X)
Perform work in or affecting navigable Naters of the United States Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344).
Therefore, our public interest
review \·lill consider the guidelines set forth under Section 404 (b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed \·dth this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable Naters 1 in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply 1·1ith the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws.
By agreement betl;een the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Nater
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-1961-65-MB, Akutan
Harbor, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After revie\·ling the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, \'lill comply \·lith the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
la\;rs.
The Department also may deny or Naive certification.
Any person desiring to comment on the project, Nith respect to Vlater Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
Page1of3
,.
\~.
VICiNITY MAP
Purpose: !Extend Existing
Seafood Processing Building &
Vessel Delivery Btslrchead
Upland Property Owner:
Trident Seafoods Corporation
Akutan FiU Project 2013
Vicinity Map and .Site View
.Trident 5eafoods·Corporation
5303 Shilshole Avenue 1\lW
Seattle, \1\l:llshington 98117
!Project: 1.57 Leased Tideland
FilL& Sheetpile Bulkhead
Project locatioC'l:
,~n Harbor, Alaska
POA-1981-65-M&
! K.lVI:.~'t'
-~t:J""';'v, · ...)
·--
,,-... '"' ' ' ' "· """ ·
BOOK 40, PAGE 295, AL2u"TTA:--l
ISlAND 'RECORDiNG DISTRICT
r---··-··-1
-...
·--
'''l'
. :r ,__
--~·~'
·-'i:
l \ ./
l
\
L \
' 175' \
L<
''-....
-....:~
:~.-
---·
pR(lPt:RTi
·r:;\0
-
---
- -- -- -- -- --
1?.\U~'"
--
- - .._..... ~·l
--- '··-·--.
\_4
-........
- .
-.....
Page2of3
_::·-~--:--~-------··---------------·
~3
R>prop
·
__.-Exi.'rlinu :r.."C:~o por fl~k 35, 1
?t:!:in 7S'J,~~~':__I::'ontls ~
----
%
.
.
~
!
-=~Go:_'=>-l..CMP'):-""'--
\
MHHW 3.9'
MHW
3.7' I
2.5'
MTl
o;o·
'MU.W
'1.£4-.- ...
.·
--..-..... .
Pump~,ouse.
-----
.
__
600'
~---~--------
,_,.
\ '?
Processing
-·-·
'
(Scale 1" =100'
1
.
·\
I
\
~
p,
.,..-~~
~
=:: :~!c.
-~: ~c
,-~v..,.
\
,
Upland Property OWner:
Trident Seafoe>d Corporation
No. 1
''
\
.....
Purpose: Extend IEldsting
Seafood Processing Building &
Vessel Delivery Bu~ltl'oead
Buildin-g
\
Akutan Rll Project 2013
Site and Bulkhead Plan
Project: 1.57leased Tidel::md
Fill &Sheetpi!e Bulkhead
Trident Seafoods Corporation iProject Location:
5303 51-oilshole Avenue.NW
Akutan Harbor
I POA-1981-65-MS
Seattle, Washington 98117
----
~""'""
Page.3of3
-JII!oftill
,.,
IPOA-1981-65-M7
I
·
IExisting Fill to -12' I 1:
120'·
/
!SheetpileBulkhead
INewFill to -30' I
lsc
~
MHHW 3.9'
MHW
3.7'
MTL
2.5'
MLLW
0.0'
Purpose: IEll'"..encl Existing
Seafood Processing Building &
Vessel Delivery Bulld1ead
Upland Property Owner.
Trident Seafood· Corporation
fo.kutan !'i!l Project 2013
Cross Secl:ion
Trident Seafood Corporation
5303 Shifshole Avenue NW
Seattle, Washington 98117
Project: 1.57 leased Tideland
Fin & Sheetpi~e Bu~khead
Project Location:
Akutan Harbor
POA-1981-65-MS
-~---
-
1