ConocoPhillips Alaska, Incorporated's stated purpose is to construct a new drill site and access road for the continued development of the Kuparuk oil reserves to provide sales quality crude oil for shipment through the Trans-Alaska Pipeline. Place 296,054 cubic yards of gravel fill material into 20.5 acres of jurisdictional wetlands for the construction of a new drill site with 24 wells, a gravel access road, pipelines, fiber optic cable and other communications equipment and power line. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.

ConocoPhillips Alaska, Incorporated's stated purpose is to construct a new drill site and access road for the continued development of the Kuparuk oil reserves to provide sales quality crude oil for shipment through the Trans-Alaska Pipeline. Place 296,054 cubic yards of gravel fill material into 20.5 acres of jurisdictional wetlands for the construction of a new drill site with 24 wells, a gravel access road, pipelines, fiber optic cable and other communications equipment and power line. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.

POA-2012-922, Miluveach River POA-2012-922, Miluveach River_PN Drawings

SHEET 1 LOCATION· NORTH SLOPE ALASKA NOTE: THESE MAPS ARE BASED ON ESRI IWAGERY

SITE-D8-2S

PROJECT LOCATION: WELL N0.1 DATUM ALASKA STATE PLANE NAD 83 ZONE 4 FIPS 5004 COORDINATE LAT. 70'13'1Q.94N LONG. 150·09 13,99·

N. 5.929.785.73

E. 1.621.342.25

URS

....

SHARK TOOTH OR ILL SITE OS -2S CIVIL PACKAGE COVER SHEET

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 1 of 34

Ü

Oliktok Pt.

Alpine

c vea

Col

lu Mi

v i l le

Riv e

r-

Ku uk

pi

k

CPF2

DS2M

hR iver

Nuiqsut

DS2L

Meltwater DS2P

DS2S

DS2K

DS2S Development Pad

POA-2012-922, Miluveach River 2.5 5 ConocoPhillips0 - DS-2S Miles Drawings dated February 8, 2013 November 1, 2012 Sheet 2 of 34

SHEET 2

"1

TOF 1?S1' 2N

KUPARUK OILAELO

F PI'ERAC SHT 1

DRILL SITE PLOT PLAN "nntll c

I

E~ERGY

r TABLE NOTES:

·01-<1

1.NI*tw. MRONG EI.EVATKW RP CF IRLl PAD IS

100'-11'.

1PREYAIJNG IMNlS ME N'PROlGYAlE AND BASED DN CRT-GA-NH0002 GENERAL 91E CC1011DNS IESIGN CRITERIA REV. 4. a>~

'~T

SPOGS ARE BASED

m. PRELMNARY

OCOJP~ ~~TD

~PAD

--

& CCfiSTRUC]Cit

\..OI'ouo..u~ I~~::=~~ ....,._

SHARK TOOlH DRILL SITE DS2S PIPING DRILL SITE PLOT PLAN

AtiJ

FIR TRUll< IN.OAiliNG NI£A.

""''"

SHEET 3

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 3 of 34

In~

... -

NO MATCHUNE CONTINUATION

----------

--

--

----------

TOE OF PAD

1

l

l

EDGE OF PAD

1

1

....; f"--12.2539191'

PREVAIUNG WNDS SUMUER

~NTm

r\\ORKING PAD EL 100'-0'J

r CD

v

nN m

WN

0

f--

NOTES: 1.N

1

r

2.PREVAILING WINDS ARE APPROXIMATE AND BASED ON CPAI CRT-GA-NS-80002 GENERAL SITE CONDillONS DESIGN

CRITERIA REV. 4. J.EOOIPMENT SPACINGS ARE BASED ON PRELIMINARY REVIEW FOR ELICTRICAL CLASSIFICATION AND OCCUPANCY REQUIREMENTS.

OVERALL PAD LENGTH IS 1200'

URS ConocriP'hillips

NO MATCHUNE CONTINUATION

Alaska Inc. Nl:£k.

MOOUL.E:

-

-

UNIT:

-

SHARK TOOTH DRILL SITE DS2S GENERAL ARRANGWENT EQUIPt.4ENT / MODULES WEST

,., -.. --- -" - -·· ·-Miluveach River - ,... , . POA-2012-922, .. "'""""

IEFEIIENCE .... HO{IlfTII>

""""flelt.E"".....,_..._,

10/16/12

--

A 10 6 2 ISSUED FOR PERt.IITllNG

SHEET 4

1"-JO'

ES

AMD

-2'9922

-

rr

1-0'36 SK'" 16

-~-

047 A

ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 4 of 34

I'~\

S.0-9HIS

I

9£0

ne6?:

I

.,._I .,._ .... I

I

·-1

. TABLE NO MATCHLINE CONllNUAllON

---------

--

--

----------

I

I

~I ~I

~~ ~~

1'f

TOE OF PAD

1

15

",z 1 __,

1

1

WELL NO. 01

~~~~~tJg_7J

1:

~,";Lil~",',f.) :··T··---r-·· · TON 175 1

~~~~C~JALVE

" ~]n"''_' rb

IlLliS ~ :;p hl-' :.!-'

EL ',_,!_rna,. _a

-----------~: 175 TON

..,!

DRill RIG

DRILl RIG

~~

:

~~ ~~ ~ ~ ~ ~~ 100' MAST UGHTlNG-.....

I "v

j

~~~I ~ L__t ~ t 1--t l.

!

PREV.o.JUNG 'MNDS

1'<1NTER

I

I

ti

DRILl RIG POWER

+--~

0 DRIP PAD ~'I~~

j

.fzs'-o"

100' MAST\ UGHTlNG

+

~~ ~

"" VM.VE HouSE'--m v(o SHELlER 10'x12'x12' l2'xiOxl2' 1

Jri

~~~

30' 0" WELL SPACING

40'

II · \V ~

· '"''

s ·!'

; l i J+J.,. 40'-0"

~8

' r, 7 \..:....

1

I

[§] [§] 0

D'"'"

1

~

'" 6'

\.V

NQill; 1.NOMINAL WORKING ELEVAllON TOP OF DRILl PAD IS 100'-0". 2.PREVAIUNG WINDS ARE APPROXIMATE AND BASED ON O'AI CRT-GA-NS-80002 GENERAL SITE CONDillONS DESIGN CRITERIA REV. 4. 'J.EOUIPMENT SPACINGS ARE BASED ON PRELIMINARY REVlEW FOR ElECTRICAL AREA CLASSIFICAllON AND OCCUPANCY REQUIREMENTS.

I

STRUCTURE W/ RJSED S'MIDI 0

340'

--NO MATCHLINE CONllNUAllON

\I\Q

~

URS 0 _ __j_

...

-

EJDm i OOII:i!RIIemll, ...

ConocciPhillips

--

Alaska, Inc.

TOE 366

.,......,

SUt.IMER

.-----2"-u

-. · L .. _l__ .. __L_ .. _l_.. ..l ~$D~M

: CLMN a i i i - CLM'-+1!-ll+-.!-IJ:.+-~-~Jl... .! 0 Jo... .!-ll+- 1-· ._ _. 4J 4J 4J 4J 4J 4-JI '-4J 4J 4J I 40'-D'I I

I

j

' ---..1

IL ___________ _j

0

'

®j

PORTABLE PIGGING AREA-.........._ · ~t _.j.

E. 1621342.25

<

a

MODULE~

WORKING PAD EL. 100'-0"

~

~ g

l

PIPERACK BRIDGE

ALASKA STATE PLANE

R .....

'

l

EDGE OF PAD

J

r

'

MODULE:

AREA: -

-

UNIT:

SHARK TOOTH DRILL SITE DS2S GENERAL ARRANGEMENT EQUIPMENT / MODULES EAST

OVERALL PAD LENGTH IS 1200'

...

.. ·--

10/16/12

..

A 10 6

..

·- - -·· ·- Miluveach POA-2012-922, - River I.... 0.36 ""SK ---m,.. , I. . . ""'·""E

~

-

AIII\EICN.EFOIIIEFEIIEIICEIILY

~

·~

-

1"-30'-0"

ISSUED FOR PERt.IITTING

SHEET 5

ES

"

-ConocoPhillips - DS-2S

At.ID

2'9922

DO

16 046 A

Drawings dated February 8, 2013 Sheet 5 of 34

A

SECTION A-A TYPICAL

SHEET 6

CONSTRUCT ION

LOOIUMC M~TH

SEE SHEET CED-DS2S-3011

LEGEND EXISTING

CR~D

PRCfOSEO CRAOE 1JN1EA

C~TRUCrJ~

GRADE

REFERENCE FILES SHEET CED-DS2S-3011 DRILL PAD fODTPR INT

7!j'

0

75'

150'

SCALE SX VERTICAL

URS SECTION B-B TYPICAL LID.INC EAST SEE SHEET CED-0525-3011

SHAAK TOOTH DR ILL SITE DS-25 DRILL PAD T'IP I CAL SECTIONS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 6 of 34

15' HICH SNOW FENCE

LEGEND PRil'OSED SNOW FENCE

SHEET 7

lOE OF FILL EDGE tf' ROAD EDGE tf' PAD

-

GRAVEL SLIJ'E INDIUTOR

"/

ISZJ

SNOW DEPOSITION SHADOW

ERENCE FILES ELEVATIONS DATUM BRITISH PETRil.EUN NEAll SEA LEVEL

MATERIAL GRAYEL fILL DR ILL PAD

TUNDRA F'ODTPR INT DR ILL PAD SNOI FENCE

116.120 9.8 1,380

CU YRD ACRE LF'

URS SHARK TOOTH DR ILL SITE DS-25 DRILL PAD FOOTPRINT

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 7 of 34

15'-0"

!.

ALIGNED WITH THE OPPOSING FENCE

I I

__

'I'

.I

15'- 0"

I

I

,.,_,,, ~

m-,~-:\~

I I

I

I ~

I

;.,

~

f

I

\

i_

~

I

I I I I I I I I

I I

3009-002

J

I I I

GUY CABLE

I

~ in I

6" RAIL (TYP)

\

I I

I

0 u z

7", UNE POST (TYP)

8"- END POST

' WIRE TYP

STA~

I

I

I

\

TURNBUCKLE

\

\ \

I

,._ I

~

0

Cl.

I

,_:

~

*«.v* ""

-~~

~

~

0

z

~,._

TUNDRA

/(~'0<' ~~'l

'<-<~

0

I

~~)\:

f

(I)

0,

I

'b z I ~ 7"- ANCHOR~ b @ POST

"'

Ill :2; UJ

z ::E

VVIBRATED INTO TUNDRA (TYP)

1JRS REV

DATE

REVISION

BY

01(

JOB I'AOJ

DRMINI

llESIGII:

D£CIC£DI

APPNIVAU

cc

SCAlEJ

DATEJ

CI!DO

-

&a.1KII& 1-.

canoc:cl'tullips

NOs Fl~

=1'-8'

SHEET 8

JOB*''

ISIB JOB

AICIMa. I no.

MOo

IIJIAIIING

NDo

FORMIBSIZE

AREA

E04 NOs

MODULE:

UNIT:

SNOW FENCE DETAILS SHT 1

rARTo aF River IREV' POA-2012-922, Miluveach SK-12-001 ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 8 of 34

!.

15'-0" AUGNED WITH THE OPPOSING FENCE

'I'

15'-0"

~I

I ! ~-'"'-~~ CED-D10Y-3009:\~1 I I

I

7"t> UNE POST {TYP)

~"'-""'""'

I

6"(J END POST

I

/

I

~ I

in

I

w 0 z

... w

-..,

A

,. '"' (m-)

\

\

! (

TYP

I

I

GUY CABLE

:I

I

~

I

\

I

TURNBUCKLE

I I I I I

WIRE STA\'--

I \

\

I

I \

TUNDRA

I

."' [

I-V>

"' :r .;_ 0

I

,_:

-

-;....

~

0

z

1--

0 z I ~ b 8

7""

"' ::10 m

ANCHOR:~ POST

w

I V

z

:il

UBS DRA\1111

DESmlt

ECM 1«11

D£tiCEDo

APPRIIVAU

CCNO.

Do\TEa

CMID FlL£JWEI

SCAlL REV

DATE

REVISION

BY

Cll(

JIB

i"RRJ

=1'-8'

SHEET 9

~VIBRATED INTO

TUNDRA {TYP)

_,_

.... FORHI BSIZE

canocxlPtumps AICllllta. lno. JOB NO·

I

SlB JIB NOt

IIIIAVING 1«11

AREA

MODULE:

UNIT:

SNOW FENCE DETAILS SHT 2

POA-2012-922, Miluveach River IPART· IF JREV· SK-12-002 ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 9 of 34

18'-01 r-

r-

r-

u

I "¢ "¢ (f)

I

N

(Y) (f)

(Y) (Y) (f)

N

N

N

::::.£: LL.

SHEET 9

co

I

u o_

I

I ......... 3:

I .........

0-J __.

Co

N

I

I "¢ "¢ (f)

(Y) (f)

N I .........

3:

I

3'-6

o_ ::::.£:

N

c._::)

r-

u

::::.£: LL.

co

I

I

"¢

r-

o_ ::::.£:

o_ ::::.£:

I

0-J __.

co

N

I

u o_

I

"¢

N

3'-5

1

T.O.S. lSI I

__.~----~~--------------------------------------------------------r-~

11

A-A SECTION 11

VSM's INSTALLATION CONFIGURATION (REF. WG SK-16-100)

PURPOSED: INSTALLED VCM' s ASSOCIATED PIPELINES AND UTILITIES. DATUM: ADJACENT PROPERTY OWNERS:

FORM: BSIZE

B

10/10/12

REV I SED

TO REFLECT SCALE

DRAWN:

DESIGN:

ECM NO:

CHECKED:

APPROVAL:

CC NO:

DATE:

CADD FILENAME:

lj..-..:A...:.........j.....:..q;-=21.....:../12~~!S:. . :.S. : . :UE:. . :.D. . .:.F- =.O. . .:. R_P.::...ER__M..:..!T______________--+_C_KE-+-A_D-+--+----1 SCALE: REV DATE REVISION BY CHK JOB PROJ

%'=1'-0'

SK -16-101.DGN

JOB NO:

SUB JOB NO:

DRAWING NO:

AREA MODULE:River UNIT: POA-2012-922, Miluveach SHARKTOOTH ConocoPhillips - DS-2SDRILL SITE DS2S TYPICAL SECTION THRU Drawings dated 8, 2013 OFFFebruary PAD PIPE LINES Sheet 10 of 34 PART: REV:

SK-16-101

1 OF 1

B

ti\r

t'l-~'1·

~ .'It!\ 400' JI"'Sjf

150

150

140

130

AI'PRODIAlE Pl'£lJE lliVA11CN (8'- f FEET ~ EliiS11NC c:RAIIE) 120 EliiSTIIG CRAilE IHIER PI'EI..NE

110

..... !--

-

..... !--

r!"--.

100 30+00

--

-

......... .........

-~ v/ I.-

vv

400'

1100'

lliiMil

NOTES: 1. GRID COORilNATES ARE ALASKA STAlE PIN£ CO

180" RE1\JRN I.OCAlED AT EDGE CE 'lltll. PAD CRAilE

130

I-- I--

v

120

110

100 50+liD

80+W

I!D+DD

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 11 of 34

90' 3D BEND W/TANGENTS TYP. 24 "-PC-2544-BKP7-3 "HF 12 "-WI -2532-FKC7-3 "HF 6"-GI-2533-GKD7-3"HF 12"-WI-2532-FKC7-3"HF 24 "-PC-2544-BKP7-3 "HF

~

~c,_S

,~c,

----

,s""-

,

c,_i-

,.,. c,_\.."

PIPELINE TIE - IN DRAWING PDD-DS2SX-5014

~SEE

NEw

p

lP[LINEs

EXPANSION LOOP DETAIL SCALE: 1/16"=1'-0"

PIPELINE PLAN SCALE: 1"=100'-0" 0

SHEET 11 BY

-

-

-

CHK JOB PROJ

SCALE:

-

Et£RCY & COOTRUCTI [)1, Inc.

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Alaska. Inc. Drawings dated February 8, 2013 NO: _I DRAWING NO: POD DS2SX-5016-A Sheet 12 of- 34

Coonooc~illi~s

-

CAOO e!LENAME:

DATE:

-

URS

CC NO:

APPROVAL:

CHECKED:

I

ECM NO:

-

-

?.00 FT

'

SCALE : , ""'100' - 0"

DESIGN:

DRAWN:

50' 100'

..--

JOB NO: -

J

SUB JD_B

EXPANSION LOOP DETAIL SCALE: 1/16"=1 '-0"

0

50

100'

200FT

SCALE: 1 "=100'-0"

SHEET 12

PIPELINE PLAN 1 SCALE: 1 "=1 00 1 -0'

URS

DRA WN:

DESIGN:

ECM NO:

CHECKED:

APPROVAL:

CC NO:

DATE:

CAOD FILENAME:

1----4-----~---------------------------------t-~~-+--~--~ SCALE: REV DATE REVISION BY CHK JOB PROJ

Ef£RCT t.

CIJ6TROC TI ~.

C@n@C~illi~

Inc .

POA-2012-922, Miluveach River ConocoPhillips - DS-2S A I ask a . I nc. Drawings dated JOB NO: SUB JOB February NO: DRAWING 8, NO:2013 POD -OSZSX So1'1-A Sheet 13 of 34

'

....----

. ......,_

EXPANSION LOOP DETAIL SCALE: 1/16"=1'-o·

o~~s~o·~1~o~oiiii·-~2~oo FT SCALE:

1 "=100'-0"

SHEET 13

URS

PIPELINE PLAN SCALE: 1 " =1oo' -o·

DRAWN:

DESIGN:

-

REVI SION

BY

-

-

-

CHECKED:

-

SCAL E:

CHK JOB PROJ

-

APPROVAL:

-

-

CC NO:

DATE:

POA-2012-922, Miluveach River C@ll@~illi~s ConocoPhillips - DS-2S Inc.

ECM NO:

-

Alaska .

-

CADD FILENAME:

UI:RCY & CIJ4STRUCJICJt, Inc..

JOB NO: -

Drawings datedNO: February 8, 2013 JOI3 NO: IDRAWING I SUB POO -DSZSX -5018-A Sheet 14 of 34

),._ _ 90' 3D BEND WITANGENTS TYP.

\ 1 ,~

\ V1'"- -

52' 3D BEND WIT ANGENTS TYP.

/"

-'

a,

-'

'"

EAST 1141' 0" ---r-----fII~~ NORTH 1026' 8 7/e" if PLANT REF.

Ll"l Ll"l

CI

.'w...

::;;

l-

LL

...... o

t::

OV)

l-

o~

V)

W

~B1

Z

...

-'

w

-'

"-

:::J

APPRDX.415'-0' "1+-"",, ( E""'D:-;; G-;: E --:O""F~ RO""'AC;:D~ TO""""""R-;-AC"'K;-;)--- ~ w z

'" W

a

/" ~

PS-136 .PA- 137

53'-3",

~HORl

PIPELINE PLAN SCALE: 1"- 100'-0"

---

/~

3'-6" !TYP. SPACING)

/

~~jN~~~~Itt~ ,

__r-~T]O~EJO~F~PA~D

a

EDGE OF PAD

N

6"-GI - 2S33-GKD7-3"HF 10"-PC-2S44-BKP7-3"HF 6"-WI - 2S32-FKC7-3"HF CONT. ON DWG. PDD-DS2SX-5020

SHEET 14

o

50' 100'

!.....:.~.

URS

TIE-IN AT DS2S PAD DETAIL SCALE: 1/16"-1' 0" DRAWN:

DESIGN:

ECM NO:

CHECKED:

AP PROVAL:

CC NO:

OA TE:

CADO FILENAME:

____________-1_--+_--1--+----1 SCALE: REVIS!ON

BY

CHK JOB PROJ

£tRCY & CIHiT1!LCTIIII. Inc.

POA-2012-922, Miluveach River

C@n@c~illi~ ConocoPhillips - DS-2S JOB NO:

I

A I aska. Inc. Drawings dated February 8, 2013 I DRAWING NO: Sheet 15 ofPDD-DS2SX-5019-A 34 -

SUB JOB NO:

-- - - ---

SHEET 15A

100'

200

TOE OF FILL EDGE OF' ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT GRAVEL EXISTING GROUND SLOPE INDICATOR

5..... ~----------------------~ i REFERENCE FILES SHEET CED-DS2S-3014 ACCESS ROAD PLAN AND PROFILE

108.200 10.7

73~

480 290

100

URS

50

0-+

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 16 of 34

cu

'II)

ACRE LF LF EA

v

....

0 ,.., I

VI

"'

VI 0 I

loJ 0

v

..... loJ

20+00

loJ

:z:

··-.. i ..~ ··-··-....... ··-··-· ---~

...... -·· -··-·· -··

VI loJ loJ

VI

0

SHEET 15B

62'

~ ....

"'..c

1-

VI

zloJ

..... :I:

v

1-

..c ::IE

-- - - ---

200'

LEGEND

TOE OF FILL EDGE OF ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT .... GRAVEL .... EXISTING GROUND ' SLOPE INDICATOR

REFERENCE FILES

SHEET CEO-DS2S-3014 ACCESS ROAD PLAN & PROFILE

100

URS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 17 of 34

\

f

-- - - ---

0 .-

SHEET 16A

........l.........

~

.o

.i~,.., I . :~

lVI ~

...I

::c

-

·

200'

TOE OF FILL EDGE OF ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT GRAVEL EXISTING GROUND SLOPE INDICATOR

~

Vl.r-------------~--------------~--------------r-------------~--------------~------------~~----~i

:1---+........,......,..,.....,....-+-------+-------+---___;:"r---+-----~~+----=rli~---+---~

NOTE: FOR QUANTITIES SEE SHEET CED-DS2S-3013

SCALE: 5 X VERTICAL SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 3 OF 61

30-+00

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 18 of 34

ll'l

0

or

II)

N

.~

· I

:u ·~

24· DIA. CULVERt

......

-- - - ---

·""' i~ 100'

·-· ·-··-·,..... .......... -. .....

'o1'

SHEET 16B

~

·O

It:?

200'

LEGEND

·o

..·'"'ill'l .l:ii · o.J

·~

...J

-

,

TOE OF' FILL EDGE OF' ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT GRAVEL EXISTING GROUND SLOPE INDICATOR

ERENCE FILES CEili-DS>L'S-·3013 CEili-DS>L'S-·3015

ACCESS ROAD PLAN ACCESS ROAD PLAN

URS

SCALE:

5X VERTICAL

SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 4 OF 61

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 19 of 34

60'

-- - - ---

-~!~J-. -..

100'

100'

200'

SHEET 17A

EGEND

-···TOE OF FILL -···EDGE OF ROAD __.. MAJOR CONTOUR -MINOR CONTOUR - - · WINTER CONSTRUCT ION GRADE -FINAL DESIGN GRADE - · EXISTING GROUND ~CULVERT

GRAVEL .... EXISTING GRADE T SLOPE INDICATOR

REFERENCE FILES

SHEET CED-DS2S-3014 ACCESS ROAD PLAN AND PROFILE

NOTE: FOR QUANTITIES SEE SHEET CED-DS2S-3013

URS SCALE: 5X VERTICAL SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 5 OF 61

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 20 of 34

-- - - ---

100'

0

SHEET 17B

LEGEND -·· · TOE OF FILL -···EDGE OF ROAD ---- MAJOR CONTOUR -MINOR CONTOUR --·WINTER CONSTRUCTION GRADE .... FINAL DESIGN GRADE - · EXISTING GROUND -CULVERT GRAVEL .... EXISTING GRADE Y SLOPE INDICATOR

QUANTITIES SEE SHEET CED-DS2S-3013

URS SCALE: 5X VERTICAL

SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 6 OF 61

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 21 of 34

PIPELINES

VARIES 500' MIN 1000' MAf

"I

IJ")

ACTIVE LAYER

t

SHEET 18

22' MINIMUM INTO PERMA FROST

rARIES 52'Mir TO 72'MAX TYPICAL ROAD SECTION WITH PIPE TRAN 32.00

ROAD WIDTH WINTER CONSTRUCTION GRADEFINAL GRADE CNO CROWN>

2Q' 0 20' 40' 5X VERTICAL EXAGERATION

LEGEND EXISTING GROUND PROPOSED GRADE WINTER CONSTRUCTION GRADE

ROADWAY SHOULDER MARKER AT 50' TO 75'CENTERS UNLESS NOTED OTHERWISE (TYP BOTH SIDES l

-'C--

- - - - - - ....... -

REFERENCE FILES SHEET CED-DS2S-3010 PERMITTING PLAN SHEET CED-DS2S-3021 PIPE CROSSING ACCESS PAD

TYPICAL ROAD SECTION I VARIES 52'MIN I ~TO 72'MAX ~

EXISTING GROUND

~~----· '~

URS

-- - - ---

20'

0

20'

40'

5X VERTICAL EXAGERATION

.WAI

...._[t SHARK TOOTH DRILL SJTE DS-ZS

ROAD TYPICAL SECT IQNS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 22 of 34

AIL ACCESS ROAD LINE EDGE OF ROAD 20'

-- - - ---

PIPE LINE

SHEET 19

LEGEND -· · TOE OF FILL -.. EDGE OF ROAD -GRAVEL

)7

SLOPE INDICATOR

REFERENCE FILES SHEET CED-DS2S-3010

PER~ITING

PLAN

ELEVATIONS DATUM BRITISH PETROLEUM

~EAN

SEA LEVEL

URS 24H DIA CULVERT SEE DETAIL SHET CED-D525-3019

SHARK TOOTH DRILL SJTE DS-ZS PI PE CROSS I MG ACCESS PAD

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 23 of 34

FINAL GRADE TOP OF ROAD WINTER CONSTRUCTION GRADE STEEL CASING IPE

l

------ ----

FINAL GRADE ACCESS ROAD WINTER CONSTRUCTION GRADE

1-32' 4' MINIMUM

---i 1.5'1 2 I

-----------

"\

11

SHEET 20

1. 5'

......

____ _

'MA~ EXISTING GROUND

\._ 6" RIGID INSULATION 6" ~IN FILL BETWEEN INSULATION AND EXISTING GROUND AND BETWEEN INSULATION AND PIPE CASING

ROAD CROSSING SECTION

ROAD CROSSING SECTION ALONG TARN PIPELINE AT ACCESS ROAD CROSSING NTS

ALONG ROAD CENTER LINE AT CROSSING OF TARN PIPELINE NTS

LEGEND --- EXISTING GROUND - PROPOSED GRADE -- WINTER CONSTRUCTION GRADE

REFERENCE FILES

SHEET CED-DS2S-3011 DRILL PAD FOOTPRINT

MATERIAL PIPE CASING 20"

LF 24 LF 30 LF 36 LF INSULATION BOARD 1,050 SF 11 11

11

11

6

68 68 68 68

URS SHARK TOOTH DR ILL SITE DS-25 TYPICAL PIPE CROSS SECTIONS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 24 of 34

LEGEND EXISTING GROUND PROPOSED GRADE EXISTING GROUND

-

PROPOSED CULVERT

llll!o.'lll

EARTH

-

GRAVEL

24· I STRUCTURAL STEEL

PIPE CULVERT

TYPICAL CULVERT BATTERY SECTION N.T.S.

SHEET 21

REFERENCE FILES SHEET SHEET SHEET SHEET SHEET

CED-DS2S-~Ot0

CED-DS2S-JOil CED-DS2S-3014 CED-DS2S-JOI 5 CED-DS2S-JOI6

PERMITTING PLAN ACCESS ROAD PLAN PRIJ' ILE ACCESS ROAD PLAN PRIJ' ILE ACCESS ROAD PLAN PRIJ' ILE ROAD TYPICAL SECTIONS

NOTE:

.r

TYPE AND EX TENT OF ARIIIR AND OR SCOUR PROlECTI ON , IF ANY. FOR EACH CROSSING WILL BE DETEYINEO DURINC FINAL DESIGN.

---32'-----t

MATERIALS: 24·1 STEEL PIPE Cl.lVERT 734 LF I I 1 CULVERTS I

ROAD

-CIIIIPACT GRAVEL FILL AS REWIRED TO PROVIDE UNI FORII GRADE VARIES TOE TO TOE 60'MIN to 70'11AX

t----------------

URS

SCOUR PROTECTION AS NEEDED

TYPICAL CULVERT PROFILE N.T.S.

AILU

-..t: SHARl TOOTH TYP I CAL CLJ..VERT CROSS SECT IIWS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 25 of 34

VSM OFF PAD OFFPAD 12" DIA VOL SLURRY

EA

ON PAD ON PAD 12" DIA

112

EA

ON PAD 18" DIA

53

EA

7

EA

ON PAD 24" DIA VOL SLURRY

SHEET 22

298

16578 CU FT

13423 CU FT

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 26 of 34

XXX-XXXX-3:3 :oN

S6~0-G"~

0000 :oN sor sns

~NIMV~a

:aN sor

MATERIAL LIST

cfY

2

'Ol

//,;;Y

SHEET 23

;

v~~~~~

~

; 21 4'-10"±

0

LEFT BRACE SHOWN

QUAN.

DESCRIPTION

1A 2 3 4A 4B 5A 6A 8 18 20B 21A 22A 30 31 32 34 35 36 38 42 43 45 61 62 63 88 89 92 116

1 1 1 2 2 1 4 17 in. ± 1 1 2 1 3 3 4 2 1 1 3

60 ft. CLASS H-2 DOUGLAS FIR POLE 4-5/8 x 7-1/2 DOUGLAS FIR CROSSARM ASSEMBLY DOUGLAS FIR FACE MOUNTING BRACE 30 ODD lb. POLYMER SUSPENSION INSULATOR 37 36 000 lb. POLYMER SUSPENSION INSULATOR 38 SHIELD WIRE SUPPORT BRACKET ARMOR-GRIP SUSPENSION 5/8 BRAIDED TINNED COPPER BONDING CABLE V STRING YOKE Y CLEVIS EYE SOCKET EYE CLEVIS EYE 4 x 6 3/4 CROSSARM GAIN 4 x 4 x 1/4 SQUARE WASHER 13/16 HOLE 4 x 4 x 1/4 SQUARE CURVED WASHER 13/16 HOLE 3 4 x 20 MACHINE BOLT WITH NUT 3 4 x 18 MACHINE BOLT ~TH NUT 3 4 x 16 MACHINE BOLT ~TH NUT 3 4 x 9-1/2 W.H. BOLT WITIH 3 TAPPED WASHER 3 4 NUT 3 4 JAM NUT 3 4 BONDING CLIP No. 6 AWG SOLID SDB COPPER WIRE 1/2 x 2 COPPERWELD STAPLE SOLDERLESS CONNECTOR IDENTIFICATION PLATIE NAIL 3 LONG x 10D COPPER BUTT PLATE VIBRATION DAMPER

5 7 5 100 ft. ± 100± 2 1 6 1 8

CATALOG NO.

REMARKS

HUGHES C4436-1A-C4436-1B-C4436-1C HUGHES 2017EB48LRT HUBBELL/0.8. D12004-1201 HUB8ELL/0.8. D12004-1202 HUGHES 1501.7A 16 BCL PREFORMED AGS-5115 BELDON 8655 CONTINENTAL 99337 4001 PREFORMED YC 5207 PREFORMED SE-5152 PREFORMED CE 5261 HUGHES 1261 A HUGHES SW4 70 HUGHES SCW4-70

HUGHES WB79-1/2-4

LEFT OR RIGHT

A 320 GRADE L7 A 320 GRADE L7 A 320 GRADE L7

& SW3-70T

A 320 GRADE L7 A 320 GRADE L7 HUGHES 2727.7 SOUTH~RE ASTM B 3 CHANCE 9169 BLACKBURN 4H SOUTHWESTERN PORCELAIN

NOT NOT NOT NOT

BLACKBURN GP114 ALCOA 1705.11

SHOWN SHOWN SHOWN SHOWN

CROSSARM TO POLE CONNECTION TYPICAL (3) PLACES

~0~

~~---~~=----~

ITEM

NOTES: 1. BOLTS THAT MUST BE CUT OFF TO SHORTEN MUST BE CUT ALL THE WAY TIHROUGH WITH A HACKSAW (NOT BE CUT PARTIALLY AND BROKEN OFF). EXPOSED ENDS OF CUT BOLTS SHALL BE PAINTED WITH ZINC RICH PAINT.

6A

"""~~~

2.

ALL HOLES IN POLES SHALL BE DRILLED PRIOR TO TREATMENT. POLES SHALL MEET RUS SPECIFICATION #1728F-700. POLE SUPPLIER SHALL VERIFY POLE DIAMETIER DOES NOT EXCEED SPECIFIED BOLT LENGTHS.

3.

ALL MACHINE BOLTS TO HAVE A 6" MINIMUM TIHREAD LENGTH.

32X36X43)

~~~

b

I

I

;,

?

~~ ~ -1- --1;;;~----------------L.. '

1

FW

0~

\

6 6'-6 1/2"±

I

rFIRST CROSSARM TO FACE STARTING DEADEND

1A ( I

l

'

l

)

'

I

l

J

'

l

I

'

J

\

'

'

c

( I

)

( I

'

I

l

I

'

l

I

l

I

'

I

'

I

I

\

I

I

'

J

''

p

I

c

I

I I

ConocriP'hillips

CROSSARM FACING PLAN TYPICAL

Alaska, Inc.

--rl~

BUTT~-~~

t;;;;\ TO POLE ~SEE DRAWING No. EE-XXXX-XXX

XX

I IDENTIFICATION PLATE TO BE 8'-0" FROM GROUND LEVEL AND AT RIGHT ANGLE TO LINE.

MODULE: XXXX

UNIT: XX

SHARKS TOOTH POWERLINE 34.5 kV OVERHEAD STRUCTURE ASSEMBLY TYPE I(A) TANGENT STRUCTURE

... r!J)~

fI ~ #nc.

CONSULTING ENGINEERS

REDRAWN FROM:

CONSTRUC;ON SHEET

1 - - - - - - - - - - - - - - - - - - - - - - . . . L . . __ _ _= - - - - - t

FORM: DBORD REFERENCE DWG NO/SHT NO:

'

1

2

I 1 · DO NOT SCALE

I

DATE:

07-27-2012

3

GSG

CHECKED:

SCALE: APPROVAL:

1:20 I--RE-V-r-D-ATE--I--------------------R-E~-S-IO-NS---------------------+--BY--+-C-H-K-+-~~~~n-rct~~8~~-+-~~~~~T-+-RE-V-r-D-ATE--r-------------------R-E~-S-IO-NS---------------------+--BY--+-C-H-K-+-~~O~n-rct~~8~~-+-~~~~T~

JOB NO:

12-0195

SUB JOB NO:

0000

4

5

I I I ABOVE SCALE FOR REFERENCE ONLY DRAWN: DESIGN: ECM NO:

KDH

JSA

CC NO:

6

I

·

-

FILE NO.River POA-2012-922,CADD Miluveach ConocoPhillips - DS-2S TYPE-1A DRAI'f1NG NO: Drawings datedPART: February 8, 2013 REV: EE-XXXX-XXX 01 OF 01 Sheet 27 of 34

TYPE V(M2) 541'12 WOOD 3- POLE DEAD END

,___

__,t_L SlliUcnJRE. TYPICAL

I...

·I ··. I . . .~-·-~- ~

· a .. ., .. ,i ~:.~· ·- ~~ .. ~~-

""''ii~:~.~~~~~~~~!!!!~!!~!!~~~!!~t-. ~· ,.:-:'" :..~ ..........""m· ·-.. l!lil!ti~ ~1~!!~~~~~~~~!!~~~:.,.. Ill

~

":, ":,

i

":,

"'

./

34.5 kV POWER CABLE 3/c, 4111 or 500 MCM COPPER WIT1i CDHT1NUOUS CORROGAT£0 ALUMINUM SHEATH AND P.C.V. OUTER JACKET AND ARMOR F.O. CABLE TO BE DIRECT BURIED 4 FT. MINIMUM BELOW GRADE

150' MINIMUM

150' MINIMUM

1

I

I

REV

DATE

REVISION

BY

Ql(

Jill

jAmJ

ECM 1«11

CI£CKfllo

AI'PRIIVAU

cc

SCALEa

OAT&

CADOFI~

SHEET 24A

_,_

~I lips

NCh

=1'-8"

i

1

I

URS DESIGit

!IllI ! 'f'

I

DAAIINa

./ ./

.... FIH4o BSIZE

AREA

AICIIICG. InD.

JOB NOo

I SIB

Jill NOo

IDRAIIIIG

NOo

MODULE:

UNIT:

POWERLINE ROAD CROSSING

POA-2012-922, Miluveach River IPARTo IREV' OF SK-17-001 ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 28 of 34

"I

8" MIN.

.... ,E3-II,._.,IE3111E3-1~_,1Ej3~11-E3111E'"'-III_..,..I........;~

;....,.m..,.,...m'·"'...,.,....,~..,..:61l..,.,EI:I:~.....,..IE='III~ .... ,I. . . . ,.~:; tiF'I I,. .F

··~~IFIIF' ':II~~

~.w.-j=ll6lJ~iWIF"'

~~~

·0

I

O-

-:.,.

~l__ ii

~

I

j

3" 0.0. USED DRILL STEEL

1.J.

USE IN ROADWAY AND DRILL PAD ONLY

m

FIBER OPnc CABLE

&

j_--------~~~~~om:~F"Lt__ POWER ~r

CABLE

::::w:=''

DIRECT BURIAL OF METAL CLAD CABLE AT ROAD CROSSINGS & DRILL PADS

UBS DRMINl

A£V

DATE

REVISION

BY

Cit(

JIB

,..,

DESIIJI:

_,_

EI:M 1111

D£CIC£Dl

APPRIIV~

CCIIII

SCAl.EI

DAm

CMIDFI~

=1'....

SHEET 24B

canocGPtutlips JOB NO·

I

SIB JIB 1101

... FIJIHI BSIZE

AREA

MOOULE1

UNIT:

DIRECT BURIED CABLE AIGIICG. Ina.POA-2012-922, Miluveach River IPART1 DRAIIING HOa REV' IF

I

ConocoPhillips - DS-2S I SK-17-002 Drawings dated February 8, 2013 Sheet 29 of 34

REV

DATE

CK

BY

I

APP

I

I

DESCRIPTION

REV

I

N

DATE

CK

BY

I I

I

APP

I

DESCRIPTION

I

I

THIS PROJECT IS LOCATED WITHIN THE: 1. HARRISON BAY (A-1) QUADRANGLE 2. BEECHEY POINT (A-5) QUADRANGLE 3. BEECHEY POINT (B-5) QUADRANGLE

LAGOON SIMpsON

OLIKTOK POINT

·~

£',,

K

-

~

7'1:;:::: 12

11

-

BAY

17

riA 20

RRisoN

18

1:fl="'

ww 0\

co

21

2«

29

26

0:: 19

20

30

29

2

p.\

\'~, -

15

21,

0

f-32

33

34

T13N .> T12N

J'\

I

~

4

3

2

1

6

5

4

8

9

10

11

12

7

8

9

3

~~~

35

34

27

~

~~1o

11

15

20

14

21

29

13

23

28

24

27

25

--- ---

\ 32

33

34

18c:>

~

16

2 0'\';:

19

30

15

26

32

34

33

35

~9

25

30

36

31

3

/

1

2

5

-

_4_--

3

2

9

11

10

9

10

11

~\1 2 )

<)

15

16

13

/

' 8

7

--17

29 /

6

18

17

16

15

7

21

29

28

22

23

26

~

18

13

I PROPOSED ICE ROADS/PADS ~~ \l ~ j) 25

30

29

\

: 32

3:)_ --

TllN ,' TlON --'

"

: 4

3

31

2

17

16

: \ 21

10

15

22~

36

I

__. /

.,__.- f-( g

0

34

11

-

14

~

23

~

12

~

31

28

;£

32

27

~~ 8

""""

~

-~ ~ ) ~ ~ "''If

ww 24 ~ ~ 19

25

26

I-= 31 lr

---~ ~

2

15

~ DS2K ~ 6

~

21

18

14

13

22

23

19 24 ~ 0\ c::

AREA:

ConocriPhillips Alaska, Inc. I LK6219D5 9/11/12

CADD FILE NO.

rr

DRAWING NO.

SHEET 25

~ CP~ 1~

~

30

29

31

32

'l

0:

0::

1

6

5

4

12

7;-

8

9

_:_

28

27

~

34

~;;

10

w

~

~ 33

....

20

21

21

20

~

~ d!:d

28

29

llj

31

2

J1

33

32

I

~1

)7

18

24

19

~5

30

23

~

35

15

4

CP F]__,

'

)

--

F\ ~

16 ~ ffil,

~

34

10

1 ~5

MINE SITE -(

12

13

14

,~ 26

3

/

I

it,

~

__.../

27

..............

16

li

30 \

25

35

3

CPF2

17

19

17

=~

~~

9

\

16

18

~ '',

9

5

24

CJ

4

16

~

-

13 ___

14

2

8

12

w

20

20\

31

36

1

3

/ 9 \ 0/ ~

~

19

r

rs""- --.J

/

0 .....

36 w

35

~'l:l

'

/

20

32

I /a

\)

14

(},

;;:::? ~ [[}...._

1

,.___

8

-

10

~

16

'--

-

-

-----

20

w

2

3

9

17

18

L4

\_ 4

8

~

__

35

T12N TUN

"

7

13

_.JL~

4

19

~

~"

14

27

28

5

6

1i

~ /"..-=---.--...

29

1

25

:;/

~ ~~

32

\

C:,l 17

0-

36

31

f--J

23

2

28

---i?:r-::=

- -l8 --

14

~ -

-

_,_ 13 ___

(~

21

20

\ 29

I

~ ~:A

2

28

33

6

5

4

w 0,...., 7

8

9

1

r---......J 12 w

11

~

0::

~ lieLOUNSBURY ASSOCIATES, INC. S'EYORS

ENGINEE RS

P LANNERS

22

MODULE: XXXX

UNIT:

DS2S DEVELOPMENT PROJECT POA-2012-922, 2013-2014 PROPOSED ICE ROADSMiluveach & PADS River ConocoPhillips DS-2S VICINITY MAP Drawings PART: dated February REV:8, 2013 NSK 6.219-d5 Sheet 30 of 34 1 OF 2 0

I

I

ii" ·:\~

'v

SHEET 26 (~

r/0· c·'>

'-\·

.-SO' WIDPICE

'·."'

ROAD >~

--tiAuL& PRmEcr .AlceEss . LENG,1H1= 89,250' \~·~

14,000

;;f

I

" ~ LOUNSBURY

It .AIIIIIICUIIII, IIIC.

S'VEYORS

ENGINEERS

PLANNERS

r~ORM: As1zel -3L- T1tle

APPROVAL: DAlE:

09/11 /2012

DS2S DEVELOPMENT PROJECT 2013-2014 PROPOSED ICE ROADS &: PADS PERMIT EXHIBIT POA-2012-922, Miluveach River REV: ConocoPhillips 2 OF 2- DS-2S 0 Drawings dated February 8, 2013 Sheet 31 of 34

REV

DATE

CK

BY

I

APP

I

DESCRIPTION

I

REV

I

N

DATE

CK

BY

I I

I

APP

I

DESCRIPTION

I

I

ITHIS PROJECT IS LOCATED WITHIN THE HARRISON BAY (A-1) QUADRANGLE I LAGOON SIMpsON

OLIKTOK POINT

·~

£',,

K

-

7'1:;:::: 12

11

-

BAY

17

riA 20

RRisoN

18

1:fl="'

ww 0\

co

21

2«

29

26

0:: 19

20

30

29

2

p.\

\'~, -

15

21,

0

f-32

33

34

T13N .> T12N

J'\

I

~

4

3

2

1

6

5

4

8

9

10

11

12

7

8

9

3

~~~

35

34

15

20

14

21

29

13

23

28

18c:>

~

~~1o

11

25

15

26

4

8

9

~ 17

18

L4

~9

25

30

33

34

35

34

33

35

36

31

\_

T12N TUN

'--

"

4

3

1

2

5

----

,.___

8

9

11

10

-

_4_--

3

2

9

10

11

29 /

13

6

' 8

7

~\1 2 )

<)

15

16

---- 32

[[}...._

1

--17

-

-

-

-----

18

17

19

20

16

15

14

7

I /a ~

\)

18

13

21

22

1',

23

24

\l ~ 22 23 j) 4:r:j~r

21

PROPOSED ICE ROADS/PADS

-

29

28

25

' 27

30

: 32

3:)_ --

TllN : TlON --'

"

: 4

3

31

17

16

: \ 21

10

15

22~

~

\

2

I

__. /

.,__.- f-( g

0

34

11

-

14

~

23

~

31

13_

32

y v;1

12

~

~

~~

28

29

2\

J

......~

""""

~

1) 4

9

/

25

26

I-= 31 lr

~

19

---~ ~

2

10

11

~

_:_

28

27

~

34

4

9

rr

1

6

12

16

16

15

18

14

13

23

19 24 ~ 0\ c::

w

20

21

22

ConocriPhillips Alaska, Inc. I LK6219D6 9/11/12

DRAWING NO.

32

'l

1

6

5

4

12

7;-

8

9

0:

~;;

~

24

\

w

19

21

20

~

~ d!:d

10

~

2

28

29

llj 33

32

J1

/

I

12

4

CP F]__,

8/ ~1

7

)7

18

13

--

F\ ~

16 1..,

ffil,

~

~

(~

20

21

30

29

28

31

32

33

6

5

4

7

8

9

24

19

~5 f t6

23

\

34

35

5

4

3

2

1

8

9

10

11

12 w

15

1 ~5

MINE SITE C

__.../

14

'

it,

~

33

21

li

31

35

3

2

20

17

30 \

25

,~ 26

16

16

18

~ '',

CPF2

17

-

13 ___

14

=~

~~ ~

~'l:l

CJ

~ }

ww 24 ~ ~ 19

35

~

~

Xs ~

0 31 .... ~ 0::

36 w

27

31

36

AREA:

CADD FILE NO.

20\

r

3

~ CP~ 1~

'

/

20

(},

;;:::? ~

'--

32

10

~

16

__

32

29

w

2

3

30

~ 7

13

_.JL~

27

28

5

6

~"

14

~ ..-=---.--...

29

1

1i

::.----

30

--- ---

16

2 0'\';:

19

24

27

~

~ ~~

32

\

C:,l 17

0-

36

31

20

25

:;/

---i?:r-::=

19

f--J

23

2

27

28

~

- -l8 --

14

~ -

-

_,_ 13 ___

w 0

.-1

0::

~ lieLOUNSBURY ASSOCIATES, INC. S'EYORS

ENGINEE RS

P LANNERS

22

MODULE: XXXX

UNIT:

DS2S DEVELOPMENT PROJECT POA-2012-922, Miluveach River 2014-2015 PROPOSED ICE ROADS & PADS ConocoPhillips DS-2S VICINITY MAP Drawings dated 8, 2013 PART: FebruaryREV: NSK 6.219-d6 Sheet 32 of 34 1 OF 2 0

I

I

3

N

s,"

1

2

/

A

;

/

.._" - -- -

~~~

,;

11

10

12 / /

I

,;

4

2

3

TOTAL AREA OF PROPOSED ICE: :=949,250 Sq. R.

"

8

7

I

...

... - --- - ... - 5

/

=21.8Acres

11

"

"'

0

I

15

14

-

I /

13

18

17

16

15

14

24

19

20

21

22

23

./

,

/

/ (

I I

I

22

23

I

/

I /

,

,

,

IJ2·

./

/ 27

25

26

30

28

29

27

"J

I

g:

I I

~~ ~

-

~e:l.

I

34

31

31

36 T.11N.R.7£ T.10N.R.7£

3

2

1

.r-

-

h..

- 10

-

PAD CENTROID NAD83 GEOGRAPHIC: 7f1" 13' 10.94" N 150° 09' 13.99" w

~

~

11 12 I~SNOW JS'WIDE ICE ROAD ~ FENCE INSTALLATION LENGTH = 1 200

35' WIDE ICE ROAD

r-w-EmsTAUA~ I..&IGTH = 2.500' 14

15

13 1150X100' ICE PAD

,

t'"--('

_,.,.,. _.,. ,.....

~

/ ~

_.

T.11N.R.BE.

~[t

~~

Alaska, Inc. CADD Fll.E NO.

12/21/12

I--..-

I

I

DRAWING NO.

60' WIDE ICE ROAD

AREA:

·I

9

10

11

15

14

rit=:ol

\)!>...

35' WIDE ICE ROAD

20

2

3

PJPB.INE CONSTRUCTlON LENGTH= 7,200

{TYP)

16

SCALE

~ ~lmile 0

~I

SNOW FENCE INSTALLATION LENGTH = 1 f!l#

19

24

eonoc6Pt,nnps LJ(621909

v

IPOWERI..lNE 3S WIDE I( ROAD INSTAI..I.ATION

23

4

//

i f

31

~

~~~I)

LENGTH = 9.()50'

22

if

32

21

1/2

1

~UNSBURY

ASSOCIATIS, INC.

'

MODULE: XXXX

- - fUNNII8

UNIT:

DS2S DEVELOPMENT PROJECT POA-2012-922, Miluveach River 2014-2015 PROPOSED ICE ROADS & PADS ConocoPhillips PERMIT EXHIBIT - DS-2S Drawings dated PART:February 8, REV:2013 NSK 6.219-d9Sheet 33 of 34 10F'1 0

I

I

POA-2 Conoc Drawin Sheet

t

EJAPIIIATIR

~El.l I

I

Il.n::J.'!:==:n=:::l!rl:;::::::==ri:===il

r l'~fi~ 1: I

. NlE/1:

-~--·

..·.····.

SHEET 29

·--· ~

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

February 15, 2013

EXPIRATION DATE:

March 18, 2013

REFERENCE NUMBER:

POA-2012-922

WATERWAY:

Miluveach River

Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Mary Romero at (907) 7532773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.

APPLICANT: ConocoPhillips Alaska, Inc. (CPAI), PO Box 100360, Anchorage, Alaska, 99510-0360, Tom Manson, (907) 263-4627 LOCATION: The project site is located within Sections 1, 7, 8, 10-12, 14-18, 20, & 21, T. 10 N., R. 8 E.; and Section 13, T. 10 N., R. 7 E., Umiat Meridian; USGS Quad Map Harrison A-3; Latitude 70.219706º N., Longitude 150.153886º W.; in the southwest Kuparuk River Unit; 20 miles east of Nuiqsut, and 42 miles west of Prudhoe Bay, Alaska. PURPOSE: The applicant's stated purpose is to construct a new drill site and access road for the continued development of the Kuparuk oil reserves to provide sales quality crude oil for shipment through the Trans-Alaska Pipeline. PROPOSED WORK: CPAI proposes to place 296,054 cubic yards of gravel fill material into 20.5 acres of jurisdictional wetlands for the construction of a new drill site with 24 wells, a gravel access road, pipelines, fiber optic cable and other communications equipment and power line. All work would be performed in accordance with the enclosed plan (sheets 1-34), dated February 8, 2013. ADDITIONAL INFORMATION: The DS-2S Project is located in the southwest area of the Kuparuk River Unit. Development of the KRU began in the early 1980's and the DS-2S Project will be a continuation of the field's development. In the late 1980's CPAI (then ARCO) drilled an exploratory well (KRU-21-10-8) in the project area and in

early 2012 an appraisal well was drilled by CPAI to confirm the DS-2S project assumptions. The well was logged and core samples were collected. The location of the proposed DS-2S Project will allow the development to use much of the existing infrastructure of the Kuparuk oil field. Prior to proposing the current DS-2S project, CPAI investigated the option of developing this area of the Kuparuk reservoir from existing drill sites in the project area. Drill sites DS-2L, DS-2M, and DS-2K were examined as possible locations for the additional wells. It was determined that the reach of the current drilling technology would not allow for wells from these locations to extend far enough to adequately develop this area of the reservoir. Additionally, there currently are no slots available on these drill sites for the new wells. The project will require several ice roads to support construction of the drill site pad and access road during the first winter season (2013-2014) and for the construction of the pipelines, power lines, and snow fences during the second winter construction season (2014-2015). During the first winter two ice roads would be built to support construction, one to access the mine site the other to the project site. During the second winter season four ice roads would be constructed one each to the construction of the pipelines and power lines and two others with turnarounds for the construction of snow fences. The ice roads would be scraped clean after they are no longer needed and allowed to melt with the spring thaw. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: The optimum location for accessing the oil reservoir placed the drill site pad approximately 1,000 feet south-southeast of the proposed location. In order to avoid having the access road cross a small unnamed stream between the pad and the Tarn Road, and the need to construct a stream crossing structure or bridge, the proposed drill site was moved approximately 1,000 feet closer to the Tarn Road. This change also avoided the additional 1,000 feet of gravel roadway. b. Minimization: The DS-2s development project design minimized impacts to waters and wetlands limiting the gravel fill discharge by using a 30 foot well spacing and increasing the slide slope design along the edges of the drill site pad and roadway. The project components have been positioned to avoid stream crossings, incorporated direct (shortest) routes to the existing field infrastructure for the access road, pipeline, and power lines thereby reducing potential gravel placement and tundra wetland impacts. The size of the gravel drill site pad was selected by CPAI to be the minimum size necessary for safe operation through optimizing facility design and equipment layouts. The gravel pad will have a minimum thickness of five feet to maintain the integrity of the underlying permafrost. The proposed development will use the existing Kuparuk infrastructure of the Tarn Road, Meltwater Pipeline, and Kuparuk field power supply minimizing the amount of new infrastructure to develop this area of the Kuparuk oil field. Additionally a proposed on site gravel pit has been eliminated from the proposed action; the original plan involved the development of a gravel pit where Conoco would have mechanically land cleared another 16.2 acres of jurisdictional -2-

wetlands for a mine site to source the materials needed for the project and utilizing an additional 29.4 acres of jurisdictional wetlands temporarily by setting up an ice pad for stockpiling organics and overburden. The elimination of the gravel pit minimized the jurisdictional wetland impacts by 45.6 acres. c. Compensatory Mitigation: CPAI proposes in-lieu fees as a means of compensatory mitigation for the unavoidable impacts to waters of the U.S. resulting from this project WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There are no listed or eligible properties in the vicinity of the worksite. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time, and he is otherwise unaware of the presence of such resources. This application is being coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: The project area is within the known or historic range of the Polar Bear (Ursus maritimus), Spectacled eider (Somateria fischeri), and Candidate for Listing species Yellow-billed loon (Gavia adamsii). We have determined the described activity may affect the Polar Bear (Ursus maritimus), Spectacled eider (Somateria fischeri), and Candidate for Listing species Yellow-billed loon (Gavia adamsii). We have initiated the appropriate consultation procedures under section 7 of the Endangered Species Act with the U.S. Fish and Wildlife Service. Any comments they may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING:

Any person may request, in writing, within the comment period -3-

specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY: This permit will be issued or denied under the following authority: (X) Discharge dredged or fill material into waters of the United States ­ Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230). Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures -4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-922, Miluveach River, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

SHEET 1 LOCATION· NORTH SLOPE ALASKA NOTE: THESE MAPS ARE BASED ON ESRI IWAGERY

SITE-D8-2S

PROJECT LOCATION: WELL N0.1 DATUM ALASKA STATE PLANE NAD 83 ZONE 4 FIPS 5004 COORDINATE LAT. 70'13'1Q.94N LONG. 150·09 13,99·

N. 5.929.785.73

E. 1.621.342.25

URS

....

SHARK TOOTH OR ILL SITE OS -2S CIVIL PACKAGE COVER SHEET

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 1 of 34

Ü

Oliktok Pt.

Alpine

c vea

Col

lu Mi

v i l le

Riv e

r-

Ku uk

pi

k

CPF2

DS2M

hR iver

Nuiqsut

DS2L

Meltwater DS2P

DS2S

DS2K

DS2S Development Pad

POA-2012-922, Miluveach River 2.5 5 ConocoPhillips0 - DS-2S Miles Drawings dated February 8, 2013 November 1, 2012 Sheet 2 of 34

SHEET 2

"1

TOF 1?S1' 2N

KUPARUK OILAELO

F PI'ERAC SHT 1

DRILL SITE PLOT PLAN "nntll c

I

E~ERGY

r TABLE NOTES:

·01-<1

1.NI*tw. MRONG EI.EVATKW RP CF IRLl PAD IS

100'-11'.

1PREYAIJNG IMNlS ME N'PROlGYAlE AND BASED DN CRT-GA-NH0002 GENERAL 91E CC1011DNS IESIGN CRITERIA REV. 4. a>~

'~T

SPOGS ARE BASED

m. PRELMNARY

OCOJP~ ~~TD

~PAD

--

& CCfiSTRUC]Cit

\..OI'ouo..u~ I~~::=~~ ....,._

SHARK TOOlH DRILL SITE DS2S PIPING DRILL SITE PLOT PLAN

AtiJ

FIR TRUll< IN.OAiliNG NI£A.

""''"

SHEET 3

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 3 of 34

In~

... -

NO MATCHUNE CONTINUATION

----------

--

--

----------

TOE OF PAD

1

l

l

EDGE OF PAD

1

1

....; f"--12.2539191'

PREVAIUNG WNDS SUMUER

~NTm

r\\ORKING PAD EL 100'-0'J

r CD

v

nN m

WN

0

f--

NOTES: 1.N

1

r

2.PREVAILING WINDS ARE APPROXIMATE AND BASED ON CPAI CRT-GA-NS-80002 GENERAL SITE CONDillONS DESIGN

CRITERIA REV. 4. J.EOOIPMENT SPACINGS ARE BASED ON PRELIMINARY REVIEW FOR ELICTRICAL CLASSIFICATION AND OCCUPANCY REQUIREMENTS.

OVERALL PAD LENGTH IS 1200'

URS ConocriP'hillips

NO MATCHUNE CONTINUATION

Alaska Inc. Nl:£k.

MOOUL.E:

-

-

UNIT:

-

SHARK TOOTH DRILL SITE DS2S GENERAL ARRANGWENT EQUIPt.4ENT / MODULES WEST

,., -.. --- -" - -·· ·-Miluveach River - ,... , . POA-2012-922, .. "'""""

IEFEIIENCE .... HO{IlfTII>

""""flelt.E"".....,_..._,

10/16/12

--

A 10 6 2 ISSUED FOR PERt.IITllNG

SHEET 4

1"-JO'

ES

AMD

-2'9922

-

rr

1-0'36 SK'" 16

-~-

047 A

ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 4 of 34

I'~\

S.0-9HIS

I

9£0

ne6?:

I

.,._I .,._ .... I

I

·-1

. TABLE NO MATCHLINE CONllNUAllON

---------

--

--

----------

I

I

~I ~I

~~ ~~

1'f

TOE OF PAD

1

15

",z 1 __,

1

1

WELL NO. 01

~~~~~tJg_7J

1:

~,";Lil~",',f.) :··T··---r-·· · TON 175 1

~~~~C~JALVE

" ~]n"''_' rb

IlLliS ~ :;p hl-' :.!-'

EL ',_,!_rna,. _a

-----------~: 175 TON

..,!

DRill RIG

DRILl RIG

~~

:

~~ ~~ ~ ~ ~ ~~ 100' MAST UGHTlNG-.....

I "v

j

~~~I ~ L__t ~ t 1--t l.

!

PREV.o.JUNG 'MNDS

1'<1NTER

I

I

ti

DRILl RIG POWER

+--~

0 DRIP PAD ~'I~~

j

.fzs'-o"

100' MAST\ UGHTlNG

+

~~ ~

"" VM.VE HouSE'--m v(o SHELlER 10'x12'x12' l2'xiOxl2' 1

Jri

~~~

30' 0" WELL SPACING

40'

II · \V ~

· '"''

s ·!'

; l i J+J.,. 40'-0"

~8

' r, 7 \..:....

1

I

[§] [§] 0

D'"'"

1

~

'" 6'

\.V

NQill; 1.NOMINAL WORKING ELEVAllON TOP OF DRILl PAD IS 100'-0". 2.PREVAIUNG WINDS ARE APPROXIMATE AND BASED ON O'AI CRT-GA-NS-80002 GENERAL SITE CONDillONS DESIGN CRITERIA REV. 4. 'J.EOUIPMENT SPACINGS ARE BASED ON PRELIMINARY REVlEW FOR ElECTRICAL AREA CLASSIFICAllON AND OCCUPANCY REQUIREMENTS.

I

STRUCTURE W/ RJSED S'MIDI 0

340'

--NO MATCHLINE CONllNUAllON

\I\Q

~

URS 0 _ __j_

...

-

EJDm i OOII:i!RIIemll, ...

ConocciPhillips

--

Alaska, Inc.

TOE 366

.,......,

SUt.IMER

.-----2"-u

-. · L .. _l__ .. __L_ .. _l_.. ..l ~$D~M

: CLMN a i i i - CLM'-+1!-ll+-.!-IJ:.+-~-~Jl... .! 0 Jo... .!-ll+- 1-· ._ _. 4J 4J 4J 4J 4J 4-JI '-4J 4J 4J I 40'-D'I I

I

j

' ---..1

IL ___________ _j

0

'

®j

PORTABLE PIGGING AREA-.........._ · ~t _.j.

E. 1621342.25

<

a

MODULE~

WORKING PAD EL. 100'-0"

~

~ g

l

PIPERACK BRIDGE

ALASKA STATE PLANE

R .....

'

l

EDGE OF PAD

J

r

'

MODULE:

AREA: -

-

UNIT:

SHARK TOOTH DRILL SITE DS2S GENERAL ARRANGEMENT EQUIPMENT / MODULES EAST

OVERALL PAD LENGTH IS 1200'

...

.. ·--

10/16/12

..

A 10 6

..

·- - -·· ·- Miluveach POA-2012-922, - River I.... 0.36 ""SK ---m,.. , I. . . ""'·""E

~

-

AIII\EICN.EFOIIIEFEIIEIICEIILY

~

·~

-

1"-30'-0"

ISSUED FOR PERt.IITTING

SHEET 5

ES

"

-ConocoPhillips - DS-2S

At.ID

2'9922

DO

16 046 A

Drawings dated February 8, 2013 Sheet 5 of 34

A

SECTION A-A TYPICAL

SHEET 6

CONSTRUCT ION

LOOIUMC M~TH

SEE SHEET CED-DS2S-3011

LEGEND EXISTING

CR~D

PRCfOSEO CRAOE 1JN1EA

C~TRUCrJ~

GRADE

REFERENCE FILES SHEET CED-DS2S-3011 DRILL PAD fODTPR INT

7!j'

0

75'

150'

SCALE SX VERTICAL

URS SECTION B-B TYPICAL LID.INC EAST SEE SHEET CED-0525-3011

SHAAK TOOTH DR ILL SITE DS-25 DRILL PAD T'IP I CAL SECTIONS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 6 of 34

15' HICH SNOW FENCE

LEGEND PRil'OSED SNOW FENCE

SHEET 7

lOE OF FILL EDGE tf' ROAD EDGE tf' PAD

-

GRAVEL SLIJ'E INDIUTOR

"/

ISZJ

SNOW DEPOSITION SHADOW

ERENCE FILES ELEVATIONS DATUM BRITISH PETRil.EUN NEAll SEA LEVEL

MATERIAL GRAYEL fILL DR ILL PAD

TUNDRA F'ODTPR INT DR ILL PAD SNOI FENCE

116.120 9.8 1,380

CU YRD ACRE LF'

URS SHARK TOOTH DR ILL SITE DS-25 DRILL PAD FOOTPRINT

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 7 of 34

15'-0"

!.

ALIGNED WITH THE OPPOSING FENCE

I I

__

'I'

.I

15'- 0"

I

I

,.,_,,, ~

m-,~-:\~

I I

I

I ~

I

;.,

~

f

I

\

i_

~

I

I I I I I I I I

I I

3009-002

J

I I I

GUY CABLE

I

~ in I

6" RAIL (TYP)

\

I I

I

0 u z

7", UNE POST (TYP)

8"- END POST

' WIRE TYP

STA~

I

I

I

\

TURNBUCKLE

\

\ \

I

,._ I

~

0

Cl.

I

,_:

~

*«.v* ""

-~~

~

~

0

z

~,._

TUNDRA

/(~'0<' ~~'l

'<-<~

0

I

~~)\:

f

(I)

0,

I

'b z I ~ 7"- ANCHOR~ b @ POST

"'

Ill :2; UJ

z ::E

VVIBRATED INTO TUNDRA (TYP)

1JRS REV

DATE

REVISION

BY

01(

JOB I'AOJ

DRMINI

llESIGII:

D£CIC£DI

APPNIVAU

cc

SCAlEJ

DATEJ

CI!DO

-

&a.1KII& 1-.

canoc:cl'tullips

NOs Fl~

=1'-8'

SHEET 8

JOB*''

ISIB JOB

AICIMa. I no.

MOo

IIJIAIIING

NDo

FORMIBSIZE

AREA

E04 NOs

MODULE:

UNIT:

SNOW FENCE DETAILS SHT 1

rARTo aF River IREV' POA-2012-922, Miluveach SK-12-001 ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 8 of 34

!.

15'-0" AUGNED WITH THE OPPOSING FENCE

'I'

15'-0"

~I

I ! ~-'"'-~~ CED-D10Y-3009:\~1 I I

I

7"t> UNE POST {TYP)

~"'-""'""'

I

6"(J END POST

I

/

I

~ I

in

I

w 0 z

... w

-..,

A

,. '"' (m-)

\

\

! (

TYP

I

I

GUY CABLE

:I

I

~

I

\

I

TURNBUCKLE

I I I I I

WIRE STA\'--

I \

\

I

I \

TUNDRA

I

."' [

I-V>

"' :r .;_ 0

I

,_:

-

-;....

~

0

z

1--

0 z I ~ b 8

7""

"' ::10 m

ANCHOR:~ POST

w

I V

z

:il

UBS DRA\1111

DESmlt

ECM 1«11

D£tiCEDo

APPRIIVAU

CCNO.

Do\TEa

CMID FlL£JWEI

SCAlL REV

DATE

REVISION

BY

Cll(

JIB

i"RRJ

=1'-8'

SHEET 9

~VIBRATED INTO

TUNDRA {TYP)

_,_

.... FORHI BSIZE

canocxlPtumps AICllllta. lno. JOB NO·

I

SlB JIB NOt

IIIIAVING 1«11

AREA

MODULE:

UNIT:

SNOW FENCE DETAILS SHT 2

POA-2012-922, Miluveach River IPART· IF JREV· SK-12-002 ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 9 of 34

18'-01 r-

r-

r-

u

I "¢ "¢ (f)

I

N

(Y) (f)

(Y) (Y) (f)

N

N

N

::::.£: LL.

SHEET 9

co

I

u o_

I

I ......... 3:

I .........

0-J __.

Co

N

I

I "¢ "¢ (f)

(Y) (f)

N I .........

3:

I

3'-6

o_ ::::.£:

N

c._::)

r-

u

::::.£: LL.

co

I

I

"¢

r-

o_ ::::.£:

o_ ::::.£:

I

0-J __.

co

N

I

u o_

I

"¢

N

3'-5

1

T.O.S. lSI I

__.~----~~--------------------------------------------------------r-~

11

A-A SECTION 11

VSM's INSTALLATION CONFIGURATION (REF. WG SK-16-100)

PURPOSED: INSTALLED VCM' s ASSOCIATED PIPELINES AND UTILITIES. DATUM: ADJACENT PROPERTY OWNERS:

FORM: BSIZE

B

10/10/12

REV I SED

TO REFLECT SCALE

DRAWN:

DESIGN:

ECM NO:

CHECKED:

APPROVAL:

CC NO:

DATE:

CADD FILENAME:

lj..-..:A...:.........j.....:..q;-=21.....:../12~~!S:. . :.S. : . :UE:. . :.D. . .:.F- =.O. . .:. R_P.::...ER__M..:..!T______________--+_C_KE-+-A_D-+--+----1 SCALE: REV DATE REVISION BY CHK JOB PROJ

%'=1'-0'

SK -16-101.DGN

JOB NO:

SUB JOB NO:

DRAWING NO:

AREA MODULE:River UNIT: POA-2012-922, Miluveach SHARKTOOTH ConocoPhillips - DS-2SDRILL SITE DS2S TYPICAL SECTION THRU Drawings dated 8, 2013 OFFFebruary PAD PIPE LINES Sheet 10 of 34 PART: REV:

SK-16-101

1 OF 1

B

ti\r

t'l-~'1·

~ .'It!\ 400' JI"'Sjf

150

150

140

130

AI'PRODIAlE Pl'£lJE lliVA11CN (8'- f FEET ~ EliiS11NC c:RAIIE) 120 EliiSTIIG CRAilE IHIER PI'EI..NE

110

..... !--

-

..... !--

r!"--.

100 30+00

--

-

......... .........

-~ v/ I.-

vv

400'

1100'

lliiMil

NOTES: 1. GRID COORilNATES ARE ALASKA STAlE PIN£ CO

180" RE1\JRN I.OCAlED AT EDGE CE 'lltll. PAD CRAilE

130

I-- I--

v

120

110

100 50+liD

80+W

I!D+DD

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 11 of 34

90' 3D BEND W/TANGENTS TYP. 24 "-PC-2544-BKP7-3 "HF 12 "-WI -2532-FKC7-3 "HF 6"-GI-2533-GKD7-3"HF 12"-WI-2532-FKC7-3"HF 24 "-PC-2544-BKP7-3 "HF

~

~c,_S

,~c,

----

,s""-

,

c,_i-

,.,. c,_\.."

PIPELINE TIE - IN DRAWING PDD-DS2SX-5014

~SEE

NEw

p

lP[LINEs

EXPANSION LOOP DETAIL SCALE: 1/16"=1'-0"

PIPELINE PLAN SCALE: 1"=100'-0" 0

SHEET 11 BY

-

-

-

CHK JOB PROJ

SCALE:

-

Et£RCY & COOTRUCTI [)1, Inc.

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Alaska. Inc. Drawings dated February 8, 2013 NO: _I DRAWING NO: POD DS2SX-5016-A Sheet 12 of- 34

Coonooc~illi~s

-

CAOO e!LENAME:

DATE:

-

URS

CC NO:

APPROVAL:

CHECKED:

I

ECM NO:

-

-

?.00 FT

'

SCALE : , ""'100' - 0"

DESIGN:

DRAWN:

50' 100'

..--

JOB NO: -

J

SUB JD_B

EXPANSION LOOP DETAIL SCALE: 1/16"=1 '-0"

0

50

100'

200FT

SCALE: 1 "=100'-0"

SHEET 12

PIPELINE PLAN 1 SCALE: 1 "=1 00 1 -0'

URS

DRA WN:

DESIGN:

ECM NO:

CHECKED:

APPROVAL:

CC NO:

DATE:

CAOD FILENAME:

1----4-----~---------------------------------t-~~-+--~--~ SCALE: REV DATE REVISION BY CHK JOB PROJ

Ef£RCT t.

CIJ6TROC TI ~.

C@n@C~illi~

Inc .

POA-2012-922, Miluveach River ConocoPhillips - DS-2S A I ask a . I nc. Drawings dated JOB NO: SUB JOB February NO: DRAWING 8, NO:2013 POD -OSZSX So1'1-A Sheet 13 of 34

'

....----

. ......,_

EXPANSION LOOP DETAIL SCALE: 1/16"=1'-o·

o~~s~o·~1~o~oiiii·-~2~oo FT SCALE:

1 "=100'-0"

SHEET 13

URS

PIPELINE PLAN SCALE: 1 " =1oo' -o·

DRAWN:

DESIGN:

-

REVI SION

BY

-

-

-

CHECKED:

-

SCAL E:

CHK JOB PROJ

-

APPROVAL:

-

-

CC NO:

DATE:

POA-2012-922, Miluveach River C@ll@~illi~s ConocoPhillips - DS-2S Inc.

ECM NO:

-

Alaska .

-

CADD FILENAME:

UI:RCY & CIJ4STRUCJICJt, Inc..

JOB NO: -

Drawings datedNO: February 8, 2013 JOI3 NO: IDRAWING I SUB POO -DSZSX -5018-A Sheet 14 of 34

),._ _ 90' 3D BEND WITANGENTS TYP.

\ 1 ,~

\ V1'"- -

52' 3D BEND WIT ANGENTS TYP.

/"

-'

a,

-'

'"

EAST 1141' 0" ---r-----fII~~ NORTH 1026' 8 7/e" if PLANT REF.

Ll"l Ll"l

CI

.'w...

::;;

l-

LL

...... o

t::

OV)

l-

o~

V)

W

~B1

Z

...

-'

w

-'

"-

:::J

APPRDX.415'-0' "1+-"",, ( E""'D:-;; G-;: E --:O""F~ RO""'AC;:D~ TO""""""R-;-AC"'K;-;)--- ~ w z

'" W

a

/" ~

PS-136 .PA- 137

53'-3",

~HORl

PIPELINE PLAN SCALE: 1"- 100'-0"

---

/~

3'-6" !TYP. SPACING)

/

~~jN~~~~Itt~ ,

__r-~T]O~EJO~F~PA~D

a

EDGE OF PAD

N

6"-GI - 2S33-GKD7-3"HF 10"-PC-2S44-BKP7-3"HF 6"-WI - 2S32-FKC7-3"HF CONT. ON DWG. PDD-DS2SX-5020

SHEET 14

o

50' 100'

!.....:.~.

URS

TIE-IN AT DS2S PAD DETAIL SCALE: 1/16"-1' 0" DRAWN:

DESIGN:

ECM NO:

CHECKED:

AP PROVAL:

CC NO:

OA TE:

CADO FILENAME:

____________-1_--+_--1--+----1 SCALE: REVIS!ON

BY

CHK JOB PROJ

£tRCY & CIHiT1!LCTIIII. Inc.

POA-2012-922, Miluveach River

C@n@c~illi~ ConocoPhillips - DS-2S JOB NO:

I

A I aska. Inc. Drawings dated February 8, 2013 I DRAWING NO: Sheet 15 ofPDD-DS2SX-5019-A 34 -

SUB JOB NO:

-- - - ---

SHEET 15A

100'

200

TOE OF FILL EDGE OF' ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT GRAVEL EXISTING GROUND SLOPE INDICATOR

5..... ~----------------------~ i REFERENCE FILES SHEET CED-DS2S-3014 ACCESS ROAD PLAN AND PROFILE

108.200 10.7

73~

480 290

100

URS

50

0-+

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 16 of 34

cu

'II)

ACRE LF LF EA

v

....

0 ,.., I

VI

"'

VI 0 I

loJ 0

v

..... loJ

20+00

loJ

:z:

··-.. i ..~ ··-··-....... ··-··-· ---~

...... -·· -··-·· -··

VI loJ loJ

VI

0

SHEET 15B

62'

~ ....

"'..c

1-

VI

zloJ

..... :I:

v

1-

..c ::IE

-- - - ---

200'

LEGEND

TOE OF FILL EDGE OF ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT .... GRAVEL .... EXISTING GROUND ' SLOPE INDICATOR

REFERENCE FILES

SHEET CEO-DS2S-3014 ACCESS ROAD PLAN & PROFILE

100

URS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 17 of 34

\

f

-- - - ---

0 .-

SHEET 16A

........l.........

~

.o

.i~,.., I . :~

lVI ~

...I

::c

-

·

200'

TOE OF FILL EDGE OF ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT GRAVEL EXISTING GROUND SLOPE INDICATOR

~

Vl.r-------------~--------------~--------------r-------------~--------------~------------~~----~i

:1---+........,......,..,.....,....-+-------+-------+---___;:"r---+-----~~+----=rli~---+---~

NOTE: FOR QUANTITIES SEE SHEET CED-DS2S-3013

SCALE: 5 X VERTICAL SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 3 OF 61

30-+00

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 18 of 34

ll'l

0

or

II)

N

.~

· I

:u ·~

24· DIA. CULVERt

......

-- - - ---

·""' i~ 100'

·-· ·-··-·,..... .......... -. .....

'o1'

SHEET 16B

~

·O

It:?

200'

LEGEND

·o

..·'"'ill'l .l:ii · o.J

·~

...J

-

,

TOE OF' FILL EDGE OF' ROAD MAJOR CONTOUR MINOR CONTOUR WINTER CONSTRUCTION GRADE FINAL DESIGN GRADE EXISTING GROUND CULVERT GRAVEL EXISTING GROUND SLOPE INDICATOR

ERENCE FILES CEili-DS>L'S-·3013 CEili-DS>L'S-·3015

ACCESS ROAD PLAN ACCESS ROAD PLAN

URS

SCALE:

5X VERTICAL

SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 4 OF 61

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 19 of 34

60'

-- - - ---

-~!~J-. -..

100'

100'

200'

SHEET 17A

EGEND

-···TOE OF FILL -···EDGE OF ROAD __.. MAJOR CONTOUR -MINOR CONTOUR - - · WINTER CONSTRUCT ION GRADE -FINAL DESIGN GRADE - · EXISTING GROUND ~CULVERT

GRAVEL .... EXISTING GRADE T SLOPE INDICATOR

REFERENCE FILES

SHEET CED-DS2S-3014 ACCESS ROAD PLAN AND PROFILE

NOTE: FOR QUANTITIES SEE SHEET CED-DS2S-3013

URS SCALE: 5X VERTICAL SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 5 OF 61

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 20 of 34

-- - - ---

100'

0

SHEET 17B

LEGEND -·· · TOE OF FILL -···EDGE OF ROAD ---- MAJOR CONTOUR -MINOR CONTOUR --·WINTER CONSTRUCTION GRADE .... FINAL DESIGN GRADE - · EXISTING GROUND -CULVERT GRAVEL .... EXISTING GRADE Y SLOPE INDICATOR

QUANTITIES SEE SHEET CED-DS2S-3013

URS SCALE: 5X VERTICAL

SHARK TOOTH DRILL SITE DS-25 ACCESS ROAD PLAN Nfl PROf' ILE ISHEEf 6 OF 61

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 21 of 34

PIPELINES

VARIES 500' MIN 1000' MAf

"I

IJ")

ACTIVE LAYER

t

SHEET 18

22' MINIMUM INTO PERMA FROST

rARIES 52'Mir TO 72'MAX TYPICAL ROAD SECTION WITH PIPE TRAN 32.00

ROAD WIDTH WINTER CONSTRUCTION GRADEFINAL GRADE CNO CROWN>

2Q' 0 20' 40' 5X VERTICAL EXAGERATION

LEGEND EXISTING GROUND PROPOSED GRADE WINTER CONSTRUCTION GRADE

ROADWAY SHOULDER MARKER AT 50' TO 75'CENTERS UNLESS NOTED OTHERWISE (TYP BOTH SIDES l

-'C--

- - - - - - ....... -

REFERENCE FILES SHEET CED-DS2S-3010 PERMITTING PLAN SHEET CED-DS2S-3021 PIPE CROSSING ACCESS PAD

TYPICAL ROAD SECTION I VARIES 52'MIN I ~TO 72'MAX ~

EXISTING GROUND

~~----· '~

URS

-- - - ---

20'

0

20'

40'

5X VERTICAL EXAGERATION

.WAI

...._[t SHARK TOOTH DRILL SJTE DS-ZS

ROAD TYPICAL SECT IQNS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 22 of 34

AIL ACCESS ROAD LINE EDGE OF ROAD 20'

-- - - ---

PIPE LINE

SHEET 19

LEGEND -· · TOE OF FILL -.. EDGE OF ROAD -GRAVEL

)7

SLOPE INDICATOR

REFERENCE FILES SHEET CED-DS2S-3010

PER~ITING

PLAN

ELEVATIONS DATUM BRITISH PETROLEUM

~EAN

SEA LEVEL

URS 24H DIA CULVERT SEE DETAIL SHET CED-D525-3019

SHARK TOOTH DRILL SJTE DS-ZS PI PE CROSS I MG ACCESS PAD

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 23 of 34

FINAL GRADE TOP OF ROAD WINTER CONSTRUCTION GRADE STEEL CASING IPE

l

------ ----

FINAL GRADE ACCESS ROAD WINTER CONSTRUCTION GRADE

1-32' 4' MINIMUM

---i 1.5'1 2 I

-----------

"\

11

SHEET 20

1. 5'

......

____ _

'MA~ EXISTING GROUND

\._ 6" RIGID INSULATION 6" ~IN FILL BETWEEN INSULATION AND EXISTING GROUND AND BETWEEN INSULATION AND PIPE CASING

ROAD CROSSING SECTION

ROAD CROSSING SECTION ALONG TARN PIPELINE AT ACCESS ROAD CROSSING NTS

ALONG ROAD CENTER LINE AT CROSSING OF TARN PIPELINE NTS

LEGEND --- EXISTING GROUND - PROPOSED GRADE -- WINTER CONSTRUCTION GRADE

REFERENCE FILES

SHEET CED-DS2S-3011 DRILL PAD FOOTPRINT

MATERIAL PIPE CASING 20"

LF 24 LF 30 LF 36 LF INSULATION BOARD 1,050 SF 11 11

11

11

6

68 68 68 68

URS SHARK TOOTH DR ILL SITE DS-25 TYPICAL PIPE CROSS SECTIONS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 24 of 34

LEGEND EXISTING GROUND PROPOSED GRADE EXISTING GROUND

-

PROPOSED CULVERT

llll!o.'lll

EARTH

-

GRAVEL

24· I STRUCTURAL STEEL

PIPE CULVERT

TYPICAL CULVERT BATTERY SECTION N.T.S.

SHEET 21

REFERENCE FILES SHEET SHEET SHEET SHEET SHEET

CED-DS2S-~Ot0

CED-DS2S-JOil CED-DS2S-3014 CED-DS2S-JOI 5 CED-DS2S-JOI6

PERMITTING PLAN ACCESS ROAD PLAN PRIJ' ILE ACCESS ROAD PLAN PRIJ' ILE ACCESS ROAD PLAN PRIJ' ILE ROAD TYPICAL SECTIONS

NOTE:

.r

TYPE AND EX TENT OF ARIIIR AND OR SCOUR PROlECTI ON , IF ANY. FOR EACH CROSSING WILL BE DETEYINEO DURINC FINAL DESIGN.

---32'-----t

MATERIALS: 24·1 STEEL PIPE Cl.lVERT 734 LF I I 1 CULVERTS I

ROAD

-CIIIIPACT GRAVEL FILL AS REWIRED TO PROVIDE UNI FORII GRADE VARIES TOE TO TOE 60'MIN to 70'11AX

t----------------

URS

SCOUR PROTECTION AS NEEDED

TYPICAL CULVERT PROFILE N.T.S.

AILU

-..t: SHARl TOOTH TYP I CAL CLJ..VERT CROSS SECT IIWS

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 25 of 34

VSM OFF PAD OFFPAD 12" DIA VOL SLURRY

EA

ON PAD ON PAD 12" DIA

112

EA

ON PAD 18" DIA

53

EA

7

EA

ON PAD 24" DIA VOL SLURRY

SHEET 22

298

16578 CU FT

13423 CU FT

POA-2012-922, Miluveach River ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 26 of 34

XXX-XXXX-3:3 :oN

S6~0-G"~

0000 :oN sor sns

~NIMV~a

:aN sor

MATERIAL LIST

cfY

2

'Ol

//,;;Y

SHEET 23

;

v~~~~~

~

; 21 4'-10"±

0

LEFT BRACE SHOWN

QUAN.

DESCRIPTION

1A 2 3 4A 4B 5A 6A 8 18 20B 21A 22A 30 31 32 34 35 36 38 42 43 45 61 62 63 88 89 92 116

1 1 1 2 2 1 4 17 in. ± 1 1 2 1 3 3 4 2 1 1 3

60 ft. CLASS H-2 DOUGLAS FIR POLE 4-5/8 x 7-1/2 DOUGLAS FIR CROSSARM ASSEMBLY DOUGLAS FIR FACE MOUNTING BRACE 30 ODD lb. POLYMER SUSPENSION INSULATOR 37 36 000 lb. POLYMER SUSPENSION INSULATOR 38 SHIELD WIRE SUPPORT BRACKET ARMOR-GRIP SUSPENSION 5/8 BRAIDED TINNED COPPER BONDING CABLE V STRING YOKE Y CLEVIS EYE SOCKET EYE CLEVIS EYE 4 x 6 3/4 CROSSARM GAIN 4 x 4 x 1/4 SQUARE WASHER 13/16 HOLE 4 x 4 x 1/4 SQUARE CURVED WASHER 13/16 HOLE 3 4 x 20 MACHINE BOLT WITH NUT 3 4 x 18 MACHINE BOLT ~TH NUT 3 4 x 16 MACHINE BOLT ~TH NUT 3 4 x 9-1/2 W.H. BOLT WITIH 3 TAPPED WASHER 3 4 NUT 3 4 JAM NUT 3 4 BONDING CLIP No. 6 AWG SOLID SDB COPPER WIRE 1/2 x 2 COPPERWELD STAPLE SOLDERLESS CONNECTOR IDENTIFICATION PLATIE NAIL 3 LONG x 10D COPPER BUTT PLATE VIBRATION DAMPER

5 7 5 100 ft. ± 100± 2 1 6 1 8

CATALOG NO.

REMARKS

HUGHES C4436-1A-C4436-1B-C4436-1C HUGHES 2017EB48LRT HUBBELL/0.8. D12004-1201 HUB8ELL/0.8. D12004-1202 HUGHES 1501.7A 16 BCL PREFORMED AGS-5115 BELDON 8655 CONTINENTAL 99337 4001 PREFORMED YC 5207 PREFORMED SE-5152 PREFORMED CE 5261 HUGHES 1261 A HUGHES SW4 70 HUGHES SCW4-70

HUGHES WB79-1/2-4

LEFT OR RIGHT

A 320 GRADE L7 A 320 GRADE L7 A 320 GRADE L7

& SW3-70T

A 320 GRADE L7 A 320 GRADE L7 HUGHES 2727.7 SOUTH~RE ASTM B 3 CHANCE 9169 BLACKBURN 4H SOUTHWESTERN PORCELAIN

NOT NOT NOT NOT

BLACKBURN GP114 ALCOA 1705.11

SHOWN SHOWN SHOWN SHOWN

CROSSARM TO POLE CONNECTION TYPICAL (3) PLACES

~0~

~~---~~=----~

ITEM

NOTES: 1. BOLTS THAT MUST BE CUT OFF TO SHORTEN MUST BE CUT ALL THE WAY TIHROUGH WITH A HACKSAW (NOT BE CUT PARTIALLY AND BROKEN OFF). EXPOSED ENDS OF CUT BOLTS SHALL BE PAINTED WITH ZINC RICH PAINT.

6A

"""~~~

2.

ALL HOLES IN POLES SHALL BE DRILLED PRIOR TO TREATMENT. POLES SHALL MEET RUS SPECIFICATION #1728F-700. POLE SUPPLIER SHALL VERIFY POLE DIAMETIER DOES NOT EXCEED SPECIFIED BOLT LENGTHS.

3.

ALL MACHINE BOLTS TO HAVE A 6" MINIMUM TIHREAD LENGTH.

32X36X43)

~~~

b

I

I

;,

?

~~ ~ -1- --1;;;~----------------L.. '

1

FW

0~

\

6 6'-6 1/2"±

I

rFIRST CROSSARM TO FACE STARTING DEADEND

1A ( I

l

'

l

)

'

I

l

J

'

l

I

'

J

\

'

'

c

( I

)

( I

'

I

l

I

'

l

I

l

I

'

I

'

I

I

\

I

I

'

J

''

p

I

c

I

I I

ConocriP'hillips

CROSSARM FACING PLAN TYPICAL

Alaska, Inc.

--rl~

BUTT~-~~

t;;;;\ TO POLE ~SEE DRAWING No. EE-XXXX-XXX

XX

I IDENTIFICATION PLATE TO BE 8'-0" FROM GROUND LEVEL AND AT RIGHT ANGLE TO LINE.

MODULE: XXXX

UNIT: XX

SHARKS TOOTH POWERLINE 34.5 kV OVERHEAD STRUCTURE ASSEMBLY TYPE I(A) TANGENT STRUCTURE

... r!J)~

fI ~ #nc.

CONSULTING ENGINEERS

REDRAWN FROM:

CONSTRUC;ON SHEET

1 - - - - - - - - - - - - - - - - - - - - - - . . . L . . __ _ _= - - - - - t

FORM: DBORD REFERENCE DWG NO/SHT NO:

'

1

2

I 1 · DO NOT SCALE

I

DATE:

07-27-2012

3

GSG

CHECKED:

SCALE: APPROVAL:

1:20 I--RE-V-r-D-ATE--I--------------------R-E~-S-IO-NS---------------------+--BY--+-C-H-K-+-~~~~n-rct~~8~~-+-~~~~~T-+-RE-V-r-D-ATE--r-------------------R-E~-S-IO-NS---------------------+--BY--+-C-H-K-+-~~O~n-rct~~8~~-+-~~~~T~

JOB NO:

12-0195

SUB JOB NO:

0000

4

5

I I I ABOVE SCALE FOR REFERENCE ONLY DRAWN: DESIGN: ECM NO:

KDH

JSA

CC NO:

6

I

·

-

FILE NO.River POA-2012-922,CADD Miluveach ConocoPhillips - DS-2S TYPE-1A DRAI'f1NG NO: Drawings datedPART: February 8, 2013 REV: EE-XXXX-XXX 01 OF 01 Sheet 27 of 34

TYPE V(M2) 541'12 WOOD 3- POLE DEAD END

,___

__,t_L SlliUcnJRE. TYPICAL

I...

·I ··. I . . .~-·-~- ~

· a .. ., .. ,i ~:.~· ·- ~~ .. ~~-

""''ii~:~.~~~~~~~~!!!!~!!~!!~~~!!~t-. ~· ,.:-:'" :..~ ..........""m· ·-.. l!lil!ti~ ~1~!!~~~~~~~~!!~~~:.,.. Ill

~

":, ":,

i

":,

"'

./

34.5 kV POWER CABLE 3/c, 4111 or 500 MCM COPPER WIT1i CDHT1NUOUS CORROGAT£0 ALUMINUM SHEATH AND P.C.V. OUTER JACKET AND ARMOR F.O. CABLE TO BE DIRECT BURIED 4 FT. MINIMUM BELOW GRADE

150' MINIMUM

150' MINIMUM

1

I

I

REV

DATE

REVISION

BY

Ql(

Jill

jAmJ

ECM 1«11

CI£CKfllo

AI'PRIIVAU

cc

SCALEa

OAT&

CADOFI~

SHEET 24A

_,_

~I lips

NCh

=1'-8"

i

1

I

URS DESIGit

!IllI ! 'f'

I

DAAIINa

./ ./

.... FIH4o BSIZE

AREA

AICIIICG. InD.

JOB NOo

I SIB

Jill NOo

IDRAIIIIG

NOo

MODULE:

UNIT:

POWERLINE ROAD CROSSING

POA-2012-922, Miluveach River IPARTo IREV' OF SK-17-001 ConocoPhillips - DS-2S Drawings dated February 8, 2013 Sheet 28 of 34

"I

8" MIN.

.... ,E3-II,._.,IE3111E3-1~_,1Ej3~11-E3111E'"'-III_..,..I........;~

;....,.m..,.,...m'·"'...,.,....,~..,..:61l..,.,EI:I:~.....,..IE='III~ .... ,I. . . . ,.~:; tiF'I I,. .F

··~~IFIIF' ':II~~

~.w.-j=ll6lJ~iWIF"'

~~~

·0

I

O-

-:.,.

~l__ ii

~

I

j

3" 0.0. USED DRILL STEEL

1.J.

USE IN ROADWAY AND DRILL PAD ONLY

m

FIBER OPnc CABLE

&

j_--------~~~~~om:~F"Lt__ POWER ~r

CABLE

::::w:=''

DIRECT BURIAL OF METAL CLAD CABLE AT ROAD CROSSINGS & DRILL PADS

UBS DRMINl

A£V

DATE

REVISION

BY

Cit(

JIB

,..,

DESIIJI:

_,_

EI:M 1111

D£CIC£Dl

APPRIIV~

CCIIII

SCAl.EI

DAm

CMIDFI~

=1'....

SHEET 24B

canocGPtutlips JOB NO·

I

SIB JIB 1101

... FIJIHI BSIZE

AREA

MOOULE1

UNIT:

DIRECT BURIED CABLE AIGIICG. Ina.POA-2012-922, Miluveach River IPART1 DRAIIING HOa REV' IF

I

ConocoPhillips - DS-2S I SK-17-002 Drawings dated February 8, 2013 Sheet 29 of 34

REV

DATE

CK

BY

I

APP

I

I

DESCRIPTION

REV

I

N

DATE

CK

BY

I I

I

APP

I

DESCRIPTION

I

I

THIS PROJECT IS LOCATED WITHIN THE: 1. HARRISON BAY (A-1) QUADRANGLE 2. BEECHEY POINT (A-5) QUADRANGLE 3. BEECHEY POINT (B-5) QUADRANGLE

LAGOON SIMpsON

OLIKTOK POINT

·~

£',,

K

-

~

7'1:;:::: 12

11

-

BAY

17

riA 20

RRisoN

18

1:fl="'

ww 0\

co

21

2«

29

26

0:: 19

20

30

29

2

p.\

\'~, -

15

21,

0

f-32

33

34

T13N .> T12N

J'\

I

~

4

3

2

1

6

5

4

8

9

10

11

12

7

8

9

3

~~~

35

34

27

~

~~1o

11

15

20

14

21

29

13

23

28

24

27

25

--- ---

\ 32

33

34

18c:>

~

16

2 0'\';:

19

30

15

26

32

34

33

35

~9

25

30

36

31

3

/

1

2

5

-

_4_--

3

2

9

11

10

9

10

11

~\1 2 )

<)

15

16

13

/

' 8

7

--17

29 /

6

18

17

16

15

7

21

29

28

22

23

26

~

18

13

I PROPOSED ICE ROADS/PADS ~~ \l ~ j) 25

30

29

\

: 32

3:)_ --

TllN ,' TlON --'

"

: 4

3

31

2

17

16

: \ 21

10

15

22~

36

I

__. /

.,__.- f-( g

0

34

11

-

14

~

23

~

12

~

31

28

;£

32

27

~~ 8

""""

~

-~ ~ ) ~ ~ "''If

ww 24 ~ ~ 19

25

26

I-= 31 lr

---~ ~

2

15

~ DS2K ~ 6

~

21

18

14

13

22

23

19 24 ~ 0\ c::

AREA:

ConocriPhillips Alaska, Inc. I LK6219D5 9/11/12

CADD FILE NO.

rr

DRAWING NO.

SHEET 25

~ CP~ 1~

~

30

29

31

32

'l

0:

0::

1

6

5

4

12

7;-

8

9

_:_

28

27

~

34

~;;

10

w

~

~ 33

....

20

21

21

20

~

~ d!:d

28

29

llj

31

2

J1

33

32

I

~1

)7

18

24

19

~5

30

23

~

35

15

4

CP F]__,

'

)

--

F\ ~

16 ~ ffil,

~

34

10

1 ~5

MINE SITE -(

12

13

14

,~ 26

3

/

I

it,

~

__.../

27

..............

16

li

30 \

25

35

3

CPF2

17

19

17

=~

~~

9

\

16

18

~ '',

9

5

24

CJ

4

16

~

-

13 ___

14

2

8

12

w

20

20\

31

36

1

3

/ 9 \ 0/ ~

~

19

r

rs""- --.J

/

0 .....

36 w

35

~'l:l

'

/

20

32

I /a

\)

14

(},

;;:::? ~ [[}...._

1

,.___

8

-

10

~

16

'--

-

-

-----

20

w

2

3

9

17

18

L4

\_ 4

8

~

__

35

T12N TUN

"

7

13

_.JL~

4

19

~

~"

14

27

28

5

6

1i

~ /"..-=---.--...

29

1

25

:;/

~ ~~

32

\

C:,l 17

0-

36

31

f--J

23

2

28

---i?:r-::=

- -l8 --

14

~ -

-

_,_ 13 ___

(~

21

20

\ 29

I

~ ~:A

2

28

33

6

5

4

w 0,...., 7

8

9

1

r---......J 12 w

11

~

0::

~ lieLOUNSBURY ASSOCIATES, INC. S'EYORS

ENGINEE RS

P LANNERS

22

MODULE: XXXX

UNIT:

DS2S DEVELOPMENT PROJECT POA-2012-922, 2013-2014 PROPOSED ICE ROADSMiluveach & PADS River ConocoPhillips DS-2S VICINITY MAP Drawings PART: dated February REV:8, 2013 NSK 6.219-d5 Sheet 30 of 34 1 OF 2 0

I

I

ii" ·:\~

'v

SHEET 26 (~

r/0· c·'>

'-\·

.-SO' WIDPICE

'·."'

ROAD >~

--tiAuL& PRmEcr .AlceEss . LENG,1H1= 89,250' \~·~

14,000

;;f

I

" ~ LOUNSBURY

It .AIIIIIICUIIII, IIIC.

S'VEYORS

ENGINEERS

PLANNERS

r~ORM: As1zel -3L- T1tle

APPROVAL: DAlE:

09/11 /2012

DS2S DEVELOPMENT PROJECT 2013-2014 PROPOSED ICE ROADS &: PADS PERMIT EXHIBIT POA-2012-922, Miluveach River REV: ConocoPhillips 2 OF 2- DS-2S 0 Drawings dated February 8, 2013 Sheet 31 of 34

REV

DATE

CK

BY

I

APP

I

DESCRIPTION

I

REV

I

N

DATE

CK

BY

I I

I

APP

I

DESCRIPTION

I

I

ITHIS PROJECT IS LOCATED WITHIN THE HARRISON BAY (A-1) QUADRANGLE I LAGOON SIMpsON

OLIKTOK POINT

·~

£',,

K

-

7'1:;:::: 12

11

-

BAY

17

riA 20

RRisoN

18

1:fl="'

ww 0\

co

21

2«

29

26

0:: 19

20

30

29

2

p.\

\'~, -

15

21,

0

f-32

33

34

T13N .> T12N

J'\

I

~

4

3

2

1

6

5

4

8

9

10

11

12

7

8

9

3

~~~

35

34

15

20

14

21

29

13

23

28

18c:>

~

~~1o

11

25

15

26

4

8

9

~ 17

18

L4

~9

25

30

33

34

35

34

33

35

36

31

\_

T12N TUN

'--

"

4

3

1

2

5

----

,.___

8

9

11

10

-

_4_--

3

2

9

10

11

29 /

13

6

' 8

7

~\1 2 )

<)

15

16

---- 32

[[}...._

1

--17

-

-

-

-----

18

17

19

20

16

15

14

7

I /a ~

\)

18

13

21

22

1',

23

24

\l ~ 22 23 j) 4:r:j~r

21

PROPOSED ICE ROADS/PADS

-

29

28

25

' 27

30

: 32

3:)_ --

TllN : TlON --'

"

: 4

3

31

17

16

: \ 21

10

15

22~

~

\

2

I

__. /

.,__.- f-( g

0

34

11

-

14

~

23

~

31

13_

32

y v;1

12

~

~

~~

28

29

2\

J

......~

""""

~

1) 4

9

/

25

26

I-= 31 lr

~

19

---~ ~

2

10

11

~

_:_

28

27

~

34

4

9

rr

1

6

12

16

16

15

18

14

13

23

19 24 ~ 0\ c::

w

20

21

22

ConocriPhillips Alaska, Inc. I LK6219D6 9/11/12

DRAWING NO.

32

'l

1

6

5

4

12

7;-

8

9

0:

~;;

~

24

\

w

19

21

20

~

~ d!:d

10

~

2

28

29

llj 33

32

J1

/

I

12

4

CP F]__,

8/ ~1

7

)7

18

13

--

F\ ~

16 1..,

ffil,

~

~

(~

20

21

30

29

28

31

32

33

6

5

4

7

8

9

24

19

~5 f t6

23

\

34

35

5

4

3

2

1

8

9

10

11

12 w

15

1 ~5

MINE SITE C

__.../

14

'

it,

~

33

21

li

31

35

3

2

20

17

30 \

25

,~ 26

16

16

18

~ '',

CPF2

17

-

13 ___

14

=~

~~ ~

~'l:l

CJ

~ }

ww 24 ~ ~ 19

35

~

~

Xs ~

0 31 .... ~ 0::

36 w

27

31

36

AREA:

CADD FILE NO.

20\

r

3

~ CP~ 1~

'

/

20

(},

;;:::? ~

'--

32

10

~

16

__

32

29

w

2

3

30

~ 7

13

_.JL~

27

28

5

6

~"

14

~ ..-=---.--...

29

1

1i

::.----

30

--- ---

16

2 0'\';:

19

24

27

~

~ ~~

32

\

C:,l 17

0-

36

31

20

25

:;/

---i?:r-::=

19

f--J

23

2

27

28

~

- -l8 --

14

~ -

-

_,_ 13 ___

w 0

.-1

0::

~ lieLOUNSBURY ASSOCIATES, INC. S'EYORS

ENGINEE RS

P LANNERS

22

MODULE: XXXX

UNIT:

DS2S DEVELOPMENT PROJECT POA-2012-922, Miluveach River 2014-2015 PROPOSED ICE ROADS & PADS ConocoPhillips DS-2S VICINITY MAP Drawings dated 8, 2013 PART: FebruaryREV: NSK 6.219-d6 Sheet 32 of 34 1 OF 2 0

I

I

3

N

s,"

1

2

/

A

;

/

.._" - -- -

~~~

,;

11

10

12 / /

I

,;

4

2

3

TOTAL AREA OF PROPOSED ICE: :=949,250 Sq. R.

"

8

7

I

...

... - --- - ... - 5

/

=21.8Acres

11

"

"'

0

I

15

14

-

I /

13

18

17

16

15

14

24

19

20

21

22

23

./

,

/

/ (

I I

I

22

23

I

/

I /

,

,

,

IJ2·

./

/ 27

25

26

30

28

29

27

"J

I

g:

I I

~~ ~

-

~e:l.

I

34

31

31

36 T.11N.R.7£ T.10N.R.7£

3

2

1

.r-

-

h..

- 10

-

PAD CENTROID NAD83 GEOGRAPHIC: 7f1" 13' 10.94" N 150° 09' 13.99" w

~

~

11 12 I~SNOW JS'WIDE ICE ROAD ~ FENCE INSTALLATION LENGTH = 1 200

35' WIDE ICE ROAD

r-w-EmsTAUA~ I..&IGTH = 2.500' 14

15

13 1150X100' ICE PAD

,

t'"--('

_,.,.,. _.,. ,.....

~

/ ~

_.

T.11N.R.BE.

~[t

~~

Alaska, Inc. CADD Fll.E NO.

12/21/12

I--..-

I

I

DRAWING NO.

60' WIDE ICE ROAD

AREA:

·I

9

10

11

15

14

rit=:ol

\)!>...

35' WIDE ICE ROAD

20

2

3

PJPB.INE CONSTRUCTlON LENGTH= 7,200

{TYP)

16

SCALE

~ ~lmile 0

~I

SNOW FENCE INSTALLATION LENGTH = 1 f!l#

19

24

eonoc6Pt,nnps LJ(621909

v

IPOWERI..lNE 3S WIDE I( ROAD INSTAI..I.ATION

23

4

//

i f

31

~

~~~I)

LENGTH = 9.()50'

22

if

32

21

1/2

1

~UNSBURY

ASSOCIATIS, INC.

'

MODULE: XXXX

- - fUNNII8

UNIT:

DS2S DEVELOPMENT PROJECT POA-2012-922, Miluveach River 2014-2015 PROPOSED ICE ROADS & PADS ConocoPhillips PERMIT EXHIBIT - DS-2S Drawings dated PART:February 8, REV:2013 NSK 6.219-d9Sheet 33 of 34 10F'1 0

I

I

POA-2 Conoc Drawin Sheet

t

EJAPIIIATIR

~El.l I

I

Il.n::J.'!:==:n=:::l!rl:;::::::==ri:===il

r l'~fi~ 1: I

. NlE/1:

-~--·

..·.····.

SHEET 29

·--· ~

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

February 15, 2013

EXPIRATION DATE:

March 18, 2013

REFERENCE NUMBER:

POA-2012-922

WATERWAY:

Miluveach River

Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Mary Romero at (907) 7532773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.

APPLICANT: ConocoPhillips Alaska, Inc. (CPAI), PO Box 100360, Anchorage, Alaska, 99510-0360, Tom Manson, (907) 263-4627 LOCATION: The project site is located within Sections 1, 7, 8, 10-12, 14-18, 20, & 21, T. 10 N., R. 8 E.; and Section 13, T. 10 N., R. 7 E., Umiat Meridian; USGS Quad Map Harrison A-3; Latitude 70.219706º N., Longitude 150.153886º W.; in the southwest Kuparuk River Unit; 20 miles east of Nuiqsut, and 42 miles west of Prudhoe Bay, Alaska. PURPOSE: The applicant's stated purpose is to construct a new drill site and access road for the continued development of the Kuparuk oil reserves to provide sales quality crude oil for shipment through the Trans-Alaska Pipeline. PROPOSED WORK: CPAI proposes to place 296,054 cubic yards of gravel fill material into 20.5 acres of jurisdictional wetlands for the construction of a new drill site with 24 wells, a gravel access road, pipelines, fiber optic cable and other communications equipment and power line. All work would be performed in accordance with the enclosed plan (sheets 1-34), dated February 8, 2013. ADDITIONAL INFORMATION: The DS-2S Project is located in the southwest area of the Kuparuk River Unit. Development of the KRU began in the early 1980's and the DS-2S Project will be a continuation of the field's development. In the late 1980's CPAI (then ARCO) drilled an exploratory well (KRU-21-10-8) in the project area and in

early 2012 an appraisal well was drilled by CPAI to confirm the DS-2S project assumptions. The well was logged and core samples were collected. The location of the proposed DS-2S Project will allow the development to use much of the existing infrastructure of the Kuparuk oil field. Prior to proposing the current DS-2S project, CPAI investigated the option of developing this area of the Kuparuk reservoir from existing drill sites in the project area. Drill sites DS-2L, DS-2M, and DS-2K were examined as possible locations for the additional wells. It was determined that the reach of the current drilling technology would not allow for wells from these locations to extend far enough to adequately develop this area of the reservoir. Additionally, there currently are no slots available on these drill sites for the new wells. The project will require several ice roads to support construction of the drill site pad and access road during the first winter season (2013-2014) and for the construction of the pipelines, power lines, and snow fences during the second winter construction season (2014-2015). During the first winter two ice roads would be built to support construction, one to access the mine site the other to the project site. During the second winter season four ice roads would be constructed one each to the construction of the pipelines and power lines and two others with turnarounds for the construction of snow fences. The ice roads would be scraped clean after they are no longer needed and allowed to melt with the spring thaw. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: The optimum location for accessing the oil reservoir placed the drill site pad approximately 1,000 feet south-southeast of the proposed location. In order to avoid having the access road cross a small unnamed stream between the pad and the Tarn Road, and the need to construct a stream crossing structure or bridge, the proposed drill site was moved approximately 1,000 feet closer to the Tarn Road. This change also avoided the additional 1,000 feet of gravel roadway. b. Minimization: The DS-2s development project design minimized impacts to waters and wetlands limiting the gravel fill discharge by using a 30 foot well spacing and increasing the slide slope design along the edges of the drill site pad and roadway. The project components have been positioned to avoid stream crossings, incorporated direct (shortest) routes to the existing field infrastructure for the access road, pipeline, and power lines thereby reducing potential gravel placement and tundra wetland impacts. The size of the gravel drill site pad was selected by CPAI to be the minimum size necessary for safe operation through optimizing facility design and equipment layouts. The gravel pad will have a minimum thickness of five feet to maintain the integrity of the underlying permafrost. The proposed development will use the existing Kuparuk infrastructure of the Tarn Road, Meltwater Pipeline, and Kuparuk field power supply minimizing the amount of new infrastructure to develop this area of the Kuparuk oil field. Additionally a proposed on site gravel pit has been eliminated from the proposed action; the original plan involved the development of a gravel pit where Conoco would have mechanically land cleared another 16.2 acres of jurisdictional -2-

wetlands for a mine site to source the materials needed for the project and utilizing an additional 29.4 acres of jurisdictional wetlands temporarily by setting up an ice pad for stockpiling organics and overburden. The elimination of the gravel pit minimized the jurisdictional wetland impacts by 45.6 acres. c. Compensatory Mitigation: CPAI proposes in-lieu fees as a means of compensatory mitigation for the unavoidable impacts to waters of the U.S. resulting from this project WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There are no listed or eligible properties in the vicinity of the worksite. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time, and he is otherwise unaware of the presence of such resources. This application is being coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: The project area is within the known or historic range of the Polar Bear (Ursus maritimus), Spectacled eider (Somateria fischeri), and Candidate for Listing species Yellow-billed loon (Gavia adamsii). We have determined the described activity may affect the Polar Bear (Ursus maritimus), Spectacled eider (Somateria fischeri), and Candidate for Listing species Yellow-billed loon (Gavia adamsii). We have initiated the appropriate consultation procedures under section 7 of the Endangered Species Act with the U.S. Fish and Wildlife Service. Any comments they may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING:

Any person may request, in writing, within the comment period -3-

specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY: This permit will be issued or denied under the following authority: (X) Discharge dredged or fill material into waters of the United States ­ Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230). Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures -4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-922, Miluveach River, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas