Olgoonik Corporation's stated purpose is to excavate and stockpile gravel to be used for constructing and maintaining Wainwright’s roads, housing, public facilities, and airport. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice.

POA-2013-40_Kuk River- Olgoonik Corporation's stated purpose is to excavate and stockpile gravel to be used for constructing and maintaining Wainwright’s roads, housing, public facilities, and airport. Please contact Mary Leykom at (907) 753-2711, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice.

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JEER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

February 11, 2013

EXPIRATION DATE:

March 13, 2013

REFERENCE NUMBER:

POA-2013-40

WATERWAY:

Kuk River

Interested parties are hereby notified that a Department of the Army permit application has been received for Nork in \'laters of the United States as described below and shm·1n on the enclosed project drawings.

Comrrtents on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Mary Leykom at (907) 753-2711, toll free from ~1ithin Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice. APPLICANT: Olgoonik Corporation, 3201 C Street, Suite 700, Anchorage, Alaska 99503; Contact: Ms. Teresa Clark at (907) 562-8728. LOCATION: The project site is located 6 miles southeast of Wainwright, Alaska, on the Kuk River, within SW ~Section 11, T. 14 N., R. 31 W., Umiat Meridian; at Latitude 70.577° N., Longitude -159.830° IV. SPECIAL AREA DESIGNATION: The project is located within the outside boundaries of the Naval Petroleum Reserve Alaska. PURPOSE: The applicant's stated purpose is to excavate and stockpile gravel to be used for constructing and maintaining Waim·1right' s roads, housing, public facilities, and airport. PROPOSED WORK: Develop a material pit by excavating a 200-foot by 300-foot pit during frozen soil conditions. Side slopes would be graded to 2H:1V. Overburden would be stored 1·1ithin a 60-foot by 60-foot area on the edge of the pit for reclamation. Excavated material t-~ould be loaded directly into trucks for haul over shore-fast ice to an existing storage area 2.1 miles northeast of Wain\·lright. All \·mrk Nould be performed in accordance \

ADDITIONAL INFORMATION: Excavation in the pit would be taken down to -15 feet belov1 the lo\·Iest elevation of original ground. After the required 60,000 cubic yards of material is removed, a channel between the pit and the Kuk River \'lould be excavated to provide potential fish over-\·lintering habitat. The existing stockpile storage pad is located near the Wainv1right landfill within SW V. Section 8, T. 15 N., R. 31 W., at Latitude 70.665° N., Longitude -159.967° w. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: Winter excavation and material haul would avoid erosion and sedimentation into adjacent vmters and v1etlands.

b. Minimization: Gravel pit excavation during frozen conditions minimizes impacts to surface soils and vegetation. No camp would be constructed or fuel stored on site to reduce potential for adverse impacts to adjacent to~aters. c. Compensatory Mitigation: Compensatory mitigation '"·muld not be required because total fill placed in waters of the U.S. l'IOuld be limited to the stockpiled overburden; occurring in less than 0.1 acre. WATER QUALITY CERTIFICATION: A permit for the described work 1·1ill not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public La1·1 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The Alaska Heritage Resources Survey (AHRS) was unavailable to us at the time this Public Notice was prepar8d. V1e v1ill consult the survey as soon as available 1 for the presence or absence of historic properties 1 including those listed in or eligible for inclusion in the National Register of Historic Places. This application is being coordinated \·lith the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknm'ln archeological or historic data that may be lost or destroyed by work under the requested permit ;lill be considered in our final assessment of the described vmrk. ENDANGERED SPECIES: The project area is l

-2-

agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded 1 or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH) .

The project area is \'lithin the known range of the fresht·Tater species: pink salmon (Oncorhynchus gorbuscha) and chum salmon (0. keta), and marine species: arctic cod (Boreogadus saida) and rainbO\·l smelt {Osrnerus mordax). We have determined the described activity would not adversely affect EFH in the project area. Excavation \·lOuld be on land, separated from Kuk River waters until the Nork is complete, when a connecting channel is excavated. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action {e.g., a permit decision} have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in \Yriting, vlithin the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision v1hether to issue a permit Nill be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, ~·1hich the proposed activity may have on the public interest 1 requires a careful Neighing of all the factors that become relevant in each particular case. The benefits 1 Nhich reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process \·muld determine whether to authorize a proposal, ahd if so, the conditions under which it \·lill be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values 1 flood hazards, floodplain values, land use, navigation 1 shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property m·mership 1 and 1 in general, the needs and welfare of the people. For activities involving 404 discharges, a permit \·dll be denied if the discharge that vmuld be authorized by such permit 1;ould not comply ;lith the Environmental Protection Agency's 404 (b) (l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it t·1ould be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order

-3-

to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine v1hether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species 1 historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

AUTHORITY:

This permit will be issued or denied under the follO\'Iing authority:

(X) Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 UoSoCo 1344) Therefore, our public interest revievr vrill consider the guidelines set forth under Section 404 (b) of the Clean Water Act (40 CFR 230) o 0

Project dra\vings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER

401 Certification Program Non·Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance \·lith Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge \·dll comply 1·1ith the Clean Water Act, the Alaska Water Quality Standards, and other applicable State lm"'s. By agreement betv1een the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2013-40, Kuk River, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After revim'ling the application 1 the Department may certify there is reasonable assurance the activity 1 and any discharge that might result, vlill comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State lavlS. The Department also may deny or vmive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit \·lritten comments to the address above by the expiration date of the Corps of Engineer 1 s Public Notice.

Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Location maps Sheet 1 of 4 · February 2013

Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Location maps

Sheet 1 of 4

February 2013

10

1-$7$

14

13

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Aerial photo & plat map

Sheet 2 of 4

February 2013

10

. Ar.~-~\i 6

·lo

6"

"'''1"''1.<{

14

13

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Aerial photo & plat map

Sheet 2 of 4

February 2013

.'1Zc.VP1'1 0

kww Y SANDS

··~··

·

0

SECTION: BEFORE EXTRACTION SCALE:

NOT TO SCALE

-- -

/

R~f'' of)ed

'

-~·

\. FINISHE:D GROUND SURFACE:

~1'------~.. ;~.~.,.~...~~.:~·.;;s~:~RF.;;~.~~.. ~.~,'~":~.c: ~

. ,;...:,:;··,·::.' :<1):/i.·:·.:aili:iit~ i "·:,' :·

;;-.,...,.,'rr.,.,.~-+.,.,-~~-:--;-r,C"'"T"...,:':"~,..,,...,-,.,~.~.~.~:'·.:·,"';.~.,.:,:.~I

......

SECTION: AFTER EXTRACTION SCALE:

NOT TO SCALE

£XIS riNG GROUND

.'-l· I

~

·-

· · ',

...-...

AUTOCAO DRAWING NAME: StOdpile Detail.dwg

PLOTTING DATE:

7/16/08 (11:52) BY: ntroyrrer

·,,

'"... 175'

.. . . .. .

-·-

.

·- .....

/ .,

/... PROPOSED STOCKPILE

SEDIMENTAT/ON POND

EXISTING GRAVEL BERM

<7/~

· STOCKPILE SECTION NOT TO SCALE

SCALE:

..... · .. rue .LCMe

.

rs

iJfiiE. DldiiiD.UIIIii2UO ,.

I

NC1111'18 Z1'S<1I!!IO

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013

OLGOONIK CORPORATION WAINWRIGHT GRAVEL EXTRACTION WAINWRIGHT, ALASKA DATE:

07/16/08

DRAWN BY:

SCALE:

AS SHOWN

CHECKED BY:

.MAR'

OAR

Gravel stockpile on existing pad SHEET:

W.O. No:

oa·

Sheet 4 of 4

· February 2013

AUTOCAD

ORA~NG

NAME:: stockpile Detoil.dwg

PLOTllNG DAlE::

7 /16/0B (11:52}

BY: mroyner

17S' ·~

...

.

-

.. PROPOSED STOCKPILE

SEDIMENTAnON POND

EXtSnNG GRAVEL BERM

STOCKPILE SECTION SCALE:

NOT TO SCALE

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Gravel stockpile on existing· pad Sheet 4 of 4 · February 2013

OLGOONIK CORPORATION

rlmLCMFILC Eil . .e.--.-......_. . . . . . . . ,

WAINWRIGHT GRAVEL EXTRACTION WAINWRIGHT, ALASKA DATE:

07/16/08

DRAWN BY:

SCALE:

AS SHOWN

CHECKED BY:

MAR

DAR

SHEET:

W.O. No:

08

AUTOCAO. DRAWING NAME: Stockpile Detoil.dwg

PLOTllNG DATE:

7/16/DB (11: 52) BY: mroyner

·, "-,·,,.

''· ......<..,. ~

175'

/

/ PROPOS£0 STOCKPIL£

S£0/M£NTA noN POND

,

£XtSnNG GRAII£L BERM

<<'.&Y.&'f.-'iV//.Y/A"/A?,?A~0.'-?.U~Z'l.¥77--?'i'~-'nr7l'-i7~WK~' I / 225' -..,___

C)/V/~h~

--~~----------~~

~/V/

STOCKPILE SECTION SCALE:

/

/

/

./-

NOT TO SCALE

/'

/

//

,....:!"'

/'

-"'

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013

OLGOONIK CORPORATION

l!lt.&fllf'~

WAINWRIGHT GRAVEL EXTRACTION WAINWRIGHT, ALASKA DATE::

07/16/08

DRAWN. BY:

SCALE:

AS SHOWN.

CHECKED BY;

MAR

DAR

Gravel stockpile on existing· pad SHEET:

W.O. No:

oa·

Sheet 4 of 4

·

· February 2013

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JEER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

February 11, 2013

EXPIRATION DATE:

March 13, 2013

REFERENCE NUMBER:

POA-2013-40

WATERWAY:

Kuk River

Interested parties are hereby notified that a Department of the Army permit application has been received for Nork in \'laters of the United States as described below and shm·1n on the enclosed project drawings.

Comrrtents on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Mary Leykom at (907) 753-2711, toll free from ~1ithin Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Mary.F.Leykom@usace.army.mil if further information is desired concerning this notice. APPLICANT: Olgoonik Corporation, 3201 C Street, Suite 700, Anchorage, Alaska 99503; Contact: Ms. Teresa Clark at (907) 562-8728. LOCATION: The project site is located 6 miles southeast of Wainwright, Alaska, on the Kuk River, within SW ~Section 11, T. 14 N., R. 31 W., Umiat Meridian; at Latitude 70.577° N., Longitude -159.830° IV. SPECIAL AREA DESIGNATION: The project is located within the outside boundaries of the Naval Petroleum Reserve Alaska. PURPOSE: The applicant's stated purpose is to excavate and stockpile gravel to be used for constructing and maintaining Waim·1right' s roads, housing, public facilities, and airport. PROPOSED WORK: Develop a material pit by excavating a 200-foot by 300-foot pit during frozen soil conditions. Side slopes would be graded to 2H:1V. Overburden would be stored 1·1ithin a 60-foot by 60-foot area on the edge of the pit for reclamation. Excavated material t-~ould be loaded directly into trucks for haul over shore-fast ice to an existing storage area 2.1 miles northeast of Wain\·lright. All \·mrk Nould be performed in accordance \

ADDITIONAL INFORMATION: Excavation in the pit would be taken down to -15 feet belov1 the lo\·Iest elevation of original ground. After the required 60,000 cubic yards of material is removed, a channel between the pit and the Kuk River \'lould be excavated to provide potential fish over-\·lintering habitat. The existing stockpile storage pad is located near the Wainv1right landfill within SW V. Section 8, T. 15 N., R. 31 W., at Latitude 70.665° N., Longitude -159.967° w. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: Winter excavation and material haul would avoid erosion and sedimentation into adjacent vmters and v1etlands.

b. Minimization: Gravel pit excavation during frozen conditions minimizes impacts to surface soils and vegetation. No camp would be constructed or fuel stored on site to reduce potential for adverse impacts to adjacent to~aters. c. Compensatory Mitigation: Compensatory mitigation '"·muld not be required because total fill placed in waters of the U.S. l'IOuld be limited to the stockpiled overburden; occurring in less than 0.1 acre. WATER QUALITY CERTIFICATION: A permit for the described work 1·1ill not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public La1·1 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The Alaska Heritage Resources Survey (AHRS) was unavailable to us at the time this Public Notice was prepar8d. V1e v1ill consult the survey as soon as available 1 for the presence or absence of historic properties 1 including those listed in or eligible for inclusion in the National Register of Historic Places. This application is being coordinated \·lith the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknm'ln archeological or historic data that may be lost or destroyed by work under the requested permit ;lill be considered in our final assessment of the described vmrk. ENDANGERED SPECIES: The project area is l

-2-

agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded 1 or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH) .

The project area is \'lithin the known range of the fresht·Tater species: pink salmon (Oncorhynchus gorbuscha) and chum salmon (0. keta), and marine species: arctic cod (Boreogadus saida) and rainbO\·l smelt {Osrnerus mordax). We have determined the described activity would not adversely affect EFH in the project area. Excavation \·lOuld be on land, separated from Kuk River waters until the Nork is complete, when a connecting channel is excavated. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action {e.g., a permit decision} have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in \Yriting, vlithin the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision v1hether to issue a permit Nill be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, ~·1hich the proposed activity may have on the public interest 1 requires a careful Neighing of all the factors that become relevant in each particular case. The benefits 1 Nhich reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process \·muld determine whether to authorize a proposal, ahd if so, the conditions under which it \·lill be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values 1 flood hazards, floodplain values, land use, navigation 1 shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property m·mership 1 and 1 in general, the needs and welfare of the people. For activities involving 404 discharges, a permit \·dll be denied if the discharge that vmuld be authorized by such permit 1;ould not comply ;lith the Environmental Protection Agency's 404 (b) (l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it t·1ould be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order

-3-

to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine v1hether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species 1 historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

AUTHORITY:

This permit will be issued or denied under the follO\'Iing authority:

(X) Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 UoSoCo 1344) Therefore, our public interest revievr vrill consider the guidelines set forth under Section 404 (b) of the Clean Water Act (40 CFR 230) o 0

Project dra\vings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER

401 Certification Program Non·Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance \·lith Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge \·dll comply 1·1ith the Clean Water Act, the Alaska Water Quality Standards, and other applicable State lm"'s. By agreement betv1een the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2013-40, Kuk River, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After revim'ling the application 1 the Department may certify there is reasonable assurance the activity 1 and any discharge that might result, vlill comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State lavlS. The Department also may deny or vmive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit \·lritten comments to the address above by the expiration date of the Corps of Engineer 1 s Public Notice.

Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Location maps Sheet 1 of 4 · February 2013

Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Location maps

Sheet 1 of 4

February 2013

10

1-$7$

14

13

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Aerial photo & plat map

Sheet 2 of 4

February 2013

10

. Ar.~-~\i 6

·lo

6"

"'''1"''1.<{

14

13

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Aerial photo & plat map

Sheet 2 of 4

February 2013

.'1Zc.VP1'1 0

kww Y SANDS

··~··

·

0

SECTION: BEFORE EXTRACTION SCALE:

NOT TO SCALE

-- -

/

R~f'' of)ed

'

-~·

\. FINISHE:D GROUND SURFACE:

~1'------~.. ;~.~.,.~...~~.:~·.;;s~:~RF.;;~.~~.. ~.~,'~":~.c: ~

. ,;...:,:;··,·::.' :<1):/i.·:·.:aili:iit~ i "·:,' :·

;;-.,...,.,'rr.,.,.~-+.,.,-~~-:--;-r,C"'"T"...,:':"~,..,,...,-,.,~.~.~.~:'·.:·,"';.~.,.:,:.~I

......

SECTION: AFTER EXTRACTION SCALE:

NOT TO SCALE

£XIS riNG GROUND

.'-l· I

~

·-

· · ',

...-...

AUTOCAO DRAWING NAME: StOdpile Detail.dwg

PLOTTING DATE:

7/16/08 (11:52) BY: ntroyrrer

·,,

'"... 175'

.. . . .. .

-·-

.

·- .....

/ .,

/... PROPOSED STOCKPILE

SEDIMENTAT/ON POND

EXISTING GRAVEL BERM

<7/~

· STOCKPILE SECTION NOT TO SCALE

SCALE:

..... · .. rue .LCMe

.

rs

iJfiiE. DldiiiD.UIIIii2UO ,.

I

NC1111'18 Z1'S<1I!!IO

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013

OLGOONIK CORPORATION WAINWRIGHT GRAVEL EXTRACTION WAINWRIGHT, ALASKA DATE:

07/16/08

DRAWN BY:

SCALE:

AS SHOWN

CHECKED BY:

.MAR'

OAR

Gravel stockpile on existing pad SHEET:

W.O. No:

oa·

Sheet 4 of 4

· February 2013

AUTOCAD

ORA~NG

NAME:: stockpile Detoil.dwg

PLOTllNG DAlE::

7 /16/0B (11:52}

BY: mroyner

17S' ·~

...

.

-

.. PROPOSED STOCKPILE

SEDIMENTAnON POND

EXtSnNG GRAVEL BERM

STOCKPILE SECTION SCALE:

NOT TO SCALE

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013 Gravel stockpile on existing· pad Sheet 4 of 4 · February 2013

OLGOONIK CORPORATION

rlmLCMFILC Eil . .e.--.-......_. . . . . . . . ,

WAINWRIGHT GRAVEL EXTRACTION WAINWRIGHT, ALASKA DATE:

07/16/08

DRAWN BY:

SCALE:

AS SHOWN

CHECKED BY:

MAR

DAR

SHEET:

W.O. No:

08

AUTOCAO. DRAWING NAME: Stockpile Detoil.dwg

PLOTllNG DATE:

7/16/DB (11: 52) BY: mroyner

·, "-,·,,.

''· ......<..,. ~

175'

/

/ PROPOS£0 STOCKPIL£

S£0/M£NTA noN POND

,

£XtSnNG GRAII£L BERM

<<'.&Y.&'f.-'iV//.Y/A"/A?,?A~0.'-?.U~Z'l.¥77--?'i'~-'nr7l'-i7~WK~' I / 225' -..,___

C)/V/~h~

--~~----------~~

~/V/

STOCKPILE SECTION SCALE:

/

/

/

./-

NOT TO SCALE

/'

/

//

,....:!"'

/'

-"'

POA-2013-40 Kuk River Olgoonik Corporation Wainwright Gravel Project 2013

OLGOONIK CORPORATION

l!lt.&fllf'~

WAINWRIGHT GRAVEL EXTRACTION WAINWRIGHT, ALASKA DATE::

07/16/08

DRAWN. BY:

SCALE:

AS SHOWN.

CHECKED BY;

MAR

DAR

Gravel stockpile on existing· pad SHEET:

W.O. No:

oa·

Sheet 4 of 4

·

· February 2013

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas