City of Old Harbor's stated purpose is to provide safer runway conditions for increased runway use as defined in the “Airport Layout Plan Approval, Airspace Case 07AAL-203-NRA. The runway would also be expanded to accommodate larger aircraft predicted to be needed in the near future. The proposed work would extend the existing runway at the Old Harbor Airport. At present the runway is a 2,750-foot by 60-foot gravel runway. The extension would extend the runway 300-foot to the south and approximately 1700‑foot to the North. The work would include (a) placement of approx. 165,000 cubic yards (cy) of rock fill on approx. 2.5 acres of marine intertidal lands northeast of the end of the current runway, to include exterior armor rock; (b) placement of mixed fill (excess rock and organic soil) in 9.23 acres of terrestrial wetlands adjacent to the airfield; (c) filling of 2,011 linear feet of three stream channels (less than 1 acre total) adjacent to the airfield in the course of expanding the airfield prism. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Heather.L.Boyer@usace.army.mil if further information is desired concerning this notice.
City of Old Harbor'sstated purpose is to provide safer runway conditions for increased runway use as defined in the “Airport Layout Plan Approval, Airspace Case 07AAL-203-NRA. The runway would also be expanded to accommodate larger aircraft predicted to be needed in the near future. The proposed work would extend the existing runway at the Old Harbor Airport. At present the runway is a 2,750-foot by 60-foot gravel runway. The extension would extend the runway 300-foot to the south and approximately 1700‑foot to the North. The work would include (a) placement of approx. 165,000 cubic yards (cy) of rock fill on approx. 2.5 acres of marine intertidal lands northeast of the end of the current runway, to include exterior armor rock; (b) placement of mixed fill (excess rock and organic soil) in 9.23 acres of terrestrial wetlands adjacent to the airfield; (c) filling of 2,011 linear feet of three stream channels (less than 1 acre total) adjacent to the airfield in the course of expanding the airfield prism. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Heather.L.Boyer@usace.army.mil if further information is desired concerning this notice.
POA-1986-95-M1, Sitkalidak Strait_PN
Location of Old Harbor Airport
File No: ?c> ;.., \ ~8l,- 'f S - M \
WATERWAY: S\-\''f..q \Ld."~ S+c tt~-\PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,T.34S,R.25W
Lat: 57 o 13'8.98"N
Long: 153 o 16'5.95"W
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 1 of 41
Location of Old Harbor Airport
File No: fo,..,,. \~t'"- .. '1S ,,.,..,
WATERWAY: S'r\~Q\',Gla~ ~ta'\-\PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Lat: 57 o 13'8.98"N
Long: 153°16'5.95"W
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 2 of 41
Project Vicinity Area
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,T.34S,R.25W
Lat: 57 o 13'8.98"N
Sheet
of
Long: 153 o 16'5.95"W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 3 of 41
Project Vicinity Area
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Long: 153 o 16'5.9511 W
Lat: 57 o 13'8.98"N
Sheet
of
City of Old Harbor
POA-1986-95-M1
Sitkalidak Strait
December 3, 2012
Sheet 4 of 41
RUh'\'IAY
CCHTERU'tE
PRO~CO TRA~.Cf001'lAl
.GUfVACE, TYP1C.l.l
-
f\IJ~fi'IAY
EVeAJI &EN T
FAR PART T7 TYPICAL SECnON
Typical Cross Section
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21, T.34S,R. 25W
Long: 153 o 16'5.95"W
Lat: 57 o 13'8.9811 N
Sheet_of _
City of Old Harbor
POA-1986-95-M1
Sitkalidak Strait
December 3, 2012
Sheet 5 of 41
-
-
2012 Work Completed
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Lat: 57 o 13'8.98"N
Long: 153 o 16'5.95"W
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 6 of 41
Project Work Area 2013-2015
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,T.34S,R.25W
Long: 153 o 1615.95 11 W
Lat: 57 o 1318.98"N
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 7 of 41
Cut Areas Shown In Red & Magenta
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,~34S,R.25W
Lat: 57 o 13'8.98"N
Sheet
of
Long: 153 o 16'5.95"W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 8 of 41
Fill Areas Shown In Blue and Green
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Long: 153 o 16'5.95"W
Lat: 57 o 13'8.98"N
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 9 of 41
Cut and Fill Areas
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,T.34S,R.25W
Long: 153 o 16'5.95"W
Lat: 57 o 13'8.98"N
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 10 of 41
Proposed 2 Foot Contours (Shown In Green, Runway Is at Elev.
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4,700 feet
Sec.21,T.34S,R.25W
Lat: 57 o 13'8.98"N
Long: 153 o 16'5.95"W
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 11 of 4 1
=55) {r
NO~TH
Estimate of Cut and Fill Volumes
Material
Total Volume
Volume Placed in Wetlands or
Intertidal Waters
Overburden (peat and soil)
500,000 CY
150,000 CY
Rock placed In fill
980,000 CY
650,000 CY
Excess Rock spoiled
400,000 CY
200,000 CY
Total
1,880,000 CY
1,000,000 CY
Estimate of Cut and Fill Areas
Wetlands Filled under current permit
4.61 Acres
Intertidal Waters Filled
2.5 Acres
Additional Wetland Fill Area
8.3 Acres
lineal Feet of Streams
2,400 LF
Cut and Fill Estimates
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,~34S,R.25W
Lat:
Sheet
57 o 13'8.98"N
of
Long: 153 o 16'5.95 11 W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 12 of 4 1
Potential Marine Fill and Stream Impacts
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Long: 153 o 16'5.95"W
Lat: 57 o 13'8.9811 N
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 13 of 41
Potential Stream Impacts
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4,700 feet
Sec. 21, T. 34S, R. 25W
Lat: 57 o 13'8.98"N
Long: 153 o 16'5.95"W
of
Sheet
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 14 of 41
Potential Wetland Impacts
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21,T.34S,R.25W
Long: 153 o 16'5.9511 W
Lat: 57 o 13'8.9811 N
Sheet
of
City of Old Harbor
POA-1986-95-M1
Sitkalidak Strait
December 3, 2012
Sheet 15 of 41
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 15, 2013
EXPIRATION DATE:
March 18, 2013
REFERENCE NUMBER:
POA-1986-95-M1
WATERWAY:
Sitkalidak Strait
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Heather Boyer at
(907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at Heather.L.Boyer@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: City of Old Harbor, Post Office Box 109, Old Harbor, Alaska 99643.
AGENT: Old Harbor Native Corporation, 2702 Denali Street, Suite 100, Anchorage,
Alaska 99503, Cynthia Bern-Lopez, (907)257-1823
LOCATION: The project site is located within Section 21, T. 34 S., R. 25 W.,
Seward Meridian; USGS Quad Map Kodiak A-4; Latitude 57.2166º N., Longitude
153.2667º W.; Old Harbor Airport, in Old Harbor, Alaska.
PURPOSE: The applicant's stated purpose is to provide safer runway conditions for
increased runway use as defined in the "Airport Layout Plan Approval, Airspace Case
07AAL-203-NRA. The runway would also be expanded to accommodate larger aircraft
predicted to be needed in the near future.
PROPOSED WORK: The proposed work would extend the existing runway at the Old
Harbor Airport. At present the runway is a 2,750-foot by 60-foot gravel runway.
The extension would extend the runway 300-foot to the south and approximately
1700-foot to the North. The work would include (a) placement of approx. 165,000
cubic yards (cy) of rock fill on approx. 2.5 acres of marine intertidal lands
northeast of the end of the current runway, to include exterior armor rock; (b)
placement of mixed fill (excess rock and organic soil) in 9.23 acres of terrestrial
wetlands adjacent to the airfield; (c) filling of 2,011 linear feet of three stream
channels (less than 1 acre total) adjacent to the airfield in the course of
expanding the airfield prism.
All work would be performed in accordance with the enclosed plan (sheets 1-41),
dated December 3, 2012.
ADDITIONAL INFORMATION: Old Harbor is a community of 208 (as of 2011) on the
southeastern coast of Kodiak Island. The community is not connected by road to any
other community on Kodiak Island. Rugged terrain, low population densities, and
federal land use restrictions are likely to forestall any road connections in the
foreseeable future. The Alaska Marine Highway, the state-operated ferry system,
serves Old Harbor on a very limited schedule compared with communities at the north
end of the Kodiak Archipelago, such as Port Lions and Ouzinkie. Building materials,
vehicles, heavy equipment, fuel, and other heavy or bulky materials are delivered by
barge. Passengers, mail, and perishable food are delivered primarily by light
aircraft.
The current 2,750-foot by 60-foot gravel runway was constructed in 1992. Due to the
scarcity of flat ground around Old Harbor, part of the runway was carved through a
hill, leaving steep embankments on either side of the middle portion of the runway.
This elevated terrain close to the runway impinges on the runway safety zone and
causes unpredictable, turbulent cross-winds that pose a danger to light aircraft and
sometimes limit flight operations. The high terrain alongside the runway also limits
the amount of land available for taxiways and aircraft parking, and for development
of airfield infrastructure and services.
High costs and limited options for transportation have constrained economic activity
at Old Harbor, leading to high unemployment and an out-migration of people in search
of work elsewhere. The community has been developing plans for a fish processing
facility and other economic improvement. The ability to accommodate heavier cargo
aircraft and more frequent flights will help spur the development of local
fisheries-based businesses, tourism, and other opportunities. However, the current
airfield is too short to allow larger aircraft, and is hemmed in by terrain features
that create potentially hazardous flying conditions and limit the expansion of
facilities at the airport. The proposed project would level intruding terrain
features and extend the runway to a new length of 4,700 feet.
The airport project began in 1990 with DA Permit 4-860095 and resulted in the
existing airstrip. At present, the permit (Ref # POA-1986-95) was modified to allow
for the cutting of the hillsides to improve safety. The existing permit action
would allow for the modification of the existing runway by the laying back of steep
hillsides adjacent to the airport runway during the 2012 construction season. Work
in 2012 consisted of removal of overburden materials from the hillsides to be cut.
Work to date for the runway extension (occurring in 2012) has consisted of design
efforts, environmental studies (fish studies), cultural resource investigations,
project estimating, and coordination with IRT, project planning/engineering,
equipment/supply estimates, and permitting.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: Several alternatives were evaluated for extension of the runway: 1)
the proposed northern extension (300 feet extension on the south), 2) a full
-2-
extension to the south, 3) shifting the runway to the east and 4) shifting the
runway to the west. When the runway was constructed in 1992, several other site
locations were evaluated, the current location was determined to be the most
practical location. Of the four alternatives considered for the extension, the
proposed northern extension offered the least impacts to wetlands, streams, and
marine lands.
The City of Old Harbor contracted Shearwater LLC to assist in working with ADOT for
planning this project. During the planning effort, careful consideration was given
to the aircraft that regularly operate on the runways, as well as likely future
operations. While Runway Safety Alignment (RSA) design standards (provided by FAA)
are dictated by the largest and heaviest aircraft regularly operating on a runway,
existing aircraft using the Old Harbor Airport runway are often smaller in size and
do not require the same RSA areas. This greatly reduces the impacts to the waters
of the U.S. that would have resulted from constructing RSA design standards for
larger aircraft.
b. Minimization: Potential Impacts of the action would be mitigated by avoidance,
minimization, and employment of best management practices to the extent practical.
The action would impact streams, lakes, marine shorelines, and identified cultural
resource sites. The overall project footprint is as small as possible without
compromising the value of the improvements, and uplands were used to the maximum
extent practicable.
The project would directly impact fish or their habitat or other important
biological populations or habitats. Impacts to streams will be mitigated through relocation and in a manner to simulate those stream segments impacted.
Natural buffers, silt fencing, re-vegetation, and other measures would be employed
to prevent fill material from migrating off site and increasing the impacted areas.
Silt and turbidity control measures would be established in the project storm water
pollution protection plan and would be enforced to protect water quality and fish
habitat. Timing and monitoring would be employed to protect birds and their nests.
Three cultural resource sites have been identified in the project area. The
applicant is working with SHPO to develop a mitigation/research plan for the sites.
c. Compensatory Mitigation: Compensatory mitigation would be achieved by using the
"permittee-responsible" mitigation approach. Several options for mitigation were
considered for compensatory mitigation. Alternative stream routes for Sculpin Creek
and Streams #3 and #4 are being coordinated with ADFG and USFWS. Also, possible
culvert design and replacement are being considered in several locations to retain
or restore the hydrologic connectivity to local wetlands that have previously
impeded or cutoff local wetlands. The mitigation effort is actively being
coordinated with several representatives from resource agencies. Thus far, resource
agency representatives have informally expressed a preference for onsite water
quality improvements by maintaining and improving the hydrologic connectivity of the
local streams and wetlands located adjacent to the Old Harbor Airport and the
Community of Old Harbor. A Final Mitigation Plan would be provided that will meet
the twelve requirements for a permittee-responsible mitigation plan submitted prior
to permit decision and/or upon completion of the ongoing multi-agency coordination
effort prior to construction. To date, the following mitigation opportunities have
been identified.
The City of Old Harbor has been working closely with ADFG to identify compensatory
mitigation opportunities. One of, or a combination of, the following mitigation
options will be undertaken to account for wetland acres loss in an effort to achieve
"no net loss" of wetlands policy as required by USACE and EPA.
Sculpin Creek: It was determined that a culvert would not provide for mitigation,
-3-
would be in excess of 800 feet in length, add significant cost to the project and
could add as much as a year to the construction. It was also noted that a culvert
failure would result in catastrophic conditions, ponding water to over 25 feet
before it would spill out along the proposed realignment. Repairs for a culvert
failure could also result in more than a year of disruption of use of the runway.
As a result, the culvert option for Sculpin Creek was deemed impracticable and not
likely to accomplish mitigation goals to minimize runway extension impacts.
The proposed mitigation for Sculpin Creek is a realignment illustrated in the
referenced drawings. The realignment provides for approximately 810 lineal feet of
replacement stream. The location will be cut through a ridge located to the north of
Sculpin Creek. The design process "copied" the meander of a lower section of Sculpin
Creek. At the deepest point of cut, bedrock would need to be excavated (possibly
blasted). Once a "rough cut" channel of the appropriate depth is achieved, the
meander would be created using boulders and organic materials from the site. The new
stream would include riffles and pools, overhanging banks to the extent possible and
transplanting of native trees from other areas impacted by construction. The new
outlet for Sculpin Creek is expected to improve the existing marine habitat where
the creek would likely create a new estuarine area accounting for the loss of the
2.5 acres of marine habitat that would be filled. Monitoring of the development of
this new stream alignment and resulting estuarine environment would verify adequate
success to compensate for stream habitat and marine habitat loss resulting from
impacts to Sculpin Creek.
Stream #3, located off the southwest corner of the current runway would have
approximately 450 lineal feet impacted by runway fill. The replacement stream was
designed in the same manner as Sculpin and restoration will follow the same
practices for creating the meander, pool, riffle, and re vegetation. The new
alignment is approximately 500 feet in length. Outflow of Stream #3 will remain at
the same location.
Stream #4 is located off the southeast corner of the existing runway and would have
approximately 761 feet impacted by runway fill. A portion of this stream was
realigned from the original runway project. The new stream would be approximately
780 feet in length and was designed with the same practices as used for Sculpin
Creek and Stream #3. Stream #4 would also maintain the same outflow location.
In order to compensate for the 9.23 acres of terrestrial wetlands loss due to fill,
one of, or a combination of, the following mitigation opportunities are being
analyzed. The goal would be to restore the hydrologic connectivity to the local
wetlands to the maximum extent practicable to account for the terrestrial wetland
loss. Further analysis is being undertaken to determine the specifics associated
with costs, as well as technical parameters associated with identifying restoring
the habitat function. Continued agency coordination would be paramount to the
success of this mitigation effort.
a. Kuglingcuk Creek: Twin culverts that were not embedded below the streambed.
It looks like a portion of the stream flow is flowing under the culverts. ADFG
personnel captured juvenile Coho salmon and Dolly Varden in the creek and adult chum
and pink salmon were observed in the creek. The stream has been nominated to the
Anadromous Waters Catalog. ADFG recommends replacing the culverts with a single
bottomless arch culvert. A hydrologist/engineer would need to determine the
specifications of a new culvert.
b.
Village Lagoon: Twin culverts that are tidally influenced but may be a barrier
-4-
during low tide (ShoreZone photograph 09122) . This is a highly productive estuary
and before the village road was built was open to Sitkalidak Straight. ADFG
personnel recommends replacing the culverts with a bridge.
c. Stream No. 258-52-10012: This is a tidally influenced culvert that is in poor
physical condition (ShoreZone photo 09136 and Stream No. 258-52-10012).
ADFG
recommends replacing the culvert with a single bottomless arch culvert. A
hydrologist/engineer would need to determine the specifications of a new culvert.
d. Stream #3: Streams #1, #2, and #3 have the same diameter culverts and were
installed when the airport was moved to the current location (photograph Stream #3).
They were installed under an ADF&G Fish Habitat Permit. ADFG personnel recommend a
hydrologist/biologist survey the culverts to determine if the culverts meet fish
passage criteria.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The Corps has determined that the proposed expansion of the
runway would have adverse effects on three prehistoric sites described in the
archaeological survey completed by the Alutiiq Museum & Archaeological Repository
(Alutiiq Museum) dated July 9, 2012. The Corps, the City of Old Harbor, and the
Alaska State Historical Preservation Officer (AKSHPO) have agreed these sites meet
the criteria for inclusion in the National Register of Historic Places under
Criterion D. The Corps has consulted with the City of Old Harbor, the Old Harbor
Native Corporation, the Alutiiq Tribe of Old Harbor, the Alutiiq Museum, and the
AKSHPO in accordance with Section 106 of the National Historic Preservation Act
(NHPA) to resolve the adverse effects of the Project on historic properties. The
Corps has prepared a Memorandum of Agreement (MOA) proposing mitigation
requirements for the prehistoric sites KOD-478, KOD-580, and KOD-1130, along with
mitigation and reporting requirements for unknown cultural resources that may be
discovered during construction, and invited the City of Old Harbor, the Old Harbor
Native Corporation, the Alutiiq Tribe of Old Harbor, the Alutiiq Museum, and the
AKSHPO to sign the MOA.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
Northern Sea Otter (Enhydra lutris kenyoni) southwest Alaska "distinct
population segment" (DPS),
Steller's Eider (Polysticta stelleri),
Kittlitz's Murrelet (Brachyramphus brevirostris; candidate species),
Yellow-billed Loon (Gavia adamsii; candidate species);
Steller Sea Lion (Eumetopias jubatus),
Finback Whale (Balaenoptera physalus),
Humpback Whale (Megaptera novaeangliae).
We have determined the described activity may affect designated critical habitat
for the Northern Sea Otter. We have concluded that at present, there is a no
affect for other species listed above. We have initiated the appropriate
consultation procedures under section 7 of the Endangered Species Act with the U.S.
Fish and Wildlife Service.
Any comments they may have concerning endangered or
-5-
threatened wildlife or plants or their critical habitat will be considered in our
final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
The project area is within the known range of:
Walleye Pollock (Theragra calcogramma)
Pacific Cod (Gadus macrocephalus)
Arrowtooth Flounder (Atheresthes stomias)
Rock Sole (Lepidopsetta bilineatus)
Flathead Sole (Hippoglossoides elassodon)
Sculpins (cottidae)
Skates (Rajidae)
Sharks (Squaliformes)
Forage Fish Complex (osmeridae)
Octopus (Octopoda)
Pink Salmon (Oncorhynchus gorbuscha)
Chum Salmon (Oncorhynchus keta)
Sockeye Salmon (Oncorhynchus nerka)
Chinook Salmon (Oncorhynchus tshawytscha)
Coho Salmon (Oncorhynchus kisutch)
The described activity would not adversely affect EFH in the project area, because
of the small extent of the project's direct impact on the marine environment, the
dissimilarity between the project environment and the marine EFH descriptions for
those species listed above, and the fact that it is unlikely to alter fishing
practices in the Old Harbor area.
This Public Notice initiates EFH consultation with the NMFS. Any comments or
recommendations they may have concerning EFH will be considered in our final
assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
-6-
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-7-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-1986-95-M1, Sitkalidak
Strait, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 15, 2013
EXPIRATION DATE:
March 18, 2013
REFERENCE NUMBER:
POA-1986-95-M1
WATERWAY:
Sitkalidak Strait
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Heather Boyer at
(907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at Heather.L.Boyer@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: City of Old Harbor, Post Office Box 109, Old Harbor, Alaska 99643.
AGENT: Old Harbor Native Corporation, 2702 Denali Street, Suite 100, Anchorage,
Alaska 99503, Cynthia Bern-Lopez, (907)257-1823
LOCATION: The project site is located within Section 21, T. 34 S., R. 25 W.,
Seward Meridian; USGS Quad Map Kodiak A-4; Latitude 57.2166º N., Longitude
153.2667º W.; Old Harbor Airport, in Old Harbor, Alaska.
PURPOSE: The applicant's stated purpose is to provide safer runway conditions for
increased runway use as defined in the "Airport Layout Plan Approval, Airspace Case
07AAL-203-NRA. The runway would also be expanded to accommodate larger aircraft
predicted to be needed in the near future.
PROPOSED WORK: The proposed work would extend the existing runway at the Old
Harbor Airport. At present the runway is a 2,750-foot by 60-foot gravel runway.
The extension would extend the runway 300-foot to the south and approximately
1700-foot to the North. The work would include (a) placement of approx. 165,000
cubic yards (cy) of rock fill on approx. 2.5 acres of marine intertidal lands
northeast of the end of the current runway, to include exterior armor rock; (b)
placement of mixed fill (excess rock and organic soil) in 9.23 acres of terrestrial
wetlands adjacent to the airfield; (c) filling of 2,011 linear feet of three stream
channels (less than 1 acre total) adjacent to the airfield in the course of
expanding the airfield prism.
All work would be performed in accordance with the enclosed plan (sheets 1-41),
dated December 3, 2012.
ADDITIONAL INFORMATION: Old Harbor is a community of 208 (as of 2011) on the
southeastern coast of Kodiak Island. The community is not connected by road to any
other community on Kodiak Island. Rugged terrain, low population densities, and
federal land use restrictions are likely to forestall any road connections in the
foreseeable future. The Alaska Marine Highway, the state-operated ferry system,
serves Old Harbor on a very limited schedule compared with communities at the north
end of the Kodiak Archipelago, such as Port Lions and Ouzinkie. Building materials,
vehicles, heavy equipment, fuel, and other heavy or bulky materials are delivered by
barge. Passengers, mail, and perishable food are delivered primarily by light
aircraft.
The current 2,750-foot by 60-foot gravel runway was constructed in 1992. Due to the
scarcity of flat ground around Old Harbor, part of the runway was carved through a
hill, leaving steep embankments on either side of the middle portion of the runway.
This elevated terrain close to the runway impinges on the runway safety zone and
causes unpredictable, turbulent cross-winds that pose a danger to light aircraft and
sometimes limit flight operations. The high terrain alongside the runway also limits
the amount of land available for taxiways and aircraft parking, and for development
of airfield infrastructure and services.
High costs and limited options for transportation have constrained economic activity
at Old Harbor, leading to high unemployment and an out-migration of people in search
of work elsewhere. The community has been developing plans for a fish processing
facility and other economic improvement. The ability to accommodate heavier cargo
aircraft and more frequent flights will help spur the development of local
fisheries-based businesses, tourism, and other opportunities. However, the current
airfield is too short to allow larger aircraft, and is hemmed in by terrain features
that create potentially hazardous flying conditions and limit the expansion of
facilities at the airport. The proposed project would level intruding terrain
features and extend the runway to a new length of 4,700 feet.
The airport project began in 1990 with DA Permit 4-860095 and resulted in the
existing airstrip. At present, the permit (Ref # POA-1986-95) was modified to allow
for the cutting of the hillsides to improve safety. The existing permit action
would allow for the modification of the existing runway by the laying back of steep
hillsides adjacent to the airport runway during the 2012 construction season. Work
in 2012 consisted of removal of overburden materials from the hillsides to be cut.
Work to date for the runway extension (occurring in 2012) has consisted of design
efforts, environmental studies (fish studies), cultural resource investigations,
project estimating, and coordination with IRT, project planning/engineering,
equipment/supply estimates, and permitting.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: Several alternatives were evaluated for extension of the runway: 1)
the proposed northern extension (300 feet extension on the south), 2) a full
-2-
extension to the south, 3) shifting the runway to the east and 4) shifting the
runway to the west. When the runway was constructed in 1992, several other site
locations were evaluated, the current location was determined to be the most
practical location. Of the four alternatives considered for the extension, the
proposed northern extension offered the least impacts to wetlands, streams, and
marine lands.
The City of Old Harbor contracted Shearwater LLC to assist in working with ADOT for
planning this project. During the planning effort, careful consideration was given
to the aircraft that regularly operate on the runways, as well as likely future
operations. While Runway Safety Alignment (RSA) design standards (provided by FAA)
are dictated by the largest and heaviest aircraft regularly operating on a runway,
existing aircraft using the Old Harbor Airport runway are often smaller in size and
do not require the same RSA areas. This greatly reduces the impacts to the waters
of the U.S. that would have resulted from constructing RSA design standards for
larger aircraft.
b. Minimization: Potential Impacts of the action would be mitigated by avoidance,
minimization, and employment of best management practices to the extent practical.
The action would impact streams, lakes, marine shorelines, and identified cultural
resource sites. The overall project footprint is as small as possible without
compromising the value of the improvements, and uplands were used to the maximum
extent practicable.
The project would directly impact fish or their habitat or other important
biological populations or habitats. Impacts to streams will be mitigated through relocation and in a manner to simulate those stream segments impacted.
Natural buffers, silt fencing, re-vegetation, and other measures would be employed
to prevent fill material from migrating off site and increasing the impacted areas.
Silt and turbidity control measures would be established in the project storm water
pollution protection plan and would be enforced to protect water quality and fish
habitat. Timing and monitoring would be employed to protect birds and their nests.
Three cultural resource sites have been identified in the project area. The
applicant is working with SHPO to develop a mitigation/research plan for the sites.
c. Compensatory Mitigation: Compensatory mitigation would be achieved by using the
"permittee-responsible" mitigation approach. Several options for mitigation were
considered for compensatory mitigation. Alternative stream routes for Sculpin Creek
and Streams #3 and #4 are being coordinated with ADFG and USFWS. Also, possible
culvert design and replacement are being considered in several locations to retain
or restore the hydrologic connectivity to local wetlands that have previously
impeded or cutoff local wetlands. The mitigation effort is actively being
coordinated with several representatives from resource agencies. Thus far, resource
agency representatives have informally expressed a preference for onsite water
quality improvements by maintaining and improving the hydrologic connectivity of the
local streams and wetlands located adjacent to the Old Harbor Airport and the
Community of Old Harbor. A Final Mitigation Plan would be provided that will meet
the twelve requirements for a permittee-responsible mitigation plan submitted prior
to permit decision and/or upon completion of the ongoing multi-agency coordination
effort prior to construction. To date, the following mitigation opportunities have
been identified.
The City of Old Harbor has been working closely with ADFG to identify compensatory
mitigation opportunities. One of, or a combination of, the following mitigation
options will be undertaken to account for wetland acres loss in an effort to achieve
"no net loss" of wetlands policy as required by USACE and EPA.
Sculpin Creek: It was determined that a culvert would not provide for mitigation,
-3-
would be in excess of 800 feet in length, add significant cost to the project and
could add as much as a year to the construction. It was also noted that a culvert
failure would result in catastrophic conditions, ponding water to over 25 feet
before it would spill out along the proposed realignment. Repairs for a culvert
failure could also result in more than a year of disruption of use of the runway.
As a result, the culvert option for Sculpin Creek was deemed impracticable and not
likely to accomplish mitigation goals to minimize runway extension impacts.
The proposed mitigation for Sculpin Creek is a realignment illustrated in the
referenced drawings. The realignment provides for approximately 810 lineal feet of
replacement stream. The location will be cut through a ridge located to the north of
Sculpin Creek. The design process "copied" the meander of a lower section of Sculpin
Creek. At the deepest point of cut, bedrock would need to be excavated (possibly
blasted). Once a "rough cut" channel of the appropriate depth is achieved, the
meander would be created using boulders and organic materials from the site. The new
stream would include riffles and pools, overhanging banks to the extent possible and
transplanting of native trees from other areas impacted by construction. The new
outlet for Sculpin Creek is expected to improve the existing marine habitat where
the creek would likely create a new estuarine area accounting for the loss of the
2.5 acres of marine habitat that would be filled. Monitoring of the development of
this new stream alignment and resulting estuarine environment would verify adequate
success to compensate for stream habitat and marine habitat loss resulting from
impacts to Sculpin Creek.
Stream #3, located off the southwest corner of the current runway would have
approximately 450 lineal feet impacted by runway fill. The replacement stream was
designed in the same manner as Sculpin and restoration will follow the same
practices for creating the meander, pool, riffle, and re vegetation. The new
alignment is approximately 500 feet in length. Outflow of Stream #3 will remain at
the same location.
Stream #4 is located off the southeast corner of the existing runway and would have
approximately 761 feet impacted by runway fill. A portion of this stream was
realigned from the original runway project. The new stream would be approximately
780 feet in length and was designed with the same practices as used for Sculpin
Creek and Stream #3. Stream #4 would also maintain the same outflow location.
In order to compensate for the 9.23 acres of terrestrial wetlands loss due to fill,
one of, or a combination of, the following mitigation opportunities are being
analyzed. The goal would be to restore the hydrologic connectivity to the local
wetlands to the maximum extent practicable to account for the terrestrial wetland
loss. Further analysis is being undertaken to determine the specifics associated
with costs, as well as technical parameters associated with identifying restoring
the habitat function. Continued agency coordination would be paramount to the
success of this mitigation effort.
a. Kuglingcuk Creek: Twin culverts that were not embedded below the streambed.
It looks like a portion of the stream flow is flowing under the culverts. ADFG
personnel captured juvenile Coho salmon and Dolly Varden in the creek and adult chum
and pink salmon were observed in the creek. The stream has been nominated to the
Anadromous Waters Catalog. ADFG recommends replacing the culverts with a single
bottomless arch culvert. A hydrologist/engineer would need to determine the
specifications of a new culvert.
b.
Village Lagoon: Twin culverts that are tidally influenced but may be a barrier
-4-
during low tide (ShoreZone photograph 09122) . This is a highly productive estuary
and before the village road was built was open to Sitkalidak Straight. ADFG
personnel recommends replacing the culverts with a bridge.
c. Stream No. 258-52-10012: This is a tidally influenced culvert that is in poor
physical condition (ShoreZone photo 09136 and Stream No. 258-52-10012).
ADFG
recommends replacing the culvert with a single bottomless arch culvert. A
hydrologist/engineer would need to determine the specifications of a new culvert.
d. Stream #3: Streams #1, #2, and #3 have the same diameter culverts and were
installed when the airport was moved to the current location (photograph Stream #3).
They were installed under an ADF&G Fish Habitat Permit. ADFG personnel recommend a
hydrologist/biologist survey the culverts to determine if the culverts meet fish
passage criteria.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The Corps has determined that the proposed expansion of the
runway would have adverse effects on three prehistoric sites described in the
archaeological survey completed by the Alutiiq Museum & Archaeological Repository
(Alutiiq Museum) dated July 9, 2012. The Corps, the City of Old Harbor, and the
Alaska State Historical Preservation Officer (AKSHPO) have agreed these sites meet
the criteria for inclusion in the National Register of Historic Places under
Criterion D. The Corps has consulted with the City of Old Harbor, the Old Harbor
Native Corporation, the Alutiiq Tribe of Old Harbor, the Alutiiq Museum, and the
AKSHPO in accordance with Section 106 of the National Historic Preservation Act
(NHPA) to resolve the adverse effects of the Project on historic properties. The
Corps has prepared a Memorandum of Agreement (MOA) proposing mitigation
requirements for the prehistoric sites KOD-478, KOD-580, and KOD-1130, along with
mitigation and reporting requirements for unknown cultural resources that may be
discovered during construction, and invited the City of Old Harbor, the Old Harbor
Native Corporation, the Alutiiq Tribe of Old Harbor, the Alutiiq Museum, and the
AKSHPO to sign the MOA.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
Northern Sea Otter (Enhydra lutris kenyoni) southwest Alaska "distinct
population segment" (DPS),
Steller's Eider (Polysticta stelleri),
Kittlitz's Murrelet (Brachyramphus brevirostris; candidate species),
Yellow-billed Loon (Gavia adamsii; candidate species);
Steller Sea Lion (Eumetopias jubatus),
Finback Whale (Balaenoptera physalus),
Humpback Whale (Megaptera novaeangliae).
We have determined the described activity may affect designated critical habitat
for the Northern Sea Otter. We have concluded that at present, there is a no
affect for other species listed above. We have initiated the appropriate
consultation procedures under section 7 of the Endangered Species Act with the U.S.
Fish and Wildlife Service.
Any comments they may have concerning endangered or
-5-
threatened wildlife or plants or their critical habitat will be considered in our
final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
The project area is within the known range of:
Walleye Pollock (Theragra calcogramma)
Pacific Cod (Gadus macrocephalus)
Arrowtooth Flounder (Atheresthes stomias)
Rock Sole (Lepidopsetta bilineatus)
Flathead Sole (Hippoglossoides elassodon)
Sculpins (cottidae)
Skates (Rajidae)
Sharks (Squaliformes)
Forage Fish Complex (osmeridae)
Octopus (Octopoda)
Pink Salmon (Oncorhynchus gorbuscha)
Chum Salmon (Oncorhynchus keta)
Sockeye Salmon (Oncorhynchus nerka)
Chinook Salmon (Oncorhynchus tshawytscha)
Coho Salmon (Oncorhynchus kisutch)
The described activity would not adversely affect EFH in the project area, because
of the small extent of the project's direct impact on the marine environment, the
dissimilarity between the project environment and the marine EFH descriptions for
those species listed above, and the fact that it is unlikely to alter fishing
practices in the Old Harbor area.
This Public Notice initiates EFH consultation with the NMFS. Any comments or
recommendations they may have concerning EFH will be considered in our final
assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
-6-
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-7-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-1986-95-M1, Sitkalidak
Strait, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
\
.
.)
~..~·-
l
.~::';':
·'l
_..;f'\~(
-..,
· -:-r..,
.·
. \\
1,'
_..,
, .,..
.@ .../
,,l .,.u
.·~
..
r.:,,,
;·'·
\
4}
-
""""""""
+
i~
. ~' ·- ....-..J:-:· "'~:...,;:;(':._"'"
...
~
,,./ '
I,
\;,
VICINITY MAP
NO SCALE
Drawings List:
1) Cover Sheet
2) E"isting Conditions
3) Pro;>osed Improvements
4) Stream //3 Existing Plan and Profile
5) Stream #3 Existing Cross Sect ions
6) Stream #3 Proposed Plcn and Profile
7) Stream #3 Proposed Cross Sections
8) Str eam 1/4 Exist ing Plan and Profile
9) Stream #4 Existing Cross Sections
1D) Str eam #4 Proposed Plan end Profile
11 ) Stream #4 Proposed Cross Sections
12) Seulpb Creek Existing Plan en ~
13) Sculpb Creek Existing Cr ~ec ti ons
14) Sculpin Creek Proposeyclon and Profile
15) Sculp in Creek Proposed Cr oss Sections
16) Details
0
~--
cnocn-uo
::rro;:::+Q;:::+
CD O
A')>"<
CDCD~oO
..... 3o.: . . >. -
No-s:uC.OO
O)CDA'CX>0-"~
0)0.
-wSQ..Ns:ll
I~
L
o;:::+s=o__,.
_,.o
N
-.
"\
:-.,G-0
"\~~
v~*
0
BOO
"\+-~
1200
L_
..
-----.----300
0
'
'
900
SCALE: 1"=300'
D
I
·-- --
--
CITY of OLD HARBOR AIRPORT
RU NWAY EXTENSION PROJECT
I
ST~EAM
REALIGNMENTS
COVER SH~!::T
~-----------------
~
4}
EXISTING STREAM #1 (UN DIS~
(1)0(1)""'00
::::rco;:::;:o;:::;:
300
CD (") "A )> '<
CDCD~, 0
SCALE: 1"=300'
...... 30:-'"-.....co,.ex>-
0>0.
-wS!t·····--·-·- ·---·-- ...
~~
-'"Nil),...,
o;:::;:s;:rr
__,_
N
-'" 0
...,
~
=========~' ~ SHEARWATER
Ncr!))0...,
900
m
'M'TC
-
.
~
I
· '""
'
· · ._
~ ~'(?J.~fY1?H:. ...
215 B ... o;n Stroot, >.CIIford, on:o 45150
PH: (51~) 249- ~999, FAX: (51 ~) 2·~-91 " 1
II
I
__j
~~;:Yoi~,~~i,~~· e~~~~~J
STREAM REALIGN MENTS
EXI STING CONDITIONS
L _ _ __::_:_.:.:.=_.:..:.:_:_:__:_:___::_
_ _ _ _ _ _____;
l.;;'-~orj l
16
~
i!
0
600
~--
300
(J)O(J)
:::r (!) - . IJ ()
roo-o;::;:
(!)
(!)
s
ex>gm~O
;:_w ~cO~
....>.1\.)!l:IO'l!l)
0;:::::;:·-""
...
1\.)
s:::oo
....,
......
~
~
o~"'m-
L
J
)> '<
'0
1\.) 3 =
a._...._
- + - - - - -- - -----j I
\V/ftJ.TER
SHEAR.W.r\1
,
~ . ~X?J.~M?.L.L;; ., ,
215 6 Moln Stroot. "::lord. Onlo 4 5150
PH: (51~) 2-'8-g~gg, F~X: (51 ~) 24e- 9111
I
~~
I
- -- -
1200
.
1100
SCALE: 1"=300'
CITY of OLD HARBOR AIRPORT
RUW/AY EXTENSION PROJECT
STREAM REALIGNMENTS
PROPOSE'
IMPROVEMEN
-S
'J
I I
..
\
\I
I
/
I
I
i
!
,!
·
*i
I
1
;
I
/
/
t
\
\
\
I
/
I
/ ' ___/,.
;' .
I
.
!
.
.
.
/
'
.
~--11..
"-V""
. ~--v
..
u·(//
;; /
~
- .. .
/
.·/ / / .,
·
,
,... -
/
I
'
'1
/
/I
'
1
I
j :
I
.
(1)0(/)"'0()
:::rro;::::;:o;::::;:
(I)O~)>'<
/
#3
I
L
0~7'"0)0..
-w~::J:
~...... CJ1
....>. N ~- I
~
I
N
....>.
I
I
§.
o-s:o~
0
_,_
;.-
--
-
""",.
j
........
.
/
/
/
·
/
:I
. / '·'
,c . i
.
1I
V
I
,,
.
oo
.
_.
/ · 1·~ . ~·yALE~,
I
.l! ,
.
.
'
/
I
. I
/
/
.
I
I/
/
.
i sq,.
I
t
/
.
. ~
/ ·.
I
.· /
,
... . /
.
,_so
'
1"=sp··
\'
,.,.P / '
2or ·/ .'
/ ·
·
/
,·
/
/
1
.
;;
/
"
~1
-·"
I.·
I
:o
7
......
.):;0
'
- -~ ~.~r.~~~:ER
-~
I
.1
P r o f iI e
/
l ;r:
.· #./ I. / )
i _r /
.J
I
/
·
·/
~
!'----- .......
)(10
(1)(1)~,0
....>.-
..... 3 -·
~O"g-~0
.
f~
/
I
.
'
/ .
.
........
I GRAI'\~
/
.
'
I
!
··
. /
! ·· _/ .
/
Ex is t in g St r eam
r-
·
/ '
I
/
.
~
' /
../,
~~ {
\
/ (, / .
i
. !' ,
,/' / . .
)
I
I
- . y'
:·..
I
·I
/
/
..
~
/
. .y.
I
0
·:·0
CITY of OLD HARBOR AIRPORT
RU NWAY EXTENSION PROJECT
IlL
(51~) 2->:l- 9999, FAX: (51~)
24e- 9111
--·- - -J
I
EXI STI NG STR::AM #3
PLAN & PROFILE
--------~---=~~~~==~==~
...,
PH:
--------~=------
EXI STING STREAM # ~
..__;
Mr±lll r1ml
lll·ltUJ 1 1 1~1
!<0-40::.04'010Ctl'
"'40S
~
<10
:0:0
:00
100.1~
JO
~
·-
(!)
(!)
0
;;:;- )> "<
I
0
(!) !))
Wo-m0(!);;:;-CX>-
-wS!l->.1'.)1»,....,
o;:::;:s:;:o.......... o
"'
.....
, ..,
-
·
to
~
I
!:1
~~
I
40
ioc
·...oo
STA 3+ 00
l!iittf!IH1
,.
:, g.
-~
..
.
><~Q.I0~
-!04() ·40
.:.0
I#Uitfjj~l
:.o
·o
:o
:oo
10
e.
ttl
zc
~
<~'l
:.o
XI
:0
tO
~i
~
-=...,z
..
-
; ,. ; ,;,.. -- ·--
. - -··· ··»- - -
-=-
l
I
·· ·
~
·~, SHEAR' V /I'I.TER
~ SYSTEMS
215 3 Moin Streot. Millord, Ohio
PH:
45,50
24H''.' ________j '
IO
:0
JO
I I Emf·+ 1,Ill H~~
:.0
40
.>C
.')
1(1
0.
1 :0
:0
JO
...,
,
40:.0
RC'It H119~~
~
..,
~
:0
10
a.
10
:-1>
JO
o60
:.0
ST A 4 _:_ 0 0
E!: Ifl-t9·· 114~~
J
:-4)
o6 G
~:'OIOO.W
:
:/\I lD
=:: t==========· - ". . .... . . . . .
. -- --
Q.
· s TA 4 + 50
STA 3 + 5 0
STA 2+ 5 0
:.0.0Jt'"100.1070J040::.0
-30:-" .....
....
- - --- -
::.0
Wlt£1 1 11 1~!
(1)0(/)IJ()
..IU
STA 2+ 00
STA 1+ 00
::::r(!);:::;:o;:::;:
.'10:.
...
:0~40::.0
STA 0 +5 0
~
.
tfNtJ,m!
,.
nmm
rm
STA 1+ 5 0
STA 0 + 00
70
:04t'
:.O
CITY of OLD HARBOR AIRPORT
RUNWAY EXTENSION PROJECT
EXISTIN G STREAI\I. #3
CROSS SECTIONS
7. .
""'-""".a.>-:;
I.
OF
1 0c
I
~
!
ll
I
I
\
1
!
I
Pr-o:)os ed Str eam #3
I
1
··
ei§.B8:P-
~~
(/)0(/)
:J ro - ·
o
ro.-T 3££)>-<"
= I 0
o"'tl
(1)
-
(..)
0.._,. _.,
_,.o-suo~"'~
_.,w(J)·a..
~-
..,Jo.
L
::::r<.OI
1\.) Q)
01 Q)
__,.
s:o->.0
....,
0;::1!
1\.)
I
EBJ W _!ie'Q
- ·
~
:.0
~,
100
-. - -
~
1\.
.
t
TREAM >Rl l F ILE'
""
...
:00
'"'
...
""
SHEARWATER
~ . ?,:(?J.~M?.L_L~.: . . ,
215 B Moln S t~ect. ~:: for<', Ohlo 45150
PH: (~13) z.:.s- 9999, F~x: (513) z·e-9m __ _j
D
I
.,,.
..
...
'"'
.
_
..
,.
,
...
'"'
""'
CI TY of
O~D
HARBOR AIRPORT
;~~w;~:~~EN;I~~:::JE:~
PLAN & PROFI LE
PR OPOS ED STRE AM #3
STA 0 +1 9
RBJ II R!~ ~
~
""'
:w
~
~.u
o4(l
~
.u
~
:0
J. 'J
;g
10
ru
10
a.
10
70
::.0
.co
~
:+H I~:WiJ~
CL
HI
10
~
'\0
:AI
0
Am~
C\
10
:tl
~
110
~~
STA 1+ 5 0
STA 3 + 00
ld ff-FJmt,,J,.Jta~~
~
40
:10
:-o
10
Cl.
'0
zo
:'0
40
~~,~~~
~:1
!10
·?
so
::"()
0..
1('1
ST ~,
STA 2+ 00
10
::"0
30
4(1
~.()
3 + 50
Ill i¥1$BJ=f]~!
FfRJtllfffl~~
STA ?+50
STA 4+00
:.0
I
:10
40
30
~
10
0.
10
20
_,.,
40
~m;;
~.W
:.0
¥1M·nlftfl m~~
40
:lO
:0
I)
Cl,
10
::0
JO
~0
~
:-;,
J0&"010
CL.IO~:IO.r.O~.O
Itt
STA 4+50
RJ+ltifM~~
:n
""
»
.::o
10
o.
,.,
.;o
;:o
10
Cl
10
:tl
~
40
CDoA")>'<
CDCD~ 1 0
- 3 -· ...... -
fd rr
§- ..
L
9,...,(1)9'0..
~W - o-:s:rr
......
...... o...,
tv
tt ··. · nnl
····· ... ........
~
OA.'It
..........
~-...
·- ..
M(VI~
@ SYSTEMS
~~
2~ss
' SHEARWATER
_:.u.
w :. '
' '
9..1....D:-tC..a....Lt..O..L....C...O..ti.J.A.J(..' I:.....--.
M;n Stroot, Mil'crd, Ohio '5150
D
I
~(51 ~) z_::s-999_:.·_!.~x: !_:~J) ~' _.....1
.I
·o :.o
=§'
--r·T~~-~
I ;~~
'..0
"<'
.!.0
11)
10
0..
10
~,(1
C/)0(/)"'U(")
:::rro;::;:o ;::;:
JO
STA 5 + 00
9t$Ff,~
¥doc 1 ~11'T
40
Xl
CITY of OLD HARBOR AIRPORT
RU NWAY EX TENSION PROJECT
ST~EAM
PROPOSED
#3
CROSS SECTIONS
.'0
::.0
110
f,('l
~
·.._;
\
:-
\!
\
iI
I
I
I
' \
.\
I
I
I
!
>j
'!
I
I.
/
·! . /
·;
/
/
I
I
'
--
..
I
*
\\
I
::/'
......._
..
.o/
I -_, /
/.'
·;;::
/ -
~
/
'\.
\'\
, ,: ,: ·
": '
.
/
/
/ / ' / g r_...Y:;
I
)
/
\
~...._.//
....-
//
---,.
_ _./
I
I
"-._!
""
,//
.·
c._ x i ::3L I ' 1Cj
I
I
I
I?'~'
I
I
#4 Pr ofi l e
e u rn
_:) u
/
/
I
I
I
I
I
lJM/1 OF ,
_,_
!
I"
lldi>A¢1
. ~ ~,I rtr=Ffi I
CD (1)
Q)
,_30:
)> O
,~
100
.....>. -
~! ~! ~ 1 --~
-->.
N ~
'{I
L_
__
nm
!l)
0
&
-l. _. ;;;:
.....)r, Q
N
~:::oQ
.:s:.o
;co
·c.o
·;o
:..c.o
:..:.o
tOO
r.~~
i'oc
I
..,
····
· · · · · ~ ~ 1~~~~'fATER
.: . ... . ···-· . - · .··-····....... . ......
OAtt'
~ttw,:~ON
_j
"~· '"~, ~:· ~'~.
" ....I '"···........ '
"l ' ,"'
PH:
;)1,3
Z.:.S- 9991), FAX: ~!>1 ..J
24e- 9'1 , 1
--------
D
1:.0
o::.o
t100
-1
I
I
~
=
D:!
tt~
1ooe
C~~~~1YQ~~T~~~~~~ p~~j~tTT
EXISTING STREAM #4
PLAN AND PROFILE
, ...':!>'
/
-··--
I8~
I
#4
EX 'ST\NG STRE AM
STA 0+30
1
.)(!
IIff··r1t I Iij~~
M>
:.o
:o
·o o.
10
:o
~
.-o
"'
STA 5+50
STA 3+00
tttttl.tJ+I M~~
)0
·o
:lO
:o
10
o.
tt~
:3
JO
~
::o
bHIIJL[]~l
[$$$jzjsl[ll ~~~
STA 6+00
STA 8 + 50
,0.-oJO:O
STA 0+50
lll+-ff~ll l d~~
~
40:00:0
'OCI,
IO
~
~
.00:00
STA 3+50
STA 1+00
~DJ·~~ir}" Iij , II~~
~.C..10ro1netiO:ft30-4tl"¢
ST ,6, 1+50
""
.30
:<1
10
(\
10
:o
:'IC
"()
~· 3
STA 2 + 00
<1(1
:.0
:'0
10
(.\
10
:"0
::'10
oiO
~
STA 2 + 50
~a?~~2
CDO A )>'<
CDCD!l>,O
- 3 0: ...... .....
wrrs:u_
0 ..,
O)Q.
.......
w~cbi
~.., O'IQ)
....>. " ' Q)
I
"'"'I
C);:::;::s;:o-
....>.
N
....>.0
..,
ffffttttfRd~!
~
JO
:0
10
C1.
10
:0
,"0
olC
3C1
X I IO
C.\0
?J
JO
40:.0
~
mtflll H~l
~-----
30
:'0
10
C\
10
~0
11~~
:\0
'.-o
10
a.
10
:t~
,!.(,j
o10
:so
;-o
10
a.
10
:c.
."0-
4\)
"~"~
:.1'1
~
' 10
S ~A
!10
~
U)
XI
:'oO
4C
~)a
10
:0
30
40
:.c'l
·I;IN
~V
'"Cl.l0:0
30~~
'
m; 1±11 1u~~
~~
.'4;'0
1 ft010;>0
JO.tt\""'
H! : B~±Jtmd~~
ol ~
:".0
J:l
~
10
C1.
10
~
:),.,
·O
~~
STA 10+00
!+SO
1
EIBIII 1~~
mnmm~~
#,I
0.
STA 9+50
mtf] T§f~ l l H~
!'.tl
STA 5+0 0
)()
"CI
STA 9 + 00
STA 7+00
--~~
."0
:o
eo0.10:0:010C.IO::"'JOo&O~
STA 4+50
·o
~
HIlI III~~
#b 1·!91
;.ou
~
R~~
Ei1$tkkl
fI 4+ I Ill M~~
~
.,
::.o
:-o
·o a
z
!.()
:o-n
."oo
·o
~
Xl40~:0100.'0;'1):0·~).!1
:'4)
D
:c
l l i"@@SHEARWATE_R__
=================j1
~ .?.X?J~M?H:r... ,
"'"
........ ..,;,;,.= ·
------·
L
.0
STA 6+50
STA 4+ 00
:.o
II ttttlll ¥1~~
~
40
4!:/
)CI
:'O:O._,!.?
:.t'I.O."''~l00.1070.'lO..tl&l'l
§ffM·iLB I j,J~~
~0
IOQ.IO
kllii II I I~! m;,,m
!IJ
STA 8 +00
215 B Mo1n St·oct. ~:,ford. Ohio <51 5~
PH: {S1J) Z"-8- 9999, FAX: {51 ~) z:_e- 9111
I
CI TY of OLD HARBOR A.IRPORT
RUNWAY EXTENSION PROJEC-
EXISTIN G STRE AM #4
CROSS SECTION S
I ~
~--
~
Of
6
I
t
>;
)
,./
/----
)
//
\
Profile
I
I
~G.& ~
f"-.....
(1)0(/)""'00
-~
::rro ;::::;: o ;::::;:
CDO A )>'<
rorom, 0
--
....... 3=_....-
~g~~o
0 .....
0'>0.
-w5!2~- <{1 ~
o_.... ....... :s;:o_.... o
_.... N
L
N
-.
--
'
...
ffi:.O:E..~s."S)_:_s.m: :a~
. ..
-
I..\... ~ ~- -::: -:_j ~
:
:
-
.
l l
~,
~
"''
.
/
.......
:.0
I
...
\V/ATER
SHEAR.Wr\1
SYSTEMS
LLC
... ·· · · ., ... ., ......
215 e Main Stroot. M'ford. Ohlo 51 50
PH: (51J) 24tl- 99~9. F·x: (51J) 24e- em
cJ
I
I,.,
4
- - -··
j
. ..
"'
_
...---
"----
:0~
--'"'
,.
---
··~
0
""
""
CITY of OLD HARBOR AIRPORT
RUNWAY EXTENSION PROJEC-
I
""'.,- 7::.'.:";;s>-(t>
10
-
PROPOSED S REAM #4
PLAN AND PROFILE
I
,
I
-
or
16 1
PROPOSED
S TA 0 + 19
·~
:.o
:'(!
Itt
a. to
:"!'
~.,
·o
IA~litkt4M PI ~~
~..o
'Ill
.en
.'0
?O
tn
a.
1:)
XI
~
~fl
:.c'l
STA 3+00
::10
tmfd-H
kH I tl~~
40
:0
~
Kr
a.
I)
:0
:0
40
0
)I)
STA 3+50
I
: ..,
STA 1+50
-- ..............
-- -- ·- -
Cl
\ 0:0:'!0<10~
0
..0
)0
tm Iff [JJ~~
.\0
:0
10
Q.
~
:'0
JO
-60
~fH~~.
fif¥tff
.
,J-.v
-·~>Q.IO
:~
J0
40
:4)
tf1:tfil : II~~
~
.a
30
:o
tO
Q.
10
;oo
:10
4C
:.!1
~
~
~
~
10
~
10
~
~
·~
:0
10
0.
It"
:0
J0
40
:.0
M)
-'0
JO
.::o
10
0..
10
:o
.>;)
"<)
:.0
r-1111 1~~
t422trllll
-- --
~v
· .,
· "'
-- -..,
0.
10
:0
JO
..0
:4
'
~
STA 6+50
STA 7 +8 0
:.0
..-
tfM'ZbfW} I I I~~
STA 4+50
40
STA 8 + 00
STA 6+00
. t11±tffl l 1 1~~
Ftf11!fPFII n~~
)0
S TA 5+5 0
Mt4±3EWII H~~
:.0
STA 2 + 00
II
· ..,
STA 4 + 00
m-rn~
t=ilcl4
M
.,.,~ ..
#4
STA 2 + 50
BiiJ I M~~
r.o
STRE~ M
!10
40
:'0
~
ICCl.IO
:0
30
:ttn¥#f 1 11
7
~40JO:OtOO.
·o:oJO
4~
~')
l~i
·)~'
cnocn-uo
::Tro;::;:o;::;:
roo 'A)>'<
(I)
(I)
ll)
I
0
-3=_,.-
~rrg.~o
0~7'0>0::
-w~cbi
~ ->.
N
-. 0"1
~.
I
~
o-s:;:rr
->.
->. 0
N
-.
1- ---- ---------- - ~·
Mlt
a ..........
, ......... ~....... ,.,.,,,,... ···-t«w."JON
I
--- ·- -
~J. ~-.:~:r:~m?.'.'f....
- SHEARWATER
215
a Mo:n
on:o :!4e
45150
248-St,oot.
9999, Mllfg,d,
FAX: (51J)
- 91"1
P~: {51 ~)
'--------·-·---
D
CITY of O~D HARBOR AIRPORT
RUNWAY EXTENSI ON PROJECT
PRoposE o s TR EAM
CROSS SECTIONS
#L
~~
S:"~
1
I
00"
1 16
I
I
(~
4)r
'·.
·-
~~
v
l
\
'
I
~
-1:,
/~_j
__..../
(
______........ ' ..J
\
.
!
r-··
.-. .
:. . _. .. :· ·.\
~// .·\.
.
.
~
./~
/
#
.
/
--~
I
\
\
··.,
.
/
(
'
__j
--
·
/'
\
r
\
~
' .
f
i
""'- -
·'---
.
,/,...--.....
~ ~~.___./
.
'·
..---...,.
'----''
\
\
\
\I
~
....,""'1 /
\
I
I
(
..... ·
\·\
'
\
~
\\
.
-- 1-~
SCALE: 1" =50'
(~-~
\
Exi s ting Sc u l:)·n Cree k Profi le
~
(I)
o Q?. -uo Q.
::lCD.-.
-
~g~~~
"~
_;;,~~if
..., ;
....>.
I
1"\.)
"....,
....>. "' ;;:
....>. rr
Q
o!"\.)
-
---..:._
l
~,.,, ,
- ··- ---···-··
=- ----- - ---1
"""""'
.... ..... ... ........... ...
EJii.S.II.ti.G_S~~M_PB.Q~_LE_ _/
~
~
- - -
~P~: (SI~)?.X?J:~!Yl?Hc....
"~ "~"" . .
R\V/1\TER
SHEA wn.l
- - · ··--- . ''"'
FAX.
--
"'
"'
"'~
·
:'
~
~
~
~
-- K
CITY of O~D HARBOR AIRPORT
RUNWAY EXTENSION PROJECT
.
Milford Ohio 45\50
248-9999,
"'' '"
~
4
'
=
D
~~e."'' :E:o::::G'.BA!l':t:
r
_,_
-
-
g. co 0
Ill · '
I
I
-3 --__,_VJ 0"
I
I .............
1I
-
I
EXISTING SCJLPIN CRoo
PLAN ANo PRoFILE
I 121
or
16
EXiSTI N G SCULP fN CREE K
.
mg
;.:f ki l[WJ~i
STA 0+00
,.
""' ~
!.0:0:
~0~
I~ d
.-
-- -- - ..
...,.
""
....
' "'
....:.
10
:::1l
.::o
o! C
~~~
;IV
...0
:10
!10
10
et.
10
X)
!~
o!~
STA 1+ 00
Uf#m
-
.. . .
--
--
.00
.:.0
~'()
'0
0..
::t~
ID
XI
0.0
4 +5 0
PItvtwl F! ¥f9~~
:.c.
:.C
"o
.10
:flo
10
c~..
·o
:."O
:oo
o~o
,_,
~
STA ? -+ 00
STA 0 - 50
!.0
S~A
STA '1+5 0
~D
tltttttl3tt1Zl~
41J
;o
:-o
·o
t\.
10
:o
~
.-.,
:.a
,
STA 2+50
~
m i iftti~
'0
o!O
X,
.::"0
10
0.
I CI
::0
J;)
"(l
~
STA 3 + 50
II I I ~~
l"l::o dJJ Ill
ST/-\ 4 + 00
bR :tttl#f#fH~~
""
:'-0
oA
.....,
"0
OA
,....,
JO
·- .,
;o
·-
"'
10
'
1;1.
0.
10
1:1
::':!
:()
JO
~
o!O
.4(1
:.0
~
'
s-A 5 +5 0
fi14,ij,ffb!
~ ;::~
~
40 ~
~ ~
·""
,.;v
w
0..
o
-:o
JO
.tO
~~ ~
~o
-- -- -- --
~O~"UO
CD CD 0 -·
cogs)>-<
-3
=
0
(;,)
o.-'"l
corrma ..
L
c;,o:
~ _(;.) ~ I
_,NmO'In>
~;::;:~'O-
N
_..g
t. -- ·- .:_: :i ~~~~~:ER :0
MCVI~:W
P-~: ( !:>1.)) 24-8-9~9-;;l,
FAX: {51J) 248 - 9111
·-------~-·--·-· -·-·····-·····-·-·-·--······--··· ---···-·--·-·---
CITY of OLD HARBOR AI RPORT
RUNWAY EXTENSION PROJEC'l:
EXISTING SCU i_PIN CREEK
CROSS SECTIONS
J
13
/ /
16
1
.I
/
/
o/
-. .
"(__~-~
~
f
·.Lrv
.
'
.
..
.
.
-
r---
0
....-~
1' ··· _ ./
100
'
~ -~
50
150
SCALE: 1"= 50'
C1reek Profile
'T"'"~
.......-----t--...
(1)0(1)
::r
(1) - ·
L_
-u ()
~ ~ ~~~
-
Cib3=·0
(0
o..-"-
ogmc.oo
_...,A"co
~(.,.)(1)~0:
-c.oi
1\.) ~- Cf!.),)
-->. -
L
~-s::a-
1\.)
...,
-->.0
.
·-
...........
.
...
.
...
-·
.
...........
...
·-
·)0
m
-
~\:.1 ~)
2:-a- 9999, FAX:
»0
S)l)
..~ --- --=------ ~~~I ~
~~~~:;:~TER
~' """'~''
··~·· ... ~"
-
"
.,
I
,..,,...
(51~) 24B-g,,,
---..··- ·- - -
. r--..
.
...
~00
:n
0
-
''"
>00
"'
7:oO
I
1001)
:o ~
J
"§
'
f---.~~
0\':10
CITY of Q;_D HARBOR 4.1RPORT
RU:-JWA Y EXTENSION PROJECT
PROPOSED SCULP IN CREEK
II===--~~~~-PLAN AND PROFILE
_ ,J
~
PR OPO SED SCU LPlN CR EEK
STA 0+39
STA 5+00
tll'mt+B~~
EI +·-t~frt I m~~
:>:)
40
::1-0
::o
1;)
a.
10
zoo
~
~
~
STA 0 + 50
8ftj7141 11 12~~
!.0
~~
:IQ
XI
lO
Cl.
10
70
~
o!O
::.0
'
STL\ 1 + 00
~
~HHR~~
.:0
40
.:")
10
a.
10
;lQ
.',0
1.0
STA 1+50
STA 4+00
:,c.
:o
1D
CL
~0
~
~
~
:.0
ttfi!tf3Jf#FF~~
~~
40
.:.o
:0
10
C1..
10
:tl
)()
40
:.0
STA '? ---:- 00
fffSltf £Jjj~~
!'-0
olt)
:.¢
~
1':1
a.
10
::o
:0
40
~.0
1:0
0.
,,
:o .:.c
..,
=""
5 + 50
~ll
"0
JO
X)
1~0.10
:'G
::.0
o!O
~
~
:.o
40
~
lO
10
a.
l l)Q,
10
?:)
;:o
~....
.:.o
;o
40
40
..,
.:.o
:o
10
Cl.
10
~
.:.0
o40
~
~'
""
).}
?O
·o
t1.
10
~
~
~o
·..r.o
STA 8+50
bf¥#fJ11 1 1.1..1~~
~
·'):IJ:0100.10~:.040X"I
STA 6+50
ffl"tiJiiif HI ~~~
STA 4 +5 0
8fFiit44fij~~
40
~
H5$tttlll l ! ~~
~r,
·"' "'
:;.o
b±t1:tM4dd~~
STA. 8+00
STA 3+50
k11:!2f1tl48 H~!
40
~'0
f"EFb
!I()
~~
!lo:J
:.0
S T~~
STA 3+00
:)!)
.0
STA 7 + 50
fH~til'"Pbl PI~~
:.o
~
-'Q
:.0
:'0
10
0.
10
::00
:'..c
~
!-:1
STA 7+00
E 15!t#kl d~~
~
:.0
40
:0
::0
10
CL
10
:o
,:..,
40
:.~
wow-uo
Q
m
~ ~ )>~
...... 3:::
Q
-:::T CD - ·
I
~
o.~-
oo-!l>«>o
CD7'00-
L
.
.......
0 -.(/)0>0.
(,.)
~-
~
I
(!)
:c
~N!l)Ol!l)
~;::;:gaN
~g
~- ----- - II ~
~~~~ATER
~-_....-'-OJ....li'~
........ J ··..Jrr._
;~
-=-~=~-=="'--=--===-:=---===-
·
.2 15 S Moln Streot, Mi11ord, Ohio 4 51 50
PH: ( 51.:5) 248-9999, F'AX: (5, ~) 2 4-e- 9:111
-
c
CI TY of OLD HARBOR AIRPORT
RUNWAY EXTENSION PROJECT
PROPOS ED SCULP IN CR EE K
CROSS SECTIONS
11/~ 161
~--~~~~~----~
I
-
""""".."""'=- - - - - - - - ---i
t,
~~I
-.....
l. . . . .___...,.ftdllew..AiiM\IWIIIt.-a.t . . toMICttof .....
~
,.,.....,......._ . . . . . . . . . NIIIIIfl . . ~~""'*""'"' · ,_
). --. ... .,...""'a ...... .... .
""""*" \ota..fl...,'llllll ti !M~ir. . . . . ~O!'d otfl- --lwl'ol
·-........
';0/UrmT, I'
.. e.:ll'fll
4.
l'loot l~ tO,I'!I)t.
l·lll<>_..,.,..., ~..,-~.lnllfltt..- t.M ~Jor
IIAII'I HIIIIMtloo 1»11
'*'" IJoloo
,...o,.......lr -r:.llt.Cft$·-'"
II:~ MUu IWdlr- ~ ~II' 10 ..._1*'\
tlfiCI-.,_Itf tfll'~·~~~ eJ'OII'A r.oto,'lc.j J·W'I'OIIIIloo!,,
wmM. :q
~~'-~ ttoe~ ~~oo,-;,.._JOo~....
.,..,..,..,Jioci..._.MIIIoetd.,_.IIW.,..,._Ia~t. bot!W~
~MCI..OI~
~ ~
lN*-,..,...WitiiP~*-.....,......,...,...,-.ca~ ..,
::.::::; :::.:"..::.::.:"* ............ """"" .. - ...
t.
·1:· P~ . CJ,s:'; !~H&Fi
eta..!.~
tol ' " - .,... ...
jill;!~·
11111'1(1 - - . . ., ~ ~~ 001 ~· , . . . .,
///
MEANDERING CHANNEL PATTERN DETAIL
NO- :.cAl(
""""..,. CMJlHINC
PRtTtRRCD TO rOR"W co..m
ENLARGED PLAN V:t;N
"'"""'
RELOCATED STREAM CHANNEL/ROCK ?LACEMENT DETAIL
'OO:;tAL[
""""'
(/)0(/)""00
::rm;:::;:o;:::;:
roo "A)>'<
CDCD~,
l
STREAM CROSS-SECTION
·!)TH
"'"""'
v~ -
0
-3 - · __,_-
~g~~o
o-.
mo..
-wSQ-->-1\.)Dl,~
o;:::;::s:;:o__,_
1\J
-->.0
-,
1--+--1- - - --
-
-
·1
::a r'LN'I
~J.r~%~~R ~o
P· : ( 51J) 248 - 9999, FAX. (51J) 24e- 9111
' - - - - - - - - - - -.......J
·..:. .._ _ __
CITY of O~D HARBOR AIRPOR T
RUNWAY EXTENSION PROJEC-
DETAI _S
Sculpin Creel<
Streams Surveyed
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Lat: 57 o 13'8.9811 N
Long: 153 o 16'5.95 11 W
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 16 of 41
Sculpin Creek Realignment
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Long: 153 o 16'5.95"W
Lat: 57 o 13'8.9811 N
Sheet
of
City of Old Harbor
POA-1986-95-M1
Sitkalidak Strait
December 3, 2012
Sheet 17 of 41
\
{
/{_
l
~)
!-~
,7
.......
j
,
I!
(( I
I
/ )//1
South Stream Realignments
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21, T.34S,R.25W
Long: 153 o 16'5.9511 W
Lat: 57 o 13'8.9811N
Sheet
of
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 18 of 41
Realigned Sculpin Creek
Sculpin Creek Realignment
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec.21,~34S,R.25W
Lat: 57 o 13'8.9811 N
Sheet
of
Long: 153 o 16'5.9511W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 19 of 41
3
500
Stream #3 Profile
500
Stream #4 Profile
Sculpin Creek Profile
500
Stream Realignment Profiles
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4, 700 feet
Sec. 21, T. 34S, R. 25W
Lat: 57 o 13'8.98"N
Sheet
of
Long: 153 o 16'5.95"W
City of Old Harbor
POA-1986-95-M1
Sitkalidak Strait
December 3, 201 2
Sheet 20 of 41
Preliminary Runway Extension Plan
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend Airport Runway to 4 ,700 feet
Sec.21,~34S,R.25W
Lat:
Sheet
57 o 1318.98 11 N
of
Long: 153 o 1G·s.9511 W
City of Old Harbor
POA-1986-95-M1
Sitkalidak Strait
December 3, 2012
Sheet21 of41
Preliminary Runway Extension Plan
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend runway to 4700 feet
Sec.21,~34S,R.25W
Lat: 57 o 13'8.98"N
Sheet
of
Long: 153 o 16'5.95"W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 22 of 41
Preliminary Runway Extension Plan-Cross Sections at Wetlands
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend runway to 4700 feet
Sec.21,~34S,R.25W
Lat: 57 o 13'8.98"N
Sheet
of
Long: 153 o 16'5.95"W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012
Sheet 23 of 41
140
130
120
110
10 0
90
'A'
Preliminary Runway Extension Plan-Cross Sections
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend runway to 4700 feet
Sec.21,~34S,R.25W
Lat:
Sheet
57 o 13'8.98 11 N
of
Long: 153 o 16'5.9511 W
City of Old Harbor
POA" 1986"95"M 1
Sitkalidak Strait
December 3, 2012
Sheet 24 of 41
Preliminary Runway Extension Plan-Cross Sections
File No:
WATERWAY:
PROPOSED ACTIVITY: Extend runway to 4700 feet
Sec.21,~34S,R.25W
Lat: 57 o 13'8.98"N
Sheet
of
Long: 153 o 16'5.95"W
City of Old Harbor
POA-1986-95-M 1
Sitkalidak Strait
December 3, 2012