PORT LIONS
REPLACEMENT
DOCK
POA-XXXX-XXX
KODIAK ISLAND, AK
PORT WAKEFIELD
Figure 4. Project Staging Areas
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 21 of 23
'JrlHilE CONSERVA'Jl'JfON JFUNID>
BRAD A MEIKLEJOiJN
ALASKA REPRESENTATIVE
2727 HILAND ROAD
EAGlE RIVER, ALASKA 99577
(907)694-9060
BRADMEIKLEJOHN@AOI-.COM
October 11, 2012
Robin Reich ·
Solstice Alaska Consulting, Inc.
2607 Fairbanks Street, Suite B
Anchorage, AK 99503
RE: Coinpensatory Mitigation for Port Lions Dock, Pmt Lions, Alaska
Dear Ms. Reich,
Tl]is letter is in response to your request for an estimate of the appropriate h1-lieu fee
compensatory mitigation associated with the replacement of the dock in Pmt Lions,
Alaska. Based on yonr correspondence, the project will impact 3.5 acres of wetlands.
The new rule on compei1satory mitigation, published in April 2008 by the Enviromnental
Protection Agency and the U.S. Army Corps of Engineers, provides the legal framework
for mitigating wetland loses for all regions of the country, including Alaska. The guiding
principle of"no net loss" of the nation's water resources is reiterated and reinforced in
the new mitigation rule.
The Conservation Fund has a Memorandum of Agreement with thtl Alaska District ofthtl
U.S. Army Corps of Engineers to receive il1-lieu fee compensatory mitigation. As
provided by that agreement, The Conservation Fund uses the mitigation fees to purchastl
and protect high-priority wetlands. Howtlver, preserving some wetlands does not
mitigate the loss of others and does not fhlfill the "no net loss" mandate. As a result, the
2008 rule requires that mitigation ratios higher than 1:1 be used where preservation is
used as mitigation.
Based on your characterization of the wetlands I will assume that the required mitigation
ratio for this project will be 3:1. Therefore, the compensatory mitigation for this project
must btl sufficitlp.t to preservtl 10.5 acres ofWtltiands.
In calculating an estimate ofthtl appropriattl in-lieu fee, we consider the following:
1. The mitigation ratio.
2. The costs to pnrchase land, including but not limited to the purchase price, appraisals,
surveys, title research, legal expenstls and closing costs.
3. Thtl costs to own and manage land in ptlrptltuity, including but 1iot limited to physical
and legal deftlnse, property taxes, stewardship fees and management expenses.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 22 of 23
For this project, the land cost is calculated at a rate of$20,000 per acre, resulting in a
total land cost for 10.5 acres of$210,000. Transaction and stewardship costs are
estimated at $21,000. Thus, the total in-lieu fee for this project is $231,000.
This is an estimate and is subject to revision. The actual required compensatory
mitigation will be based on the acreage and mitigation ratio described in the permit issued
for this project by the U.S. Army Corps of Engineers.
Please provide me with a copy of the permit issued by the U.S. Army Corps of
Engineers for this project prior to maldng payment. We retain the right to revise
·
this estimate based on information contained in the permit.
Payment can be made by sending a check to:
The Conservation Fund
2727 Hiland Road
Eagle River, Alaska 99577
Please include the permit number and the name and contact information for the individual
at the Corps ofEngineers who is handling the permit. We will notiJy the permittee and
the Corps once payment is received.
Please contact me at (907) 694-9060 ifl can be of fhrther assistance.
Sincerely,
~c-!Vv~~"Brad Meiklejohn
Alaska Representative
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 201 2
Sheet 23 of 23
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JEER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
February 27, 2013
EXPIRATION DATE:
March 29, 2013
REFERENCE NUMBER:
POA-1966-43
WATERWAY:
Kizhuyak Bay
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Heather Boyer at (907)
753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at Heather.L.Boyer@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
City of Port Lions, Kathryn Adkins, Post Office Box 110, Port Lions,
Alaska 99550, (907) 454-2332
AGENT:
Solstice Alaska Consulting, Inc., Robin Reich, 2607 Fairbanks Street, Suite
B, Anchorage, Alaska 99501, (907) 929-5960
LOCATION:
The project site is located within Sections 4 and 5, T. 27 S., R. 22 W.,
Seward Meridian; USGS Quad Map NAME X-X; Latitude 57.8604° N., Longitude 152.8600°
W.; at the end of Kizhuyak Drive, in Port Lions, Alaska.
PURPOSE:
The applicant's stated purpose is to construct a new City Dock in Port
Lions to support the existing ferry, barge, and other marine transportation
services in Port Lions.
PROPOSED WORK:
The applicant proposes to place 113,200 cubic yards (CY) of clean
shot rock, 6,200 CY of underlayer rock, and 3,800 CY of riprap into 3.5 acres of
tidelands for the construction of a new municipal and ferry terminal dock.
Detailed project information and drawings are provided in the enclosed plan (sheets
1-23), dated December 2012.
APPLICANT PROPOSED MITIGATION:
The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance:
The applicant considered other construction designs that did
not involve the placement of fill or required less fill.
The applicant determined
that these alternatives would not meet the purpose and need or would not be
practicable due to cost and/or maintenance issues.
Therefore, the placement of
fill into waters of the United States could not be avoided. A detailed discussion
of these alternatives is provided on attached sheets 3-5 of 24, dated December
2012.
b. Minimization:
The applicant has proposed a variety of minimization
measures and is detailed in the enclosed plan sheets 12-15 of 24, dated December
2012.
c. Compensatory Mitigation:
The applicant has proposed to provide
compensatory mitigation in the form of an in-lieu fee payment to The Conservation
Fund at a 3:1 ratio.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places.
There are no listed or eligible properties in the
vicinity of the worksite.
Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources.
This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
southwest distinct population segment of northern sea otter (Enhydra lutris
kenyoni), humpback whale (Megaptera novaeangliae), fin whale (Balaenoptera
physalus), the western distinct population segment of Steller sea lion (Eumetopias
jubatus) and the potential for members of the eastern distinct population of
Steller sea lion to occur near the project area.
The project is also within
designated critical habitat for the northern sea otter and Steller sea lion.
We have determined the described activity may affect the threatened and endangered
species and designated critical habitat listed above. We will initiate the
appropriate consultation procedures under section 7 of the Endangered Species Act
with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service.
Any comments they may have concerning endangered or threatened wildlife or plants
or their critical habitat will be considered in our final assessment of the
described work.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
-2-
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken b~ the agency, that may adversely affect Essential Fish
Habitat (EFH) .
The project area is within the known range of squid, yellowfin sole, arrowtooth
flounder, rock sole, flathead sole, sculpin, pacific cod, skate, walleye Pollock,
chum salmon, pink salmon, Coho salmon, Chinook salmon, and sockeye salmon.
We are currently gathering information regarding these species and have yet to make
a determination of effect.
Should we find that the described activity may affect
the species listed above, we will follow the appropriate course of action under
Section 305(b) (2) of the Magnuson-Stevens Act.
Any comments the National Marine
Fisheries Service may have concerning essential fish habitat will be considered.in
our final assessment of the described work.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING:
Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application.
Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION:
The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments.
The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, ~and use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (1) guidelines.
Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
-3-
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate. the impacts of this proposed activity.
Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal.
To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above.
Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X)
Perform work in or affecting navigable waters of the United States Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344).
Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNQ')
STATE O,F ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result ~n a dlscharge into navigable waters, in accordanc~ wi~h Section ~01 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the.discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws.
By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable·waters under
S~ction 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hepeby given that the application for a Department of the .Army Permit
described in the Corps of Engineers' Public Notice No. POA-1966-43, Kizhuyak Bay,·
serves as application for State Water Quality Certification from the Department of
Environmental Conservation.
After reviewing the application,· the Department may certify there is reasonable
assurance the activity, and any discharge that might resplt, will complywith the
c;:lean Water Act, the Alaska Water Quality Standards, and other applicable State
laws.- The Department also may deny or waive certificatiOn.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice~
City of Port lions
City Dock and Ferry Terminal Replacement Project, Port Lions, Aiaska
Project Description
December 2012
Overview
The City of Port Lions (City) In association with the Native V111age of Port Lions, identified replacing the
existing City Dock and Ferry Terminal as their number one priority for the community. Thus, with
funding from the State of Alaska, the City proposes to construct a new municipal and ferry terminal dock
to replace the existing dock serving the community. Once the new dock is constructed the existing dock
would be removed. Port Lions is located on the northern coast of Kodiak Island, about thirty air miles
northwest of the City of Kodiak and 260 air miles southwest of Anchorage (T027S, R022W, S04, Seward
Meridian; USGS Quad Kodiak D-3, Figure 1), The new dock would be located approximately 30 meters
(100 feet) south of the existing dock In Port Wakefield of Kizhuyak Bay.
Purpose and Need
The purpose of this project is to construct a new City Dock In Port lions. A new dock Is needed to
support the existing ferry, barge, and other marine transportation services in Port Lions.
'-,
Port Lions Is a remote coastal community on Kodiak Island with no road connection to the City of Kodiak
or the mainland . The existing City dock provides transportation that Is vital to the life of the
community, The dock makes it possible to transport equipment and goods to and from Port Lions. The
dock connects residents to the mainland via the Alaska Marine Highway System (AMHS) and provides a
landing for fuel barges, commercial fishers, oil spill response vessels, and other vessels including those
of the U.S. Coast Guard and the Alaska State Troopers. The community of Port Lions relies on the City
Dock for cost effective delivery of cargo and fuel and for lower-cost passenger transport.
The existing City Dock was constructed with creosote treated timber piles in 1968. Age-related
dilapidation and damage have left the dock In a deteriorated sub-standard state: the dock is In poor
condition with Inadequate lateral stabilization with a significantly reduced weight capacity. According to
the October 2009 City Dock and Ferry Terminal Repairs Technical Report, prepared by the U.S. Army
Corps of Engineers (USACE) with funding from The Denali Commission, the dock Is in such a degraded
condition that repairing the existing dock Is not a viable option and replacement is necessary (USACE
2009). [Photographs 1 and 2 provide close-up and aerial views of the existing dock.]
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 1 of 23
City Dock Replacement Project; Port lions, Alaska
Project Description
Page 2
Phota,grView existing Port lions City
(Photo credit: TerraSond, May 13, 2011)
The existing dock, due to its degraded and unsafe condition, no longer meets the current or future
needs of the community. In orderto continue using the existing dock the City has been required to
reduce the weight limits that are allowed on the structure. The original weight capacity of the dock was
50,000 pounds but that capacity has been downgraded to 17,000 pounds In recent years and vehicle
traffic is now limited to two at a time (USACE 2009; ADOT&PF 2011). These weight restrictions have
resulted in negative Impacts to dock users, including cargo vessels and fishers.
Barge service from Seattle was discontinued in 2005 due to changes within the shipping company.
Residents now rely on a State ferry, beach landing craft, or plane for cargo delivers: services that are less
cost effective than larger barge service. Due to the weight restrictions on the City dock, large or heavy
loads must be delivered to the small boat harbor or the barge landing ramp via beach landing craft.
Currently, fuel is delivered by tug-assisted barges to the existing dock. This method Is the most costeffective for the community because the fuel lines are located at the dock. The progressively
. City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 2 of23
City Dock Replacement Project1 Port lions, Alaska
Project Description
Page3
deteriorating condition of the dock could make It unusable for fuel barges within the foreseeable future;
wherein alternate means of fuel deliveries would significantly Increase the cost of fuel (USACE 2009}; ·
Further, most boaters in the community receive fuel at the dock and these users would have to Incur
additional expenses to purchase fuel elsewhere. This would also negatively impact tourism, an
Important Industry for Port Lions, since tourists arrive aboard the State ferry and private vessels, which
rely on the fuel facilities at the dock.
·
Currently, the AMHS's 300-foot M/V Tustumena provides ferry service to Port Lions, docking In the
community two to three times per week year round. The M/V Tustumena was built lri 1964 and is
reaching the end of its usable life. Correspondingly, the existing dock cannot accommodate the newer
and larger M/V Kennlcott, which was built In 1998, because the ·water depth at the dock and the dock
configuration are not sufficient to meet the safety docking requirements of this vessel. Thus, the new
dock Is Intended and designed to accommodate the AMHS's approximately 400 foot long M/V Kennicott,
which currently serves southwest Alaska communities.
If the new dock Is not constructed prior to the retirement or overhaul of the M/V Tustumena, Port Lions
could lose State ferry service which provides a critical passenger service to· Kodiak, the mainland, and
other transportation systems In Alaska: and, Is an Important cargo link for the community. At this time
the AMHS states that It Is unlikely that the M/V Kennlcott would dock in Port Lions, however, currently
they have no plans of relinquishing ferry service to Port Lions (USACE 2009}.
Therefore, the new City Dock project would increase the safety, efficiency and reliability of marine
transport while improving the community's Infrastructure and quality of life.
Alternatives Analysis
A No Action Alternative and six potential build alternatives were considered for this project, as
summarized below.
No-Action Alternative
The City considered a no-action alternative. Under this alternative the existing dock, which is in very
poor condition,.has significantly reduced weight capacity, and is beyond the stage of repair, would
continue to serve the community. According to the USACE's October 2009 City Dock and Ferry Terminal
Repairs Technical Report, within the next 50 years, the existing City Dock will become unable to
accommodate users. The no-action alternative would continue to jeopardize the safety and efficiency of
marine transport in the community.
. This alternative was dlslnlssed because it does not meet the project's purpose and need for supporting
the existing and future ferry, barge, and other marine transportation services in Port Lions.
Repair the Existing Pile-Supported Dock
The City considered repairing the existing Dock. According to the 2009 USACE Technical Report, it Is not
feasible to repair the existing dock. The Corps report states that the ·existing dock Is beyond repair due
to the extent of damage and age-related degradation that has occurred.
This alternative was dismissed because it did not meet the project's purpose and need for supporting
the existing and future ferry, barge, and other marine transportation services In Port lions.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 3 of23
City Dock Replacement Project} Port Uons1 Alaska
Project Description
Page4
Construct a Concrete Launch Ramp
The City considered constructing a concrete launch ramp sited at the existing launch ramp (2009 USACE
Technical Report). This alternative would accommodate barges and other vessels wishing to launch
from shore. In 2009 the project cost for this alternative was estimated to be $540,000.
This alternative was dismissed because It does not make any provisions for continued ferry service Into
Port lions, and the launch ramp would n<;>t accommodate fuel barge deliveries. Fuel barges would be
required to 4tllize beach landing craft to bring fuel to shore.
Construct a Pile and Concrete Deck Trestle
The City considered constructing a ferry trestle with mooring points and a fuel line (2009 USACE
Technical Rerort). In 2009 the project cost for this alternative was es!imated to be $6,400,000.
This alternative was dismissed because it does not make provisions for heavy cargo service.
Constru~t a New Pipe Pile Supported Dock
The City considered constructing a steel pipe pile and concrete multipurpose dock with mooring and
breasting dolphins, and an access trestle (2009 USACE Technical Report). This alternative would provide
for continued ferry service from the M/V Tustumena, facilities for cargo loading and offloading, and
continued fuel barge service. In 2009 the project cost for this alternative was estimated to be
$8,800,000. . .
This alternative was dismissed because of Its shorter lifespan (50-60 years) than the preferred solid fill
dock alternative (explained below). This alternative was also dismissed because of the costs of
maintenance and upkeep that are common to pile supported docks but not needed with a solid fill
alternative. The City wants to construct a community facility that will last well into the future without
costing the community valuable resources. The pile supported dock Is not reasonable considering that It
would require maintenance and because it would have to be reconstructed In approximately 50 years.
Construct a Minimal Solid Fill Sheetpfle Dock
The City considered construction of a minimal solid fill dock with a 530 fQot long by 24 foot wide gravel
causeway (2012 PND Design Study Report). The face of the dock would be positioned over the -25 foot
mean lower low water (MLLW) contour at the mudline. This alternative provides adequate dock face ·
width and mooring capability for the M/V Tustumena, which was requested by the AMHS. However,
dredging would be required In the future to continue to accommodate the M/V Tustumena. Continued
dredging would be costly and disruptive to the marine environment. This alternative would not
accommodate the M/V Kennlcott or other similar draft vessels, which are larger than the M/V
Tustumena. In 2009 the project cost for this alternative was estimated to be $10,867,000.
This alternative was dismissed because it would require maintenance dredging In the future in order to
serve the M/V Tustumena, which would be costly to the City and would have long term expense and
environmental impacts. In addition this alternative would not accommodate mooring of the M/V
Kennicott or other similar draft vessels.
Construct a Solid Fill Sheet Pile Dock {Preferred Alternative)
The City is proposing to construct a new approximately 3.75 acre solid gravel fill sheet pile dock with a
gravel and armor/rip rap embanked causeway, (February 2012 PND Design Study Report, August 2012
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 4 of 23
City Dock Replacement Project, Port lions, Alaska
Project Description
PageS
PND 50% Design Submittal ). The dock would have an approximately 65 meter (215 foot) long fender
face with a catwalk extending to breasting and mooring dolphins to accommodate the M/V Kennlcott
(Figure 2).
This solid fill dock was selected as the preferred alternative due to its longevity and sustainablllty. This
· solid fill design will minimize requirements for maintenance and repair, and is an optimal long term
structure for meeting the Project's purpose and need. This solid fill dock would not require repairs, or
construction of a replacement dock, in the foreseeable future. The sustalnability and longevity of the
dock will minimize disruption to the marine environment. Solid fill docks are oftentimes significantly
more expensive than pile-supported docks due to the purchase and transportation of large amounts of
material; however, Konlag, Inc. has committed to providing project materials at a competitive rate
making this alternative feasible.
Preferred Alternative Details
The face of the dock would be positioned over the -9 meter (-30 foot) MLLW contour at the mudline In
order to accommodate vessels similar in size to the M/V Kennicott and 30 meter by 120 meter (100 foot
by 400 foot) barges at low tide. The new dock Is located approximately 100-feet south of the existing
dock along the same dock face alignment as requested by the AMHS and other users. The location of
the new dock would eliminate any requirement for dredging and allow the existing dock to remain In
service until the new dock is constructed. Erosion protection measures have been incorporated Into the
design Including construction of an armor rock slope, with a median size of 5 tons, at the exposed
southern end of the dock to protect the dock from exposure to waves from the northeast.
An approximately 190 meter long by 7.5 meter wide (620 foot by 24 foot) gravel causeway would
provide access to the dock. To provide erosion protection from waves and currents along the causeway
an armor rock slope with a median size of 5 tons would be constructed. A riprap slope would be
constructed on the lee side of the causeway to provide erosion protection from waves and currents.
This project would provide fuel, water, and electrical services to the end of the dock. The fuel piping
system, which would provide both gasoline and diesel, would consist of an above ground welded steel
piping, a fueling dispenser, a dockside fuel barge connection, and a connection to the existing
aboveground piping system. The fuel pipe would be protected from corrosion by a cathodic protection
system. A water service connection would be extended from the existing water distribution system to a
dock fire hydrant and the water building. The electrical system would consist of a distribution conduit
and cables from the existing transformer to a new dock transformer servicing distribution panels for: 3
down shielded high mast lights at the dock, approximately 12 to 18 meters (40 to 60 feet) in height; 7
lights along the causeway, approximately 6 to 9 (20 to 30 feet) in height; and water and fuel dispensing
facilities. Electric lines would not be aboveground.
The existing timber dock and guide/fender piles would be removed after construction of the new dock is
complete.
Project costs are estimated to be approximately $16,500,000, which includes the cost of
mobilization/demobilization, rock materials, sheetpile, utilities, mooring and breasting dauphins,
engineering, and removal of the existing dock.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 5 of 23
City Dock Replacement Project, Port lions, Alaska
Project Description
Page 6
The City of Port lion plans to construct the new dock in two phases. At first the City will construct the
gravel causeway and sheet pile dock. Next the City will construct the mooring and breastlng dolphins
and remove the existing dock.
Construction Methods and Equipment
The project would Involve In-water construction, including the placement of fill and sheet pile driving for
the new dock, and removal of piles at the existing dock. This project would not require dredging of
native material, or blasting. If necessary, a City-owned, previously disturbed upland stockpile area will
be used for contractor lay-down and staging of equipment and materials (Photograph 3). A barge would
offload equipment and materials on the beach adjacent to this staging area (Figure 4). No
improvements would be made to the beach. A City-owned, pre-existing concrete pad adjacent to the
dock access road may be ·used as a temporary facility staging area (Photograph 4 and Figure 4).
owned, previously developed, upland staging area for equipment and materials.
(Photo credit: City of Port lions, September 2012)
Placement of Fill
·Approximately 107,419 cubic meters (140,500 cubic yards) of clean fill would be placed to construct the
causeway and dock. Material would be transported to the project site by two 75 meter by 20 meter ·
(250 foot by 70 foot) flat deck material barges. On site the contractor will have a third spud barge
equipped with an excavator with a hydraulic clamshell used to place the material. Only one material
barge would be at the project site at a time. While one material barge is placing fill, the other material
barge would be in transit, allowing for a continuous supply of material to the project site. To minimize
construction time, cost, and impacts, material would not be stockpiled; It is the intent that material
would be directly placed from the material barge. Clean shot rock fill and armor rock for the causeway
would be placed first, followed by clean fill for the dock.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 6 of 23
City Dock Replacement Proj~ct, Port UonsJ Alaska
Project Description
Page7
Placement of Sheet Pile
Twenty meter (70 foot) long sheet piles would be driven at the -9 meter (-30 foot) MLLW contour, to
support the face of the dock. Because partial fill at the face of the dock would be unsupported at the
time of sheet pile placement, some of the fill would slough. The sheet pile wall would be driven
approximately 6-9 meters (20-30 feet) deep, first through approximately 4 meters (15 feet) of sloughed
fill material, and then through approximately 1-4 meters (5-15 feet) of native material, and finally into
bedrock. Once the sheet ·pile wallis In place, the sloughed fill material would be recovered from the
seabed with a crane and clam bucket to be used as dock fill material Inside the sheet pile. All sheet pile
installation would occur either from the dock or from a 50 meter by 10 meter (160 foot by 60 foot)
barge equipped with a crane, a vibratory hammer, and an Impact hammer. Construction of the sheet
pile wallis expected to take approximately two months often-hour work days. Sheet pile driving would
occur approximately seven and a half hours a day during that time, with no more than one and a half
hours of consecutive pile driving at a time. Between periods of pile driving, sheet piles would be staged.
Piles would be driven with a vibratory hammer. In the event of an Isolated obstruction, an impact
hammer would be used to complete pile driving. Engineers have estimated the total duration of impact
pile driving would be less than 5 hours for the project.
Placement of Dolphins
Once the sheet pile dock is In place the fender piles and a mooring and breasting dolphin will be placed.
The fender piles and mooring and breasting dolphin will be lifted with a 225 ton floating crane from a
barge. An 0.06 meter (2 foot) diameter rock drill bit will be inserted though the fender pile, mooring
pile, and dolphin pile so that they can be drilled with a percussion drill approximately 3.05 meters (10
feet) deep Into bedrock. The drill will use air to chip away at the overburden and bedrock, and this
material will be extracted through the top of the pile and back Into the water. The rock cuttings will
quickly settle back to the sea floor and will not generate a large turbidity plume.
Removal of Existing Dock
After construction of the new dock, the existing timber dock and guide/fender piles would be removed.
The existing dock is supported by approximately 250 wooden piles. All pile removal would occur 50
meter by 10 meter (160 foot by 60 foot) barge equipped with a crane and vibratory extractor. The
contractor would at first attempt a dead pull of each pile. If the pile does not come loose with the dead
pull a vibratory extractor would be used to vibrate the pile for up to a minute before it would be pulled
onto the barge. The piles would be transported to Washington for disposal. Removal of the existing
dock Is expected to take approximately eight work days, with up to a total of five hours of vibratory
·
extraction.
Operations
The new dock will replace the existing dock as of a hub of marine transport for people and goods to and
from Port Lions. The dock would accommodate the AMHS for regularly scheduled passenger service.
currently the AMHS services Port Lions twice a week between April and September. The dock will also
provide a landing for cargo vessels, fuel barges, commercial fishermen, oil spill response vessels, and
other vessels including the U.S. Coast Guard and the Alaska State Troopers.
The project area has been used for vessel docking since the existing dock was constructed in 1968. This
project may cause a slight increase in vessel traffic in the project area because the new dock will be able
to accommodated larger vessels than the existing dock and will be structurally sound so that it can be
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 7 of23
City Dock Replacement Project, Port i.tons, Alaska
Project Description
PageS
used for storage and other marine needs that the existing dock, in Its weight restricted capacity, is no
longer able to seJVe.
Fueling
Boats currently fuel at the existing dock. The new dock would Include similar fueling facilities. Fueling
operations would follow U.S. Coast Guard standards and procedures. Fuel spill response equipment
currently available at the existing dock would remain available at the new dock.
Tlmelines
Construction funding for this project was received from the State of Alaska in 2012, and construction Is
expected to take two summer seasons beginning in the spring of 2013 and ending in the fall of 2014. All
in-water construction will be conducted between April 30 and November 1 to avoid impacts to
overwintering Steller's eiders.
Project Impacts
Cultural Resources
The Area of Potential Affect (APE) of the project consists of the marine waters of Kizhuyak Bay, the
existing pile-supported dock (Photograph 4), which will be removed once construction of the new dock
is complete, the short roadway to the dock (Photographs 5 and 6), and the project staging areas. The
temporary facility staging area would be located on the City-owned existing concrete pad, previously
used by a cannery (Photograph 4 and Figure 4). The material and equipment staging area would be
located on City-owned, previously disturbed, uplands (Photograph 3 and Figure 4).
Photograph 4. Aerial View of existing Port lions City dock. (photo credit: TerraSond, May 13, 2011)
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 8 of23
,;)
.
"/ &,~~
A~
~t~.{.,'
Photograph 5. View of existing dock access.
(Photo credit: Solstice, April 9, 2012)
Outside of the APE there is a lighted navigation marker located south of the project area, crab pots, a
dilapidated pump house shack located along the dock access road, and public picnic structures located
along the beach of Port Wakefield near the public launch ramp (Photograph 4). These structures will not
be Impacted by the project.
Intertidal, geotechnical, aerial, sonar, and seismic surveys have all been used to study the project area.
These studies have included visual foot s·urvey, high oblique aerial photography, sonar, and seismic of
study the project area. Other than the existing City dock, these surveys have not revealed any other
structures above or below water within the project APE.
A literature review of records on file at the Alaska Heritage Resources Survey (AHRS) database was
conducted to identify potential historic properties in the area of potential effect of the project. The
literature review revealed that much of the project area was previously studied by Pipkin in 2007 for
bulk fuel facility upgrades in Port Lions. Based on this review there are no recorded sites within the APE.
Five listed sites are located near the APE. The closest site to the project, KOD-OS1: Peregrebni Point 2 is
700 feet northwest of the project .
. On September 17,2012 Solstice discussed this project with Mark Rollins of the Alaska Department of
Natural Resources Office of History and Archaeology. Mr. Rollins stated, given the information provided,
that it was unlikely that the project would impact cultural or historic sites. He requested additional
photographs of the project area and more information to make a final determination as to whether the
project would affect cultural or historic sites. Photographs of the staging area were provided.
This project would avoid all known cultural and historic resources in the project area. The majority of
the project wo.uld be built below mean lower low water; therefore, there Is low potential for
encountering unknown cultural and historic resources during construction. If cultural and historic
properties are encountered, construction would stop and the State Historic Preservation Officer (SHPO)
would be contacted immediately.
Tidelands Ownership
The City owns the tidelands under the existing ferry dock (ADL 32640); however, the new dock would
not occur completely within the existing tidelands lease. The City has an application pending with the
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 9 of 23
City Dock Replacement Project, Port l!ons1 Alaska
Project Description
Page 10
Alaska Department of Natural Resources to expand the existing tidelands lease. Once construction Is
complete an approved as-built survey would be received, and the State would convey the property to
the City. The transaction would be recorded at the State Recorder's Office.
Waters of the U.S.
Approximately 3.5 acres of Kizhuyak Bay (considered a navigable waters under Federal jurisdiction)
would be filled by this project (Table 1). Fill would Include clean shot rock (113,200 cubic yards),
underlayer rock (6,200 cubic yards), and rip rap (3,800 cubic yards). In addition, approximately 30 piles
wquld be placed below MHW.
Table 1. Port lions Dock areas of Impact
Potential Proje~t
lnlpa~ts
Area
Above High Tide line (10. 7 feet MllW; Uplands)
Below HTl (Section 404)
Below MHW (Section 404 and Section 10)
0.25 acres
3.50 acres
3.50 acres
Total project impacts
3.75 acres
Removal of the existing dock would temporarily Impact to navigable waters but would result In the·
creation of additional navigable waters once the dock is removed. The City wJU seek a Department of
Army permit from the USACE for the placement of flU.
Water Quality
A Certificate of Reasonable Assurance will be obtained for the placement of fill during construction. The
City wJU be required to ·submit a Department of the Army permit application to the USACE, and the
Corps "Public Notice of Application for Permit" will serve as the Alaska Department of Environmental
Conservation application for Certificate of Reasonable Assurance.
Endangered Species and Marine Mammals
Endangered Species Act (ESA) listed species that may occur In .the project area include and the
southwest distinct population segment of northern "sea otter (Enhydra lutrfs kenyon/), humpback whales
(Megaptera novaeangllae), fin whales·(Ba/aenoptera physalus), the western distinct population segment
of Steller sea lions (Eumetopias jubatus), and the eastern distinct population segment of Steller sea
lions.
The project area contains critical habitat for the northern sea otter and Steller sea lions. In 2009, 5,900
squaremiles of nearshore marine waters, Including all of the Kodiak Archipelago, were designated as
Northern sea otter critical habitat. The essential elements of Northern sea otter critical habhat are
shallow, rocky areas; nearshore waters; kelp forests; and sufficient prey (USFWS 2012).
In 1993 Critical habitat was defined for Steller sea lions as a 20 nautical mile buffer around all major
haul-outs and rookeries, as well as associated terrestrial, air and aquatic zones, and three large offshore
foraging areas (50 CFR. 226.202). The closest Steller sea lion haul-out to Port lions Is a small haul-out
located on the Port lions side of Whale Pass. The haul-out is located within approximately 2 miles of the
City dock and is used by approximately 30 sea lions in winter months (Wynne 2012).
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 10 of 23
City Dock Replacement Project} Port l!onsJ Alaska
ProJect Description
Page 11
The ESA listed Alaska breeding population of Steller's eider and two candidate species; the Kittlitz's
murrelet (Brachyramphus brevlrostris) and yellow-billed loon (Gavia adamsll), may occur within the
project area.
According to the August 16, 2012 letter from National Oceanic and Atmospheric Administration (NOAA)
Fisheries, ESA-IIsted Pacific salmon stocks are not be expected In the project area.
The ESA provides protection to threatene-d and endangered species. The Marine Mammal Protection
Act (MMPA) provides protection to all marine mammals. Species listed as endangered or threatened
under the ESA are,by default, also considered "depleted" under the MMPA. Permits and authorizations
are required under the ESA and the MMPA to conduct activities that may result In the "taking" of a
protected species. Take is defined by the ESA as "to harass, harm, pursue, hunt, shoot, wound, kill, trap,
capture, or collect, or to attempt to engage In any conduct". Take is defined by the MMPA as "to harass,
hunt, capture, collect, or kill, or attempt to harass, hunt, capture, collect, or kill any marine mammal."
A Biological Assessment has been prepared for the USFWS on the anticipated potential impacts of the
project on listed on USFWS managed ESA species (Steller's elder [Polyst/cta stellerl], and the southwest
distinct population segment of northern sea otter) and USFWS designated critical habitat in the project
area (for the southwest distinct population segment of northern sea otter). Because of the avoidance
and minimization measures outlined in the Biological Assessment, and listed below, the project will
avoid take of marine mammals and is not likely to adversely affect any marine mammals or critical
habitat. Noise associated with In-water sheet pile driving at the new dock face and pile extraction of the
existing dock would be localized and short-term, (no more than seven and a half hours a day for
approximately two months and no more than five hours, respectively). In addition, measure~ would be
implemented to avoid sea otters' and other marine mammals' exp 0sure to noise associated with Inwater pile driving. Minimal modifications to sea otter and Steller sea lion critical habitat are anticipated
In the footprint of the dock; however, this area of modification is negligible In terms of the overall
Impact to the critical habitats.
Essential Fish Habitat
The following species may occur in the project area during at least one phase of their lifestage: squid,
yellowfln sole, arrowtooth flounder, rock sole, flathead sole, sculpin, pacific cod, skate, walleye pollock,
chum salmon, pink salmon, coho salmon, chinook salmon, and sockeye salmon (NMFS 2012). There are
no anadromous fish streams near the project area (ADF&G 2012).
Several of these species are found In areas of specific, preferred substrate Including sand, mud and
gravel. A geophysical study of the area was conducted by TerraSond Limited in 2011 and determined
the geology of the site consists mostly bf sand with some shell hash imd exposed bedrock. Based on the
EFH listing and the geology of the site It is expected the above listed species could be present at the site
(NOAA Fisheries 2012). Because of the conservation measures listed below, the project is not likely to
impact EFH.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 11 of 23
City Dock Replacement Project, Po.rt UoOs, Alaska
ProJect Description
Page 12
Avoidance, Minimization, and Mitigation Measures
Cultural Resources
This project would avoid ali known cultural and historic resources in the project area. The majority of
the project would be built below mean lower low water; therefore, there is low potential for
encountering unknown cultural and historic resources during construction. If cultural and historic
properties are encquntered, construction would stop and the State Historic Preservation Officer {SHPO)
would be contacted immediately.'
Waters of the U.S. Mitigation Statements
Avoidance of Impacts to waters of the U.S., including wetlands:
The purpose of this project Is to construct a new ferry dock In Port Lions to replace the existing City dock
that is in disrepair. To meet the project purpose and need of supporting the existing ferry, barge, and
other marine transportation services In Port Lions, the project must fill approximately 3.50 acres of
waters of the U.S.
Minimization of unavoidable impacts to waters of the U.S., Including wetlands:
To minimize Impacts to waters of the U;S. the project uses the most compact design possible, while
meeting the objectives for the new dock. Catwalk extending to mooring and breastlng dolphins north of
the dock's face will service 400 foot long vessels thus minimizing the size of the dock face at 65 meter
(215 foot). Unlike some .of the dismissed alternatives, this alternative will not require dredging to
construct or maintain.
Compensation for unavoidable Impacts to waters of the U.S., Including wetlands:
Compensatory mitigation is proposed. The City of Port Lions will provide compensatory mitigation at a
3:1 ratio to The Conservation Fund. Based on the amount of fill {3.5Q acres) and the compensatory
mitigation ratio, the total in-lieu fee for the project would be $230,000. Please see the attached Jetter
from The Conservation Fund for more information.
A permit for the described work will not be Issued until a certification or waiver of certification, as
required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the
Alaska Department of Environmental Conserv&tlon.
Marine Mammals and Birds
The following measures will be Implemented to avoid any Impacts to ESA-Iisted species:
· No clearing will take place between April15 and July 15 in areas where there are trees present
or between May 1 and July 15 where there are shrubs to protect migratory birds.
· Ali in-water work will be conducted between April30 and November 1 to avoid impacts to
overwintering Steller's eiders.
· Plans for avoiding, minimizing, and responding to releases of sediments, contaminants, fuels, oil,
and other pollutants will be developed and Implemented.
·
· USCG fueling requirement and spill response procedures will continue to be implemented.
· A Spill Prevention, Control, and Countermeasure Plan will be implemented to reduce the
possibility and impact of a spill.
· Spill respon~e equipment will be kept on-site.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 12 of 23
City Dock Replacement Project1 Port Uons1 Alaska
Project Description
Page 13
·
·
·
·
·
·
Potential for contamination from fuel spills will be minimized by using double-wall containment
tanks equipped with additional external spill !'Ontainment for fueling operations, overfill
warning devices, and positive shutoff overfill prevention valves.
The project will avoid Installing overhead structures such as transmission lines.
Overhead structures_ will be co-located on existing utility poles.
New transmission lines will be installed underground.
lights on the dock will be shielded to focus the beams downward to minimize the amount of
light transmitted toward the horizon and reduce the likelihood of attracting birds and chance of
collision with overhead structures.
The USFWS's recommended draft protocols for avoiding harm to sea otters from noise during
pile ~riving will be Implemented. See below.
USFWS Observer Protocols for Impact and Vibratory Pile Driving
USFWS's Observer Protocols for Impact and Vibratory Pile Driving will be adopted during project
construction (USFWS 2012b). Based on USFWS guidelines for the type of piles used In the project, harm
could occur if sea otters are within 300 meters (985 feet) of sheet pile vibratory driving or old pile
extraction or within 500 meters (1,640 feet) of impact driving. The following measures will be used to
avoid harm or injury to sea otters:
Ramp-up procedures
Ramp-up or soft-start procedures will be applied to all pile driving activities. These procedures help to
warn the animals and provide a chance for animals to leave the area prior to working at full capacity.
For Impact pile driving, contractors will be required to proylde an initial set of three strikes fran\ the
hammer at 40% energy, followed by a 30-second waiting period, then two subsequent three-strike sets
at the reduced energy. For vibratory pile driving, sound should be Initiated for fifteen seconds at
reduced energy followed by a 30-second waiting period. This procedure would be repeated two
additional times.
Monitoring the "hazard area"
1. All observers must be capable of spotting and iaentlfying sea otters and recording applicabledata during all types of weather In which pile driving will be conducted.
2. Observers will be given the authority to halt project activities If a sea otter is present and to
provide clearance for work to resume after the animal leaves on its own.
3. Observers will have no other duties during the observation period In order to ensure that
watching for protected species remains tlie observer's main focus.
4. Observers will watch for sea otters within the hazard area for 30 minutes prior to pile driving.
Observations will continue for the full duration of pile driving activities.
5. If one or more sea otters occur within the noise impact area before or at any time during pile
driving, the observer will report the presence of the animal and work will cease or be postponed
until the sea otter leaves the hazard area of Its own accord.
6. If a sea otter Is seen within the hazard area during the 30-mlnute observation period prior to
start-up, the observation period need not start over once the animal moves out of the hazard
area, but work may not commence until the animal is outside the area.
7. A lead observer should be responsible for Implementing the protocols. The lead observer may
select and train additional observers, but should remain accountable for their performance.
8. Observers must be trained In the monitoring methods to Include the following topics:
· Types of construction activities that require monitoring
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 13 of 23
City Dock Replacement Project, Port Uons,Aiaska
Project Description
Page 14
· Observation methods and equipment
· Observation ,locations
· Distance estimation
· Data to record (parameters) and field forms
· Species Identification
9. Tools, such as a laser range finder or buoys placed at known distances away from the shoreline
will be used to aid the observer in estimating distances.
10. Observers will use some or all of the following stah.dard equipment:
· High power spotting scope and/or reticle binoculars, (e.g. 10 x 50 Bushnell or
equivalent)
· Range finder, (e.g. leica LRF 1200 or equivalent)
· GPS and compass with Identified/established targets
11. Observation stations wili be established to maximize visibility of the hazard areas.
12. Observation stations may be established aboard moored vessels and stationary skiffs.
13. Use of a particular station may depend upon weather conditions. If the observable range from
any one vantage point is limited due to weather or construction activity, the observer will use an
established station that has a better vantage point for monitoring.
14. If vislbli,lty Is poor due to weather or low llght, noise-generating activities will not commence
until vlewlng·conditlons make it possible to clear the entire hazard area.
15. During periods of low visibility, work will commence if additional observers are added in
. multiple stations· to provide complete visual coverage of the entire hazard area.
16. Observers will record basic metrics such as start and end times, date, GPS location of the
observation station, name of observers, type of work occurring, numbers and locations of
observed sea otters, environmental conditions (air temperature, wind speed and direction, sea
state, swell height, tide stage, visibility, percent cloud cover, and precipitation), documentation
of work shut downs or postponements due to presence of sea otters, and If so, for how long.
17. Other data that may be recorded includes: records of sea otter movements (direction and
distance of travel), and the times during which the movements occur, categorical assessment of
sea otter behaviors during the observation period. For example, whether sea otters are resting,
feeding, grooming, engaging in social interactions, or travelling from one place to another.
Behavioral changes during the observation period will be recorded with comments on whether
these behaviors appear to be associated with the work being conducted, and if so, what
Indications lead to that conclusion.
18. All observation records will be made available to the USFWS upon request.
19..A summary report will be provided to the USFWS upon request annually or after completion of a
project lasting less than one year.
If warranted by new Information, and observer protocols are revised by the USFWS, the revised
protocols wlli be incorporated into construction monitoring for this project {USFWS 2012b).
EFH/Fisheries
The following measures will be Implemented to avoid and minimize impacts to EFH:
1) .The project has been designed so that no dredging will take place. Dredging is described by the
NOAA Fisheries as being associated with adverse impacts such as turbidity effects, release of oxygen
consuming substances, noise disturbance, contaminant release, and other disturbances affecting
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 14 of 23
City Dock Replacement Project~ Port Uons1 Alaska
ProJect Description
Page 15
aquatic life. As such It Is recommended by the NMFS that dredging be avoided when possible. This
project will not utilize dredging.
·
2) This project will. utilize a vibratory hammer as much as possible to decrease Intense sound
pressure waves. To minimize Injury to fish as a result of intense sound pressure levels the sheet
piles will be driven with a vibratory hammer. In the event of an obstruction an Impact hammer
would be used to complete pile driving. This use of an Impact hammer is expected to take five hours
or less during all of construction. Vibratory hammers produce sounds of lower intensity and fish do
not habituate to the sound and exhibit an avoidance response keeping them at a safer distance.
3) The project has minimized the areal extent of any flllln EFH and Is proposing to mitigate for all
non-avoidable adverse ImpaCts as appropriate. To minimize Impacts to EFH and waters of the U.S.,
the Dock Replacement Project uses the most compact design possible, while meeting the vessel
demands In the area. In addition, the project would use sheet piles to contain the fill footprint. For
unavoidable Impacts, the City proposes to provide compensatory mitigation at a 3:1 ratio to The
Conservation Fund.
4) This project considers alternatives to the placement of fill Into areas .that support EFH species.
Other alternatives were seriously considered, but dismissed, because they did not meet the
Project's purpose and need or were not suitable to the preferred alternative. (See detailed
Alternatives Analysis section of thl~ document.)
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 15 of 23
City Dock Replacement ProJect, Port Lions, Alaska
Project Description
Page 16
References
Alaska Department of Transportation and Public Facilities (ADOT&PF). 2011. 2011 Shore Facilities
Condition Survey Report: Port Lions. As viewed In July 2012 at
http://dot.alaska.gov/projecUnfo/docs/2011_Shore_Cond_Rep-224-236.pdf
Allen, B.M., and R.P. Angllss 2011. Alaska marine mammal stock assessments, 2010. U.S. Department of
Commerce, NOAA Technical Memorandum. NMFS-AFSC-223, 292 p.
National Oceanic and Atmospheric Administration (NOAA) Fisheries. 2012. Habitat
Conservation/Protection National Marine Fisheries Service. Essential Fish Habitat Mapper. As viewed
July 2012 at:
http://www.habitat.noaa.gov/protection/efh/efhmapper/index.html
NOAA Fisheries. 2012. NOAA Fisheries Office of Protected Resources. Steller Sea Lion. As viewed July
2012 at: http://www.nmfs.noaa.gov/pr/species/mammals/plnnipeds/stellerseallon.htm
NOAA Fisheries. 2012. File Number POA-1966-43, Kizhuyak Bay. Species List letter re: City of Port Lions
City Dock Construction. letter from James Balsiger, NMFS Alaska Region to Kate Arduser, Solstice Alaska
Consulting, Inc.
.
.
NOAA Fisheries. ·2011. Impacts to Essential Fish Habitat from Non1ishing Activities in Alaska.
Prepared by National Marine Fisheries Service, Alaska Region.
Pipkin, Mark E. 2007. Archaeological Monitoring for the Port lions Bulk Fuel Upgrade Project, Kodiak
Island, Alaska. Prepared for CRW Engineering Group.
PND Engineers, Inc. (PND). February 2012. Design Study Report: Port Lions City Dock and Ferry Terminal
Improvements.
PND. 2012. Port Lions Ferry Terminal Limited Geotechnical Investigation.
TerraSond. 2011. Port Lions City Dock Engineering and Design Survey. Project Summary Report
prepared for the Native Village of Port lions.
U.S. Army Corps of Engineers (USACE). October 2009. City Dock and Ferry Terminal Repairs Technical
Report- Port Lions, Alaska.
U.S. Fish and Wildlife Service (USFWS). May 2012. Endangered Species. Threatened and Endangered
Species Northern Sea Otter {Southwest Alaska Distinct Population Segment). As viewed July 2012 at:
http://alaska.fws.gov/fisherles/endangered/pdf/Nseaotter_factsheet_v2.pdf
USFWS. 2012. Consultation Number 2012-0129. Species List letter re: Kodiak Port Lions City Dock and
Ferry Terminal replacement. letter from Kim Klein, USFWS to Kate Arduser, Solstice Alaska Consulting,
Inc.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 16 of 23
City Dock Replacement Project, Port lions, Alaska
Project Description
Page 17
USFws: 2011. Anchorage Fish and Wildlife Field Office -Section 7 Consultation Guide Grid Block 16. As
viewed July 2012 at:
http://alaska. fws.gov/flsheries/fleldoffice/anchorage/endangered/pdf/C6nsult_Grld_Biock_16.pdf
USFWS. 2011. Endangered, Threatened, Proposed, Candidate, and Delisted Species in Alaska (Updated
Apri/21, 2011). As viewed July 2012 at:
http://alaska.fws.gov/fisherles/endangered/pdf/consultation_gulde/4_Species_list.pdf
Wynne, Kate 2012. Personal communication between Kate Arduser (Planner, Solstice Alaska Consulting)
and Kate Wynne (University of Alaska Professor and Marine Mammal Specialist based In Kodiak, Alaska)
on July 2, 2012 regarding marine mammals near Port Lions, Alaska.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 17 of 23
~
i~
'r.
~
I
TIDAL DATUM
,;
HIGH TIDE UNE (HTL) .
MEAN HIGH WATER (MH\'1)
~
MEAA LOWER LOW WATER (I.ILLW)
~
j
~
~
j
f
~
!
10.7'
7,6'
0.0'
PROPOSED ACTIVITY:
REPLACE EXISTING TIMBER
DOCK ~TH BULKHEAD DOCK
AND CAUSEWAY
DATUM:
0.0' MLLW
PROJECT LOCATION:
SEC. 4 & 5, T27S, R22W, S.M.
LAT.: 57.8604' LONG.: -152.8600'
~-~-'li-~-'li-'I""S~C;;;:AL;;.E~IN~MI;,;LEoi'iS~""""'""""'I
0
1
2
4
PORT LIONS
REPLACEMENT
DOCK
POA-XXXX-XXX
VICINITY MAP AND
PROJECT LOCATION
CITY OF PORT LIONS
P.O. BOX 110
PORT LIONS, ALASKA 99550
§~------------------L----------
~
3
ON:
AT:
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 18 of 23
ILEGEND
_ , _ _F _
FUEL UNE
~ ARI)OR ROCK
U-1-L-'-'-'-'-"-'-'"
EXISTII\~ DOCK
RIP RAP
...
''
"
''
.··
-~
"
... -·
300
PORT LIONS
REPLACEMENT
DOCK
POA-XXXX-XXX
SITE PLAN
DATUM:
0.0' MLLW
PROJECT LOCATION:
SEC. 4 & 5, T27S, R22W, S.M.
LAT.: 57.8604' LONG.: -152.8600'
CITY OF PORT LIONS
P.O. BOX 110
PORT LIONS, ALASKA 99550
ON:
AT:
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 19 of 23
KODIAK ISLAND, AK
PORT WAKEFIELD
''
BULUWL
~ SCOURSE
o.o' l.fLLW
FENDER PILE
SOCKET
DOLPHIN
BEDROCK
POLE
SECTION A-A'
RAJL
NTS
PIPING
ARI.lOR ROCK SLOPE
UNDERLAYER ROCK
SLOPE
TOE
l'
l?i
SHOT ROCK
~
~
!
;8
"
~
I
I
~
TIDAL DATUM
HIGH TIDE UNE (HTL)
MEAN HIGH I'IATER (I.IH\V)
MEAN LOWER LO\'{ WATER (I,ILLI'/)
10.7'
7,6'
o.o'
MLLW
iJ PROJECT LOCATION:
~
~
NTS
g.o'
PROPOSED ACTIVITY:
REPLACE EXISTING TIMBER
DOCK WITH BULI
SECTION 8-8'
SEC. 4 & 5, T27S, R22W, S.M.
LAT.: 57.8604' LONG.: -152.8600'
SEPARATION
GEOTEXTILE
~IATERIAL
PlACEI.(ENT
SHOT ROCK Flll - PUSHED INTO PLACE
ARI,IOR/RIPRAP - SELECTIVELY PLACED
TYPICAL
SECTIONS
CITY OF PORT LIONS
ON:
P.O. BOX 110
AT:
PORT LIONS, ALASIi§ '-----------L-----
PORT LIONS
REPLACEMENT
DOCK
POA-XXXX-XXX
KODIAK ISLAND, AK
PORT WAKEFIELD
Figure 4. Project Staging Areas
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 21 of 23
'JrlHilE CONSERVA'Jl'JfON JFUNID>
BRAD A MEIKLEJOiJN
ALASKA REPRESENTATIVE
2727 HILAND ROAD
EAGlE RIVER, ALASKA 99577
(907)694-9060
BRADMEIKLEJOHN@AOI-.COM
October 11, 2012
Robin Reich ·
Solstice Alaska Consulting, Inc.
2607 Fairbanks Street, Suite B
Anchorage, AK 99503
RE: Coinpensatory Mitigation for Port Lions Dock, Pmt Lions, Alaska
Dear Ms. Reich,
Tl]is letter is in response to your request for an estimate of the appropriate h1-lieu fee
compensatory mitigation associated with the replacement of the dock in Pmt Lions,
Alaska. Based on yonr correspondence, the project will impact 3.5 acres of wetlands.
The new rule on compei1satory mitigation, published in April 2008 by the Enviromnental
Protection Agency and the U.S. Army Corps of Engineers, provides the legal framework
for mitigating wetland loses for all regions of the country, including Alaska. The guiding
principle of"no net loss" of the nation's water resources is reiterated and reinforced in
the new mitigation rule.
The Conservation Fund has a Memorandum of Agreement with thtl Alaska District ofthtl
U.S. Army Corps of Engineers to receive il1-lieu fee compensatory mitigation. As
provided by that agreement, The Conservation Fund uses the mitigation fees to purchastl
and protect high-priority wetlands. Howtlver, preserving some wetlands does not
mitigate the loss of others and does not fhlfill the "no net loss" mandate. As a result, the
2008 rule requires that mitigation ratios higher than 1:1 be used where preservation is
used as mitigation.
Based on your characterization of the wetlands I will assume that the required mitigation
ratio for this project will be 3:1. Therefore, the compensatory mitigation for this project
must btl sufficitlp.t to preservtl 10.5 acres ofWtltiands.
In calculating an estimate ofthtl appropriattl in-lieu fee, we consider the following:
1. The mitigation ratio.
2. The costs to pnrchase land, including but not limited to the purchase price, appraisals,
surveys, title research, legal expenstls and closing costs.
3. Thtl costs to own and manage land in ptlrptltuity, including but 1iot limited to physical
and legal deftlnse, property taxes, stewardship fees and management expenses.
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 2012
Sheet 22 of 23
For this project, the land cost is calculated at a rate of$20,000 per acre, resulting in a
total land cost for 10.5 acres of$210,000. Transaction and stewardship costs are
estimated at $21,000. Thus, the total in-lieu fee for this project is $231,000.
This is an estimate and is subject to revision. The actual required compensatory
mitigation will be based on the acreage and mitigation ratio described in the permit issued
for this project by the U.S. Army Corps of Engineers.
Please provide me with a copy of the permit issued by the U.S. Army Corps of
Engineers for this project prior to maldng payment. We retain the right to revise
·
this estimate based on information contained in the permit.
Payment can be made by sending a check to:
The Conservation Fund
2727 Hiland Road
Eagle River, Alaska 99577
Please include the permit number and the name and contact information for the individual
at the Corps ofEngineers who is handling the permit. We will notiJy the permittee and
the Corps once payment is received.
Please contact me at (907) 694-9060 ifl can be of fhrther assistance.
Sincerely,
~c-!Vv~~"Brad Meiklejohn
Alaska Representative
City of Port Lions
POA-2012-920
Kizhuyak Bay
December, 201 2
Sheet 23 of 23