City and Borough of Juneau, Docks and Harbors Department's stated purpose is to expand the “Smokeries dock, and improve access, security, berthing capacity, and safety at the City and Borough of Juneau’s Downtown Cruise Ship Docks.” Please contact Randal Vigil at (907) 790-4491 or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.
City and Borough of Juneau, Docks and Harbors Department's stated purpose is to expand the “Smokeries dock, and improve access, security, berthing capacity, and safety at the City and Borough of Juneau’s Downtown Cruise Ship Docks.” Please contact Randal Vigil at (907) 790-4491 or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.
POA-2011-924-M1_Gastineau Channel, Drawings
POA-2011-924-M1_Gastineau Channel_ PN
SKAGWAY
HAINES
DOWNTOWN
JUNEAU
JUNEAU /
DOUGLAS
BRIDGE
SITKA
PETERSBURG
AS
G
KAKE
N
TI
WRANGELL
U
EA
CRAIG
CBJ
DOWNTOWN
CRUISE
SHIP
DOCK
KETCHIKAN
AN
H
C
JUNEAU
ROCK
DUMP
EL
N
SCALE IN MILES
0
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
1
1
2
VICINITY MAP
LOCATION MAP
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
DOUGLAS
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 1
OF 15
MERCHANTS
WHARF
EGA
N DR
.
MA
HTL = 20.8
MHW = 15.4
MLLW = 0
RIN
EW
MARINE
PARK
AY
SEAPLANE
FLOAT
CBJ
PARKING
GARAGE
AL
LIGHTERING
FLOAT
AS
KA
ST
EA
M
SH
FM
IP
DO
H
UT
SO
CK
ATS 3
BOUNDARY
FR
TRAM PLAZA
AN
KL
SEWER
FORCE
MAIN
IN
UI
ST
CR
SE
CBJ DOCKS
CRUISE SHIP TERMINAL
STAGING AREA
SH
IP
FISHERMEN'S
MEMORIAL
TE
RM
IN
TAKU
SMOKERIES/
FISHERIES
AL
FM
PORT
CUSTOMS
BLDG
TAKU
FISHERIES
DOCK
MINERS
COVE
SEAWALK
AS
G
MINERS
COVE
U
EA
N
TI
INTERMEDIATE
VESSEL
FLOAT
FM
EL
N
AN
H
C
SOUTH
FRANKLIN
DOCK
FM
PURPOSE:
EXISTING CONDITIONS
SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
0
500
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
1000
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 2
OF 15
HTL = 20.8
MHW = 15.4
MLLW = 0
HTL = 20.8
MHW = 15.4
MLLW = 0
PROPOSED RETAINING WALL,
MOORAGE FLOAT AND
TAKU SMOKERIES IMPROVEMENTS,
SEE SHEETS 6 & 7.
'
00
10
PROPOSED
NORTH BERTH
BOUNDARY,
SEE SHEET 4
HTL = 20.8
MHW = 15.4
MLLW = 0
'
00
10
PROPOSED
SOUTH BERTH
BOUNDARY,
SEE SHEET 5
U
EA
N
TI
AS
G
EL
N
AN
H
C
PURPOSE:
PROPOSED
SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
0
500
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
1000
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 3
OF 15
EGAN
HTL = 20.8
MHW = 15.4
MLLW = 0
DR.
MERCHANTS
WHARF
NEW
APPROACH
DOCK
w/ SECURITY
GATE
MA
MARINE
PARK
RIN
EW
AY
EXISTING
SEAPLANE
FLOAT
EXISTING
CBJ DOCK
EXISTING
LIGHTERING
FLOAT
CBJ
PARKING
GARGAGE
B
H
UT
SO
C
FR
AN
HTL = 20.8
MHW = 15.4
MLLW = 0
B
KL
IN
ST
C
NEW VEHICLE
TRANSFER
BRIDGE
D
NEW BRIDGE
LANDING
D
00
10
'
STRUCTURE SUMMARY (NORTH BERTH)
STRUCTURE
SIZE
PILE #
PILE DIA.
APPROACH DOCK
6,200 SF
24
24"
VEHICLE TRANSFER BRIDGE
20' x 148'
5
24'
BRIDGE LANDING
30' x 65'
0
0
CONCRETE FLOATING DOCK
50' x 400'
14
48"
MOORING & BREASTING
DOLPHINS
6 EA
38
48"
NEW CONCRETE
FLOATING DOCK
E
PURPOSE:
NEW MOORING
& BREASTING
DOLPHINS,
SEE SHEET 10
H
TC
MA INE
L
SCALE IN FEET
0
200
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
4
T
EE T 5
H
S
EE
SH
NORTH BERTH
PROPOSED SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
E
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
400
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 4
OF 15
HTL = 20.8
MHW = 15.4
MLLW = 0
EXISTING
CBJ DOCK
SO
4
T
EE T 5
SH EE
SH
CH
T
MA INE
L
UT
NEW
APPROACH
DOCK W/
SECURITY
GATE
H
FR
AN
KL
IN
ST
CRUISE SHIP
TERMINAL
STAGING
AREA
B
C
B
NEW VEHICLE
TRANSFER BRIDGE
TAKU
SMOKERIES/
FISHERIES
BLDG
SEE
SHEETS
6 & 7
C
D
NEW BRIDGE
LANDING
NEW CONCRETE
FLOATING DOCK
MINERS
COVE
SEAWALK
D
10
'
00
INTERMEDIATE
VESSEL
FLOAT
STRUCTURE SUMMARY (SOUTH BERTH)
E
STRUCTURE
SIZE
PILE #
PILE DIA.
APPROACH DOCK
7,800 SF
26
24"
VEHICLE TRANSFER BRIDGE
20' x 148'
5
24"
BRIDGE LANDING
30' x 65'
0
0
CONCRETE FLOATING DOCK
50' x 300'
14
48"
MOORING AND BREASTING
DOLPHINS
7 EA
47
48"
NAVIGATIONAL BOOM
410 LF
5
48"
PURPOSE:
SCALE IN FEET
200
APPLICANT ADDRESS:
MLLW = 0.0 FT
NEW
NAVIGATIONAL
BOOM,
SEE SHEET 15
NEW MOORING &
BREASTING DOLPHINS,
SEE SHEET 9
0
DATUM:
J
SOUTH BERTH
PROPOSED SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
J
E
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
400
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 5
OF 15
HTL = 20.8
MHW = 15.4
MLLW = 0
REMOVE
TRANSFER BRIDGE
EXISTING
CBJ DOCK
SO
TRAM
PLAZA
BLDG
TO REMAIN
UT
H
FR
AN
KL
IN
ST
CRUISE SHIP
TERMINAL
STAGING AREA
DEMO PORTION OF
SOUTH FERRY DOCK
EXISTING DOCK
TO REMAIN
PORT CUSTOMS BLDG
TO REMAIN
FISHERMEN'S
MEMORIAL
TAKU SMOKERIES/
FISHERIES BLDG
REMOVE DOLPHINS
& CATWALKS, TYP.
HTL = 20.8
MHW = 15.4
MLLW = 0
DEMOLITION SUMMARY
STRUCTURE
SIZE
NO. OF PILES
PILE Ø
TRANSFER BRIDGE
2,600 SF
12 (STEEL)
12" (8)
24" (4)
SOUTH FERRY DOCK
7,250 SF
120 (TIMBER)
12"
DOLPHINS & ASSOC. CATWALKS
6 EA @ 300LF
22
VARIES
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
100
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
MINERS
COVE
SEAWALK
EXISTING
INTERMEDIATE
VESSEL
FLOAT
TRANSFER BRIDGE
PROPOSED DEMOLITION PLAN
0
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
TAKU FISHERIES
DOCK TO BE
RECONFIGURED
200
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 6
OF 15
HTL = 20.8
MHW = 15.4
H
MLLW = 0
NEW CONCRETE
RETAINING WALL
AND FILL
G
EXISTING
CBJ DOCK
SOUTH
FERRY
DOCK
G
SO
TRAM
PLAZA
BLDG
CRUISE SHIP
TERMINAL
STAGING AREA
UT
H
FR
AN
KL
IN
ST
H
NEW DOCK ADDITION,
APPROX. 11,000 SF
A
NEW GANGWAY
NEW CONCRETE
MOORAGE FLOAT
PORT
CUSTOMS
BLDG
A
FISHERMEN'S
MEMORIAL
STRUCTURE SUMMARY (RETAINING WALL AND TAKU
SMOKERIES DOCK)
STRUCTURE
SIZE
# OF PILES
PILE ø
CONCRETE RETAINING WALL
AND FILL
75 LF X
1'-3" WIDE
9
24"
NEW DOCK ADDITION
11,000 SF
2, 34
16", 12.75"
CONCRETE MOORAGE
FLOAT
16' X 200'
6
20"
GANGWAY
8' X 120'
0
0
15, 1
16", 24"
NEW WORK DECK ADDITION
1,200 SF
TAKU SMOKERIES/
FISHERIES BLDG
TAKU
FISHERIES
DOCK
NEW
MOORING
PILE
HTL = 20.8
MHW = 15.4
MLLW = 0
F
F
NEW WORK DECK
ADDITION
MINERS
COVE
SEAWALK
SUMMARY OF FILL QUANTITIES
MATERIAL
TOTAL
PROJECT
QTY
QTY BELOW
HTL
QTY
SEAWARD
MHW
FILL
700 CY
200 CY
1
400 CY
BASE COURSE
20 CY
20 CY
20 CY
RIP RAP
50 CY
50 CY
50 CY
EXCAVATION
100 CY
0 CY
0 CY
PURPOSE:
EXISTING
INTERMEDIATE
VESSEL
FLOAT
TRANSFER BRIDGE
PROPOSED SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
0
100
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
200
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 7
OF 15
TOP OF PILE
ELEV. +30' ±
GANGWAY
EXISTING DOCK
TO REMAIN
HTL
ELEV. +20.8
MHW
ELEV. +15.4'
TOP OF DOCK
ELEV. +25' ±
16' x 250' CONCRETE FLOAT
MLLW
ELEV. +0.0'
16'
APPROX.
GROUND LINE
APPROX.
BEDROCK
SECTION A-A
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 8
OF 15
24'
BULLRAIL
EXISTING DOCK
TO REMAIN
TIMBER
DECK
TOP OF DECK
ELEV. +27' ±
TOP OF PIER
ELEV. +27'±
HTL
ELEV. +20.8'
STEEL PILE
CAP
MHW
ELEV. +15.4'
MLLW
ELEV. +0.0'
STEEL PIPE
PILE, TYP.
APPROX.
GROUNDLINE
APPROX.
BEDROCK
SECTION B-B
NEW
PIER
14 0'
HTL
ELEV. +20.8'
MHW
ELEV. +15.4'
TRANSFER
BRIDGE
MLLW
ELEV. +0.0'
FLOATING
DOCK
SECTION C-C
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET
9 OF 15
50'
PEDESTRIAN
GUARDRAIL
30'-0"
REMOVABLE
COMBINATION
VEHICULAR AND
PEDESTRIAN BARRIER
24'-0"
STEEL VEHICLE
TRANSFER BRIDGE
FLOATING
CONCRETE
DOCK
FOAM FILLED
MARINE FENDER
STEEL DECK
BRIDGE LANDING
8'-0"
FREEBOARD
SECTION D-D
CATWALK
QUICK RELEASE MOORING
HOOK NOT SHOWN
DOLPHIN CAP
TOP OF DECK
ELEV. +30'±
TOP OF PILE
ELEV. +24'±
MHHW
ELEV. +15.4'
MLLW
ELEV. +0.0'
FOAM FILLED
MARINE FENDER
DROP ON FENDER
FRAME
STEEL PIPE
PILE, TYP.
STEEL PIPE
FENDER PILE, TYP.
APPROX.
GROUNDLINE
APPROX.
BEDROCK
SECTION E-E
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 10 OF 15
TIMBER
DECK
BULLRAIL
VARIES
0' TO 100'±
EXISTING DOCK
TO REMAIN
TOP OF DECK
ELEV. +27' ±
TOP OF DOCK
ELEV. +27'±
HTL
ELEV. +20.8'
STEEL PILE
CAP
MHW
ELEV. +15.4'
STEEL PIPE
PILE, TYP.
MLLW
ELEV. +0.0'
STEEL PIPE
FENDER, TYP.
APPROX.
GROUNDLINE
APPROX.
BEDROCK
SECTION F-F
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 11 OF 15
26'-2"
CONCRETE RETAINING
WALL
STEEL PILES, TYP.
38'-2"
EXISTING CONCRETE
RETAINING WALL
1'-3"
END OF CONCRETE
RETAINING WALL
9'-4"
RETAINING WALL
FOUNDATION PLAN
TIMBER
DECK
CONCRETE
DECK
CONCRETE
RETAINING WALL
SHOT ROCK
BACKFILL
EXISTING TIMBER PILE
EXISTING TIMBER WALL
+18.0' MLLW
RIP RAP
+16.0' MLLW
1.5
SHOT ROCK
BACKFILL
1
5
24" GALVANIZED
STEEL PILE PIPE
1
EXISTING
GROUND
SECTION G-G
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTION AT TIMBER WALL
NTS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 12 OF 15
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
HTL
ELEV. +20.8'
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
STEEL
BATTER
PILE,
TYP
PORT CUSTOMS
DOCK SECTION
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
EXISTING
GROUND
EXISTING
WALL
CONCRETE
DECK
STEEL
VERTICAL
PILE,
TYP
SECTION H-H
STEEL
PILE
CAP
TOP OF DECK
ELEV. +27' ±
TIMBER
GLU-LAM
STRINGER
TIMBER
DECK
PURPOSE:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 13 OF 15
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
HTL
ELEV. +20.8'
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
STEEL
BATTER
PILE,
TYP
PORT CUSTOMS
DOCK SECTION
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
EXISTING
GROUND
EXISTING
WALL
CONCRETE
DECK
STEEL
VERTICAL
PILE,
TYP
SECTION H-H
STEEL
PILE
CAP
TOP OF DECK
ELEV. +27' ±
TIMBER
GLU-LAM
STRINGER
TIMBER
DECK
PURPOSE:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 13 OF 15
STEEL PIPE
PILE, TYP.
GROUNDLINE
PILE TIP
AS REQ'D
BEDROCK
DRIVEN PILE
DRILLED AND
GROUTED PIPE
PIN PILE
DRILLED SOCKET
SIMILAR IN
SIZE TO PILE
DRILLED AND
GROUTED ROD
PIN PILE
PILE SOCKET
NOTE:
STEEL PIPE PILE TIPS FOR THIS PROJECT
WILL BE INSTALLED PER ONE OF THE
METHODS DEPICTED ON THIS SHEET. ACTUAL
METHOD TO BE DETERMINED AS SUBSURFACE
CONDITIONS BECOME KNOWN. ALL PILES
DRIVEN TO IMPACT HAMMER REFUSAL
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
ROCK ANCHOR
PILE DETAILS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 14 OF 15
48"ø
MOORING PILE
PILE HOOP
48"ø
PIPE
STABILIZER
STRUT
BUMPER
48"ø
PIPE
NAVIGATION
BOOM
SECTION J-J
PURPOSE:
PIPE NAVIGATION BOOM
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
NTS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 15 OF 15
SKAGWAY
HAINES
DOWNTOWN
JUNEAU
JUNEAU /
DOUGLAS
BRIDGE
SITKA
PETERSBURG
AS
G
KAKE
N
TI
WRANGELL
U
EA
CRAIG
CBJ
DOWNTOWN
CRUISE
SHIP
DOCK
KETCHIKAN
AN
H
C
JUNEAU
ROCK
DUMP
EL
N
SCALE IN MILES
0
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
1
1
2
VICINITY MAP
LOCATION MAP
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
DOUGLAS
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 1
OF 15
MERCHANTS
WHARF
EGA
N DR
.
MA
HTL = 20.8
MHW = 15.4
MLLW = 0
RIN
EW
MARINE
PARK
AY
SEAPLANE
FLOAT
CBJ
PARKING
GARAGE
AL
LIGHTERING
FLOAT
AS
KA
ST
EA
M
SH
FM
IP
DO
H
UT
SO
CK
ATS 3
BOUNDARY
FR
TRAM PLAZA
AN
KL
SEWER
FORCE
MAIN
IN
UI
ST
CR
SE
CBJ DOCKS
CRUISE SHIP TERMINAL
STAGING AREA
SH
IP
FISHERMEN'S
MEMORIAL
TE
RM
IN
TAKU
SMOKERIES/
FISHERIES
AL
FM
PORT
CUSTOMS
BLDG
TAKU
FISHERIES
DOCK
MINERS
COVE
SEAWALK
AS
G
MINERS
COVE
U
EA
N
TI
INTERMEDIATE
VESSEL
FLOAT
FM
EL
N
AN
H
C
SOUTH
FRANKLIN
DOCK
FM
PURPOSE:
EXISTING CONDITIONS
SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
0
500
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
1000
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 2
OF 15
HTL = 20.8
MHW = 15.4
MLLW = 0
HTL = 20.8
MHW = 15.4
MLLW = 0
PROPOSED RETAINING WALL,
MOORAGE FLOAT AND
TAKU SMOKERIES IMPROVEMENTS,
SEE SHEETS 6 & 7.
'
00
10
PROPOSED
NORTH BERTH
BOUNDARY,
SEE SHEET 4
HTL = 20.8
MHW = 15.4
MLLW = 0
'
00
10
PROPOSED
SOUTH BERTH
BOUNDARY,
SEE SHEET 5
U
EA
N
TI
AS
G
EL
N
AN
H
C
PURPOSE:
PROPOSED
SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
0
500
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
1000
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 3
OF 15
EGAN
HTL = 20.8
MHW = 15.4
MLLW = 0
DR.
MERCHANTS
WHARF
NEW
APPROACH
DOCK
w/ SECURITY
GATE
MA
MARINE
PARK
RIN
EW
AY
EXISTING
SEAPLANE
FLOAT
EXISTING
CBJ DOCK
EXISTING
LIGHTERING
FLOAT
CBJ
PARKING
GARGAGE
B
H
UT
SO
C
FR
AN
HTL = 20.8
MHW = 15.4
MLLW = 0
B
KL
IN
ST
C
NEW VEHICLE
TRANSFER
BRIDGE
D
NEW BRIDGE
LANDING
D
00
10
'
STRUCTURE SUMMARY (NORTH BERTH)
STRUCTURE
SIZE
PILE #
PILE DIA.
APPROACH DOCK
6,200 SF
24
24"
VEHICLE TRANSFER BRIDGE
20' x 148'
5
24'
BRIDGE LANDING
30' x 65'
0
0
CONCRETE FLOATING DOCK
50' x 400'
14
48"
MOORING & BREASTING
DOLPHINS
6 EA
38
48"
NEW CONCRETE
FLOATING DOCK
E
PURPOSE:
NEW MOORING
& BREASTING
DOLPHINS,
SEE SHEET 10
H
TC
MA INE
L
SCALE IN FEET
0
200
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
4
T
EE T 5
H
S
EE
SH
NORTH BERTH
PROPOSED SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
E
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
400
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 4
OF 15
HTL = 20.8
MHW = 15.4
MLLW = 0
EXISTING
CBJ DOCK
SO
4
T
EE T 5
SH EE
SH
CH
T
MA INE
L
UT
NEW
APPROACH
DOCK W/
SECURITY
GATE
H
FR
AN
KL
IN
ST
CRUISE SHIP
TERMINAL
STAGING
AREA
B
C
B
NEW VEHICLE
TRANSFER BRIDGE
TAKU
SMOKERIES/
FISHERIES
BLDG
SEE
SHEETS
6 & 7
C
D
NEW BRIDGE
LANDING
NEW CONCRETE
FLOATING DOCK
MINERS
COVE
SEAWALK
D
10
'
00
INTERMEDIATE
VESSEL
FLOAT
STRUCTURE SUMMARY (SOUTH BERTH)
E
STRUCTURE
SIZE
PILE #
PILE DIA.
APPROACH DOCK
7,800 SF
26
24"
VEHICLE TRANSFER BRIDGE
20' x 148'
5
24"
BRIDGE LANDING
30' x 65'
0
0
CONCRETE FLOATING DOCK
50' x 300'
14
48"
MOORING AND BREASTING
DOLPHINS
7 EA
47
48"
NAVIGATIONAL BOOM
410 LF
5
48"
PURPOSE:
SCALE IN FEET
200
APPLICANT ADDRESS:
MLLW = 0.0 FT
NEW
NAVIGATIONAL
BOOM,
SEE SHEET 15
NEW MOORING &
BREASTING DOLPHINS,
SEE SHEET 9
0
DATUM:
J
SOUTH BERTH
PROPOSED SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
J
E
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
400
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 5
OF 15
HTL = 20.8
MHW = 15.4
MLLW = 0
REMOVE
TRANSFER BRIDGE
EXISTING
CBJ DOCK
SO
TRAM
PLAZA
BLDG
TO REMAIN
UT
H
FR
AN
KL
IN
ST
CRUISE SHIP
TERMINAL
STAGING AREA
DEMO PORTION OF
SOUTH FERRY DOCK
EXISTING DOCK
TO REMAIN
PORT CUSTOMS BLDG
TO REMAIN
FISHERMEN'S
MEMORIAL
TAKU SMOKERIES/
FISHERIES BLDG
REMOVE DOLPHINS
& CATWALKS, TYP.
HTL = 20.8
MHW = 15.4
MLLW = 0
DEMOLITION SUMMARY
STRUCTURE
SIZE
NO. OF PILES
PILE Ø
TRANSFER BRIDGE
2,600 SF
12 (STEEL)
12" (8)
24" (4)
SOUTH FERRY DOCK
7,250 SF
120 (TIMBER)
12"
DOLPHINS & ASSOC. CATWALKS
6 EA @ 300LF
22
VARIES
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
100
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
MINERS
COVE
SEAWALK
EXISTING
INTERMEDIATE
VESSEL
FLOAT
TRANSFER BRIDGE
PROPOSED DEMOLITION PLAN
0
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
TAKU FISHERIES
DOCK TO BE
RECONFIGURED
200
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 6
OF 15
HTL = 20.8
MHW = 15.4
H
MLLW = 0
NEW CONCRETE
RETAINING WALL
AND FILL
G
EXISTING
CBJ DOCK
SOUTH
FERRY
DOCK
G
SO
TRAM
PLAZA
BLDG
CRUISE SHIP
TERMINAL
STAGING AREA
UT
H
FR
AN
KL
IN
ST
H
NEW DOCK ADDITION,
APPROX. 11,000 SF
A
NEW GANGWAY
NEW CONCRETE
MOORAGE FLOAT
PORT
CUSTOMS
BLDG
A
FISHERMEN'S
MEMORIAL
STRUCTURE SUMMARY (RETAINING WALL AND TAKU
SMOKERIES DOCK)
STRUCTURE
SIZE
# OF PILES
PILE ø
CONCRETE RETAINING WALL
AND FILL
75 LF X
1'-3" WIDE
9
24"
NEW DOCK ADDITION
11,000 SF
2, 34
16", 12.75"
CONCRETE MOORAGE
FLOAT
16' X 200'
6
20"
GANGWAY
8' X 120'
0
0
15, 1
16", 24"
NEW WORK DECK ADDITION
1,200 SF
TAKU SMOKERIES/
FISHERIES BLDG
TAKU
FISHERIES
DOCK
NEW
MOORING
PILE
HTL = 20.8
MHW = 15.4
MLLW = 0
F
F
NEW WORK DECK
ADDITION
MINERS
COVE
SEAWALK
SUMMARY OF FILL QUANTITIES
MATERIAL
TOTAL
PROJECT
QTY
QTY BELOW
HTL
QTY
SEAWARD
MHW
FILL
700 CY
200 CY
1
400 CY
BASE COURSE
20 CY
20 CY
20 CY
RIP RAP
50 CY
50 CY
50 CY
EXCAVATION
100 CY
0 CY
0 CY
PURPOSE:
EXISTING
INTERMEDIATE
VESSEL
FLOAT
TRANSFER BRIDGE
PROPOSED SITE PLAN
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SCALE IN FEET
0
100
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
200
IN:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 7
OF 15
TOP OF PILE
ELEV. +30' ±
GANGWAY
EXISTING DOCK
TO REMAIN
HTL
ELEV. +20.8
MHW
ELEV. +15.4'
TOP OF DOCK
ELEV. +25' ±
16' x 250' CONCRETE FLOAT
MLLW
ELEV. +0.0'
16'
APPROX.
GROUND LINE
APPROX.
BEDROCK
SECTION A-A
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 8
OF 15
24'
BULLRAIL
EXISTING DOCK
TO REMAIN
TIMBER
DECK
TOP OF DECK
ELEV. +27' ±
TOP OF PIER
ELEV. +27'±
HTL
ELEV. +20.8'
STEEL PILE
CAP
MHW
ELEV. +15.4'
MLLW
ELEV. +0.0'
STEEL PIPE
PILE, TYP.
APPROX.
GROUNDLINE
APPROX.
BEDROCK
SECTION B-B
NEW
PIER
14 0'
HTL
ELEV. +20.8'
MHW
ELEV. +15.4'
TRANSFER
BRIDGE
MLLW
ELEV. +0.0'
FLOATING
DOCK
SECTION C-C
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET
9 OF 15
50'
PEDESTRIAN
GUARDRAIL
30'-0"
REMOVABLE
COMBINATION
VEHICULAR AND
PEDESTRIAN BARRIER
24'-0"
STEEL VEHICLE
TRANSFER BRIDGE
FLOATING
CONCRETE
DOCK
FOAM FILLED
MARINE FENDER
STEEL DECK
BRIDGE LANDING
8'-0"
FREEBOARD
SECTION D-D
CATWALK
QUICK RELEASE MOORING
HOOK NOT SHOWN
DOLPHIN CAP
TOP OF DECK
ELEV. +30'±
TOP OF PILE
ELEV. +24'±
MHHW
ELEV. +15.4'
MLLW
ELEV. +0.0'
FOAM FILLED
MARINE FENDER
DROP ON FENDER
FRAME
STEEL PIPE
PILE, TYP.
STEEL PIPE
FENDER PILE, TYP.
APPROX.
GROUNDLINE
APPROX.
BEDROCK
SECTION E-E
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 10 OF 15
TIMBER
DECK
BULLRAIL
VARIES
0' TO 100'±
EXISTING DOCK
TO REMAIN
TOP OF DECK
ELEV. +27' ±
TOP OF DOCK
ELEV. +27'±
HTL
ELEV. +20.8'
STEEL PILE
CAP
MHW
ELEV. +15.4'
STEEL PIPE
PILE, TYP.
MLLW
ELEV. +0.0'
STEEL PIPE
FENDER, TYP.
APPROX.
GROUNDLINE
APPROX.
BEDROCK
SECTION F-F
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTIONS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 11 OF 15
26'-2"
CONCRETE RETAINING
WALL
STEEL PILES, TYP.
38'-2"
EXISTING CONCRETE
RETAINING WALL
1'-3"
END OF CONCRETE
RETAINING WALL
9'-4"
RETAINING WALL
FOUNDATION PLAN
TIMBER
DECK
CONCRETE
DECK
CONCRETE
RETAINING WALL
SHOT ROCK
BACKFILL
EXISTING TIMBER PILE
EXISTING TIMBER WALL
+18.0' MLLW
RIP RAP
+16.0' MLLW
1.5
SHOT ROCK
BACKFILL
1
5
24" GALVANIZED
STEEL PILE PIPE
1
EXISTING
GROUND
SECTION G-G
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
SECTION AT TIMBER WALL
NTS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 12 OF 15
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
HTL
ELEV. +20.8'
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
STEEL
BATTER
PILE,
TYP
PORT CUSTOMS
DOCK SECTION
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
EXISTING
GROUND
EXISTING
WALL
CONCRETE
DECK
STEEL
VERTICAL
PILE,
TYP
SECTION H-H
STEEL
PILE
CAP
TOP OF DECK
ELEV. +27' ±
TIMBER
GLU-LAM
STRINGER
TIMBER
DECK
PURPOSE:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 13 OF 15
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
HTL
ELEV. +20.8'
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
STEEL
BATTER
PILE,
TYP
PORT CUSTOMS
DOCK SECTION
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
EXISTING
GROUND
EXISTING
WALL
CONCRETE
DECK
STEEL
VERTICAL
PILE,
TYP
SECTION H-H
STEEL
PILE
CAP
TOP OF DECK
ELEV. +27' ±
TIMBER
GLU-LAM
STRINGER
TIMBER
DECK
PURPOSE:
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 13 OF 15
STEEL PIPE
PILE, TYP.
GROUNDLINE
PILE TIP
AS REQ'D
BEDROCK
DRIVEN PILE
DRILLED AND
GROUTED PIPE
PIN PILE
DRILLED SOCKET
SIMILAR IN
SIZE TO PILE
DRILLED AND
GROUTED ROD
PIN PILE
PILE SOCKET
NOTE:
STEEL PIPE PILE TIPS FOR THIS PROJECT
WILL BE INSTALLED PER ONE OF THE
METHODS DEPICTED ON THIS SHEET. ACTUAL
METHOD TO BE DETERMINED AS SUBSURFACE
CONDITIONS BECOME KNOWN. ALL PILES
DRIVEN TO IMPACT HAMMER REFUSAL
PURPOSE:
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
ROCK ANCHOR
PILE DETAILS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 14 OF 15
48"ø
MOORING PILE
PILE HOOP
48"ø
PIPE
STABILIZER
STRUT
BUMPER
48"ø
PIPE
NAVIGATION
BOOM
SECTION J-J
PURPOSE:
PIPE NAVIGATION BOOM
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
NTS
IN:
APPLICANT ADDRESS:
DATUM:
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
GASTINEAU CHANNEL
NEAR: JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
AT:
APPLICATION BY: CITY AND BOROUGH OF JUNEAU
DATE:
JANUARY 2013
SHEET 15 OF 15
US Army Corps
of Engineers
Alaska District
Juneau Field Office
Regulatory Division (1145)
CEPOA-RD
8800 Glacier Highway, Suite 106
Juneau, Alaska 99801-8079
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
March 4, 2013
EXPIRATION DATE:
March 18, 2013
REFERENCE NUMBER:
POA-2011-924-M1
WATERWAY:
Gastineau Channel
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Randal Vigil at (907)
790-4491 or by email at Randal.P.Vigil@usace.army.mil if further information is
desired concerning this notice.
APPLICANT: City and Borough of Juneau, Docks and Harbors Department, 155 South
Seward Street, Juneau, Alaska 99801.
AGENT:
PND Engineers, Inc., 9360 Glacier Highway, Suite 100, Juneau, Alaska 99801.
LOCATION: The project site is located within Section 23, T. 41 S., R. 67 E.,
Copper Meridian; USGS Quad Map Juneau B-2; Latitude 58.296º N., Longitude 134.402º
W.; Alaska Tidelands Survey 3; at the Smokeries dock, the Alaska Steamship Wharf
and the Cruise Ship Terminal, in Juneau, Alaska.
PURPOSE: The applicant's stated purpose is to expand the "Smokeries dock, and
improve access, security, berthing capacity, and safety at the City and Borough of
Juneau's Downtown Cruise Ship Docks."
PROPOSED WORK: The applicant requests authorization for the following work in
waters and navigable waters of the United States: 1. Discharge approximately 270
cubic yards of fill material into approximately 0.049 acres below the high tide
line (approximate elevation +20.8 feet above the 0.0 foot contour) to construction
a retaining wall. 2. Construct below the Mean High Water mark (approximate
elevation +15.4 feet above the 0.0 foot contour) (MHW) two offshore cruise ship
berths, and the Taku Smokeries new work deck addition. Work would include the
removal of the existing South Ferry Dock, transfer bridge, and associated dolphins
and catwalks. All work would be performed in accordance with the enclosed plan
(sheets 1-15), dated January 2013.
- 1 -
ADDITIONAL INFORMATION: The previous permit was issued on March 30, 2012 to the
City and Borough of Juneau, to: 1. Discharge 270 cubic yards of fill material into
0.049 acres below the high tide line (approximate elevation +20.8 feet above the 0.0
foot contour) (HTL) to construct a retaining wall. 2. Construct below the Mean
High Water mark (approximate elevation +15.4 feet above the 0.0 foot contour) two
offshore cruise ship berths, including the removal of the existing South Ferry Dock,
transfer bridge, and associated dolphins and catwalks. Refer to the below impact
tables for details, including the removal of the existing South Ferry Dock, transfer
bridge, and associated dolphins and catwalks.
Phase 1 Retaining Wall, Moorage Float, Taku Smokeries
Table 1 Demolition Plan
Structural Element
Transfer Bridge
South Ferry Dock
Dolphins and Catwalks
Size (+/- 10%)
2,600 SF
7,250 SF
6 EA, 300 LF
Number of Piles
12(Steel)
120 (Timber)
22
Pile
12" (8), 24" (4)
12"
varies
Table 2 Retaining Wall, Moorage Float and Taku Smokeries Design Elements
Structural Element
Concrete Retaining Wall
(Fill Quantities Below)
New South Ferry Dock
Replacement and Addition
Concrete Moorage Float
Gangway
Taku Smokeries Work
Deck
Addition
and
Mooring Pile
Size (+/- 10%)
75 LF x 1'-3" wide
Number of Piles
9
Pile
24"
11,000 SF
2; 34
16" ; 12.75"
16' x 250'
8' x 120'
1,000 SF
9
8
16"
16"
Number of Piles
36
8
10
27
Pile
16"
16"
48"
48"
Number of Piles
16
8
Pile
16"
16"
Table 3 Retaining Wall Fill Quantities
Material
Fill
Base Course
Rip Rap
Excavation
Total Area Impacted
Qty Below HTL
200 CY
20 CY
50 CY
0 CY
0.049 AC
(2,134.44 SF)
Phase 2 South Berth
Table 4 South Berth Design Elements
Structural Element
Size (+/- 10%)
Approach Dock
7,000 SF
Vehicle Transfer Bridge
140' x 24'
Bridge Support Float
25' x 30'
Bridge Landing
50' x 40'
Concrete Floating Dock
50' x 400'
Mooring and Breasting 6 EA
Dolphins and Catwalks
Phase 3 North Berth
Table 5 North Berth Design Elements
Structural Element
Size (+/- 10%)
Approach Dock
4,200 SF
Vehicle Transfer Bridge
140' x 24'
- 2 -
Bridge Support Float
Bridge Landing
Concrete Floating Dock
Mooring and Breasting
Dolphins and Catwalks
25' x 30'
50' x 40'
50' x 300'
6 EA
10
24
48"
48"
The currently proposed project would rotate the dock offshore at the south end,
reposition the 400 feet long concrete pontoon to the north berth, and reposition the
300 feet long concrete pontoon to the south berth. Pontoon restraint dolphins and
breasting dolphins would also be relocated. The approach docks would be extended as
a result of the revised dock alignment and modifications would be made to the
transfer bridge landings. A navigational boom would be added at the south berth to
aid vessels approaching or departing the Taku Fisheries Dock.
Additionally, the
Taku Fisheries Dock would be redesigned to allow for safer access and moorage.
The proposed project design is a combination of fixed and floating docks, both of
which require steel piles to support or anchor these structures. The floating docks
would be manufactured offsite, towed to the site and field installed. The overall
in-water work would be significantly shortened by this process. The primary type of
pile that would be used at the site would be hollow steel pipe piles. The means of
installation would vary with specific locations and would include rock anchors, pin
piles, or rock sockets as necessary. The piles would be driven to bedrock or as
deep into existing soils as necessary to resist the design loads. Rock anchor and
pin pile installation would be similar in that a smaller diameter hole would be
drilled into the bedrock underneath the pile, and an anchor rod or small diameter
pin pile would be grouted into the hole. Then the annulus between the pile and the
anchor rod or pin pile would be also grouted to transfer load between the pile and
the anchor rod or pin pile. A rock socket consists of a hole drilled into bedrock.
The structural pile would then be driven into the hole to provide a stable base and
provide a higher level of uplift and lateral resistance. The means with which piles
would be installed would need to be evaluated on a case-by-case basis. The
applicant supports the use of vibratory pile driving equipment as the primary
installation method for the project, impact hammers would only be allowed for piles
that encounter soils too dense to penetrate with the vibratory equipment, however,
bedrock conditions are anticipated.
APPLICANT PROPOSED MITIGATION: The applicant has made the following statements
concerning mitigation measures to avoid, minimize, and compensate for impacts to
waters of the United States from activities involving discharges of dredged or fill
material.
a. Avoidance: This project utilizes pile supported and floating structures
to the maximum extent possible. Complete avoidance is not possible.
b. Minimization: The design has been optimized to minimize any impacts
beyond what is required to construct the retaining wall associated with the CBJ
Downtown Cruise Ship Docks project. While the existing fill slope at the site varies
from approximately 1:4 to 1:9 (H:V), the project design incorporates the use of a
concrete retaining wall with a rip rap slope at the base of the wall designed at
1.5:1 to minimize fill quantities as much as practicable while still meeting the
intended purpose and need.
c.
Compensatory Mitigation:
No compensatory mitigation is proposed.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
- 3 -
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There is an unevaluated property in the vicinity of
the worksite. It has been designated JUN-314. There are also registered or
eligible properties in the vicinity of the worksite. They have been designated
JUN-00376, JUN-00118, JUN-00374, JUN-00212, and JUN-00373. Because these properties
have been determined to be outside of the project area, we have determined that
there would be no effect to historic properties. Consultation of the AHRS
constitutes the extent of cultural resource investigations by the District
Commander at this time. This application is being coordinated with SHPO. Any
comments SHPO may have concerning presently unknown archeological or historic data
that may be lost or destroyed by work under the requested permit will be considered
in our final assessment of the described work.
ENDANGERED SPECIES: The project area is within the known or historic range of the
Humpback whale (Megaptera novaeangliae) and Steller sea lion (Eumetopias jubatus).
We have determined the described activity would have no effect on the Humpback
whale or the Steller sea lion, and would have no effect on any designated or
proposed critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
Therefore, no consultation with the U.S. Fish and Wildlife Service or the National
Marine Fisheries Service is required. However, any comments they may have
concerning endangered or threatened wildlife or plants or their critical habitat
will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
The project area is within the known range of the Chinook (Oncorhynchus
tshawytscha), chum (Oncorhynchus keta), Coho (Oncorhynchus kisutch), pink
(Oncorhynchus gorbuscha), and sockeye (Oncorhynchus nerka) salmon.
We have determined the described activity may adversely affect EFH in the project
area for pink salmon. The proposed project location is near-shore habitat
primarily for adult and juvenile salmon migration, which provides refuge from
predators and opportunity to rest. The proposed project would involve pile
driving, which may increase the potential for injury or mortality to salmon from
pressure waves generated from pile driving. This Public Notice initiates EFH
consultation with the NMFS. Any comments or recommendations they may have
concerning EFH will be considered in our final assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
- 4 -
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
- 5 -
US Army Corps
of Engineers
Alaska District
Juneau Field Office
Regulatory Division (1145)
CEPOA-RD
8800 Glacier Highway, Suite 106
Juneau, Alaska 99801-8079
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
March 4, 2013
EXPIRATION DATE:
March 18, 2013
REFERENCE NUMBER:
POA-2011-924-M1
WATERWAY:
Gastineau Channel
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Randal Vigil at (907)
790-4491 or by email at Randal.P.Vigil@usace.army.mil if further information is
desired concerning this notice.
APPLICANT: City and Borough of Juneau, Docks and Harbors Department, 155 South
Seward Street, Juneau, Alaska 99801.
AGENT:
PND Engineers, Inc., 9360 Glacier Highway, Suite 100, Juneau, Alaska 99801.
LOCATION: The project site is located within Section 23, T. 41 S., R. 67 E.,
Copper Meridian; USGS Quad Map Juneau B-2; Latitude 58.296º N., Longitude 134.402º
W.; Alaska Tidelands Survey 3; at the Smokeries dock, the Alaska Steamship Wharf
and the Cruise Ship Terminal, in Juneau, Alaska.
PURPOSE: The applicant's stated purpose is to expand the "Smokeries dock, and
improve access, security, berthing capacity, and safety at the City and Borough of
Juneau's Downtown Cruise Ship Docks."
PROPOSED WORK: The applicant requests authorization for the following work in
waters and navigable waters of the United States: 1. Discharge approximately 270
cubic yards of fill material into approximately 0.049 acres below the high tide
line (approximate elevation +20.8 feet above the 0.0 foot contour) to construction
a retaining wall. 2. Construct below the Mean High Water mark (approximate
elevation +15.4 feet above the 0.0 foot contour) (MHW) two offshore cruise ship
berths, and the Taku Smokeries new work deck addition. Work would include the
removal of the existing South Ferry Dock, transfer bridge, and associated dolphins
and catwalks. All work would be performed in accordance with the enclosed plan
(sheets 1-15), dated January 2013.
- 1 -
ADDITIONAL INFORMATION: The previous permit was issued on March 30, 2012 to the
City and Borough of Juneau, to: 1. Discharge 270 cubic yards of fill material into
0.049 acres below the high tide line (approximate elevation +20.8 feet above the 0.0
foot contour) (HTL) to construct a retaining wall. 2. Construct below the Mean
High Water mark (approximate elevation +15.4 feet above the 0.0 foot contour) two
offshore cruise ship berths, including the removal of the existing South Ferry Dock,
transfer bridge, and associated dolphins and catwalks. Refer to the below impact
tables for details, including the removal of the existing South Ferry Dock, transfer
bridge, and associated dolphins and catwalks.
Phase 1 Retaining Wall, Moorage Float, Taku Smokeries
Table 1 Demolition Plan
Structural Element
Transfer Bridge
South Ferry Dock
Dolphins and Catwalks
Size (+/- 10%)
2,600 SF
7,250 SF
6 EA, 300 LF
Number of Piles
12(Steel)
120 (Timber)
22
Pile
12" (8), 24" (4)
12"
varies
Table 2 Retaining Wall, Moorage Float and Taku Smokeries Design Elements
Structural Element
Concrete Retaining Wall
(Fill Quantities Below)
New South Ferry Dock
Replacement and Addition
Concrete Moorage Float
Gangway
Taku Smokeries Work
Deck
Addition
and
Mooring Pile
Size (+/- 10%)
75 LF x 1'-3" wide
Number of Piles
9
Pile
24"
11,000 SF
2; 34
16" ; 12.75"
16' x 250'
8' x 120'
1,000 SF
9
8
16"
16"
Number of Piles
36
8
10
27
Pile
16"
16"
48"
48"
Number of Piles
16
8
Pile
16"
16"
Table 3 Retaining Wall Fill Quantities
Material
Fill
Base Course
Rip Rap
Excavation
Total Area Impacted
Qty Below HTL
200 CY
20 CY
50 CY
0 CY
0.049 AC
(2,134.44 SF)
Phase 2 South Berth
Table 4 South Berth Design Elements
Structural Element
Size (+/- 10%)
Approach Dock
7,000 SF
Vehicle Transfer Bridge
140' x 24'
Bridge Support Float
25' x 30'
Bridge Landing
50' x 40'
Concrete Floating Dock
50' x 400'
Mooring and Breasting 6 EA
Dolphins and Catwalks
Phase 3 North Berth
Table 5 North Berth Design Elements
Structural Element
Size (+/- 10%)
Approach Dock
4,200 SF
Vehicle Transfer Bridge
140' x 24'
- 2 -
Bridge Support Float
Bridge Landing
Concrete Floating Dock
Mooring and Breasting
Dolphins and Catwalks
25' x 30'
50' x 40'
50' x 300'
6 EA
10
24
48"
48"
The currently proposed project would rotate the dock offshore at the south end,
reposition the 400 feet long concrete pontoon to the north berth, and reposition the
300 feet long concrete pontoon to the south berth. Pontoon restraint dolphins and
breasting dolphins would also be relocated. The approach docks would be extended as
a result of the revised dock alignment and modifications would be made to the
transfer bridge landings. A navigational boom would be added at the south berth to
aid vessels approaching or departing the Taku Fisheries Dock.
Additionally, the
Taku Fisheries Dock would be redesigned to allow for safer access and moorage.
The proposed project design is a combination of fixed and floating docks, both of
which require steel piles to support or anchor these structures. The floating docks
would be manufactured offsite, towed to the site and field installed. The overall
in-water work would be significantly shortened by this process. The primary type of
pile that would be used at the site would be hollow steel pipe piles. The means of
installation would vary with specific locations and would include rock anchors, pin
piles, or rock sockets as necessary. The piles would be driven to bedrock or as
deep into existing soils as necessary to resist the design loads. Rock anchor and
pin pile installation would be similar in that a smaller diameter hole would be
drilled into the bedrock underneath the pile, and an anchor rod or small diameter
pin pile would be grouted into the hole. Then the annulus between the pile and the
anchor rod or pin pile would be also grouted to transfer load between the pile and
the anchor rod or pin pile. A rock socket consists of a hole drilled into bedrock.
The structural pile would then be driven into the hole to provide a stable base and
provide a higher level of uplift and lateral resistance. The means with which piles
would be installed would need to be evaluated on a case-by-case basis. The
applicant supports the use of vibratory pile driving equipment as the primary
installation method for the project, impact hammers would only be allowed for piles
that encounter soils too dense to penetrate with the vibratory equipment, however,
bedrock conditions are anticipated.
APPLICANT PROPOSED MITIGATION: The applicant has made the following statements
concerning mitigation measures to avoid, minimize, and compensate for impacts to
waters of the United States from activities involving discharges of dredged or fill
material.
a. Avoidance: This project utilizes pile supported and floating structures
to the maximum extent possible. Complete avoidance is not possible.
b. Minimization: The design has been optimized to minimize any impacts
beyond what is required to construct the retaining wall associated with the CBJ
Downtown Cruise Ship Docks project. While the existing fill slope at the site varies
from approximately 1:4 to 1:9 (H:V), the project design incorporates the use of a
concrete retaining wall with a rip rap slope at the base of the wall designed at
1.5:1 to minimize fill quantities as much as practicable while still meeting the
intended purpose and need.
c.
Compensatory Mitigation:
No compensatory mitigation is proposed.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
- 3 -
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There is an unevaluated property in the vicinity of
the worksite. It has been designated JUN-314. There are also registered or
eligible properties in the vicinity of the worksite. They have been designated
JUN-00376, JUN-00118, JUN-00374, JUN-00212, and JUN-00373. Because these properties
have been determined to be outside of the project area, we have determined that
there would be no effect to historic properties. Consultation of the AHRS
constitutes the extent of cultural resource investigations by the District
Commander at this time. This application is being coordinated with SHPO. Any
comments SHPO may have concerning presently unknown archeological or historic data
that may be lost or destroyed by work under the requested permit will be considered
in our final assessment of the described work.
ENDANGERED SPECIES: The project area is within the known or historic range of the
Humpback whale (Megaptera novaeangliae) and Steller sea lion (Eumetopias jubatus).
We have determined the described activity would have no effect on the Humpback
whale or the Steller sea lion, and would have no effect on any designated or
proposed critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
Therefore, no consultation with the U.S. Fish and Wildlife Service or the National
Marine Fisheries Service is required. However, any comments they may have
concerning endangered or threatened wildlife or plants or their critical habitat
will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
The project area is within the known range of the Chinook (Oncorhynchus
tshawytscha), chum (Oncorhynchus keta), Coho (Oncorhynchus kisutch), pink
(Oncorhynchus gorbuscha), and sockeye (Oncorhynchus nerka) salmon.
We have determined the described activity may adversely affect EFH in the project
area for pink salmon. The proposed project location is near-shore habitat
primarily for adult and juvenile salmon migration, which provides refuge from
predators and opportunity to rest. The proposed project would involve pile
driving, which may increase the potential for injury or mortality to salmon from
pressure waves generated from pile driving. This Public Notice initiates EFH
consultation with the NMFS. Any comments or recommendations they may have
concerning EFH will be considered in our final assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
- 4 -
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
- 5 -