Home

Alaska District

Run scraper

POA-2005-1243

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

ENI U.S. Operating Company, Incorporated's stated purpose is to maintain sufficient draft for barge and boat landing and to maintain cover on subsea pipeline. ENI is proposing to conduct annual maintenance dredging for 10 years at its Nikaitchuq Development site to maintain sufficient draft for barge and boat landings and to cover the subsea pipeline. Proposed Work: To dredge approximately 7,100 cubic yards of sediment per year on 6.1 acres of marine waters substrate, of which 0.92-acre would be dredged from two OPP’s barge/boat ramps and 0.92-acre would be dredged from two SID’s barge/boat ramps. Dredged material would be placed on 4.61 acres along the 3.8-mile subsea pipeline between SID and OPP. Fill would be placed to restore 6 feet of cover material on top of the scoured pipeline (permit POA-2005-1243 requirement). Dredged material not used to cover the scoured pipeline would be deposited on areas approved for brine sediment and reuse either as bulk fill or in sand bags. Please contact Estrella Campellone at (907) 753-2518, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Estrella.f.campellone@usace.army.mil if further information is desired concerning this notice.

ENI U.S. Operating Company, Incorporated's stated purpose is to maintain sufficient draft for barge and boat landing and to maintain cover on subsea pipeline. ENIis proposing to conduct annual maintenance dredging for 10 years at its Nikaitchuq Development site to maintain sufficient draft for barge and boat landings and to cover the subsea pipeline.Proposed Work: To dredge approximately 7,100 cubic yards of sediment per year on 6.1 acres of marine waters substrate, of which 0.92-acre would be dredged from two OPP’s barge/boat ramps and 0.92-acre would be dredged from two SID’s barge/boat ramps. Dredged material would be placed on 4.61 acres along the 3.8-mile subsea pipeline between SID and OPP. Fill would be placed to restore 6 feet of cover material on top of the scoured pipeline (permit POA-2005-1243 requirement). Dredged material not used to cover the scoured pipeline would be deposited on areas approved for brine sediment and reuse either as bulk fill or in sand bags. Please contact Estrella Campellone at (907) 753-2518, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Estrella.f.campellone@usace.army.mil if further information is desired concerning this notice. POA-2005-1243, Beaufort Sea_PN POA-2005-1243, Beaufort Sea_PN Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas