The nature of the activity is to expand the OTP, install a 12-inch 3-phase above-ground flowline from the OTP to DS3H, install a 12-inch seawater above-ground flowline from the OTP to a new seawater tie-in pad, and expand the offshore ODS. Discharge a total of 189,450 cubic yards of gravel fill material into navigable waters, inland surface waters, and wetlands. USACE PROJECT MANAGER: Harry A. Baij Jr.,Alaska District, Regulatory Division, E-mail address: harry.a.baij@usace.army.mil; Office phone: 907-753-2784, Cell phone: 907-782-7517, Toll-free phone (within Alaska): 800-478-2712.

The nature of the activity is to expand the OTP, install a 12-inch 3-phase above-ground flowline from the OTP to DS3H, install a 12-inch seawater above-ground flowline from the OTP to a new seawater tie-in pad, and expand the offshore ODS. Discharge a total of 189,450 cubic yards of gravel fill material into navigable waters, inland surface waters, and wetlands. USACE PROJECT MANAGER: Harry A. Baij Jr.,Alaska District, Regulatory Division, E-mail address: harry.a.baij@usace.army.mil; Office phone: 907-753-2784, Cell phone: 907-782-7517, Toll-free phone (within Alaska): 800-478-2712.

POA-2005-1295-M11 Oooguruk Expansion_PN POA-2005-1295-M11 Oooguruk Expansion_PN_Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas