Home

Alaska District

Run scraper

POA-2013-565

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

On November 1, 2013, the Alaska District Corps of Engineers published a Public Notice for Department of the Army (DA) permit number POA-2013-565, Chilkat River for a DA permit application from Mr. John Floreske Jr., to discharge 1,437 cubic yards of fill material into 0.34 acres of palustrine emergent wetlands to construct 3 helipads each 59 feet long by 59 feet wide with 3 approach-ways each 39 feet long by 59 feet wide. The project site is located within Section 8, T. 30 S., R. 58 E., Copper River Meridian; USGS Quad Map Skagway B-2; Latitude 59.282º N., Longitude 135.678º W.; Milepost 10 Haines Highway; near Haines, Alaska. The comment period for the Public Notice has been extended for an additional 15 days in order for members of the public and other interested parties to consider and evaluate the impacts of this proposed activity. All other information contained in the previous notice remains the same. Please bring this announcement to the attention of anyone you know who is or may be interested. Please contact Randal Vigil at (907) 790-4491 or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.

On November 1, 2013, the Alaska District Corps of Engineers published a Public Notice for Department of the Army (DA) permit number POA-2013-565, Chilkat River for a DA permit application from Mr. John Floreske Jr., to discharge 1,437 cubic yards of fill material into 0.34 acres of palustrine emergent wetlands to construct 3 helipads each 59 feet long by 59 feet wide with 3 approach-ways each 39 feet long by 59 feet wide. The project site is located within Section 8, T. 30 S., R. 58 E., Copper River Meridian; USGS Quad Map Skagway B-2; Latitude 59.282º N., Longitude 135.678º W.; Milepost 10 Haines Highway; near Haines, Alaska. The comment period for the Public Notice has been extended for an additional 15 days in order for members of the public and other interested parties to consider and evaluate the impacts of this proposed activity. All other information contained in the previous notice remains the same. Please bring this announcement to the attention of anyone you know who is or may be interested. Please contact Randal Vigil at (907) 790-4491 or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice. POA-2013-565, Chilkat River_PN_Revision

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas