Home

Alaska District

Run scraper

POA-2013-0395

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Trillium Mitigation Bank proposes to establish, design, construct, and operate a compensatory wetland and stream mitigation site to be known as Trillium Mitigation Bank. The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and streams and other waters of the United States in the El Capitan Watershed. The Sponsor plans to preserve the entire proposed site in perpetuity; re-establish wetlands and stream channel connectivity through the removal of road fill, logging debris and degraded log water crossing structures; and, rehabilitate wetlands and streams by improving water crossing structures and removal of road fill. Comments on the proposed mitigation site should be made in writing to the Alaska District, U.S. Army Corps of Engineers ATTN: Linda Speerstra, Post Office Box 16, Sitka, Alaska 99835, or e-mail linda.speerstra@usace.army.mil.

Trillium Mitigation Bank proposes to establish, design, construct, and operate a compensatory wetland and stream mitigation site to be known as Trillium Mitigation Bank. The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and streams and other waters of the United States in the El Capitan Watershed.The Sponsor plans to preserve the entire proposed site in perpetuity; re-establish wetlands and stream channel connectivity through the removal of road fill, logging debris and degraded log water crossing structures; and, rehabilitate wetlands and streams by improving water crossing structures and removal of road fill. Comments on the proposed mitigation site should be made in writing to the Alaska District, U.S. Army Corps of Engineers ATTN: Linda Speerstra, Post Office Box 16, Sitka, Alaska 99835, or e-mail linda.speerstra@usace.army.mil.

POA-2013-0395, Mitigation Bank Prospectus_PN POA-2013-0395, Mitigation Bank Prospectus_PN Drawings POA-2013-0395, Mitigation Bank Prospectus_PN Trillium Prospectus

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas