You can copy from here when filling out the rest of the page.
Mr. Todd White's stated purpose is to construct a pad for single family residential housing. Placement of 366 cubic yards (cy) of clean shot rock and 428 cy of rip rap material within 0.09-acre below the high tide line (HTL) of Zimovia Strait to construct a fill pad and associated rip rap retaining wall. The lot above the high tide line is steep and does not contain wetlands or other waters of the U.S. All work would be performed in accordance with the enclosed plan (sheets 1-7), dated March 24, 2014. Please contact Marcia L. Heer at (907) 753-5759, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Marcia.L.Heer@usace.army.mil if further information is desired concerning this notice.
Mr. Todd White's stated purpose is to construct a pad for single family residential housing. Placement of 366 cubic yards (cy) of clean shot rock and 428 cy of rip rap material within 0.09-acre below the high tide line (HTL) of Zimovia Strait to construct a fill pad and associated rip rap retaining wall. The lot above the high tide line is steep and does not contain wetlands or other waters of the U.S. All work would be performed in accordance with the enclosed plan (sheets 1-7), dated March 24, 2014.Please contact Marcia L. Heer at (907) 753-5759, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Marcia.L.Heer@usace.army.mil if further information is desired concerning this notice.
POA-2014-29, Zimovia Strait_PN
POA-2014-29, Zimovia Strait_PN Drawings