Jim Hatheway, City of Delta, has applied for a permit to place dredged or fill material and/or work in approximately 2.09 acres of waters of the United States to construct an alternate truck route to direct truck traffic around downtown Delta. This project is located near the Gunnison and Uncompahgre Rivers, within Sections 13 and 24, Township 15 South, Range 96 West, Sixth Principal Meridian, City of Delta, Delta County, Colorado, and can be seen on the CO-NORTH DELTA USGS Topographic Quadrangle.
CESPK-RD-C
May 30, 2012 – June 29, 2012
SUBJECT: The U.S. Army Corps of Engineers, Sacramento District, (Corps) is evaluating a permit application to construct the Delta Alternate Truck Route project, which would result in impacts to approximately 2.09 acres of waters of the United States, including wetlands, adjacent to the Gunnison River. This notice is to inform interested parties of the proposed activity and to solicit comments.
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States.
APPLICANT: Mr. Jim Hatheway
City of Delta
640 West 4th Street
Delta, Colorado 81416
970-874-7566
jim@cityofdelta.net
Ms. Hillary Seminick
Parsons Brinckerhoff
555 17th Street
Denver, Colorado 80202
303-390-5939
Seminick@pbworld.com
LOCATION: The approximately 104-acre site is located near the Gunnison and Uncompahgre Rivers, within Sections 13 and 24, Township 15 South, Range 96 West, Sixth Principal Meridian, City of Delta, Delta County, Colorado, and can be seen on the CO-NORTH DELTA USGS Topographic Quadrangle.
PROJECT DESCRIPTION: The applicant is proposing to construct an alternate truck route to divert truck traffic around downtown Delta. Based on the available information, the applicant’s stated project purpose is to reduce heavy truck traffic volumes in Delta’s Historic Main Street corridor, create a pedestrian friendly downtown corridor to help revitalize the Main Street businesses, decrease travel times of US-50 through traffic, improve emergency vehicle response times by eliminating train delays, provide an alternative for school buses to avoid train conflicts and create a hazardous materials route that will reduce exposures to Delta’s citizens and the truck drivers. The applicant believes there is a need to increase safety and decrease travel times for vehicles. The attached drawings provide additional project details.
ADDITIONAL INFORMATION:
Environmental Setting. There are approximately 6.15 acres of palustrine emergent wetlands within the project area. The site is characterized by numerous drainage ditches with adjacent wetlands and a few depressional areas containing wetland soils, vegetation and hydrology.
Alternatives. The applicant has provided information concerning project alternatives. Additional information concerning project alternatives may be available from the applicant or their agent. Other alternatives may develop during the review process for this permit application. All reasonable project alternatives, in particular those which may be less damaging to the aquatic environment, will be considered. The applicant evaluated three potential truck route options including a Western Route (Option 1), Central Route (Option 2), and Eastern Route (Option 3). The applicants preferred option, based upon benefits and costs, is the Central Route. The original alternatives presented are shown on the map entitled “Hazardous Materials & Truck Route 3 Options” in the attachments to this Public Notice. The following alternatives were considered in early phases of the feasibility study: An underpass option to create grade separation between the UPRR rail lines and the proposed Confluence Drive was considered but was discounted due to high groundwater at the site location and potential for flooding. A viaduct was also considered; however this alternative did not meet the need of removing traffic and improving safety in Delta’s Historic Main Street Corridor.
Option 1 – Western Route would be the most impactful with 12.5 acres of desktop-identified wetlands.
Option 2 – Central Alternative (Preferred Alternative) would be the least impactful with 2.09 acres of wetland impacts. The wetlands in this alternative were field verified
Option 3 – Eastern Alternative, would potentially impact 9.3 acres of desktop-identified wetlands.
Mitigation. The Corps requires that applicants consider and use all reasonable and practical measures to avoid and minimize impacts to aquatic resources. If the applicant is unable to avoid or minimize all impacts, the Corps may require compensatory mitigation. The applicant has proposed to construct compensatory wetland mitigation for 1.4 acres of the 2.09 acres wetlands permanently lost as a result of the project at a site in nearby Confluence Park. The site is situated at the confluence of the Uncompahgre and Gunnison rivers. Figures describing the proposed compensatory mitigation are included in the attachments to this Public Notice. The remaining 0.69 acre of impact is proposed to be offset by additional mitigation to be defined in future conversation between the City of Delta and the Corps should the preferred alternative, Option 2, be selected.
OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification or a waiver, as required under Section 401 of the Clean Water Act from the Department of Public Health and Environment Water Quality Control Commission is required for this project. The applicant has indicated they have applied for certification.
HISTORIC PROPERTIES: Based on the available information (including applicant's report entitled Cultural Resources Reconnaissance Survey for Delta Alternate Truck Route), potentially eligible cultural resources may be affected by the proposed project. The Corps will initiate consultation with the State Historic Preservation Officer under Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED SPECIES: The proposed activity may affect Federally-listed endangered or threatened species or their critical habitat. The Corps has conducted consultation with the U.S. Fish and Wildlife, pursuant to Section 7 of the Endangered Species Act and has received concurrence that the project may affect but is not likely to adversely affect Federally-listed Colorado pikeminnow and razorback sucker and their critical habitat.
ESSENTIAL FISH HABITAT: The proposed project will not adversely affect Essential Fish Habitat (EFH) as defined in the Magnuson-Stevens Fishery Conservation and Management Act.
The above determinations are based on information provided by the applicant and our preliminary review.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230).
The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
SUBMITTING COMMENTS: Written comments, referencing Public Notice SPK-2011-00704 must be submitted to the office listed below on or before June 29, 2012
Nathan Green, Project Manager
US Army Corps of Engineers, Sacramento District
Colorado West Regulatory Branch
400 Rood Avenue, Room 224
Grand Junction, Colorado 81501-2563
Email: Nathan.J.Green@usace.army.mil
The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information please contact the applicant or the Corps' project manager Nathan Green, 970-243-1199 x12, Nathan.J.Green@usace.army.mil.
Attachments: 12 drawings