The Nevada Department of Transportation has applied for a permit to place dredged or fill material and/or work in approximately 4.02 acres of waters of the United States to construct a new interchange. This project is located on Duck Creek, in Section 32, Township 22 South, Range 61 East, Las Vegas, Clark County, Nevada.
Written comments and/or a request for a paper copy of the notice may be submitted to project manager Patricia McQueary at 196 East Tabernacle Street, Room 30,
St. George, Utah 84770, email Patricia.L.McQueary@usace.army.mil, or telephone 435-986-3979.
Comments must be received by September 7, 2012.
CESPK-RD-U
SUBJECT: The U.S. Army Corps of Engineers, Sacramento District, (Corps) is evaluating a permit application to construct the Nevada Department of Transportation Interstate-15 Cactus Interchange project, which would result in impacts to approximately 4.02 acres of waters of the United States, including wetlands, in or adjacent to Duck Creek. This notice is to inform interested parties of the proposed activity and to solicit comments.
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States.
APPLICANT:
Steve Cooke
Nevada Department of Transportation
1263 South Stewart Street
Carson City, Nevada 89712
LOCATION: The 4.02-acre site is located on or near Duck Creek, in Section 32, Township 22 South, Range 61 East, Mount Diablo Meridian, Latitude 35.9993069°, Longitude -115.180813°, Las Vegas, Clark County, Nevada, and can be seen on the NV-SLOAN USGS Topographic Quadrangle.
PROJECT DESCRIPTION: The applicant is proposing to construct a new interchange at Mile Post (MP) 30.3 on Interstate 15 (I-15). Based on right-of-way constraints at the project site, the interchange will be a Tight Urban Diamond Interchange (TUDI) configuration. The Cactus Avenue Interchange Bridge over I-15 will be a two-span continuous Composite Steel Plate Girder structure. An existing flood control facility consisting of a three-cell 12-foot by 4-foot reinforced concrete box (RCB) culvert crosses I-15 at an approximate skew of 44 degrees within the footprint of the proposed bridge structure for Cactus Avenue. The substructure will provide a cap beam spanning the existing three-cell box culvert. The project includes roadway improvements along Cactus Avenue from Dean Martin Drive to Las Vegas Boulevard, a distance of 3,500 feet, to connect the interchange to the existing arterial street network. The proposed Cactus Avenue bridge over I-15 will be 132 feet wide, comprised of four 11-foot and two 15-foot traffic lanes, four 10-foot traffic turning lanes, one four-foot median, two 5.5-foot sidewalks, and two 1-foot barriers with Type “M” pedestrian rail. Roadway improvements will include drainage, traffic, and utility work from Dean Martin Drive to Las Vegas Boulevard. The project will also include landscaping of the interchange.
Based on the available information, the overall project purpose is to alleviate existing and projected congestion, serve proposed future growth within the corridor by improving local circulation and access to 1-15, and provide for more efficient interstate transportation. The applicant believes there is a need to provide better access and circulation within the transportation network. The attached drawings provide additional project details. The basic project purpose is a roadway improvement project.
ADDITIONAL INFORMATION:
Environmental Setting. There are approximately 4.02 acres of ephemeral washes within the project area, including the main channel of Duck Creek. The site is characterized by a rapidly urbanizing environment. The area southwest of Cactus Avenue is a fully developed residential area. To the east, there is a strip of undeveloped land about 1.0 mile wide between I-15 and Las Vegas Boulevard. The area along Cactus Avenue to the northwest is relatively undeveloped with scattered, small residential area. To the northeast of Cactus Avenue and I-15 is a heavily developed area with both residential and commercial facilities.
Alternatives. An Environmental Assessment (EA) was prepared in October 2008 and a Finding
of No Significant Impact was issued on April 20, 2009. A list of alternatives is provided in the EA
and can be found at: http://pwgate.co.clark.nv.us/arra/tiger/cactus/cdocs/Environmental%20Assessment%20for%20I-15%20South%20Corridor%20Improvement.pdf.
Mitigation. The Corps requires that applicants consider and use all reasonable and practical measures to avoid and minimize impacts to aquatic resources. If the applicant is unable to avoid or minimize all impacts, the Corps may require compensatory mitigation.
OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification or a waiver, as required under Section 401 of the Clean Water Act, from the Nevada Department of Environmental Protection is required for this project. The applicant has not indicated they have applied for certification.
HISTORIC PROPERTIES: Based on the available information, no cultural resources were identified within the project's area of potential effect. A concurrence letter from Nevada State Historical Preservation Office dated May 31, 2007, indicated that nine sites within the corridor were ineligible for listing.
ENDANGERED SPECIES: The applicant has completed Section 7 consultation through the U.S. Bureau of Land Management Biological Opinion I-5-96-f-23R.3 dated December 20, 2004.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230).
The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
SUBMITTING COMMENTS: Written comments, referencing Public Notice SPK-2012-00837-SG must be submitted to the office listed below on or before September 7, 2012.
Patricia McQueary, Project Manager
US Army Corps of Engineers, Sacramento District
196 East Tabernacle Street, Room 30
St. George, Utah 84770
Email: Patricia.L.McQueary@usace.army.mil
The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information please contact the applicant or the Corps' project manager Patricia McQueary, telephone 435-986-3979, or email Patricia.L.McQueary@usace.army.mil.
Attachments: 4 drawings