Yolo County Natural Resources Manager, Cindy Tuttle has applied for a permit for the re-issuance of Regional General Permit #58 for Section 404 activities in waters of the United States to implement the Cache Creek Resources Management Plan (CCRMP). This project is located along a 14.5-mile reach of Cache Creek, in Yolo County, California.

CESPK-RD-D SUBJECT: The U.S. Army Corps of Engineers, Sacramento District, (Corps) is evaluating a permit application to reissue Department of the Army Regional General Permit #58 (RGP-58) for activities involving the discharge of dredged or fill material in waters of the United States, including Cache Creek, under the authority of Section 404 of the Clean Water Act. This notice is to inform interested parties of the proposed activity and to solicit comments. AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: General Public LOCATION: Along a 14.5-mile reach, encompassing approximately 2,800 acres, extending from the Capay Dam downstream to a leveed section of Cache Creek near Yolo, in Yolo County, California, CA-MADISON USGS Topographic Quadrangle, as shown in the attached drawing. PROJECT DESCRIPTION: The Cache Creek Resources Management Plan and the Cache Creek Improvement Program for Lower Cache Creek (CCRMP/CCIP) are Yolo County river management plans that focus on channel stabilization and habitat restoration. The CCRMP/CCIP involve work requiring Department of the Army permits including gravel bar skimming; vegetation removal; minor bank protection work; maintenance or modification of the defined low flow channel; removal of debris upstream of bridges; and off-channel wetland/riparian habitat restoration. Selective gravel bar skimming would be performed to prevent reduction in overall channel capacity and to aid in the control of bank erosion patterns. Vegetation removal would be used to manage flow velocities and hydraulic capacity, to control bar formation and minimize bank erosion and remove invasive species such as giant reed and tamarisk. Bank stabilization activities would include minor grading, revegetation, and bio-technical protection techniques and conventional “hardscape” (rip-rap) bank protection. The permit would also authorize minimal relocation and reshaping of the defined low-flow channel to improve the stability of the channel and reduce the magnitude of stream bank erosion. Normal maintenance activities would include removal of debris from bridge areas, and from channel areas upstream of bridges. Restoration activities would include the addition of substrate, replanting of native vegetation and minimal impact activities to provide sufficient hydrology to sustain wetland and riparian habitat. Work authorized by RGP-58 would be subject to preconstruction notification and prior acknowledgment by the Corps that the proposed project activity may proceed under this permit. Authorization and verification of individual projects under GP-58 would rely on the projects' adherence to the CCRMP/CCIP and a demonstration the project would have no more than minimal individual and cumulative impacts. ADDITIONAL INFORMATION: Environmental Setting. The regional topography consists of low rolling hills and broad alluvial plains formed at the base of the eastern flank of the California Coast Range. Cache Creek traverses Yolo, Lake, and Colusa counties, and its drainage basin extends from the upper basin highlands, north and northeast of Clear Lake, to the Yolo Bypass, east of the City of Woodland. Mitigation. The Corps requires that applicants consider and use all reasonable and practical measures to avoid and minimize impacts to aquatic resources. If the applicant is unable to avoid or minimize all impacts, the Corps may require compensatory mitigation. OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification, as required under Section 401 of the Clean Water Act from the Central Valley Regional Water Quality Control Board is required for this project. The applicant has applied for certification. HISTORIC PROPERTIES: Any activity conducted under GP-58 must be in compliance with the National Historic Preservation Act. Potentially eligible cultural resources may be affected by the proposed project. The Corps will initiate consultation with the State Historic Preservation Officer under Section 106 of the National Historic Preservation Act, as appropriate. ENDANGERED SPECIES: The proposed activity may affect Federally-listed endangered or threatened species or their critical habitat. The Corps will initiate consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act, as appropriate. ESSENTIAL FISH HABITAT: The proposed project will not adversely affect Essential Fish Habitat (EFH) as defined in the Magnuson-Stevens Fishery Conservation and Management Act. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. SUBMITTING COMMENTS: Written comments, referencing Public Notice SPK-1995-00652 must be submitted to the office listed below on or before October 12, 2012.

Marc Fugler, Project Manager US Army Corps of Engineers, Sacramento District 1325 J Street, Room 1350 Sacramento, California 95814-2922 Email: Marc.A.Fugler@usace.army.mil

The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information please contact the applicant, Ms. Cindy Tuttle, Yolo County Administrator’s Office, 530-666-8061, cindy.tuttle@yolocounty.org or the Corps' project manager Marc Fugler, 916-557-5255, Marc.A.Fugler@usace.army.mil. Attachments: 2 drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas