Home

Galveston District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS U.S. ARMY CORPS OF ENGINEERS AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY AND TEXAS RAILROAD COMMISSION ANNOUNCING PUBLIC COMMENT ON SECTION 401 WATER QUALITY CERTIFICATION.

PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS U.S. ARMY CORPS OF ENGINEERS AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY AND TEXAS RAILROAD COMMISSION ANNOUNCING PUBLIC COMMENT ON SECTION 401 WATER QUALITY CERTIFICATION On February 21, 2012, the U.S. Army Corps of Engineers (Corps) published the notice in the Federal Register announcing the reissuance of all existing nationwide permits (NWPs), general conditions, and definitions with some modifications. The Corps also issued two new NWPs, three new general conditions, and three new definitions. The NWPs will be effective on March 19, 2012, and will expire on March 18, 2017. With the publication of this Federal Register notice, Corps districts will begin finalizing their regional conditions for the new and reissued NWPs. Regional conditions will provide additional protection for the aquatic environment, and will help ensure that the NWPs authorize only those activities with minimal adverse effects on the aquatic environment. Regional conditions will help ensure protection of high value waters within the Districts. The publication of this Federal Register notice also begins the 60-day period for states, Indian Tribes, and the Environmental Protection Agency (EPA) to complete their water quality certification (WQC) process for the NWPs. The 60-day period for WQC will end on April 20, 2012. This Federal Register notice also begins the 90-day period for coastal states to complete their Coastal Zone Management Act (CZMA) consistency determination processes. The 90-day period for CZMA consistency determinations will end on May 21, 2012. While the states, Indian Tribes, and EPA complete their WQC processes, the use of an NWP to authorize a discharge into waters of the United States is contingent upon obtaining individual water quality certification or a case-specific WQC waiver. Likewise, while coastal states complete their CZMA consistency determination processes, the use of an NWP to authorize an activity within, or outside, a state’s coastal zone that will affect land or water uses or natural resources of that state’s coastal zone, is contingent upon obtaining an individual CZMA consistency determination, or a case-specific presumption of CZMA concurrence. The February 21, 2012, Federal Register notice is available for viewing Corps’ Galveston District Office at 2000 Fort Point Road, Galveston, Texas, or on the Internet at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx . As an alternate, Internet users can access the Federal Register through the U.S. Government Printing Office at http://www.gpo.gov/fdsys/browse/collection.action?collectionCode=FR .

The Corps has also issued final decision documents for the new and reissued NWPs. These documents are also available on the Internet at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx and Corps district offices. Furthermore, the NWP decision documents will be supplemented by Division Engineers to address decisions concerning the addition of regional conditions to the NWPs. Concurrent with Corps processing of this notice, the Texas Commission on Environmental Quality (TCEQ) is reviewing this notice under Section 401 of the CWA and in accordance with Title 30, Texas Administrative Code Section 279.1-279.13 to determine if the work would comply with State water quality standards. This public notice is also issued for the purpose of advising all known interested persons that there is pending before the TCEQ a decision on water quality certification under such act. Any comments concerning this notice may be submitted to the Texas Commission on Environmental Quality, 401 Coordinator, MC-150, P.O. Box 13087, Austin, Texas 78711-3087. The public comment period extends 30 days from the date of publication of this notice. A copy of the public notice with a description of the work is made available for review in the TCEQ's Austin office. The complete notice may be reviewed in the Corps office listed in this public notice. The TCEQ may conduct a public meeting to consider all comments concerning water quality if requested in writing. A request for a public meeting must contain the following information: the name, mailing address, notice title, or other recognizable reference to the application; a brief description of the interest of the requester, or of persons represented by the requester; and a brief description of how the notice, if granted, would adversely affect such interest. The Corps has also issued final decision documents for the new and reissued NWPs. These documents are also available on the Internet at and Corps district offices. Furthermore, the NWP decision documents will be supplemented by Division Engineers to address decisions concerning the addition of regional conditions to the NWPs. Concurrent with Corps processing of this notice, the Texas Commission on Environmental Quality (TCEQ) is reviewing this notice under Section 401 of the CWA and in accordance with Title 30, Texas Administrative Code Section 279.1-279.13 to determine if the work would comply with State water quality standards. This public notice is also issued for the purpose of advising all known interested persons that there is pending before the TCEQ a decision on water quality certification under such act. Any comments concerning this notice may be submitted to the Texas Commission on Environmental Quality, 401 Coordinator, MC-150, P.O. Box 13087, Austin, Texas 78711-3087. The public comment period extends 30 days from the date of publication of this notice. A copy of the public notice with a description of the work is made available for review in the TCEQ's Austin office. The complete notice may be reviewed in the Corps office listed in this public notice. The TCEQ may conduct a public meeting to consider all comments concerning water quality if requested in writing. A request for a public meeting must contain the following information: the name, mailing address, notice title, or other recognizable reference to the application; a brief description of the interest of the requester, or of persons represented by the requester; and a brief description of how the notice, if granted, would adversely affect such interest. Railroad Commission of Texas (RRC) certification is required for activities associated with the exploration, development, or production of oil, gas, or geothermal resources, as described in Tex. Nat. Res. Ann. §91.101. Concurrent with the processing of notice, the RRC is reviewing Section 401 of the Clean Water Act and Title 16, Texas Administrative Code, Section 3.93, to determine if the proposed work would comply with applicable water quality laws and regulations. By virtue of an agreement between the Corps and the RRC, this public notice is issued for the purpose of advising all known interested persons that there is pending before the RRC a decision on water quality certification under the above authorities. Written comments concerning the request for certification may be submitted to the Assistant Director, Environmental Services, Railroad Commission of Texas, P.O. Box 12967, Austin, Texas 78711-2967. The public comment period extends 30 days from the date of publication of this notice. The RRC may also hold a public meeting on the request for certification if the RRC determines that a public meeting is in the public interest. If the RRC holds a meeting to receive public comment on a request for certification, the RRC will give notice of the meeting to the applicant, the USACE, and persons identified under 16 TAC §3.93(d)(2) at least ten days prior to the meeting. This notice contains a copy of the Texas regional conditions. You may also find a copy on the Galveston District’s Internet Site at http://www.swg.usace.army.mil/reg/.

Also enclosed is a copy of the final NWPs, general conditions, further information, and definitions. They are also available through Corps Home Page or the Federal Register. Also enclosed is a copy of the final NWPs, general conditions, further information, and definitions. They are also available through Corps Home Page or the Federal Register. Index of Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions Nationwide Permits 1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Associated Intake Structures 8. Oil and Gas Structures on the Outer Continental Shelf 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys 11. Temporary Recreational Structures 12. Utility Line Activities 13. Bank Stabilization 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 2012 Nationwide Permits 4 18. Minor Discharges 19. Minor Dredging 20. Response Operations for Oil and Hazardous Substances 21. Surface Coal Mining Activities 22. Removal of Vessels 23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 25. Structural Discharges 26. [Reserved] 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 29. Residential Developments 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access, and Dewatering 34. Cranberry Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Commercial and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. [Reserved] 48. Commercial Shellfish Aquaculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects

Nationwide Permit General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Bird and Bald and Golden Eagle Permits 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Pre-Construction Notification District Engineer’s Decision See Section D Further Information See Section E Definitions See Section F 2012 Nationwide Permits 6 Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Enhancement Ephemeral stream Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Intermittent stream Loss of waters of the United States Non-tidal wetland Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification Preservation Re-establishment Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Vegetated shallows Waterbody

Nationwide Permit Publication Notice Regional Conditions for Texas

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas