Home

Galveston District

Run scraper

Texas Department of Transportation (Grand Parkway Segment F-2)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to discharge 329,794 cubic yards of fill material into 40.677 acres of forested, scrub shrub, and emergent wetlands and 2,589 linear feet of stream during the construction of a 12.1-mile new location controlled access road with intermittent frontage roads and associated facilities within a 400-foot right of way (ROW) between SH 249 and IH 45.

PROJECT DESCRIPTION: The applicant proposes to discharge 329,794 cubic yards of fill material into 40.677 acres of forested, scrub shrub, and emergent wetlands and 2,589 linear feet of stream during the construction of a 12.1-mile new location controlled access road with intermittent frontage roads and associated facilities within a 400-foot right of way (ROW) between SH 249 and IH 45. The applicant proposes to discharge 329,794 cubic yards of fill material into 40.677 acres of forested, scrub shrub, and emergent wetlands and 2,589 linear feet of stream during the construction of a 12.1-mile new location controlled access road with intermittent frontage roads and associated facilities within a 400-foot right of way (ROW) between SH 249 and IH 45. Click here for more information. View plans.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas