You can copy from here when filling out the rest of the page.
The applicant owns Lot 2 and will be constructing 40 linear feet of a proposed bulkhead along their property line. The applicant proposes to jointly construct with the owner of Lot 1 (SWG-2011-01114) a 169-linear-foot bulkhead along the property lines of Lot 2 and Lot 1 in the Northwoods Subdivision for a footprint of 0.19 acre into Lake Livingston. Approximately 224 cubic yards of fill material will be placed behind the bulkhead. The bulkhead configuration and placement is limited by the various property lines existing along the shoreline of Lake Livingston.
The applicant owns Lot 2 and will be constructing 40 linear feet of a proposed bulkhead along their property line. The applicant proposes to jointly construct with the owner of Lot 1 (SWG-2011-01114) a 169-linear-foot bulkhead along the property lines of Lot 2 and Lot 1 in the Northwoods Subdivision for a footprint of 0.19 acre into Lake Livingston. Approximately 224 cubic yards of fill material will be placed behind the bulkhead. The bulkhead configuration and placement is limited by the various property lines existing along the shoreline of Lake Livingston.
Full Public NoticeProject Plans