Home

Galveston District

Run scraper

Port Isabel Public Improvement District

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to bulkhead and fill undeveloped areas off of the Laguna Madre for the installation of infrastructure for the development of residential lots in an area known as Modern Venice.

Full Public NoticeProject Plans The applicant proposes to bulkhead and fill areas along West Tarpon Avenue, West Bass Avenue, as well as an undeveloped portion of Oyster Cove that is included within the Port Isabel Improvement District. The purpose of this project is to develop the area for residential lots. The project will include the installation of a bulkhead, placement of associated backfill, installation of infrastructure, and roadway improvements. The project will result in the permanent filling of 4.955 acres of jurisdictional area, including 0.455 acres of wetlands, 0.13 acres of shallow water habitat, and 4.37 acres of area classified as sand tidal flat. To account for jurisdictional area not delineated as wetlands, the applicant included the low lying areas (elevations below 2.0 feet MSL) as sand tidal flat habitat. The 6,953 feet of bulkhead (3,856 feet along West Tarpon Avenue, 2,705 feet along West Bass Avenue, and 392 feet along Oyster Cove) will be constructed along historic shoreline boundaries using ultra composite sheet piling. Upon installation of the bulkhead, the area between the seawall and the existing mean high tide line would be backfilled with native soil, thereby bringing the properties to an elevation consistent with the bulkhead. It is anticipated that the backfill will be placed from the bulkhead to at least 1 foot above sea level. The proposed bulkhead alignment will be located on or inland of the jurisdictional line along Oyster Cove, thus no impacts to jurisdictional waters are anticipated. The applicant anticipates temporary impacts during the construction of the bulkhead, which will extend 5 feet waterward from the location of the bulkhead, due to the method of construction involving driving the sheetpile. This will result in temporary wetland impacts to 0.32 acres on West Tarpon Avenue and 0.15 acres on West Bass Avenue.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas