The applicant is proposing to install a saltwater barrier consisting of a low sand berm across the Brazos River channel, armored with gravel to protect against immediate erosion.

Full Public Notice

Project Plans The applicant is proposing to install a saltwater barrier consisting of a low sand berm (12,000 cubic yards) across the Brazos River channel, armored with gravel (1,000 cubic yards) to protect against immediate erosion. The sand and gravel would be stockpiled in adjacent upland areas. The berm would be installed approximately 3.2 feet below the elevation of the Ordinary High Water Mark (OHWM-elevation +2.7), at a depth of -0.5 feet, to allow fish passage and navigation by small craft. Approximately 1.5 acres of the Brazos River would be temporarily impacted by the proposed work. It is anticipated that the berm would be temporary; installed as needed, during threats of saltwater intrusion, and naturally removed/dissipated by storm action. If the berm is not washed away within 1 year, the material will be mechanically removed and the river bed restored to grade. Buoys indicating the placement of a barrier and signs will be placed along the Brazos River to alert boaters; warning them to slow down and raise motors, if necessary. The applicant is proposing the temporary saltwater barrier to protect Dow’s Freeport operation freshwater intake

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas