The applicant proposes to install approximately 413 linear feet of sheetpile bulkheading and six 24-inch mooring pilings along the remnants of an existing bulkhead in the Gulf Intracoastal Waterway.

Full Public NoticeProject Plans The applicant is proposing to install approximately 413 linear feet of sheetpile bulkheading and six 24-inch mooring pilings along the remnants of an existing bulkhead. Approximately 2,185 cubic yards of clean upland fill (1,555 cubic yards below the high water mark) will be used to backfill the bulkhead and fill an existing boat slip; displacing approximately 0.27 acre of subaqueous bottom and 0.003 acre of wetlands. Distance between the uplands and the proposed bulkhead varies from 0 to 30 feet, because of the irregularly-shaped shoreline.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas