Home

Galveston District

Run scraper

Texas Lehigh Cement Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant has revised the project originally described in our public notice, dated 21 August 2012, to include advance maintenance and allowable overdepth dredging.

Revised Full Public NoticeRevised Project Plans The applicant proposes to amend his previously approved project to accommodate a new barge unloading area. Six monopile breasting structures are now proposed instead of the two that were previously approved. Three of the monopiles would be located north of the existing dock and three to the south. The proposed dredging area would be moved closer to the shoreline and would include removal of a portion of the existing shore (6,800 square feet of area and 760 cubic yards of material). A total of 20,700 cubic yards of material would be removed by hydraulic and mechanical methods from two irregularly shaped areas totaling approximately 86,000 square feet of area to achieve the target depths shown in the plans. Dredged material would be placed in South Shore Dredged Material Placement Area (DMPA) Cell A or Cell B, DMPA No. 1, or the Herbie A. Maurer DMPA. The new shoreline would be armored by a steel sheetpile bulkhead approximately 230 feet long. The existing dock would remain in place and a proposed elevated walkway/pipe-bridge, approximately 66 feet long, would span from the shoreline to the dock.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas