Home

Galveston District

Run scraper

Chroma Operating

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to drill 5 wells from 2 well pads in wetlands adjacent to Steepbank Creek

Full Public NoticeProject Plans The applicant proposes to construct, install, operate and maintain structures and equipment necessary for oil and gas drilling, production and transportation activities. Such activities include installation of two drill pads, production structures with attendant facilities, and a flowline and access road

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas