Home

Galveston District

Run scraper

Texas Department of Transportation

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct the Grand Parkway, Segment G, between Interstate Highway 45 and U.S. Highway 59.

Full Public NoticeProject Plans The applicant proposes to discharge 356,789 cubic yards of fill material into 81.14 acres of forested, scrub shrub, and emergent wetlands and 8,804 linear feet of stream during the construction of an 13.6-mile new-location controlled-access road with intermittent frontage roads and associated facilities within a 400-foot right of way (ROW) between IH 45 and US 59.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas