Home

Galveston District

Run scraper

Ducks Unlimited

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a rock breakwater along a 3-mile section of the northern bank of the Gulf Intracoastal Waterway (GIWW).

Full Public NoticeProject Plans The applicant proposes to construct a rock breakwater along a 3-mile section of the northern bank of the GIWW. For safety and navigation concerns, the toe of the breakwater will be placed at least 172.5 feet from the centerline of the channel in water depths of 1.5 feet. Approximately 23,436 cubic yards of 8-inch graded riprap will be placed within a 5.24-acre area of the GIWW during construction of the breakwater. The purpose of the breakwater is to accrete marsh behind it and prevent saltwater intrusion into Sargent Marsh.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas