Home

Galveston District

Run scraper

Sabine Pass LNG additional work area

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Applicant proposes to amend current permit for additional construction and operation activities of an LNG liquefaction facility

Full Public NoticeProject Plans The applicant proposes to modify their existing Liquefaction Permit Amendment to add additional work spaces and structures. Subsequent to the Corps issuance of the Liquefaction Permit Amendment (SWG-2004-02523) on 15 March 2012, the applicant determined that additional work activities were necessary to accommodate construction and operation of the liquefaction facility. In order to accommodate these activities, the applicant proposes to place fill material into a previously authorized mitigation area, referred to as “Mitigation Area D”, to place fill material into wetlands to create additional workspaces around the liquefaction site, to install a stack guy wire foundation, and to install two additional potable water lines under Sabine Lake via horizontal directional drill. A total of 132,704 cubic yards of fill material, in the form of native material, stabilized native material, and gravel, is proposed to be placed into 58.04 acres of wetlands.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas