Endeavor Natural Gas

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to mechanically dredge 2,500 cubic yards of material from a 13,277-square-foot open water area.

Full Public Notice Project Plans

The applicant proposes to mechanically dredge 2,500 cubic yards of material from a 13,277-square-foot open water area, within Cedar Lakes, to a depth of 7 feet below mean low tide, plus 1-foot overdredge, to allow barge access for drilling a new well adjacent to Cedar Lakes. A 15-foot by 25-foot permanent access road and a 22,500-square-foot well pad will be constructed in uplands. A 3.5-inch pipeline will be bored under Cedar Lakes for a distance of 5,463 linear feet, extending from the new well pad to a spoil island, located approximately 265 feet west of an existing production platform. From the bore exit, the pipeline will be trenched through 40 linear feet of wetlands. The remaining 228 linear feet of pipeline will be jetted across a 684-square-foot-area, within an existing channel, located between State Tract 2 and Cedar Lakes, to an existing production facility. All temporary fills within jurisdictional wetlands will be restored within 180 days of the initial impact to wetlands. The applicant has avoided impacts to oyster reefs and permanent impacts to wetlands by boring most of the pipeline route.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas