The applicant proposes to replace a geotextile tube for bank stabilization at a barge terminal.

Full Public NoticeProject Plans The applicant proposes to replace an existing geotextile tube (geotube) that provides bank stabilization for an existing barge terminal. The applicant is proposing to place a new 550-linear-foot geotube in front of the existing geotube, and then would backfill behind the new geotube with approximately 1,800 cubic yards of compacted sand. The applicant is also proposing to install a 20- by 25-foot riprap scour pad at the discharge point of an existing outfall structure which would be extended so that it would outfall beyond the newly proposed geotube. The project would result in the discharge of fill material into approximately 0.2 acre of Waters of the U.S. The applicant is not proposing to impact wetlands.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas