Home

Galveston District

Run scraper

Khang T. Bui

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a bulkhead in the Sabine-Neches Waterway.

Full Public NoticeProject Plans PROJECT DESCRIPTION: The applicant proposes to construct a 650-foot bulkhead from a previously authorized docking structure to exiting riprap along the shoreline and adjacent to Highway 82. The applicant is proposing to mechanically excavate approximately 40,000 cubic yards of dredge material from the area in front of the proposed bulkhead to achieve a depth of -20 feet Mean Low Tide. The excavated dredge material would be used to backfill behind the bulkhead and would constitute a discharge of fill material into approximately 1.2 acres of navigable waters of the United States. Dredge material would also be discharged in 0.05 acre of water on the opposite side of the existing docking structure from the proposed bulkhead.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas