The YMCA of Greater Houston

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to bulkhead two sections of Lake Livingston shoreline for erosion protection

Full Public NoticeProject Plans The applicant proposes to bulkhead two stretches of shoreline. The first bulkhead would be a 430-foot addition to the existing bulkhead located at an existing boat pier. The second would be a new 570-foot bulkhead. The bulkheads would be backfilled with approximately 2,444 cubic yards of 60/40 sandy-clay select fill which would be brought in by the contractor from an off-site location. The proposed work would discharge fill materials into a total of 0.09 acre of waters of the United States. The applicant is not proposing to discharge fill material into wetlands

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas