East Bay Farms

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to establish and operate the Gulf Coastal Plains Wetland Mitigation Bank.

Full Public Notice Project Plans PROJECT DESCRIPTION: East Bay Farms, LLC (Sponsor), is proposing to establish and operate a mitigation bank to be known as the Gulf Coastal Plains Wetland Mitigation Bank (GCPWMB) on properties owned by the Sponsor. The GCPWMB is planned to eventually encompass approximately 1,851 acres, currently maintained in agricultural production and previously cleared, levied, ditched and drained. Phase 1 will include re-establishing tidally influenced wetlands in the southern portion of Phase 1 and the conversion of existing freshwater wetlands. Proposed impacts associated with the hydrologic restoration for Phase 1 include dredging and fill activities of 11,427 cubic yards in 8.39 acres of Waters of the U.S., including wetlands.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas