The applicant is requesting after-the-fact authorization for shoreline stabilization and construction work
Full Public NoticeProject Plans
The applicant is requesting after-the-fact authorization for the placement of riprap and earthen fill along the water’s edge for the purpose of shoreline stabilization, the dredging and placement of fill associated with the construction of a new boat ramp, and the construction of new docks. Approximately 3,161 square feet (approximately 163 cubic yards) of riprap and approximately 3,626 square feet of earthen fill were placed below the Annual High Tide Line (AHTL) along 460 linear feet of shoreline. The applicant also dredged and filled approximately 657 square feet (approximately 17 cubic yards of dredging and 12 cubic yards of fill) below the AHTL for the construction of a boat ramp and constructed additional bulkheads to protect the boat ramp (approximately 215 square feet and 10 cubic yards fill below the AHTL). Lastly, the applicant also constructed 484 square feet of floating dock perpendicular to the existing shoreline in addition to approximately 3,947 square feet of fixed dock and pier structures constructed mostly parallel to the existing shoreline.