Home

Galveston District

Run scraper

Mr. Mike Mobley

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to redesign the previously authorized residential canal subdivision to a 3.16-acre marina.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to redesign the previously authorized residential canal subdivision to a 3.16-acre marina. Such activity includes the excavation of 1.18 acres of high intertidal marsh wetlands and 1.47 acres of uplands for the construction of an 8-foot-deep recreational boat harbor, an entrance canal to the GIWW, and an upland trailer park. The entrance canal dimensions, location, mitigation and impacts to wetlands are identical to those previously authorized.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas