The applicant proposes to install a well pad for drilling three petroleum production wells.
Full Public NoticeProject Plans
The applicant proposes to install a 340-foot by 455-foot well pad for the drilling and completion of three petroleum production wells resulting in permanent impacts to 1.03 acres of forested wetlands. In addition, the applicant proposes to construct a 50-foot-wide by 100-foot-long concrete low water crossing over an emergent wetland for the required access road to the drill pad. Impacts to emergent wetlands resulting from this road crossing are calculated at 0.126 acres, for the overall project total of 1.156 acres of wetland impacts.