You can copy from here when filling out the rest of the page.
The applicant proposes to mitigate for fill in wetlands adjacent to the Gulf of Mexico placed by a previous owner.
PROJECT DESCRIPTION:
The applicant seeks after-the-fact authorization for the unauthorized
placement of fill material into six depressional freshwater wetlands with a
combined area of 1.8 acres that was placed by a previous owner of the
site. The applicant proposes to mitigate
for the fill impacts by creating a total of 6.6 acres of wetlands that include
6.1 acres of high marsh habitat and 0.5 acre of open water habitat by
mechanically lowering uplands, and preserving a total of 1.58 acres of existing
habitat that includes 0.5 acre of high marsh and 1.08 acres of upland coastal
prairie. All created and preserved
habitat would be protected in perpetuity by a deed restriction, conservation
easement, or an equivalent legal instrument.
Public NoticePlansMitigation
Public Notice
U.S. Army Corps
Of Engineers
Galveston District
Permit Application No:
SWG-2007-01623
Date Issued:
Comments Due:
7 August 2013
9 September 2013
U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
AND
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
PURPOSE OF PUBLIC NOTICE: To inform you of a proposal for work in which you
might be interested. It is also to solicit your comments and information to better enable
us to make a reasonable decision on factors affecting the public interest. The U.S.
Army Corps of Engineers (Corps) is not the entity proposing or performing the proposed
work, nor has the Corps taken a position, in favor or against the proposed work.
AUTHORITY: This application will be reviewed pursuant to Section 404 of the Clean
Water Act.
APPLICANT:
Koontz McCombs Beach, LLC
755 East Mulberry Avenue, Suite 100
San Antonio, Texas 78212-3194
AGENT:
HDR Engineering Inc.
555 North Carancahua Street, Suite 1600
Corpus Christi, Texas 78401-0849
Telephone: 361-696-3362
POC: Jeffrey Pollack
LOCATION: The project is located in wetlands adjacent to the Gulf of Mexico that were
located at Newport Beach and Golf South located south of Beach Access Road 1 on the
east side of State Highway 361, Port Aransas, Nueces County, Texas. The mitigation
project site is located on the west side of SH 361 approximately 5.5 miles south of Port
Aransas, in Nueces County Texas. The projects can be located on the U.S.G.S.
quadrangle map titled: Port Aransas, Texas.
LATITUDE & LONGITUDE (NAD 83):
Fill Project - Latitude: 27.795093 North;Longitude: -97.090651 West
Mitigation Project Latitude: 27.768676 North; Longitude: -97.113013 West
PROJECT DESCRIPTION: The applicant seeks after-the-fact authorization for the
unauthorized placement of fill material into six depressional freshwater wetlands with a
combined area of 1.8 acres that was placed by a previous owner of the site.
AVOIDANCE AND MINIMIZATION: Since the work has already been completed, no
avoidance and/or minimization is possible.
MITIGATION: The applicant proposes to mitigate for the fill impacts by creating a total
of 6.6 acres of wetlands that include 6.1 acres of high marsh habitat and 0.5 acre of
open water habitat by mechanically lowering uplands, and preserving a total of 1.58
acres of existing habitat that includes 0.5 acre of high marsh and 1.08 acres of upland
coastal prairie. All created and preserved habitat would be protected in perpetuity by a
deed restriction, conservation easement, or an equivalent legal instrument.
CURRENT SITE CONDITIONS: The project site is currently a 260-acre tract of land
that has been developed as a golf course playing area. The tract is contiguous with the
Gulf of Mexico shoreline to the east, bordered by SH 361 and undeveloped coastal
prairie to the west, hotel and condominium development to the north, and an RV park to
the south. The project site receives regularly mowing, allowing mainly herbaceous
vegetation to grow. The subject wetlands were adjacent to Gulf of Mexico and Corpus
Christi Bay and were filled and graded as part of the golf course development. The
filled wetlands consisted of six separate areas that covered approximately 1.8 acres.
The wetlands were comprised of two naturalized, manmade drainage features and four
depression features described as palustrine emergent wetlands. The areas were
dominated by Fimbrystylis castanea, Paspalum vaginatum, Hydrocotyle bonariensis,
and Scirpus pungens. Dense monocultures of Typha sp. and Sesbania drummondii
were present within the shallow depressional areas.
NOTES: This public notice is being issued based on information furnished by the
applicant. This project information has not been verified by the Corps. The wetland
delineation has been completed and was verified by the Corps on 3 July 2008. The
applicant's plans are enclosed in 3 sheets and the mitigation plan in 6 sheets.
A preliminary review of this application indicates that an Environmental Impact
Statement (EIS) is not required. Since permit assessment is a continuing process, this
preliminary determination of EIS requirement will be changed if data or information
brought forth in the coordination process is of a significant nature.
Our evaluation will also follow the guidelines published by the U.S. Environmental
Protection Agency pursuant to Section 404 (b)(1) of the Clean Water Act (CWA).
Permit Application SWG-2007-01623
2
OTHER AGENCY AUTHORIZATIONS:
Consistency with the State of Texas Coastal Management Plan is required. The
applicant has stated that the proposed activity complies with Texas' approved Coastal
Management Program goals and policies and will be conducted in a manner consistent
with said program.
This project was initiated without a Department of the Army permit and is considered an
after-the-fact permit application. After-the-fact permit applications require review under
the Tier II criteria. Therefore, Texas Commission on Environmental Quality (TCEQ)
certification is required. Concurrent with Corps processing of this application, the TCEQ
is reviewing this application under Section 401 of the CWA and in accordance with Title
30, Texas Administrative Code Section 279.1-13 to determine if the work would comply
with State water quality standards. By virtue of an agreement between the Corps and
the TCEQ, this public notice is also issued for the purpose of advising all known
interested persons that there is pending before the TCEQ a decision on water quality
certification under such act. Any comments concerning this application may be
submitted to the Texas Commission on Environmental Quality, 401 Coordinator, MSC150, P.O. Box 13087, Austin, Texas 78711-3087. The public comment period extends
30 days from the date of publication of this notice. A copy of the public notice with a
description of work is made available for review in the TCEQ's Austin office. The
complete application may be reviewed in the Corps office listed in this public notice.
The TCEQ may conduct a public meeting to consider all comments concerning water
quality if requested in writing. A request for a public meeting must contain the following
information: the name, mailing address, application number, or other recognizable
reference to the application; a brief description of the interest of the requester, or of
persons represented by the requester; and a brief description of how the application, if
granted, would adversely affect such interest.
NATIONAL REGISTER OF HISTORIC PLACES: The staff archaeologist has reviewed
the latest published version of the National Register of Historic Places, lists of properties
determined eligible, and other sources of information. The following is current
knowledge of the presence or absence of historic properties and the effects of the
undertaking upon these properties:
The proposed work and/or structures are of such limited nature and scope
that little likelihood exists for the proposed project to impinge upon a
historic property, even if present within the affected area.
THREATENED AND ENDANGERED SPECIES: Preliminary indications are that no
known threatened and/or endangered species or their critical habitat will be affected by
the proposed work.
Permit Application SWG-2007-01623
3
ESSENTIAL FISH HABITAT:
This notice initiates the Essential Fish Habitat
consultation requirements of the Magnuson-Stevens Fishery Conservation and
Management Act. Our initial determination is that the proposed action would not have a
substantial adverse impact on Essential Fish Habitat or Federally-managed fisheries in
the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
PUBLIC INTEREST REVIEW FACTORS: This application will be reviewed in
accordance with 33 CFR 320-332, the Regulatory Programs of the Corps, and other
pertinent laws, regulations and executive orders. The decision whether to issue a
permit will be based on an evaluation of the probable impacts, including cumulative
impacts, of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. All factors, which may be relevant to the
proposal, will be considered: among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shore erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public,
Federal, State, and local agencies and officials, Indian tribes, and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition or deny a permit for this proposal. To make this decision, comments
are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Impact Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
This public notice is being distributed to all known interested persons in order to assist
in developing facts upon which a decision by the Corps may be based. For accuracy
and completeness of the record, all data in support of or in opposition to the proposed
work should be submitted in writing setting forth sufficient detail to furnish a clear
understanding of the reasons for support or opposition.
Permit Application SWG-2007-01623
4
PUBLIC HEARING: The purpose of a public hearing is to solicit additional information
to assist in the evaluation of the proposed project. Prior to the close of the comment
period, any person may make a written request for a public hearing, setting forth the
particular reasons for the request. The District Engineer will determine if the reasons
identified for holding a public hearing are sufficient to warrant that a public hearing be
held. If a public hearing is warranted, all known interested persons will be notified of the
time, date, and location.
CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must
reach this office on or before 9 September 2013. Extensions of the comment period
may be granted for valid reasons provided a written request is received by the limiting
date. If no comments are received by that date, it will be considered that there are
no objections. Comments and requests for additional information should reference our
file number, SWG-2007-01623, and should be submitted to:
Mark Pattillo
Regulatory Branch, CESWG-PE-RCC
U.S. Army Corps of Engineers
5151 Flynn Parkway, Suite 306
Corpus Christi, Texas 78411-4318
361-814-5847 Phone
361-814-5912 Fax
swg_public_notice@usace.army.mil
DISTRICT ENGINEER
GALVESTON DISTRICT
CORPS OF ENGINEERS
Permit Application SWG-2007-01623
5
Rev. 7/23/2013
MITIGATION PLAN
1. Mitigation Goals and Objectives
Per details in Sheets 2 and 3 of the enclosed Mitigation Exhibits, as compensatory mitigation for
impacts to approximately 1.8 acres of wetlands by a previous owner of the property, as well as
for temporal loss of function and value, the current owner of the property proposes--on the basis
of discussions with USACE on December 18, 2012--to:
A. Mechanically lower uplands to create a total of 6.6 acres of wetland (a 3.7:1 ratio of
created to impacted wetland), including:
6.1 acres of high marsh habitat
0.5 acres of open water habitat
B. Preserve a total of 1.6 acres of existing habitat (a 0.89:1 ratio of preserved to impacted),
including:
0.5 acres of high marsh
1.1 acres of upland coastal prairie
The proposed mitigation site is located on Mustang Island adjacent (north of) an existing
mitigation site (Conservation Area C, created as compensatory mitigation for impacts associated
with the Newport Marina development) (see Mitigation Exhibits, Sheet 1).
All created and preserved habitat will be protected in perpetuity by a deed restriction,
conservation easement, or an equivalent legal instrument.
2. Site Selection Information
The applicant identified a number of candidate locations for habitat creation within the vicinity
of the impacted wetlands, ultimately selecting the proposed mitigation site because it was
deemed to have a high probability of success for natural recruitment of target species due to its
proximity to existing natural wetlands and to an existing, successful, wetlands creation project.
3. Site Protection Instrument
The created habitat will be protected in perpetuity by a deed restriction, conservation easement,
or equivalent legal instrument; this instrument will be established within six months of issuance
of the after-the-fact permit.
4. Baseline Information
Impact Site
The approximately 1.8 acres of wetlands on the northern portion of the property that were
impacted by fill included two naturalized, manmade drainage features comprising freshwater
emergent species (e.g. Typha sp., Scirpus americanus, Hydrocotyle umbellata) as well as four
depression features, best described as freshwater emergent wetlands, that were dense
monocultures of Typha sp. with Sesbania drummondii along the margins.
Page 1 of 3
Rev. 7/23/2013
Mitigation Site
The upland areas to be lowered by mechanical excavation to create freshwater emergent
wetlands are best characterized as coastal prairie, typified by Schizachyrium scoparium, Spartina
patens, and Panicum virgatum.
5. Number of Credits to be Provided
The applicant proposes to:
A. Create a total of 6.6 acres of wetland (a 3.7:1 ratio of created to impacted wetland),
including:
6.1 acres of high marsh habitat
0.5 acres of open water habitat
B. Preserve a total of 1.6 acres of existing habitat (a 0.88:1 ratio of preserved to impacted),
including:
0.5 acres of high marsh
1.1 acres of upland coastal prairie
6. Mitigation Work Plan
Construction of the mitigation will be complete within twelve months of issuance of the afterthe-fact permit. The applicant will be responsible for constructing the mitigation. The applicant
will excavate the mitigation areas to elevations conducive to recruitment and survival of the
target species (exact elevations will be determined through a pre-construction reference elevation
survey of adjacent existing freshwater emergent wetlands). Excavated material will be placed in
uplands onsite or on nearby offsite uplands. Vegetation of converted area will be via natural
recruitment.
7. Maintenance Plan
Maintenance of the mitigation sites will be the sole responsibility of the permittee and may
include trash removal and/or the removal of invasive species.
8. Monitoring Requirements
The applicant will conduct a post-construction survey of the mitigation area within 60 days of
completion of construction and will submit a report to the USACE a report that conforms to the
USACE Regulatory Guidance Letter 08-03 and includes monitoring methodology, , and
photographs documenting site conditions.
The applicant will also monitor annually for a period of five years or until the USACE has
determined that performance standards have been achieved. After each monitoring event, the
applicant will submit to the USACE a report that conforms to the USACE Regulatory Guidance
Letter 08-03, including a description of monitoring methodology, results, and photographic
documentation of site conditions.
Page 2 of 3
Rev. 7/23/2013
9. Ecological Performance Standards
o If 25% coverage of the target habitat is not achieved after one year, the USACE will
determine if planting of the mitigation site is required.
o If 50% coverage of the target habitat is not achieved after three years, the USACE will
determine if planting of the mitigation site is required.
o If 70% coverage of the target habitat is not achieved by the end of the fifth year, the
USACE will determine if planting of the mitigation site is required.
o The USACE may waive the requirement for monitoring at any point during the five year
period if the USACE deems that there is sufficient evidence that re-vegetation of the
mitigation area meets the success criteria.
10. Long-Term Management Plan
As stated above, the created habitat will be protected in perpetuity by a deed restriction,
conservation easement, or equivalent legal instrument. Long-term management may include
removal of trash and/or invasive species as well as measures agreed upon by the applicant and
the USACE if the site does not meet ecological performance standards defined in Section 9.
11. Adaptive Management Plan
If results of the monitoring indicate that the mitigation is not successful, the applicant will
coordinate with USACE in attempt to agree upon the appropriate course of action. Potential
remedies may include but are not limited to supplemental monitoring, planting efforts,
identification of alternative sites, etc.
12. Financial Assurances
The applicant, KM Beach, LLC is a solvent company with a compelling track record of
completing successful projects. As illustrated by their request to meet with the USACE
(December 18, 2012) to vet mitigation concepts, KM Beach, LLC did their due diligence
regarding the outstanding regulatory compliance issues associated with the subject property
before purchasing it, and KM Beach, LLC is committed to resolving any regulatory compliance
issues swiftly and completely, and, as such, is committed to fulfilling any compensatory
mitigation requirements.
Page 3 of 3