The applicant proposes to install three wind turbines with an electric collection system between the turbines.
Full Public NoticeProject Plans
The applicant proposes to install three wind turbines with an electric collection system between the turbines. The turbine area will then be tied into an existing electric substation located on South Padre Island. The beach and nearshore area of the export transmission cable will be installed using Horizontal Directional Drilling (HDD).