Home

Galveston District

Run scraper

Mr. James Cacioppo

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant is requesting an after-the-fact permit.

Full Public NoticeProject Plans The applicant is requesting an after-the-fact permit for work already completed and is also applying for additional work to complete the project. Work Completed: • 422-linear-foot bulkhead into adjacent wetlands • Discharge of fill material (750 cubic yards) into 0.16 acre of adjacent wetlands • Discharge of fill material into upland areas (not calculated) Proposed Additional Work: • 170-linear-foot bulkhead into adjacent wetlands • Discharge of fill material (250 cubic yards) into 0.04 acre of adjacent wetland • 100-linear-foot-long by 4-foot wide pier with 15-foot-long by 20-foot-wide T-head

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas