The applicant has revised plans for the deepening and shifting of the Barbours Cut Channel.

Full Public NoticeProject Plans

The permit application proposal has been revised to add: 1) the acreage of new work (construction) dredging impacts to shallow bay bottom located between the existing BCC northern top of slope and the Spilmans Island PA shoreline; 2) additional acreage of new work dredging in the interior of the Turning Basin; 3) construction of riprap shore protection along the proposed modified Spilmans Island PA shoreline; 4) replacement of BCCT wharf cranes with cranes extending farther over navigable waters; 5) identification of specific locations within Spilmans Island PA where new work dredged material suitable for construction and/or repair of levees would be placed/stockpiled; and 6) enlargement of berthing areas, portions of which were previously authorized by a separate Department of the Army (DA) permit.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas