The applicant proposes to expand the existing Sabine Pass LNG Terminal (Phase III).

Full Public NoticeProject PlansTimeline The applicant proposes to expand the existing Sabine Pass LNG Terminal (Phase III). Such activities include the discharge of fill material into 153.53 acres of wetlands for the proposed addition of two liquefaction “Trains” (Trains 5 & 6) with associated infrastructure and facilities for the purpose of exporting LNG. The project site was previously a DMPA and is currently a mitigation area (Mitigation Area C) and DMPA. The applicant has filed Federal Energy Regulatory Commission Docket No. CP13-552-000, September 2012 (PF13-8-000).

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas