Home

Galveston District

Run scraper

Greehey and Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a marina development with a hotel, condominiums, retail space and single-family residential development.

Full Public NoticeProject PlansMitigation Plan

The applicant proposes to create a mixed-use marina development with direct access to the Gulf Intracoastal Waterway (GIWW) on a 46.72- acre tract, which will include a marina, hotel, condominiums, retail space and single-family residential development. The applicant states that the proposed marina design will include a canal system which will allow for water circulation by expanding the existing connection to the GIWW to take advantage of the predominant southeasterly breeze and allow water to move into and out of the canal. The proposed canal will have a uniform depth of -8.00 ft MSL and will vary in width from 100 feet at its narrowest point to 550 feet at its widest point. Approximately 56,551 cubic yards of material are proposed to be mechanically excavated from jurisdictional areas and 183,585 cubic yards of material from uplands during the creation of the proposed marina and canal. Additionally, the applicant proposes to construct approximately 4,430 linear feet of bulkhead within the proposed canal.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas