Coastal Water Authority SWG-2009-00188 Record of Decision Special Public Notice
Special Public NoticeRecord of Decision
To inform you of that the U.S. Army Corps of Engineers, Galveston District, is issuing a notice to advise the public that the Record of Decision, for which you might be interested, has been completed and is available for review.
Record of Decision
Department of the Army Permit Application SWG-2009-00188
Luce Bayou Interbasin Transfer Project
Name and Address of Applicant
Coastal Water Authority
1801 Main St., Suite 800
Houston, Texas 77002-8119
Project Introduction and Background
The Coastal Water Authority (CWA or Applicant) submitted an application for a
Department of the Army (DA) permit in 2009. CWA submitted an application to the U.S.
Army Corps of Engineers, Galveston District (Corps) requesting authorization to
construct a 26.5 mile conveyance structure that includes a raw water pump station
located in the Trinity River, subsurface pipeline and surface canal, sedimentation basin,
and associated berms, access roads, drainage ditches, perimeter fencing, and an outfall
structure into Luce Bayou just above its confluence with Lake Houston. The proposed
project was assigned DA permit application number SWG-2009-00188 and is commonly
referred to as the Luce Bayou Interbasin Transfer Project (LBITP).
The project proposes work in Waters of the U.S., including wetlands (WOUS). This work
requires a DA permit pursuant to Section 404 of the Clean Water Act and Section 10 of
the Rivers and Harbors Act of 1899 prior to construction. Because the project requires a
federal decision/action to be made it is subject to the National Environmental Policy Act
(NEPA). A draft and final Environmental Impact Statement (DEIS/FEIS) was prepared in
accordance with NEPA, and Council on Environmental Quality regulations (CEQ: 40
CFR 1500 to end) and Corps regulations implementing NEPA. The DEIS/FEIS prepared
for this project addressed NEPA, environmental and cultural resource laws, Corps
Regulatory Program procedures (33 CFR 320-332) including Corps regulations
implementing NEPA at 33 CFR 325 Appendix B, and requirements of the Section 404
(b)(1) Guidelines (40 CFR 230). The EIS documents provide the information needed for
the Corps permit decision-making process.
Preparation of Environmental Impact Statement
Determining if the proposed action would have a significant effect on the human
environment is central to deciding whether an EIS would be required. To make this
decision, the Corps reviewed factors regarding intensity for short-term and long-term
effects in the context of the region affected by the proposed project, specifically the
Trinity River and Lake Houston. In accordance with NEPA, the significance of Federal
actions must be evaluated in terms of both context and intensity, 40 CFR Section
1508.27. The significance of an action must be analyzed in several contexts such as
society as a whole (human, national), the affected region, the affected interests, and the
locality. Significance varies with the setting and must be considered in conjunction with
the intensity of the proposed action. Intensity must also be considered with the
identification of a major Federal action requiring the development of an EIS. The
1
intensity of the effect on the social and human environment refers to the severity of
impact and is evaluated with respect to 10 factors related to the intensity of the effect on
the natural and human environment including public health and safety. 40 C.F.R
1508.27(b). During review of the significance of the proposed action, the Corps
determined that three of 10 factors regarding intensity seemed to be relevant to the
identification of a major Federal action based on the information provided by the
Applicant. These factors are provided as follows:
Factor 2: The degree to which the proposed action affects public health or safety.
A major concern identified by the Texas Parks and Wildlife Department (TPWD) Inland
Fisheries Regional Director, Trinity National Wildlife Refuge (TRNWR) Refuge Manager,
and during the public notice process was the project's potential to introduce non-native,
invasive species into Lake Houston, which is Houston's primary drinking water supply
source. Based on information provided by the TPWD and the U.S. Geological Survey
(USGS), Lake Houston is currently free from zebra mussels (Dreissena polymorpha), an
invasive species. According to a TPWD Inland Fisheries article released in January
2010, zebra mussels have been found in Lake Texoma and the upper Trinity River
basin. Zebra mussel infestations have been known to significantly impact water quality
and have caused large declines in fish, birds, and native mussel populations
nationwide. Successful measures to control zebra mussels are limited to physical and
chemical treatments many of which are prohibited for use in drinking water supplies
such as Lake Houston.
Factor 4: The degree to which the effects on the quality of the human
environment are likely to be highly controversial. The U.S. Congress included the
zebra mussel in the Non-indigenous Aquatic Nuisance Prevention and Control Act
(NAPCA) of 1990 as amended through Public Law (PL) 106-580, December 29, 2000.
A Congressional study reported zebra mussels have resulted in U.S. economic impacts
estimated at $5 billion between 1998 and 2000 by fouling infrastructure. Another
concern identified during the public notice process was related to another invasive
species, giant salvinia (Salvinia molesta). Giant salvinia, as with many non-native
aquatic plant species, forms dense mats that eliminate all other aquatic vegetation in
the area including phytoplankton and zooplankton, which are vital to water quality for
healthy fish populations. Giant salvinia can also create anoxic zones in the water
column impacting overall water quality. Controlling giant salvinia is generally
accomplished by using herbicides, many of which are prohibited for use in drinking
water supplies.
Factor 5. The degree to which the possible effects on the human environment are
highly uncertain or involve unique or unknown risks. By a letter dated September 8,
2010, the Applicant indicated physical treatment for zebra mussels and giant salvinia
are often difficult to implement and/or are unproven for large-scale operations. The
Applicant also indicated chemical treatment for zebra mussels and giant salvinia are
limited due to their prohibition for use in drinking water. The Applicant needs to
thoroughly address the methods for potential treatment to prevent these non-native,
invasive species from being introduced into Lake Houston. The Applicant has stated
2
they will consider control options and treatment for these non-native invasive species
during the project's design phase.
Based on the review and after evaluating all factors from interested parties, the Corps
determined that the proposed project may have a significant effect on the human
environment and, as such, in accordance with 33 CFR 325 Appendix B, Paragraph 7,
the Corps determined that an EIS must be prepared. Additional investigation into those
areas with potential significant impacts on the human environment would be necessary
to allow the Corps to evaluate the DA permit application and make the appropriate
decision.
The Notice of Intent (NOI) to prepare an EIS for the LBITP was published in the Federal
Register (FR) on May 25, 2011. The Notice of Availability of the Draft EIS was published
in the FR on October 26, 2012. The Notice of Availability for the Final EIS was
published in the Federal register on October 4, 2013. This Record of Decision
incorporates by reference the Luce Bayou Interbasin Transfer Project (LBITP)
Environmental Impact Statement (EIS) Prepared For Department Of The Army (DA)
Permit Application No. SWG-2009-00188.
Authorities Applicable to the Proposed Project
Corps Authorities
Rivers and Harbors Act of 1899 (RHA) (33 U.S.C. §403): Under Section 10 of the RHA,
a permit is required for any structure and/or work in navigable waters of the United
States.
Clean Water Act (CWA) (33 U.S.C. §1344): Under Section 404 of the CWA, a permit is
required for the discharge of dredged or fill material into waters of the United States.
Other Authorities
National Environmental Policy Act (NEPA)
Clean Air Act
Coastal Zone Management Act
National Historic Preservation Act
Fish and Wildlife Coordination Act
Endangered Species Act
Non-indigenous Aquatic Nuisance Prevention and Control Act
Executive Orders
EO 13175, Consultation with Indian Tribes, Alaska Natives, and Native Hawaiians.
EO 11988, Floodplain Management.
EO 12898, Environmental Justice.
3
EO 13112, Invasive Species.
EO 13212 and 13302, Energy Supply and Availability.
Project Description
The CWA proposes to construct water conveyance pipelines and a surface canal
structure with associated maintenance roadway, perimeter security fencing, and
drainage structures from the Capers Ridge proposed raw water pump station to Lake
Houston 26.5 miles from the Trinity River. A typical cross section indicates a 300-ft. right
of way would be required to accommodate all elements necessary for the operation and
maintenance of the canal and pipelines. All excavated material for the pipeline, canal,
and sedimentation basin would be utilized within the right of way or placed in upland
placement areas. Drainage structures including siphons would not adversely affect
drainage and sheet flow in the vicinity of the project, but would be designed to maintain
pre-project drainage conditions as much as practicable. These structures are described
in Appendix B of the FEIS entitled Preliminary Engineering Report.
Scope of Analysis
The determination of what is the appropriate Scope of Analysis governing the Corps'
permit review and decision is guided by the Corps' NEPA regulations for the regulatory
program: 33 CFR Part 325, Appendix B. The Scope of Analysis should be limited to the
specific activity requiring a DA permit and any additional portions of the entire project
over which there is sufficient Federal control and responsibility to warrant NEPA review.
Appendix B states that factors to consider in determining whether sufficient "control and
responsibility" exist include: 1) whether or not the regulated activity comprises "merely a
link" in a corridor type project; 2) whether there are aspects of the upland facility in the
immediate vicinity of the regulated activity that affect the location and configuration of
the regulated activity; 3) the extent to which the entire project will be within Corps
jurisdiction; and 4) the extent of cumulative Federal control and responsibility.
Generally, the Corps' area of responsibility includes all waters of the U.S. as well as any
additional areas of non-jurisdictional waters or uplands where the District determines
there is adequate Federal control and responsibility to justify including those areas
within the Corps' NEPA scope of analysis. This normally includes upland areas in the
immediate vicinity of the waters of the U.S. where the regulated activity occurs
(Standard Operating Procedures for the U.S. Army Corps of Engineers Regulatory
Program July 2009).
Factors.
(i) With regard to the first factor that must be considered in the determination of
sufficient Federal control and responsibility, the regulated activities associated
with this interbasin transfer proposal do not comprise a link in a corridor type of
project.
(ii) With regard to the second factor, the design of upland portions of the interbasin
transfer occurring in the immediate vicinity of the regulated activities does affect
the location and configuration of the regulated activities. The project will involve
placement of excavated materials from the construction onto waters of the United
4
States and uplands immediately adjacent to the waters of the United States to
meet required implementation of security and safety measures; management of
sediment; pipeline, utility, stream, wildlife and roadway crossings; provision of
electrical power; acquisition of property; construction of drainage crossings,
outfall and ancillary structures. Therefore, this project does meet the second
factor.
(iii) With regard to the third factor, the extent to which the entire project will be within
Corps jurisdiction, the proposed interbasin transfer project has environmental
consequences that are essentially products of the Corps' permit action. The
jurisdictional waters are scattered throughout the footprint of the project, and will
be affected by the excavation and fill activities. The project will also involve
placement of excavated materials from the construction onto waters of the U. S.
and uplands to meet required implementation of security and safety measures;
management of sediment; pipeline, utility, stream, wildlife and roadway
crossings; provision of electrical power; acquisition of property; construction of
drainage crossings, outfall and ancillary structures. While impacts to upland
areas on the project site will be considered under our Scope of Analysis since the
work on uplands cannot be made independent of the fill of wetlands, upland
areas are not jurisdictional under the authorities of Section 404 of the CWA, or
Section 10 of the RHA of 1899. Although there are areas within the footprint of
the project wherein the Corps does not have jurisdiction, the entire project is
within the Corps' Scope of Analysis; thus this project does meet the third factor.
(iv) With regard to the fourth factor that must be considered in the determination of
sufficient Federal control and responsibility, during our consideration of the extent
of cumulative Federal control and responsibility for this project, we appropriately
relied on, and fully considered, information and reports from Federal agencies
pursuant to their responsibilities under the Fish and Wildlife Coordination Act, the
Endangered Species Act (ESA), the Magnuson-Stevens fishery Conservation
and Management Act for Essential Fish Habitat (EFH), and other relevant
authorities. The Corps' staff archeologist reviewed the project site and
determined that there are properties listed in the National Register of Historic
Places for the permit area that will be affected, but no sites outside of the permit
area may be affected. The U.S. Fish and Wildlife Service (USFWS) and TPWD
provided comments regarding impacts to mussel species and the introduction of
noxious and non-native species, particularly the zebra mussel, to Lake Houston.
In addition, the Corps analysed the proposed project's affects on the Wallisville
Lake Project saltwater barrier operations. While the analysis of the proposed
project concluded that the withdrawal of water from the Trinity River will not affect
operations of the Wallisville Lake Project saltwater barrier, the Corps did
conclude that the transfer of water from the Trinity River to Lake Houston did
pose a risk of introduction of zebra mussels to a primary source of water for the
City of Houston. Therefore, the Corps's Scope of Analysis will include the Trinity
River Basin and Lake Houston as they pertain to zebra mussels.
5
Determined Scope. This project does not meet factor 1, but does meet factors 2 and 3
as well as factor 4 as it pertains to zebra mussels. Therefore, sufficient Federal control
and responsibility does exist to warrant expanding our review to areas outside our
jurisdiction, inclusive of those areas adjacent to project features that require DA permit
authorization. Our Scope of Analysis for uplands will include the direct impacts to
uplands resulting from canal excavation as well as impacts to uplands areas that will
result from the placement of fill material obtained from the excavation activities. The
analysis will also include the Trinity River Basin and Lake Houston as they pertain to
zebra mussels.
Environmental Assessment
Purpose and Need for the Work
Under NEPA guidelines and implementing regulations in 40 CFR 1502.13, the lead
Federal agency must state the purpose and need for the proposed action when
preparing an EIS. Defining the project purpose is also critical to the evaluation of any
project's compliance with the Section 404(b)(1) guidelines. In accordance with Section
404(b)(1) Guidelines for Specification of Disposal Sites for Dredged or Fill Material,
Subpart B, Compliance with the Guidelines, [40 CFR 230.10(a)(3)], where the activity
associated with a discharge that is proposed for a special aquatic site (as defined in
Subpart E) does not require access or proximity to or siting within the special aquatic
site in question to fulfill its basic purpose (i.e., is not "water dependent''), practicable
alternatives that do not involve special aquatic sites are presumed to be available,
unless clearly demonstrated otherwise. In addition, where a discharge is proposed for a
special aquatic site, all practicable alternatives to the proposed discharge which do not
involve a discharge into a special aquatic site are presumed to have less adverse
impacts on the aquatic ecosystem, unless clearly demonstrated otherwise. The
404(b)(1) guidelines (40 CFR 230) distinguish between the basic purpose and overall
project purpose, and specifies that the basic purpose determines whether the proposed
action is water dependent. This distinction ensures that the range of alternatives
analyzed are sufficiently broad to fully inform the public and agency decision maker.
The EIS was prepared based upon Corps' defined purpose and need, and also
considered the proposed water supply delivery system benefits compared to the
expected detriments. The Applicant has stated that the proposed inter-basin transfer of
water would be a significant measure allowing Harris County, Texas to comply with a
State mandate to reduce reliance on groundwater, provide enough new surface water
supply to meet future population demand as projected by the Texas Water Development
Board, fulfill water contract commitments to major water customers, and also meet
criteria for being a reliable supply of water. The perpetual water surface rights already
secured in Lake Livingston by the City of Houston would allow water to be legally
transferred to Lake Houston, the City's primary water supply reservoir.
6
Applicant's Stated Purpose
The Applicant intends for the LBITP to achieve the following:
Comply with a regulatory mandate from the Harris-Galveston Subsidence District
(HGSD) to control subsidence by significantly reducing and eventually eliminating
the current heavy reliance on groundwater supplies to meet water demand. The
Applicant sees the LBITP as a major part of the surface water development
strategy that enables water use reduction according to the subsidence district
timeline.
Transfer enough surface water to the Northeast Water Purification Plant
(NEWPP) at Lake Houston to provide a long-term and reliable municipal water
supply that will meet the future population growth forecast by the Texas Water
Development Board's (TWDB 2011) Region H Regional Water Plan (RWP) and
water contract commitments to major customers.
Provide the required surface water supply by exercising previously secured
perpetual surface water rights in Lake Livingston, and construct water
conveyance facilities using previously acquired property to convey water to Lake
Houston, the City of Houston's primary water supply reservoir.
Basic Project Purpose
The basic purpose for the proposed action is to provide municipal water supply for the
City of Houston and surrounding area. As such, the project does not require access or
proximity to or siting within a special aquatic site, such as a wetland, to fulfill its basic
purpose.
Overall Project Purpose
The overall project purpose is to provide municipal water supply to the City of Houston
and its customers by exercising the City of Houston's perpetual surface water rights in
Lake Livingston.
Alternatives Analysis
Rationale for Determining Practicability of Alternatives
The Corps regulatory permit review process requires an analysis of water supply
sources and alternative project designs to demonstrate the avoidance and minimization
of impacts on aquatic resources to the greatest extent possible.
NEPA requires that a No Action Alternative be analyzed to determine the environmental
consequences of not undertaking the proposed project, and thereby provide a
framework for measuring the benefits and adverse effects of other alternatives.
Pursuant to Clean Water Act Section 404(b), the Corps defines practicable alternatives
as those that are, "available and capable of being done after taking into consideration
cost, existing technology, and logistics in light of overall project purposes." (40 CFR
230.10 (a)). On the basis of the information developed through the screening analysis,
7
and preliminary evaluation, the following alternatives were selected by the Corps for a
more detailed impacts analysis: No Action, Alternative 3A, Alternative 4, and Alternative
6.
Alternatives Considered but Not Included in the Detailed Analysis
Of the original 14 alternatives identified during scoping, four were determined not to
meet the project's overall purpose and need and were eliminated from further analysis.
The remaining 11 alternatives, the No Action and ten build alternatives, were screened
to determine which would be carried forward into detailed analysis. This screening
process, after consideration of cost, existing technology, and logistics in light of overall
project purposes, resulted in 7 additional alternatives being determined not to be
practicable and were eliminated from detailed analysis. Chapter 2 of the FEIS presents
the reasons for eliminating alternatives and discusses why the three build alternatives
were determined to be practicable and were carried forward along with No Action
Alternative.
Alternatives Considered
The Corps has three options relative to the Least Environmentally Damaging
Practicable Alternative (LEDPA). The three options available to the Corps are: 1) issue
the permit; 2) issue the permit with special conditions; or 3) deny the permit.
Alternatives are evaluated and discussed in Chapters 2 and 4 in the EIS. An analysis of
alternative site plans for avoiding and minimizing project specific impacts to WOUS
including wetlands is discussed in Chapter s 4 and 5 of the EIS.
Permit denial is identified and described as the No Action Alternative in Chapter 4 of the
EIS. In accordance with 33 CFR Part 320.4(b)(4) and 40 CFR 230.10, the Corps
performed an evaluation of alternatives, as described below.
No-Action Alternative
Under the No Action Alternative, the Corps would not issue any permits for construction
of a raw water pump station and conveyance facility between the Trinity River and Lake
Houston. As a result, the City of Houston's water supply system would remain in its
current condition and continue to serve its customers. An existing water conveyance
(Trinity River Pump Station) would have to be expanded and additional pump station(s)
would have to be implemented to convey water supply up-gradient to customers located
in north and northwest Harris County. Build Alternatives 5, 5A, 6, and 6A were
developed to evaluate this approach in more detail in the EIS. Some, but not all, of the
Applicant's project purposes would be met under this alternative.
Action Alternatives
All proposed action alternatives are located in Liberty and Harris Counties, Texas within
an area bounded by Luce Bayou on the north, the Trinity River on the east, an existing
CWA raw water canal on the south and Lake Houston on the west. Major north/south
roadways in this large study area include FM 2100 near Lake Houston, and State
Highway 321 just west of the Trinity River, which connects the towns of Cleveland,
8
Dayton, and Mont Belvieu. The major east/west roadway in the study area is U.S. 90,
which connects the towns of Crosby, Dayton, and Liberty. Most of the study area is rural
and dominated by agricultural land uses. North of U.S. 90 from west to east, are the
towns of Atascocita, Huffman, and Kenefick.
Depending on the alignment, the project would directly affect from 364.76 acres to 59
acres of jurisdictional wetlands, affect varying lengths of intermittent and perennial
streams, and varying areas of non-wetland floodplain and riparian areas. Most wetlands
affected by the alternatives constitute a productive and valuable public resource. The
wetlands, streams, and associated vegetation communities provide surface water
storage, stream flow maintenance, groundwater recharge, sediment removal and
nutrient re-cycling, aquatic productivity which generates opportunities for fishing and
waterfowl hunting, and plant and wildlife habitat important for hunting, trapping, and
other recreational activities.
Alternative 4
This alternative would convey water from the Trinity River to Lake Houston via a
pipeline to Lake Houston. The diversion point for Alternative 4 is the Trinity River near
Capers Ridge. A river intake and pump station would be constructed along the river's
west embankment. Ancillary facilities would include an administration and control
building, a maintenance facility, chemical storage and feed facilities, a fuel facility,
resident operator housing, a potable water supply, onsite waste disposal, a power
supply, communications, access roadways and related facilities. A pipeline would
convey the raw water approximately 24 miles directly into Lake Houston. Most of the
pipeline would be constructed adjacent to an existing Houston Natural Gas Company
(HNG) pipeline easement south of Capers Ridge extending southwesterly to a point
south of FM 1960. The pipeline could be located adjacent to an existing Sunoco pipeline
easement from FM1960 to Lake Houston. About 126,300 linear feet of constructed
improvements would be needed to develop this alternative into a conveyance facility.
The pipeline ROW would traverse multiple land uses and natural areas as follows.
From Capers Ridge to SH 321, the approximate 8-mile-long ROW would mostly
traverse the heavily wooded Trinity River floodplain.
From SH 321 to FM 1960, the approximate 10-mile long ROW traverses
farmland and scattered wetlands and wooded areas as the ROW enters the
upper Cedar Bayou watershed.
From FM 1960 to FM 2100, the approximate 3-mile ROW crosses the Cedar
Bayou watershed. It is carried under Cedar Bayou itself in a deep tunnel and is
then tunneled under a number of Cedar Bayou's western tributary streams.
As the ROW continues west of FM 2100, it must either be tunneled under
existing housing development or located to avoid these land uses. However, the
proposed pipeline would not be able to avoid heavily wooded areas and wetlands
west of FM 2100 and east of Lake Houston south of the FM 1960 East Bridge
across Lake Houston. Development along Lake Houston's eastern shore allows
almost no opportunity to locate the ROW without being immediately adjacent to
existing subdivisions.
9
Alternative 6
This alternative would convey water from the Trinity River at the existing Trinity River
Pump Station (TRPS) facility to Lake Houston via a pipeline. The existing river intake
and pump station would be modified and/or expanded along the river's west
embankment. The existing ancillary facilities would require some improvements;
however, extensive new facilities would not be required.
The pipeline would convey raw water in a pipeline extending approximately 21.6 miles
adjacent to an existing ExxonMobil pipeline easement to FM 2100 and then northward
to Foley Road and west directly to Lake Houston. About 114,200 feet of constructed
improvements would be needed to develop this alternative into a conveyance facility
Limited development exists along the proposed conveyance route; however,
development is occurring along FM 2100. Alternative 6 would traverse a variety of land
uses as described below.
From TRPS, the pipeline would be aligned in a 300-foot wide Right-of-Way
(ROW) and traverse farmland and patches of wooded areas and tunneled under
multiple streams. Between Hatchfield Road and Cedar Bayou's main stem,
residential areas would have to be traversed and ROW identified for the
pipelines.
Cedar Bayou would be crossed in a tunnel section and then aligned to cross US
90 and then across farmland and residential areas to a canal just south of the
dam at Lake Houston.
For Alternative 6, the pipeline ROW would be located through residential subdivisions
and transition to an existing canal west of FM 2100. The fenced ROW and other
security measures for the pipeline would be visible to adjacent residents.
Applicant's Preferred Alternative (Alternative 3a)
The Applicant's preferred alternative is to withdraw water from the lower Trinity River
near Caper's Ridge, pump the water through an approximate 3.1-mile long segment of
pipe (two 108-inch diameter pipes), into a sedimentation basin, and then into an
earthen, open channel canal that would transport water using gravity to Luce Bayou at
the confluence with Lake Houston. The average depth of water in the open canal
constructed within the 300-ft wide project easement is anticipated to be 7 ft and the flow
and depth would be controlled by water control equipment/facilities installed along the
route. Water intake and discharge structures and construction/maintenance areas and
easements would also be part of the alternative. The Sam Houston Electrical
Cooperative would supply electric power to the Capers Ridge Pump Station (CRPS).
The pumping capacity of the project would be sufficient to supplement the Lake
Houston water supplies so that water demands would be satisfied until at least planning
year 2040. As specified by the City of Houston's Certificate of Adjudication No. 08-4261,
the total amount of permitted water that can be diverted at the Capers Ridge diversion
point is 550.86 MGD. The design of the project and the canal portion of the interbasin
transfer system would be developed to convey water at the maximum permitted
diversion rate.
10
The applicant's preferred alternative would require the construction of new facilities
within approximately 1,050 acres (ac) of land owned by the Applicant. The project would
also require implementation of security and safety measures; management of sediment;
pipeline, utility, stream, wildlife and roadway crossings; provision of electrical power;
acquisition of property; construction of drainage crossings, outfall and ancillary
structures; mitigation of unavoidable project effects, including shoreline and river bank
erosion protection; and management of public project funds.
Operations of the project would include canal maintenance such as repair, nuisance
and exotic aquatic species removal from the canal, mowing of the canal berms, and
sediment management. The proposed compensatory mitigation plan includes transfer of
property ownership for an approximate 3,000-ac parcel of property located within the
floodplain of the lower Trinity River from the Applicant to the Trinity River National
Wildlife Refuge (TRNWR).
Zebra mussels (Dreissena polymorpha), a non-native freshwater bivalve, is a prolific
aquatic nuisance species, which the Secretary of the Interior has designated as
"injurious wildlife." It was introduced into the Great Lakes in the mid-1980s and has
since spread throughout the Great Lakes Basin and the Mississippi River drainage
system. It may be introduced into the San Jacinto or Trinity River watersheds prior to
constructing the LBITP through natural dispersion and incidental transfer from human
activities.
If the zebra mussel has not already been introduced into the San Jacinto River
watershed prior to constructing this alternative, the proposed water conveyance canal
could potentially be a conduit for transferring zebra mussels from the Trinity River to
Lake Houston. Therefore, as directed by the Corps, the Applicant has developed zebra
mussel control options to be incorporated into this alternative's design that would
provide for specific control and treatment methods implemented according to identified
triggers during the operation and maintenance of this alternative. Appendix P of the
FEIS includes the Luce Bayou Interbasin Transfer Project Zebra Mussel Control Plan,
which outlines methods for the reduction of potential impacts if and when zebra mussels
become a problem. The Applicant determined that a three-tiered response plan is
appropriate for monitoring and responding to the zebra mussel risk for the facilities. The
Applicant's Response Plan provides the following:
Actual locations of the three reaches or zones of the Trinity River and the zebra
mussel risk levels assigned to each zone;
Response actions assigned to each zone or zebra mussel risk level;
Threshold or triggers monitored and evaluated by the Applicant to "trigger"
actions under the next, higher level of zebra mussel risk; and,
Description of the response actions that the Applicant will undertake as the level
of risk increases.
11
Appendix P, Figure 3-1 presents the Applicant's Response Plan in summary; Appendix
P, Figure 3-2 shows all three reaches or zones of the Trinity River basin that correspond
to the three levels of zebra mussel risk.
Environmental Setting
The Applicant's proposed project and the build alternatives are located within the
Western Gulf Coastal Plain/Gulf Coast Prairies and Marshes Ecoregion as designated
under the EPA's Level III Ecoregion classification. The principal distinguishing
characteristics of the Western Gulf Coastal Plain are its relatively flat coastal plain
topography and grassland vegetation. Inland from this region the plains are older, more
irregular, and have mostly forest or savannah vegetation. There is a higher percentage
of cropland in this area than in bordering ecological regions and urban and industrial
land uses have expanded greatly over the past fifty years with oil and gas production
being common. Dominating the area between the Trinity and San Jacinto basins is the
approximately 200 square mile area of the Cedar Bayou watershed which is the
dominating hydrologic feature between the two river basins. The climate for the
watershed is humid subtropical with average rainfall between 40" to 54" with increasing
levels toward the coast. Temperatures can exceed 100 degrees Fahrenheit in the
summer and remain moderate during the winter with frequent cold fronts followed by
strong southerly return winds. The watershed is vulnerable to extreme weather events
originating in the Gulf of Mexico and is seasonally prone to tropical events including
hurricanes.
Jurisdictional wetlands that would be affected by the Applicant's preferred alternative
include 125.07 ac of forested wetlands, 31.68 ac of scrub shrub wetlands, 206.78 ac of
emergent wetlands, 3.57 ac of surface drainage features, and 2.11 ac of open water
where portions of the proposed pump station would be located in the Trinity River.
Some 75% or 277 ac of the total jurisdictional areas identified are characterized as
wetlands or waters having reduced or impaired function due to a variety of human
activities including farming, silviculture or related activities,
Environmental Impacts and Public Interest Review
The possible consequences of this Applicant's preferred alternative were studied for
environmental concerns, social well-being, and the public interest, in accordance with
regulations published in 33 C.F.R. 320-332. All factors, that may be relevant to the
proposal, must be considered. The following factors were evaluated appropriately, as
they relate to the Applicant's preferred alternative described in the alternative analysis
section.
12
Historical and Cultural Resources
No direct or indirect effects are anticipated on historic resources. The LBITP right of way
follows property lines of residential properties, and identified historical properties or sites
were avoided during project planning and no mitigation is needed for historical
resources.
Pre-historic areas eligible for the Natural Register were identified on Capers Ridge, an
upland portion of the LBITP. Consultation has been conducted with the State Historic
Preservation Officer (SHPO) and relevant Indian nations. A Memorandum of Agreement
(MOA) is being developed that will establish how these resources will be managed. In
addition, the permit will be conditioned to prohibit work on Capers Ridge until all terms
of the MOA are satisfied.
Water Quality
Effects from the LBITP to water quality would be minimal such that direct or indirect
effects are not anticipated. There would be a potential minor long-term beneficial effect
on the water quality of Lake Houston as a result of implementation of the LBITP. Lake
Houston is currently classified as impaired per Clean Water Act Section 303(d).
Rare, Threatened or Endangered Species
The proposed LBITP project area was selected in consultation with the U.S. Fish and
Wildlife Service to avoid impacts to rare threatened or endangered species.
Fish and Wildlife Values
No direct, indirect, long-term, or adverse effects to fishes would occur related to
implementation of the LBITP. Appropriate mitigation in the form of intake screen slot
size would be used at the river pump intake location. Pumping could impinge larger fish
on intake screens, and entrain fish eggs and mussel larvae through the transfer system.
The proposed project would utilize a trash rack and bar screen that would otherwise
minimize impacts to aquatic species that could potentially become caught and trapped
in the pumps.
Temporary effects to wildlife habitat that would result from the proposed action include
the decreased attractiveness of habitat adjacent to the project corridor, as well as
possible disturbances to normal behavior patterns of wildlife as a result of increased
noise levels from construction activities. Alternative 3A would result in direct, short-term
impacts on wildlife habitat, including habitat loss through its conversion to surface water
conveyance infrastructure and maintained ROW.
Shoreline Erosion and Accretion
No impacts to shoreline areas adjacent to the pump station are anticipated as a result of
the LBITP. The proposed intake structures along the Trinity River were studied to
assess their potential to affect the stability of the Trinity Rivers geomorphology. The
studies concluded that the reach of the Trinity River is very stable and that the
13
placement of the intake structure and associated fill material will not affect stability of
the Caper's ridge shoreline or the opposite bank.
Essential fish habitat
The LBITP is not located within an area mapped as Essential Fish habitat by the
national Marine Fisheries and will not have an adverse affect on the bay or estuaries
located downstream of the project site.
Wetlands and special aquatic sites
Wetlands affected by the LBITP are estimated at 364.76 ac. with over 75% of this total
located in agricultural fields and those previously affected by farming activities. Stream
impacts amount to 65 linear feet.
Recreation
A limited, local effect in the area of intake pump construction would occur to recreation
and non-commercial navigation, including boating, on the Trinity River section of the
LBITP. It is anticipated that Lake Houston water levels would remain consistent with
baseline conditions in accordance with operating procedures. No direct, indirect, longterm, or adverse effects to navigation and boating would occur related to
implementation of the LBITP.
Aesthetics
Direct impacts from the LBITP include the aesthetics of the riparian tree line along the
Trinity River; the viewshed where project elements such as the maintenance facility and
any elevated structures are implemented; and the removal of vegetation along the
project right of way. Most of the right of way would be located on agricultural lands or
farmed fields. The proposed, fenced conveyance canal with access road and
associated facilities would traverse agricultural fields and undeveloped areas for much
of the length of the alignment. Near the Lake Houston discharge, in the vicinity of FM
2100 and Wolff Road, several residential subdivisions or planned residential areas
would be located near the discharge location.
Land use
All elements of LBITP would be located in sparsely populated areas of Liberty County
and northeast Harris County. Approximately 1,005 ac would be converted from private
to public use. Land uses adjacent to the proposed water conveyance are presently in
agricultural use, or wooded natural area. Few residential or commercial uses are
located near the proposed right of way. Primary activities occurring in the area of the
right of way include farming, sand, gravel, oil and gas mining (drilling), and recreational
(hunting)
Navigation
The intake structures of the LBITP are located on the Trinity River, a navigable water,
but will not impede navigation or littoral access to private land owners once constructed.
14
Federal Projects
No effect is anticipated on Federal projects by the LBITP. The proposed action was
studied to evaluate the potential impacts to the Wallisville Lake Project salt water barrier
operations. Both the Corps and the CWA's independent reviews concluded that the
release of water from Lake Livingston and intake of water at Capers Ridge would have
no affect on the daily operations of the salt water barrier.
Water Supply and Conservation
Potential direct and indirect, long-term benefit to water supply and conservation would
occur for these resources.
The LBITP would provide a public benefit with respect to water supply. The LBITP is a
long-planned project identified by the state of Texas as critical to providing water to
meet projected population growth of Houston. The need for the LBITP is to meet
projected water requirements as exemplified by Water Supply Contracts held between
Houston and North Harris County Regional Water Authority (NHCRWA), Central Harris
County Regional Water Authority (CHCRWA), West Harris County Regional Water
Authority (WHCRWA), and North Fort Bend Water Authority (NFBWA) for future water.
A secondary objective is to assist with the conversion from groundwater to surface
water sources to meet mandated goals developed to control area subsidence. Without
the LBITP, Houston would not be able to meet its contracted demand allocations,
projected long-term water supply requirements identified by the 2011 Region H
(Houston) Regional Water Plan (RHRWP) and the TWDB 2012 State Water Plan
(SWP); and would not be able to meet mandated conversion of groundwater to surface
water supply sources to control area subsidence by the mandated conversion dates
imposed by Harris-Galveston Subsidence District (HGSD) and the Fort Bend
Subsidence District.
Texas state law requires retail and wholesale water providers to prepare and submit
plans to the Texas Commission on Environmental Quality; these plans must specify
demand management measures for use during drought including curtailment of "nonessential water uses" i.e., landscape irrigation and water for swimming pools or
fountains (Texas Environmental Quality Code §288.20). The purpose of the LBITP is to
provide water to the Houston area thus providing additional water supply to the region
that can be combined with conservation measures developed and implemented by the
City of Houston when needed.
Floodplain values
The LBITP would be located within approximately 54 acres of an existing floodplain. No
adverse effects to the floodplain are anticipated and no increased risk of flooding of
constructed or agricultural assets are expected.
Safety
The LBITP would be designed, operated, and maintained consistent with Department of
Homeland Security standards for public infrastructure.
15
Energy Needs
No direct, indirect, long-term, or adverse effects to minerals and mineral resources
would occur in relation to the implementation of the LBITP. One Natural Gas Pipeline
(NGPL) Interconnect Meter Site Crossing was identified near the Stoesser property. No
electrical power corridors were identified within the ROW of the proposed Alternative 3A
and no oil wells are located in the proposed Alternative 3A footprint, although there is a
dry hole present in the vicinity of the sedimentation basin. No other energy or mineral
resources were identified within the proposed project ROW.
Flood Hazards
Flood hazards and flood hazard values are critical components integral to project
development and design/mitigation considered for the action alternatives. Flood hazards
and flood hazard values are directly affected and design features to minimize the affect
have been developed during project evaluations/studies. Additional design features
include a series of siphons in conjunction with collector ditches and culverts along the
canal alignment that will assure overland flow/floodplain values will be maintained
reducing the potential for flood hazards.
Economics
Both positive and negative economic impacts are anticipated as result of the LBITP.
The loss of income and tax revenue from change of land use from agricultural and
timber production to public use would consist of $8,782 or 5.8% of the total economic
value of the properties within the ROW. There are 34 properties that provide economic
value through agricultural and timber production within the ROW. Tax revenue is
assessed at 8% per $1,000 per acre property.
Socioeconomics and Environmental Justice
No direct and indirect, long-term and adverse effects to environmental justice
populations would occur for the implementation of Alternative 3A.
Air Pollution
The proposed project has been analyzed for conformity applicability pursuant to
regulations implementing Section 176(c) of the Clean Air Act. It has been determined
the activities proposed under this permit will not exceed de minimis levels of direct
emissions of a criteria pollutant or its precursors and are exempted by 40 CFR PART
93.153. For these reasons, a conformity determination is not required for this individual
permit.
Food and Fiber production
Direct and indirect effects to food and fiber production would occur and the health of
these sources is declining in the area of the LBITP (Chapter 5, Section 5.3.4 of the
FEIS). Farmland areas within the vicinity of the proposed Alternative 3A have been
identified. Alternative 3A traverses through approximately 9.5 miles of farmland
resources that would be permanently converted to public use from agriculture. However,
16
none of the proposed project alternatives, including the No Action alternative, exceeded
thresholds for identifying that adverse impacts to prime farmland may occur as a result
of project-related construction, operation, and maintenance activities.
Mineral Needs
No direct, indirect, long-term, or adverse effects to minerals and mineral resources
would occur in relation to the implementation of the LBITP. One Natural Gas Pipeline
(NGPL) Interconnect Meter Site Crossing was identified near the Stoesser property. No
electrical power corridors were identified within the ROW of the proposed Alternative 3A
and no oil wells are located in the proposed Alternative 3A footprint, although there is a
dry hole present in the vicinity of the sedimentation basin. No other energy or mineral
resources were identified within the proposed project ROW.
Other Federal State or Local Requirements
A Section 401 Water Quality Certification (WQC, 33 USC 1342) has not been issued for
the proposed project and must be obtained from the Texas Commission on
Environmental Quality (TCEQ). The TCEQ has not yet acted on the Applicant's request
for water quality certification under Section 401 of the CWA. The Corps will provide the
TCEQ with a copy of this permit decision document when finalized. The final permit
decision document will contain the environmental assessment and mitigation and
Section 404(b)(1) analysis. The TCEQ will then make its determination whether the
project will comply with state surface water quality standards in accordance with Section
401 of the CWA. The Corps will provide a permit decision to the applicant when the
following procedures have been completed. The TCEQ will either provide its certification
decision to the Corps or request an extension from the Corps within 10 working days
from receipt of the Corps decision document. If the TCEQ does not provide a
certification decision or request an extension within the 10 day period, the Corps will
presume waiver of certification in accordance with 33 CFR 325.2(b) and proceed with
the issuance or denial of the permit. If TCEQ requests an extension of time, the Corps
will determine the merit of the time extension request and the length of the extension
based on 33 CFR 325.2(b) and notify TCEQ of its intended decision. If the Corps
decides to deny or modify a request for extension, TCEQ will have 10 working days
from the date it is notified of the intended action of the Corps on the request for
extension in which to either certify or deny certification. The TCEQ will be solely
responsible for determining the project's consistency with the goals and policies of the
Coastal Management Plan. This determination will accompany TCEQ's Section 401
certification.
Cumulative Impact Assessment
An assessment of cumulative impacts takes into consideration the consequences that
past, present, and reasonably foreseeable future projects had, have, or will have on an
ecosystem. Every permit application must be considered on its own merits. Its impacts
on the environment must be assessed in light of historical permitting activity, along with
anticipated future activities in the area. Although a particular project may constitute a
minor impact in itself, the cumulative impacts that result from a large number of such
17
projects could cause a significant impairment of resources and interfere with the
productivity and quality of existing ecosystems.
Direct, indirect, and cumulative environmental, cultural, and socioeconomic effects were
analyzed that would likely occur upon implementation of the three alternatives, plus the
no build alternative. The physical, natural, and social impacts for each alternative are
discussed in Chapter 4.0 of the FEIS. The impacts to each resource area are
summarized below. Cumulative effects were analyzed taking into account past, present,
and reasonably foreseeable future actions in the project area and are discussed in
Chapter 5.0 of the FEIS. Table 1 (below) summarizes the sum of the potential direct,
indirect and cumulative effects of the build alternatives based on identified resource
area.
Table 1. Summary of Potential Direct, Indirect and Cumulative Environmental
Consequences on Resource Areas Affected by the Build Alternatives.
Resource Area
Alternative 3A
Alternative 4
Alternative 6
Topography and Bathymetry
No effect
No effect
No effect
Soils
No effect
No effect
No effect
Prime Farmland Soils
Minor effect
Minor effect
Minor effect
Geology
Minor effect
Minor effect
Minor effect
Groundwater
Positive effect
Positive effect
Positive effect
Subsidence
Minor effect
Minor effect
Minor effect
Sedimentation and erosion
Minor effect
Minor effect
Minor effect
Surface water and drainage
No effect
No effect
No effect
Water quality
Minor effect
Adverse effect
Adverse effect
Climate change
No effect
No effect
No effect
Regional air quality
Minor effect
Adverse effect
Adverse effect
Hazardous air pollutants
Minor effect
Minor effect
Minor effect
Air quality (NAAQS)
No effect
No effect
No effect
Greenhouse gas emissions
Minor effect
Minor effect
Minor effect
Wetlands
Minor/Mitigated
Adverse effect
Adverse effect
Streams
Minor effect
Adverse effect
Adverse effect
Bottomlands
Minor/Mitigated
Adverse effect
Adverse effect
Floodplain
Minor effect
Adverse effect
Adverse effect
Avifauana
Minor effect
Adverse effect
Adverse effect
Aquatic species
Minor effect
Adverse effect
Adverse effect
Habitat fragmentation
Minor/Mitigated
Adverse effect
unknown
Adverse effect
unknown
18
Resource Area
Alternative 3A
Alternative 4
Alternative 6
T&E species
No effect
Neutral/Mitigated
Neutral/Mitigated
Invasive species
Minor/Mitigated
Minor effect
Minor effect
Recreation/Boating
Minor effect
Adverse effect
Adverse effect
Agriculture
Minor effect
Adverse effect
Adverse effect
Residential land use
Minor effect
Adverse effect
Adverse effect
Oil and gas storage
Minor effect
Adverse effect
Adverse effect
Energy/Mineral resources
Minor effect
Adverse effect
Adverse effect
Roads/Infrastructure
Minor effect
Adverse effect
Adverse effect
Relocations/Displacements
Minor effect
Adverse effect
Adverse effect
Incompatible land use
Minor effect
Adverse effect
Adverse effect
Visual/Aesthetic effects
Minor effect
Adverse effect
Adverse effect
Noise effects
Minor effect
Minor effect
Minor effect
Hazardous materials
Minor effect
No effect
No effect
Minor effect
Minor effect
Safety/Security of water supply No effect
Environmental justice issues
Beneficial effect Adverse effect
Adverse effect
Cultural Resources
Minor/Mitigated
Adverse effect
unknown
Adverse effect
unknown
Descriptors:
`No effect' = no adverse or beneficial effect
`Minor effect' = minor adverse impact
The identification and assessment of cumulative impacts for each alternative and
resource category are summarized by resource category in Chapter 5 of the EIS. An
assessment of the need for mitigation is described for each alternative and resource
category and is summarized in Chapter 5, Table 5-1 of the FEIS. No adverse effects on
resources were identified for Alternative 3A. The need for mitigation was identified for
five resources: 1) cultural resources; 2) invasive species; 3) habitat fragmentation;, 4)
bottomlands; and 5) wetlands.
When considering the overall impacts that will result from Alternative 3A, in relation to
the overall impacts from similar past, present, and reasonably foreseeable future
projects, the cumulative impacts resulting from the Alternative 3A are not considered to
be significantly adverse. Overall, the project will result in minimal environmental
impacts.
19
Public Interest Review
Coordination
DA Permit Application Public Notice and Scoping
The Luce Bayou Inter-basin Transfer Project public notice was published on April 19,
2010. After a joint agency evaluation meeting was held, which included federal and
state resource agencies (February 10, 2010), the Applicant began to develop alternative
routes and initiated the process of avoiding and minimizing effects to aquatic resources
through the development of an environmental assessment. After reviewing the
environmental assessment, considering the comments of resource agencies and other
stakeholders, and developing information concerning potential effects of inter-basin
water transfers from invasive species, the Corps decided to initiate the EIS process to
better evaluate the Applicant's proposal.
An EIS Scoping Meeting was held on July 21, 2011 at the Dayton, Texas Community
Center after a Notice of Intent to prepare an EIS was published in the Federal Register
(May 25, 2011). Some 224 substantive comments were provided during the Scoping
Comment period with the majority of comments focused on NEPA compliance, wetlands
and aquatic environment effects of the project, facility construction and operation, and
freshwater inflow to Galveston Bay (Luce Bayou Inter-basin Transfer FEIS, Chapter
7.0).
Draft Environmental Impact Statement (DEIS)
The Corps made the DEIS available for public review and comment online through the
Corps website, through U.S. EPA's NEPA Net site, and provided copies of the DEIS to
the Dayton, Texas library The DEIS was available for comment for 52 days beginning
October 26, 2012 through December 17, 2012. The DEIS public hearing was held in
Dayton, Texas on November 28, 2012.
Substantive Issues - Summary
Some 1,122 substantive comments were received on the DEIS (Luce Bayou Inter-basin
Transfer Project FEIS, Appendices A and T).
Most comments were in the form of letters with a large number of form letters received
in support of the project but without substantive comment on the DEIS.
A substantial number of comments received from the Sierra Club focused on the impact
of providing for municipal water demand. In various ways, the commenter indicated that
population growth and urban development in the Houston area would increase while the
size and quality of natural areas would decrease if municipal water was provided to
meet demand. This circumstance was thought to be objectionable and was presented
as a reason to not build the project.
20
Related to the comments mentioned in the preceding item, the Sierra Club also noted
that transportation and other infrastructure growth impacts from the future population
served by adequate water supplies are not evaluated in the EIS.
Multiple comments requested various re-evaluations of specific build alternatives to
better understand how these could be feasible.
The Applicant and the City of Houston expressed hope the Corps would provide a
favorable permit decision at an early date.
Multiple comments expressed concern that by removing the proposed volumes of water
from the Trinity River that wetland habitat along the river and its tributaries would begin
to dry up and lose wetland functions and values, and that upper Galveston Bay would
not receive freshwater needed to maintain productive estuarine values.
Multiple comments expressed concern over the impact of invasive zebra mussels
should they be transferred from the Trinity River watershed to the San Jacinto
watershed.
The City of Houston provided a number of comments clarifying and better explaining the
type and nature of its water rights ownership in the Livingston Reservoir.
Several comments concerned the mitigation proposal and whether it adequately
compensated for resource losses.
Agency Comments on the DEIS
Chapter 8, Section 8.6 of the FEIS provides detailed, point-by-point discussion of how
the FEIS responded to Federal/State agency comments on the DEIS. The following is a
summary:
U.S. EPA Region 6 (EPA) requested another look at dredging Lake Houston to increase
water supply capacity and to also consider providing for fringe wetlands along the lake's
shoreline with the dredged material excavated to deepen the lake. This re-look was
made and additional discussion is provided in the FEIS.
EPA also requested additional information concerning Indian Trust assets and Tribal
Consultation. The FEIS provides the requested information in Chapter 8, Section 8.5.
EPA requested specific air emission impacts from construction be minimized through an
emissions mitigation program. The FEIS includes mitigation measures to be used to
reduce emission effects during construction periods.
EPA requested a specific section of the FEIS include all City, State, Federal and public
coordination/correspondence, including tribal government co-ordination/consultation.
Such a section has been provided in the FEIS at Appendix A and Chapter 8.0.
The Natural Resources Conservation Service presented a letter that presented how the
Service defines wetlands. The Corps responded by stating that farmed wetlands and
21
possible prior converted croplands have been considered in the jurisdictional
determinations for the right of way proposed by the Applicant.
The National Marine Fisheries Service stated that with respect to areas under their
jurisdiction, including essential fish habitat, that the Service proposed to `take no action
at this time.'
The U.S. Department of Interior, Office of Environmental Policy and Compliance
commented that Alternative 3A is `one of the most environmentally damaging
alternatives because of the extensive alterations to wildlife habitats along the proposed
canal.' The DEIS does not adequately evaluate impacts downstream of the proposed
pump station nor does the DEIS assess secondary impacts caused by removing water
from the Trinity River. It (the DEIS) does not include adequate compensation/mitigation
for direct and indirect impacts that may occur from project construction. Interior also
provided a hydrological analysis intended to show that the water needed for the
proposed water supply is not available due to drought or to maintain the constant levels
required at Livingston Dam. The FEIS provides responses to these comments in
Appendix A of the FEIS.
The USFWS, Ecological Services Field Office, Houston, Texas was consulted during
the development of environmental documentation. Impacts to a bald eagle nest and
migratory bird rookery were avoided through this consultation. The FEIS includes details
of this consultation and coordination and provides detailed information concerning
wildlife and habitat learned as a result of the Service's communications.
The USFWS, Trinity River National Wildlife Refuge System, by letter dated July 25,
2013, has indicated their willingness to accept the donation of the approximately 3,000acre mitigation tract (Harrison tract) into the refuge system. Specific details for this
transaction are being resolved by the Applicant and the USFWS.
The TCEQ, who is responsible for providing water quality certification under the Clean
Water Act Section 401, expressed no comment on the project.
The TPWD's Coastal Fisheries Division acknowledged the extensive coordination that
occurred during the project planning period and stated that avoidance and minimization
of impacts to aquatic resources and mitigation have been adequate. The Coastal
Services Division would still want to resolve issues relating to the restoration of 200
acres of logged areas. Additionally, the Division requests further analyses of river low
flows and water withdrawals. The Division also requests that the conveyance right of
way provide for wildlife crossings along the 26-mile route.
The GLO commented that the "impacts would occur to critical habitat and waterways,
including the Cedar Bayou watershed, which feeds into Galveston Bay." The Land
Office will review the FEIS pursuant to the Coastal Coordination Act, 31 Texas
Administrative Code Section 506.30.
The Texas Historical Commission indicated that the project would not affect historic
properties, though Tribal Nation coordination continues. Resources important to Tribal
22
Nations have been discovered within Alternative 3A, and a MOA has been developed
(to be completed).
Final Environmental Impact Statement (FEIS)
The Corps made the FEIS available for public review on their website and through U.S.
EPA's NEPA Net site, as well as published a notice of availability of the FEIS in the
Federal Register on October 4, 2013 and a subsequent Special Public Notice through
its standard public notice process. The FEIS review period began October 3, 2013 and
ended November 18, 2013. In response to the FEIS review period, only one comment
letter was received.
Comments on the FEIS
The U.S. EPA Region 6 letter, dated November 17, 2013, raised eight sets of concerns
under specific categories as follows:
1. Water Use Calculations
EPA asked for an explanation of forecasted water use per person. Based on the
forecasted Harris County population change from 4 million to 6 million people between
2010 and 2040, and a change in water use from 450 million gallons per day (MGD) to
1,350 MGD the EPA calculates that the water use per person doubles during the time
period from 112.5 gallons per day (gpd) to 225 gpd. The EPA requested an explanation
for the doubling in per person use in the face of aggressive conservation measures.
The Applicant provided water demand information, which was presented in the EIS as
follows: Between 2030 and 2050 (water) demand is forecast to be between 1,300 and
1,400 MGD. The source of this information was attributed to the City of Houston.
Elsewhere in the EIS, population forecasts were presented, also provided by the
Applicant, and reviewed and verified as to source.
In all the data reviewed concerning water demand, no information was presented that
specifically identified `per capita' water use. What was presented was water demand
information relevant to establishing the need for the proposed Luce Bayou Interbasin
Transfer project. This information includes the following:
1. Information relating to the historical reliance on groundwater resources and how
this major water source must, by regulation, be replaced with surface water.
2. Total surface water supply and demand forecast (Chapter 1, Figure 1-6 in the
FEIS) for the City of Houston.
3. A discussion of Water Authorities and other water customers of the City of
Houston that expands the population served by water sold by the City of
Houston, which is included in the City of Houston's water demand estimates.
4. Water Authorities demand projections (Chapter 1, Figure 1-8 in the FEIS).
23
5. Information (Chapter 1, Figure 1-7 in the FEIS) that identifies the City of
Houston's treated and untreated water customers, which includes the customers
mentioned in item 3 above, and also includes municipal utility districts,
commercial/industrial, large industrial, local (incorporated) cities and villages, and
other customers, including residential.
6. Population forecasts for multiple counties, including Harris County, from the
Texas Water Development Board.
The demand projections by the City of Houston and the Water Authorities, while being
supported by population forecasts, also include diverse water users and
populations/businesses located outside the City of Houston, such as those located in
Fort Bend County, Galveston County, and others. Chapter 1, Figure 1-6 of the FEIS
estimates a 1,300 MGD demand by the year 2050. This forecast includes both the City
of Houston forecast demand plus the pending contracted water the City must provide,
primarily to Water Authorities. How this demand estimate translates to `per capita use'
was not a focus of the EIS evaluation, primarily because `demand' is understood more
broadly.
EPA limits the population projection in its per capita calculation to Harris County. The
information provided by the Applicant indicates that populations beyond Harris County
are part of the Applicant's/City of Houston's 2060 demand estimate, and this may be as
many as 8 to 9 million versus the almost 7 million estimated for Harris County alone.
2. Historical and Archaeological Resources
The EPA's November 17, 2013 letter included the following comment on Historic and
Archeological Resources: In the DEIS comment letter, EPA asked what process was
used to determine Indian Trust Assets (ITA's) that were not in the project vicinity, and
why National Historic Preservation Act (NHPA) and Archeological and Historical
Protection Act (AHPA) consultation was not completed. The response to EPA
comments was that the CORPS has, and will continue, to coordinate with tribes, and
that consultation documentation is provided in Appendix H. Appendix H contains
consultation documents with the Texas State Historic Preservation Officer (SHPO) and
an unsigned Memorandum of Agreement (MOA) between several parties, including
tribes. EPA was unable to locate any letters to, or from, tribes indicating specific tribes
were contacted for this project. This is not adequate consultation for NHPA, AHPA, or
Executive Order (EO) 13175. The ROD should include letters to/from tribes, and a
signed copy of the MOA.
Appendix C of 33 CFR 325 establishes the procedures to be followed by the U.S. Army
Corps of Engineers (Corps) to fulfill the requirements set forth in the National Historic
Preservation Act (NHPA), other applicable historic preservation laws, and Presidential
directives as they relate to the regulatory program of the Corps (33 CFR parts 320
334). Appendix C, Paragraph 2.d states that if a permit application requires the
preparation of an Environmental Impact Statement (EIS) pursuant to the National
Environmental Policy Act, the SHPO and the ACHP will be given the opportunity to
participate in the scoping process and to comment on the Draft and Final EIS
24
In developing the cultural resource information necessary for the Draft and Final EIS,
the district engineer coordinated with the applicant and the SHPO throughout the permit
evaluation process. Consultation was initiated on April 19, 2010 when the initial public
notice was published notifying all interested parties and has been a continuing process
thought the development of the EIS to accommodate new information resulting from
continuing investigations and changing interests in those resources. As a result of
continuing field investigations and archeological testing conducted by the applicant
under the direction of the district engineer and SHPO, cultural resources of religious and
traditional importance to the Indian Tribes were located and direct coordination with the
appropriate Indian Tribes was initiated within days of discovery. Until this point in the
investigation, Indian Tribes had been notified of project through standard coordination
procedures and the Tribes had not provided any comment or objection.
The district engineer has considered all comments provided by the SHPO, ACHP,
applicant, and appropriate Indian Tribes during consultation in the development of
NEPA documentation. The process followed by the Corps is in compliance with
Appendix C and has provided for the maximum consideration of historic properties
within the jurisdictional constraints of the Corps regulatory program.
Locational and sensitive information related to archeological sites is excluded from the
Freedom of Information Act (Section 304 of the NHPA and Section 9 of ARPA). The
disclosure to the public of information pertaining to coordination of cultural resources
included the location and character of sensitive historic resources and release of
correspondences would create a substantial risk of harm, theft, or destruction to the
resources or to the area or place where such resources are located. Based on this
conclusion, the district engineer did not include afore mentioned information in the Draft
or Final EIS and will not otherwise make it available to the public. The table below
(Table 2) catalogs the various correspondences between the SHPO, ACHP, Tribes and
Applicant demonstrating that adequate consultation was conducted in a timely and
effective manner in regards to Indian Tribe resources.
When conclusion of the consultation process results in an agreement, Appendix C,
Paragraph 8 authorizes the district engineer to formalize this agreement with either a
permit condition or by signing a Memorandum of Agreement (MOA) with the parties.
Completion of a Memorandum of Agreement for inclusion in the Final EIS is not a
requirement and should not delay the district engineer's decision. The district engineer
will formalize the agreement for the proposed LBITP project with both an MOA signed
by the interested parties and by permit special condition referencing the MOA and
attachments that also prohibits construction of the portion of the project located within
the cultural resource areas until the Section 106 process is completed.
Indian Trust Assets (ITAs) are legal interests in property held in trust by the U.S. for
federally recognized Indian tribes or individual Indians. An Indian trust has three
components: (1) the trustee, (2) the beneficiary, and (3) the trust asset. ITAs can
include land, minerals, federally-reserved hunting and fishing rights, federally-reserved
water rights, and in-stream flows associated with trust land. Beneficiaries of the Indian
trust relationship are federally-recognized Indian tribes with trust land; the U.S. is the
25
trustee. A review of the Proposed Action was conducted to determine whether the
Proposed Action has potential to affect ITAs. The Proposed Action is an interbasin
transfer of water rights from the Trinity River to Lake Houston for use by the City of
Houston. The Corps published several notices to solicit comments from the public, state
and federal agencies as well as Indian Tribes. Subsequent to these notices, ongoing
cultural resource investigations identified relics of religious and traditional importance to
the Indian Tribes. Upon this discovery, the Corps began direct consultation with the
appropriate tribes. At no time when soliciting comments from or coordinating and
consulting with Indian Tribes did any of the Indian Tribes assert or declare Indian Trust
Assets on the project site. Based on the information provided it is determined that
neither the Applicant's Preferred Action nor the alternatives carried through the EIS for
analysis have a potential to affect Indian Trust Assets.
Table 2: Summary of Coordination with Indian Tribes. The following table outlines the
date, type of coordination, method of communication and Indian Tribes participating in
coordination pursuant to DA Permit Application SWG-2009-00188.
Date
Action
Communication
Method
19-Apr-10
Public Notice
Identifying need for
Cultural Resource
Investigation
Website
Publishing/ Email
Notification
29-Oct-12
Special Public Notice
- Draft Environmental
Impact Statement
Website
Publishing/ Email
Notification
8-Jan-13
Notice of Inadvertent
Discovery of Human
Remains
Electronic Mail
11-Jan-13
14-Feb-13
Re-coordination of
Draft Environmental
Statement and
Cultural Resource
report
Consultation
Regarding
Inadvertent
Discovery
Tribes Participating
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Electronic Mail
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Teleconference
Coushatta of Louisiana,
Alabama-Coushatta
28-Feb-13
Site Visit
Electronic Mail
5-Mar-13
Coordination of
Record of Field Trip
to Site
Electronic Mail
Coushatta of Louisiana,
Alabama-Coushatta
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
26
Date
Action
Communication
Method
Tribes Participating
Electronic Mail
Kiowa
Electronic Mail
Tonkawa Tribe of Oklahoma
Electronic Mail
Tonkawa Tribe of Oklahoma
Coordination Reburial of Grave at
Site
Coordination Reburial of Grave
Site
Concurrence of
Reburial of Grave
Site
Coordination of
Proposed Ground
Penetrating Radar
Assessment
Coordination of
Proposed Ground
Penetrating Radar
Assessment
Kiowa withdrew
themselves from
Reburial of Grave
Site Consultation
Confirmed Reburial
of Grave Site
Coordination of Draft
Data Recovery Plan,
Draft Reburial Plan
and draft Testing
Report
Consultation
Regarding Draft data
Recovery Plan, Draft
Reburial Plan and
Draft testing Plan
Coordination of
Summary of
Additional testing,
Geoarch testing and
Draft MOU
Teleconference
Kiowa
Electronic Mail
Alabama-Coushatta
Electronic Mail
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Teleconference
Coushatta of Louisiana,
Alabama-Coushatta
Electronic Mail
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
9-Oct-13
Special Public Notice
-Final Environmental
Impact Statement
Website
Publishing/ Email
Notification
5-Nov-13
Consultation
Regarding Summary
Teleconference
6-Mar-13
6-Mar-13
8-Mar-13
22-Mar-13
22-Mar-13
11-Apr-13
2-May-13
2-Jul-13
15-Jul-13
23-Sep-13
Electronic Mail
Electronic Mail
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Coushatta of Louisiana,
Alabama-Coushatta
27
Date
3-Dec-13
6-Dec-13
Action
of Additional testing,
Geoarch testing and
Draft MOU
Coordination of
Revised Draft MOU,
Revised Data
Recovery Plan
Consultation
Regarding Revised
Draft MOU, Revised
Data Recovery Plan
Communication
Method
Tribes Participating
Electronic Mail
Alabama-Coushatta,
Coushatta of Louisiana,
Kiowa, Tonkawa Tribe of
Oklahoma
Teleconference
Coushatta of Louisiana,
Alabama-Coushatta
3. Environmental Justice
EPA requested that EO 12898 be complied with by assessing potential effects to low
income populations, the elderly, children and other vulnerable populations as specified
by the EO 12898. The following discussion supplements EIS discussions of these
populations.
Low-income Population
Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low Income Populations, was issued on February 11, 1994, and
mandates that federal agencies identify and address, as appropriate, disproportionately
high and adverse human health or environmental effects of programs on minority and
low income populations. Environmental Justice Impacts are discussed in the FEIS in
Chapter 3, Section 3.10.3, Chapter 4, Section 4.9.1, and in Chapter 5, Table 5-1, which
summarizes existing resource conditions and potential impacts included in FEIS.
Chapter 3, Section 3.9.4 Housing and Residential Development in the FEIS also
discusses housing costs and occupancy for existing residents. Additional data on lowincome populations are discussed further in the text below.
A low income population is defined as a group of people and/or a community that, as a
whole, lives below the national poverty level. The average poverty level threshold for a
family of four people in 2013, as defined by the U.S. Department of Health and Human
Services (HHS) thresholds, was a total annual household income of $23,550. For
purposes of determining low-income populations, median household income was
examined, using the U.S. Census poverty thresholds for 2007 to 2011 (a 5-year
average), as reported in the American Community Survey (ACS). The geographic areas
evaluated include the United States, Texas, counties in the project area, and Census
tracts within the three proposed LBITP alternative alignments.
As shown in Tables 3, 4, and 5 (below) developed for each alternative using data
compiled by the 2007-2011 American Community Survey, none of the Census tracts
have median household incomes below the 2013 poverty threshold. It is important to
28
note that Median Household income is the average of households within a Census tract.
Individual households could have incomes below the 2013 HHS poverty threshold.
Table 3: Median Household Income for Census Tracts within Alternative 3A
Geographic Area
United States
Texas
Harris County
Liberty County
Census Tract 7003
Census Tract 7004
Census Tract 7007
Census Tract 7008
Census Tract 7009
Census Tract 7010
Census Tract 2504.01
Census Tract 2504.02
Census Tract 2508
Census Tract 2509
Census Tract 2516
Census Tract 2517
Median Household Income
$52,762
$50,920
$52,675
$47,460
$39,912
$53,571
$59,970
$50,476
$66,250
$51,473
$88,731
$87,034
$109,947
$131,563
$74,821
$59,766
Source: U.S. Census Bureau (2007-2011) American Community Survey 5-Year estimates
Table 4: Median House Income for Census Tracts within Alternative 4
Geographic Area
United States
Texas
Harris County
Liberty County
Census Tract 7004
Census Tract 7008
Census Tract 7009
Census Tract 7010
Census Tract 2517
Median Household Income
$52,762
$50,920
$52,675
$47,460
$53,571
$50,476
$66,250
$51,473
$59,766
29
Table 5: Median House Income for Census Tracts within Alternative 6
Geographic Area
Median Household Income
United States
$52,762
Texas
$50,920
Harris County
$52,675
Liberty County
$47,460
Census Tract 7010
$51,473
Census Tract 7011
$55,792
Census Tract 2518
$77,936
Census Tract 2519.01
$62,286
Census Tract 2519.02
$94,016
Census Tract 2527
$56,884
Source: U.S. Census Bureau (2007-2011) American Community Survey 5-Year
estimates
Based on the low-income Census data presented in Tables 3, 4, and 5, it is expected
that the proposed project would not result in disproportionately high and adverse effects
on low-income populations, for any of the LBITP alternatives. However, tract level data
does not identify the specific locations of low-income households or individuals that
could be impacted by residential displacements for Alternatives 4 and 6. Individual lowincome households could be adversely impacted by the proposed project, if the
residences are within the areas of potential displacements.
Age Vulnerable Populations
In order to examine vulnerable populations that could be affected by the proposed
project, children defined as 18 years old and younger and elderly population defined as
65 years or older were identified by Census tract within each of the LBITP alternative
alignments. Group quarter populations such as group homes for children or elder care
facilities are not included in the percentages shown below in Tables 6, 7, and 8.
30
Table 6: Age Sensitive Populations for Alternative 3A
Geographic Area
Children
(Under 18 years Old)
Elderly
(65 years or older)
United States
17.6%
12.9%
Texas
19.6%
10.3%
Harris County
19.8%
8.1%
Liberty County
19.0%
11.0%
Liberty County
Census Tract 7003
19.3%
12.6%
Census Tract 7004
17.4%
11.0%
Census Tract 7007
14.1%
11.4%
Census Tract 7008
22.4%
10.3%
Census Tract 7009
6.2%
3.7%
Census Tract 7010
26.6%
6.3%
Harris County
Census Tract 2504.01
29.9%
3.2%
Census Tract 2504.02
22.4%
5.2%
Census Tract 2508
20.2%
10.3%
Census Tract 2509
22.5%
12.3%
Census Tract 2516
21.1%
10.5%
Census Tract 2517
23.9%
8.6%
Source: U.S. Census Bureau (2007-2011) American Community Survey 5-Year
estimates
Table 7: Age Sensitive Populations for Alternative 4
Geographic Area
United States
Texas
Harris County
Liberty County
Liberty County
Census Tract 7004
Census Tract 7008
Census Tract 7009
Census Tract 7010
Harris County
Census Tract 2517
Children
(Under 18 years Old)
Elderly
(65 years or older)
17.6%
19.6%
19.8%
19.0%
12.9%
10.3%
8.1%
11.0%
17.4%
22.4%
6.2%
26.6%
11.0%
10.3%
3.7%
6.3%
23.9%
8.6%
Source: U.S. Census Bureau (2007-2011) American Community Survey 5-Year
estimates
31
Table 8: Age Sensitive Populations for Alternative 6
Geographic Area
Children
(Under 18 years Old)
Elderly
(65 years or older)
United States
17.6%
12.9%
Texas
19.6%
10.3%
Harris County
19.8%
8.1%
Liberty County
19.0%
11.0%
Liberty County
Census Tract 7010
26.6%
6.3%
Census Tract 7011
16.7%
6.9%
Harris County
Census Tract 2518
13.5%
18.5%
Census Tract 2519.01
8.3%
19.3%
Census Tract 2519.02
11.5%
16.1%
Census Tract 2527
10.1%
15.5%
Source: U.S. Census Bureau (2007-2011) American Community Survey 5-Year
estimates
As shown in Table 6, 7 and 8, in order to examine potential Census tracts with a high
population of children or elderly, the percentages of these populations was compared to
the county averages in which they reside. The bolded cells identify Census tracts with
populations of children or elderly that are higher than the county comparison group.
Although these percentages are higher than the comparison no Census tract is above
50 percent of these vulnerable populations.
Based on the age distribution census data presented in Tables 6, 7, and 8, it is
expected that the proposed project would not result in disproportionately high and
adverse effects on children or elderly populations, for any of the LBITP alternatives.
However, tract level data does not identify the specific numbers of children or elderly in
each household. It is expected that children or elderly individuals could be impacted by
residential displacements for Alternatives 4 and 6.
4. Indirect Impacts to Adjacent Aquatic Resources
EPA expressed concern regarding construction of a channel through large wetland
complexes and tributaries, possibly resulting in subsurface drainage of adjacent
wetlands and diversion of tributaries, the indirect and cumulative effects of which could
alter the chemical, biological, or physical integrity of these aquatic resources.
Wetlands within the areas of Alternatives 3A, 4, and 6 are typically shallow depressions
on the landscape hydrologically driven by episaturation (direct precipitation and possibly
some minor contribution from surface runoff in the immediately adjacent area) rather
than endosaturation (ground water inflows that saturate the wetlands). Construction of a
water conveyance channel would permanently remove wetlands within the project
32
footprint; however, wetlands situated adjacent to the project footprint would not be
directly affected by construction. Precipitation events would continue to provide
hydrology to support these wetlands, similar to conditions prior to construction of the
channel. Large storm events or periods of excessive rainfall could result in the shallow
depressional wetlands filling with water and excess surface runoff moving across the
relatively level landscape. Although the elevated berms lining the conveyance channel
could impede the movement of surface runoff, siphons located in slightly lower
elevations where surface runoff would naturally move across the landscape would be
constructed along the channel to allow for the continued movement of surface flows.
Where the conveyance channel intersects with a natural stream or watercourse,
siphons would be constructed such that water in the channel would be conveyed below
the stream or watercourse, thereby not affecting stream flows.
Indirect adverse impacts to wetlands adjacent to the conveyance channel would not be
expected to occur. Because wetlands in the project area are not dependent on ground
water inflows for hydrology, construction of the conveyance channel would not interrupt
or deplete the source of hydrology for the wetlands. For wetlands directly abutting the
project footprint, a small berm would be constructed along the project boundary to allow
for the retention of surface water within the adjacent wetland. Flows within area streams
and watercourses are generally confined to the surface expression of the
stream/watercourse. Crossings of the conveyance channel at these
streams/watercourses would incorporate a siphon structure, whereby water in the
channel would be enclosed within concrete box culverts and conveyed under the
stream/watercourse. Therefore, any subsurface flows that may be associated with these
streams/watercourses would not enter into the conveyance system to reduce or divert
flows from the streams/watercourses. Other than a change in the physical configuration
of wetlands adjacent to the conveyance channel footprint (i.e., a reduction in the size of
the wetland due to construction within the project footprint), the chemical, biological, or
physical integrity of wetlands outside the project footprint would not be indirectly
impacted by the proposed project.
5. Discrepancies in Wetland Acreages Impacted
EPA's review of the EIS found a number of discrepancies in the acres of wetlands listed
(for the various build alternatives), wetland acres by type, and linear feet of streams.
There is a difference between the wetland acreages associated with Alternative 3A in
Chapter 2.0 of the EIS and in subsequent EIS chapters. There also is a difference in
linear feet of streams affected by Alternative 3A in Chapter 2.0 and subsequent
chapters. The reasons for the differences are as follows:
Chapter 2.0 included an evaluation of all build alternatives according to a common base
of information, the National Wetlands Inventory (NWI). The purpose of using these data
was to compare each of the alternatives for the purpose of screening out those that
would cause the greatest impact to aquatic resources. The screening process also
identified those alternatives that should be analyzed in greater detail in the EIS. Once
those alternatives that should be analyzed in more detail were identified, more rigorous
analysis of them occurred.
33
Alternative 3A was identified as the Applicant's preferred alternative and was analyzed
in greater details as a result of a preliminary jurisdictional determination, which resulted
in the expansion of the areas considered jurisdiction wetlands in comparison to the
NWI-mapped data used in the screening process. However, it was also determined in
this detailed analysis that most of the linear feet of streams potentially affected by
Alternative 3A were non-jurisdictional drainage ditches constructed through uplands.
Consequently, the linear feet of streams potentially affected by Alternative 3A were
significantly reduced.
An approved jurisdictional determination of the 2,979-acre mitigation site identified
1,131.76 acres of aquatic resources (wetlands, streams, ponds, various drainage
features) and 1,847.24 acres of upland resources. Chapter 3, Section 3.6.2.2 of the
FEIS references the entire 3,135-acre mitigation property, which includes approximately
156 acres of the LBITP footprint occurring within the mitigation property. Excluding the
LBITP footprint, the mitigation site encompasses approximately 2,979 acres. Chapter 3,
Section 3.6.2.2 Proposed Compensatory Mitigation Property states that 796.52 acres of
jurisdictional waters were verified on the mitigation property. The remaining aquatic
resources include 332.99 acres of non-jurisdictional wetlands and 4,493 linear feet of
non-regulated tributaries. The collective acreage of aquatic resources presented in this
section totals 1,129.51 acres, but does not include the acreage associated with the
4,493 linear feet of non-regulated tributaries. Chapter 5, Section 5.3.2.7 Mitigation
Opportunities includes text that explains the exclusion of the 156 acres of the LBITP
footprint from the 3,135-acre mitigation property. In this section, all aquatic resources
identified on the 2,979-acre mitigation site total 1,131.8 acres. This total includes both
jurisdictional and non-jurisdictional waters, and includes the acreage for all surface
drainage features. The difference between the aquatic resource acreages presented in
Chapter 3, Section 3.6.2.2 (1,129.51 acres) and Chapter 5, Section 5.3.2.7 (1,131.8
acres) is the area of the non-regulated tributaries that was not quantified in Chapter 3,
Section 3.6.2.2.
6. Effects to Coastal Estuarine Systems
EPA observed that according to Chapter 5, Table 5-1 of the FEIS, Alternative 3A would
indirectly affect the Galveston Bay (Trinity Bay) estuarine environment and mud
flats/bay bottom as environmental flows are altered during project implementation. EPA
requested that ROD should quantify all indirect or cumulative impacts to the affected
bay systems, and identify the appropriate compensatory mitigation for any adversely
affected aquatic resource.
The Trinity River Authority operations staff at Lake Livingston coordinates with the
Applicant TRPS to maintain river inflow to meet downstream water demands. Releases
from Lake Livingston occur to allow the TRPS to remove the amount of water permitted
under existing water rights. A similar operational scheme will be implemented for the
LBITP to meet demands at the CRPS diversion point.
Flows downstream of the CRPS will be maintained to match or exceed the minimum
levels currently experienced in the Trinity River, controlled by the demand at the existing
34
TRPS. Low flows upstream of the CRPS will be slightly increased to allow for the
withdrawal of water at both the CRPS and the existing TRPS.
The pattern of bay and estuary (B&E) flows to the Galveston Bay system from the
Trinity River and San Jacinto River results from the combined effects of Region H water
management strategies (WMS), including upstream implementation of Region C
conservation strategies (reuse and return flows). Evaluation of Region C return flows
and Trinity Bay inflows indicate that upstream reuse will have an effect on Galveston
Bay inflows. Based on modeling studies, the net effect of the Region H WMS after 2010,
including the LBITP diversion, on B&E flows into Galveston Bay meet the Galveston
Bay Freshwater Inflows Group (GBFIG) identified environmental flow targets, although
there would be year-to-year variability based on variability in weather conditions.
Implementation of the LBITP and other WMS identified by the 2012 State Water Plan
will impact not only the Frequency of Target Attainment (FTA), but also the proportion of
inflow to Galveston Bay supplied by the San Jacinto River and Trinity River Basins.
Inflows for the San Jacinto River and Trinity River Basins for various flow scenarios
involving WMS outlined by the Region H Water Plan are shown below in Table 9.
Table 9. B&E Contributions to Galveston Bay of the San Jacinto River and Trinity River
Basins
Sum of Monthly Median Inflows (Ac-Ft)
6,000,000
San Jacinto
5,000,000
Trinity
4,000,000
3,000,000
2,000,000
1,000,000
0
A
Naturalized
B
Existing Conditions
C
Full Diversions +
Return
D
2060 Conditions +
Return
E
All Strategies
F
TCEQ Run 3
Scenario
As shown in the graph above, for "naturalized" flow conditions (Model Scenario A), as
well as the existing conditions scenario (Model Scenario B), Galveston Bay B&E inflows
are dominated by contributions from the Trinity River Basin. Trinity River Basin inflow
contributions to Galveston Bay decrease by comparison for Model Scenario C (fully
authorized diversions + expected return flows). As for the Future Year 2060 conditions,
(Model Scenario D, incorporating future flow conditions + expected return flows) and
Model Scenario E (assuming all upstream WMS are implemented), these measures
cause an increase in the relative contribution of Trinity River Basin inflows to Galveston
Bay. Model Scenario E (TCEQ Run 3 fully authorized diversions + no return flows)
35
provides the least amount of median inflows to Galveston Bay of all water management
scenarios modeled.
The environmental flow investigations conducted through the Region H water planning
process evaluated alternatives to identify water diversion and management strategies
that would meet Galveston Bay B&E inflow targets at the desired frequency for Future
Year 2060 conditions. The models were developed to evaluate alternatives to reservoir
operations that would minimize the effects of water supply diversions on Galveston Bay
B&E target inflows. The goal was to assess whether water management strategies
could be successful in meeting Galveston Bay B&E inflow targets (at the desired
frequency of attainment) while also maintaining current and future water supplies
needed from Lake Houston and Lake Livingston, and without reducing the firm yields of
these reservoirs. A major assumption in development of water management strategies
was that Galveston Bay B&E inflow targets would be achieved by any flow that equaled
or exceeded the targeted inflow volume identified by GBFIG as sufficient. Another
model constraint was that the inflow scenarios modeled would comply with the existing
water rights diversion priority system. The net result of the investigations documented
by the Environmental Flows Study (2009) was that wastewater return flows were critical
to supplying water to Region H, and will not impact the firm yield of either Lake Houston
or Lake Livingston.
The function of the Galveston Bay B&E system is influenced by a number of factors.
The Trinity River Basin currently dominates inflows into the Galveston Bay B&E system,
followed by the San Jacinto River Basin, with the other rivers making relatively minor
contributions. Viewed over the entire period of record, the change from the naturalized
condition (Model Scenario A) to current or existing conditions (Model Scenario B)
describes a change to Galveston Bay inflows, with a greater proportion of inflows
coming from the San Jacinto River Basin, while the Future Year 2060 model conditions
with strategies (Model Scenario E) shows Galveston Bay inflow contributions of similar
proportion to current conditions (Model Scenario B).
However, there are two factors that indicate that Galveston Bay B&E inflow change
caused by WMS implementation would not be directly responsible for impacts to the
Galveston Bay B&E system. The first factor is that the most significant change to the
inflow contributions to Galveston Bay from the San Jacinto River Basin and the Trinity
River Basin occurs through the comparison between the naturalized condition (Model
Scenario A) and the current conditions model (Model Scenario B) and a healthy
Galveston Bay B&E system. The second factor is that the change in the proportion of
inflows to Galveston Bay from the San Jacinto River Basin would not be a function of
WMS implementation (i.e., the LBITP), but rather is the result of the full authorized
diversion model (Model Scenario C). In addition, the fact that the Model Scenario D
(Future Year 2060) and Model Scenario E (TCEQ Run 3 fully authorized diversions + no
return flows) exhibit identical median discharges during the period of concern suggests
that the identified shift of Galveston Bay inflows away from the Trinity River Basin could
be largely a result of the implementation of upstream Trinity River WMS.
36
Upper basin return flows are an important consideration in this study due to their
inclusion in the base model and, in particular, the substantial contributions made by
Region C (upper Trinity River Basin) return flows to Region H illustrated by the Trinity
River Basin model. Water imports into the upper Trinity River Basin account for
additional return flows that may be an important source for maintaining lower Trinity
River Basin water rights and Galveston Bay B&E inflows. Upper basin return flows are
also important in providing water for the proposed LBITP diversion and supplying
major demands for water in Region H. The importance of return flows to the WMS
models presented is highlighted by a comparison of Model Scenario C and Model
Scenario F. For every month of the full period of simulation, the addition of return flows
in the Model Scenario C resulted in increased Galveston Bay B&E inflows compared
with the Model Scenario F; the minimum monthly increase is represented by 27,897
acre-feet and the median monthly increase is modeled at 80,878 acre-feet. Additional
modeling conducted during the development of water management strategies for
Region H indicated that loss of Region C return flows over the period of record would
result in a 20 percent reduction in Galveston Bay B&E inflows generated by the Trinity
River Basin. For seven major water rights evaluated, six experienced a reduction in
firm yield due to removal of upper basin return flows. These reductions in firm yield
ranged from 34 to 54 percent. As such, any Region C WMS that would reduce the
return flows to Region H would have the potential to substantially alter Galveston Bay
B&E inflow regimes as well as the firm yield of water rights in the Trinity River and San
Jacinto River Basins.
The potential hydrological effects related to construction and implementation of the
LBITP are not, by themselves, considered to result in regional, large-scale, permanent
long-term effects to hydrologic systems. The LBITP would not cause substantial
change to stream flow of the Trinity River or Lake Houston compared to existing
conditions because, in general, average flow rates within the lower Trinity River would
substantially change during high or median flow regimes. During low flow conditions,
hydrological effects of the proposed LBITP diversion of up to 450 MGD from the lower
Trinity River are not anticipated to be significant. The LBITP would cause water from
the Trinity River Basin, stored in Lake Livingston, to be transferred to the San Jacinto
River Basin for temporary storage in Lake Houston prior to use as a water supply
source. The subsequent diversion, treatment and beneficial use of this water has been
authorized by Certificate of Adjudication 08-4261 for storage and release to the meet
the City of Houston's anticipated municipal and industrial demands within the
downstream region. The flows diverted from the lower Trinity River would only be in
the river for use when released from storage from Lake Livingston to meet the City of
Houston's demands for water. Lake Wallisville already limits flows from the lower
Trinity River to Galveston Bay; in addition, the LBITP would result in an indirect benefit
to Galveston Bay B&E inflows since water released to the lower Trinity River would not
otherwise be present if not for the LBITP diversion.
37
Mitigation
The City of Houston, City of Dallas, Trinity River Authority (TRA), Tarrant Regional
Water District (TRWD), and North Texas Regional Water District (NTRWD) have
agreed to allow the reuse of treated effluent in the upper Trinity River Basin to flow
downstream and be allocated for the protection of inflows to Lake Livingston and
downstream Galveston Bay B&E flows. As reflected in water rights and water right
amendments to existing permits obtained by TRA, TRWD, the City of Dallas, and the
NTRWD since 2002, a wastewater discharger may recover and beneficially reuse on a
one-time basis up to 70 percent of its treated effluent. The remainder of the treated
effluent (30 percent) must be allowed to flow downstream for the protection of existing
water rights, including Lake Livingston, at all times. The original 70 percent of treated
effluent after the one-time beneficial reuse must thereafter be available for
downstream flows. Additionally, since 2005 when the City of Houston started to pursue
the LBITP WMS, the City has obtained five new water rights permits in the Trinity
River and San Jacinto River with the goal to mitigate downstream impacts, particularly
to downstream bay and estuary systems. These permits include Certification of
Adjudication No. 08-4277, Permit Nos. 5807 and 5808 (which are jointly owned by the
San Jacinto River Authority), and Permit Nos. 5826 and 5827. The City of Houston has
also acquired Permit No. 08-4277 from the American Rice Growers Association to
keep more water in the lower Trinity River Basin for discharges to the Galveston Bay
B&E system. Permit Nos. 5826 and 5827 provide for the beneficial reuse of treated
return flows (approximately 600,000 acre-feet/annum) and also require the City of
Houston to return 50 percent of return flows generated (up to 300,000 acrefeet/annum) to flow downstream to the receiving Galveston Bay B&E system.
7. Wetland Compensatory Mitigation
EPA requested documentation that the Harrison mitigation tract `is under imminent
threat of destruction or adverse modification. Further, EPA requested that preservation
be implemented in conjunction with aquatic resource restoration, establishment and/or
enhancement activities. Additionally, and based on jurisdictional acreages, EPA states
the compensation ratio is approximately 2:1 of acres preserved vs. impacted acres.
Because preservation is proposed for compensation, EPA requests the compensation
ratio to be `much higher than 2:1.'
The Applicant reports that the former owner of the tract (Harrison family) had specific
plans to subdivide the tract and market large-tract home sites in addition to the
continuation of selected logging of the tract and offering of cattle grazing leases.
Preservation is defined in 33 CFR 332.2 as the removal of a threat to, or preventing the
decline of, aquatic resources by an action in or near those aquatic resources. On the
mitigation site in question, the activities that may be removed to prevent the decline of
the existing aquatic resources include; 1) silviculture, 2) ranching, and 3) sand mining.
Of these three activities, silviculture and ranching are specifically exempted from
regulation by Section 404(f) of the Clean Water Act. In contrast, sand mining that results
in a deposition of fill material within a water of the United States is a regulated activity;
however, sand mining is frequently conducted in the region in a manner that does not
38
result in the deposition of fill material and may be conducted in wetlands without a
permit. All three of these activities have occurred on the mitigation tract and the
resulting decline in the function of the wetlands was commented on by state and federal
agencies during the evaluation of this project and included in both the Draft and Final
EIS. The threat to the aquatic resources on the mitigation site property is clear,
measurable, unregulated, and removable.
The Corps has calculated that the proposed compensatory mitigation property has
approximately 1,132 acres of aquatic resources versus approximately 365 impacted
acres, or a 3:1 compensation ratio, not the 2:1 ratio reported by the EPA. However,
when functional or condition assessment methods or other suitable metrics are
available, these methods should be used where practicable to determine how much
compensatory mitigation is required. The Corps reviewed several wetland assessments
for the proposed impact site and compensatory mitigation site to evaluate their function.
These assessments are included in the appendices of both the Draft and Final EIS and
include: 1) Wetland Evaluation Technique Version 2 (WET 2); 2) Interim
Hydrogeomorphic Model for Herbaceous Riverine Wetlands; 3) Interim
Hydrogeomorphic Model for Forested Riverine Wetlands; 4) Modified Charleston
Method; 5) Galveston District Stream Condition Assessment; and 6) Habitat Evaluation
Procedures (HEP). The analysis of the aquatic resource functions by a single
assessment procedure is limited by procedures that are designed to compare a specific
classification of aquatic resources which prohibits direct comparisons between
resources. Of these assessments, two will be used to further clarify the conclusion that
the proposed compensatory mitigation plan sufficiently offsets loss of function in
impacted wetlands. For a detailed review of these assessments, see Appendix D and O
of the FEIS.
WET 2, a wetland assessment procedure historically used by the Corps calculates a
Quality Point Score (QPS) to quantify the functional value of the wetlands based on
their social significance, effectiveness, and opportunity to perform function. Analysis of
the 365-acre wetland impact site concluded a QPS score of 0.645 and the 1,132 acre
mitigation site concluded a QPS score of 0.674. When calculating compensatory
mitigation using WET 2, the QPS score is multiplied by the wetland acreage to calculate
the lost function and values and compare them to the a mitigation plan. In the case of
the LBITP Compensatory Mitigation Plan, the mitigation to impact ratio using WET 2 is
3:1 due to the lower function and value of the impact site compared the Compensatory
mitigation site.
Although not specific to aquatic resources, HEP is used to document the quantity and
quality of available habitat for selected wildlife species. Results of the HEP analysis
indicate that the Applicant's preferred alternative contains 384 Annual Average Habitat
Units (AAHU) s for the no action alternative and 191 AAHUs for the with-project
alternative over the 50-year period of analysis. Therefore, a net loss of 193 AAHUs
would be expected to result from construction of the preferred alternative. The net loss
exhibited by the analysis largely results from alteration of habitat from vegetated areas
to a conveyance canal and adjacent access berms. The mitigation site contains 1,414
AAHUs for the no-action alternative and 1,467 AAHUs for the with-project alternative
39
over the 50-year period of analysis. Therefore, a net gain of 53 AAHUs would be
realized as a result of construction of the preferred alternative. The HEP analysis
indicates that the mitigation site contains 3.6 times the amount of baseline AAHUs over
the 50-year period of analysis.
The results of this study clearly indicate that the quality of the habitat on the mitigation
site to be preserved provides important physical, chemical, or biological functions and is
measurably more ecologically sustainable than the resources located within the
preferred alignment. While the EPA did not state how much higher they felt the
compensation ratio should be, the ratio for both aquatic function and aquatic acreage
already exceeds 3:1.
8. Stream Compensatory Mitigation
EPA requested the Record of Decision include discussion of compensatory mitigation
for impacts to the Trinity River and adjacent wetlands at the intake structure from
mechanized clearing and bank hardening. Further, EPA stated that if no work is
performed to enhance the proposed preservation areas and most of the water and
stream impacts for the project are unaccounted for, the EPA recommends permit denial.
While some work will occur below the line of ordinary high water in the Trinty River
relevant to constructing the pump station, there is no riverine functional loss in the
Trinity River and, therefore, no need to require compensatory mitigation. As is made
clear in the discussion (see item 5. above), other than the 65 linear feet of impact to
Luce Bayou, all other impacts are to non-jurisdictional agricultural drainage ditches.
Compensatory mitigation of impacts to Luce Bayou is included with the compensatory
mitigation site. The mitigation site itself is part of the riparian corridor of the Trinity River
and contains a tributary, Gillen Bayou. The bayou is located in one of the areas deeply
impacted by the demonstrable threat discussed in the wetland compensatory mitigation
section above. The riparian corridor and stream channel have begun stabilizing and are
of sufficient quality to qualify as a stream preservation site in accordance with the
Galveston District Stream Condition Assessment Procedure. Approximately 65-linear
feet of Luce Bayou will be impacted by the LBITP which will be compensated by the
preservation of 12,100 linear feet of Gillen Bayou and its riparian buffer zone.
Findings
The Corps concludes that the on-site and off-site build alternatives, including the noaction alternative, for the project were properly considered and that the alternatives
carried through the impact evaluation process in the EIS were reasonable and sufficient
to meet the need for alternatives evaluation. Impacts to waters of the United States
proposed for the LBITP project were quantified in the EIS. In addition, the EIS included
an estimate of waters present at each off-site alternative. Furthermore, the Corps
evaluated in the EIS the nature and degree of the effect that the discharge into waters
at the proposed off-site alternatives will have, both individually and cumulatively, on the
structure and function of: 1) the aquatic ecosystem and organisms; 2) the water quality,
current patterns, circulation, including downstream flows, and normal water fluctuation;
40
and 3) the introduction, relocation, or increase in contaminants within those waters. The
Applicant, in identifying their preferred alternative, minimized environmental impacts to
those necessary to meet the stated purpose and need for the project.
The Applicant's preferred alternative will affect 365 acres of wetlands and 65 linear feet
of Luce Bayou, more than the other two build alternatives. However, through analysis
using functional assessments, the Corps concluded that 75%, or 277 acres, of waters
affected in Alternative 3 are of low function. Waters of the United States that would be
affected by the Applicant's preferred alternative include 125.07 acres of forested
wetlands, 31.68 acres of scrub shrub wetlands, 206.78 ac of emergent wetlands, 3.57
ac of surface drainage features, and 2.11 acres of open water where portions of the
proposed pump station would be located in the Trinity River. The low quality 277 acres
are characterized as wetlands or waters having reduced or impaired function due to a
variety of human activities including farming, silviculture or related activities,
Additionally, Alternative 3A affects fewer streams as compared to the other build
alternatives. Many of the streams within the rights of way of Alternatives 4 and 6 will
have to be enclosed in culverts or otherwise routed over or under the water supply
pipelines as a consequence of how the water supply conveyance must be constructed.
Right of way design would necessarily alter natural streams so as to remove riparian
vegetation and modify the stream course within the right of way. By contrast, Alternative
3A affects a short length of a natural stream and only affects man made drainages and
ditches along the route to Lake Houston.
The applicant has proposed to compensate for unavoidable impacts to 365 acres of
wetlands and 65 linear feet of Luce Bayou by preserving a 2,979-acre tract along the
Trinity River. The mitigation tract is comprised of 1,132 acres of high functioning
wetlands and12,100 linear feet of Gillen Bayou, a tributary of the Trinity River. The
compensatory mitigation tract will be conveyed to the Trinity National Wildlife Refuge
who will manage and protect the site in perpetuity. The Corps concludes that the
proposed compensatory mitigation plan will offset the loss of functions and values of the
proposed project impacts. A special condition will be added to the permit to require the
compensatory mitigation plan be implemented prior to work in Waters of the United
States.
In response to the potential significant affect on the human environment resulting from
the transmission of zebra mussels from the Trinity River to Lake Houston, the primary
drinking water source for the City of Houston, the applicant developed a control and
treatment plan, titled Coastal Water Authority Zebra Mussel Response Plan: Luce
Bayou Interbasin Transfer Project. The Corps concludes that the response plan
sufficiently mitigates the risk of transfer of zebra mussels and will add a special
condition to the permit to require implementation of the plan upon issuance of the
permit.
Biological surveys of Alternative 3A have verified that there would be no effect on
Federally listed threatened or endangered species or species that may be of concern to
the TPWD. On-site archaeological and historical structure surveys have been
conducted that demonstrate these resources have been avoided to the maximum extent
41
practicable, and potential impacts to affected resources will be mitigated according to
formal agreement with the State Historic Preservation Officer and Indian Tribes, and
special permit conditions.
40 CFR 230.10(a)(2) charges the Corps with taking cost (in addition to existing
technology and logistics) into account in light of overall project purposes when
evaluating the practicability of alternatives. Alternative 3A is estimated to cost $228
million to construct. Alternative 4 is estimated to cost $595.3 million, with Alternative 6
estimated at $494 million to construct (Chapter 2, Section 2.7.23 of the FIES). The
primary difference in the cost of these alternatives is the 200,000 linear feet of 108" pipe
necessary for Alternatives 4 and 6 versus the 10,000 linear feet of 108" pipeline
necessary for Alternative 3A. The use of 108" pipeline is further complicated by the
need to specifically manufacture 108" pipeline for the project and the uncertainty of the
availability of the materials necessary for manufacture. While the project purpose
cannot eliminate the need for the pipeline altogether, Alternative 3A was designed to
minimize the need for the pipeline thus reducing the cost and uncertainty of the project.
While cost is not the sole factor determining practicability of an alternative, it is
reasonable to conclude that alternatives that would cost twice or more than the
preferred alternative would be considered significant additional cost alternatives. The
Applicant is a public entity who is not in the business of making a profit from the water
conveyance. It is concerned with providing necessary infrastructure to residents and
businesses that pay for such facilities through their taxes and water bills. Consequently,
implementation costs of such facilities must be considered as part of the public interest
review.
The Corps' analysis of both the on-site and off-site alternatives did not identify a
practicable alternative to the proposed discharge that would have less adverse effect on
the aquatic ecosystem. Therefore, the Corps concludes that the applicant's preferred
alternative, Alternative 3A, is the least environmentally damaging practicable alternative.
The following Special Conditions will be Added to the Authorization:
1. The Applicant understands and agrees that, if future operations by the United
States require the removal, relocation, or other alteration of the structure or work
herein authorized, or if, in the opinion of the Secretary of the Army or his
authorized representative, said structure or work shall cause unreasonable
obstruction to the free navigation of the navigable waters, the permittee will be
required, upon due notice from the Corps, to remove, relocate, or alter the
structural work or obstructions caused thereby, without expense to the United
States. No claim shall be made against the United States on account of any such
removal or alteration.
2. When structures or work authorized by this permit are determined by the
District Engineer to have become abandoned, obstructive to navigation or
cease to be used for the purpose for which they were permitted, such
42
structures or other work must be removed, the area cleared of all
obstructions, and written notice given to the Chief of Compliance,
Galveston/District Regulatory Branch, within 30 days of completion.
3. Prior to construction or the commencement of work within the boundary of site
41LB42, the permittee shall: (1) sign and adhere to the terms and conditions of
the Memorandum of Agreement Regarding the Resolution of Adverse Effects to
Site 41LB42 and Tribal and Archeological Monitoring of Project Work on Capers
Ridge, Liberty County, Texas (MOA), including all attachments to the MOA; (2)
shall conduct data recovery on site 41LB42 as described in the statement of work
titled "Data Recovery Plan for Investigations at 41LB42, Liberty County, Texas"
dated December 6, 2013, and prepared by Moore Archeological Consulting, Inc.
(Attachment 1 of the MOA); (3) the data recovery effort shall be considered
complete upon written confirmation from the Corps; and (4) have a Tribal Monitor
present during all data recovery efforts and adhere to the terms and conditions of
the Monitoring Plan (Attachment 2 of the MOA).
4. During construction and preconstruction activities on the landform referred to as
Capers Ridge, the permittee shall have a Tribal Monitor and an Archeological
Monitor present and shall adhere to the terms and conditions of the Monitoring
Plan (Attachment 2 of the MOA).
5. Should burials or human remains be encountered during data recovery,
preconstruction activities, or construction, the permittee shall adhere to the terms
and conditions of the Reburial Plan (Attachment 4 of the MOA).
6. Prior to start of work in waters of the United States, including wetlands, the
permittee will transfer ownership of the 2,979-acre tract identified in the attached
Luce Bayou Interbasin Transfer Project Final Mitigation Plan Permit Application
No. SWG-2009-00188 to the U.S. Fish and Wildlife Service's Trinity River
National Wildlife Refuge with receipt of transfer of ownership provided to the
Chief of the Compliance, U.S. Army Corps of Engineers, Galveston District.
7. The permittee agrees to immediately implement the commitments in the attached
Coastal Water Authority Zebra Mussel Response Plan: Luce Bayou Interbasin
Transfer Project. The permittee will provide copies of the plan's monitoring
reports annually to the Chief of the Compliance, U.S. Army Corps of Engineers,
Galveston District. The permittee will provide notification of a confirmed
occurrence of zebra mussels in any location that triggers a change in risk level to
the Chief of the Compliance, U.S. Army Corps of Engineers, Galveston District
within 1 month of encountering.
43
Special Public Notice
Record of Decision
Luce Bayou Inter-basin Transfer Project
January 31, 2014
Galveston District
Regulatory Branch
Record of Decision for Coastal Water Authority's Luce Bayou
Inter-basin Transfer Project in Liberty, and Harris Counties,
Texas
PURPOSE OF PUBLIC NOTICE: To inform you of that the U.S. Army Corps of
Engineers, Galveston District (Corps), is issuing a notice to advise the public that the
Record of Decision, for which you might be interested, has been completed and is
available for review.
ENVIRONMENTAL DOCUMENTS: A Public Notice for Permit Application SWG-200900188 was published in 2010 and comments were requested and compiled for
evaluation. A Notice of Intent (NOI) to prepare an EIS was published on May 25, 2011
in the Federal Register, and a scoping meeting was held on July 21, 2011 in Dayton,
Texas at the Dayton Community Center. The Corps made a Draft Environmental Impact
Statement (DEIS) available for public review and comment online through the Corps
website, through U.S. EPA's NEPA Net site, and provided copies of the DEIS to the
Dayton, Texas library The DEIS was available for comment for 52 days beginning
October 26, 2012 through December 17, 2012. The DEIS public hearing was held in
Dayton, Texas on November 28, 2012. The Corps made the Final Environmental Impact
Statement (FEIS) available for public review on their website and through U.S. EPA's
NEPA Net site, as well as published a notice of availability of the FEIS in the Federal
Register on October 4, 2013 and a subsequent Special Public Notice through its
standard public notice process. The FEIS review period began October 3, 2013 and
ended November 18, 2013.
The environmental documents are available online through a link via the SWG Special
Projects web site at:
http://www.swg.usace.army.mil/BusinessWithUs/RegulatoryBranch/SpecialProjectsEnvi
ronmentalImpactStatements.aspx
INFORMATION: The Coastal Water Authority proposes to construct a 26.5 mile water
supply conveyance consisting of subsurface pipeline and surface canal within a 300 ft.
wide right of way from the Trinity River in Liberty County, TX to Lake Houston in Harris
County, TX. The proposed project would transfer water from the Trinity River basin to
the San Jacinto River basin. The Coastal Water Authority is the applicant for the
Department of Army permit (DA) SWG-2009-00188. A pump station would be
constructed on the Trinity River at Capers Ridge approximately 10 miles north of
Dayton, Texas. Water from the river would be conveyed by pipeline to a sedimentation
basin and then conveyed by earthen canal to Lake Houston to a discharge point in the
lake. The canal right of way would include canal side berms, a maintenance access
roadway, drainage ditches, and perimeter fencing surrounding the canal. Other
elements of the project proposal include the following:
a. Dual 108 inch diameter pipelines constructed to convey water 3.5
miles to a 20 acre sedimentation/settling basin.
b. A 23.5 mile clay lined earthen canal with 4:1 side lopes within a 300 ft.
wide right of way (ROW) which would include a maintenance roadway,
access roads, chain link perimeter fencing, flow control and metering
facilities.
c. Other facilities include box culverts at roadway and canal crossings,
and multiple below ground siphons constructed to maintain existing
drainage patterns along the length of the conveyance.
d. A maintenance facility is proposed 6 miles north of Dayton, Texas.
e. A discharge structure is proposed along the southeast shoreline of
Lake Houston.
The proposed inter-basin transfer of water from the Trinity River basin to the San
Jacinto River basin is an effort by the City of Houston to continue replacing groundwater
use with previously secured water resources stored in Lake Livingston. The Applicant
has indicated that groundwater reduction is a statutory requirement and is critical to
managing the damaging consequences of subsidence throughout the Houston/Harris
County area. In addition, water demand projections developed by the City of Houston
and State of Texas regional water plan analysis indicate substantial new demand from
residential, commercial, industrial, and other water users over the next 50 years. In
order to both reduce reliance on groundwater and to continue to meet existing and
projected demand with surface water supplies, the Applicant proposes to use the
previously secured surface water resources in the Trinity River basin. Up to 400 million
gallons per day is proposed to be conveyed in accordance with existing water rights.
The applicant has proposed to compensate for unavoidable impacts to 365 acres of
wetlands and 65 linear feet of Luce Bayou by preserving a 2,979-acre tract along the
Trinity River. The mitigation tract is comprised of 1,132 acres of high functioning
Special Public Notice: SWG-2009-00188
2
wetlands and12,100 linear feet of Gillen Bayou, a tributary of the Trinity River. The
compensatory mitigation tract will be conveyed to the Trinity National Wildlife Refuge
who will manage and protect the site in perpetuity. The Corps concludes that the
proposed compensatory mitigation plan will offset the loss of functions and values of the
proposed project impacts. A special condition will be added to the permit to require the
compensatory mitigation plan be implemented prior to work in Waters of the United
States.
CONCLUSION: The Corps reviewed and evaluated, in light of the overall public
interest, the documents and factors concerning this permit application, as well as the
stated views of other interested Federal and non-Federal agencies and the concerned
public, relative to the proposed work in waters of the United States. This evaluation is in
accordance with the guidelines contained in 40 CFR 230 pursuant to Section 404(b)(1)
of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. The
Corps has required the Applicant to avoid, minimize, and mitigate for impacts and
believes that the project, with conditions, represents the least environmentally damaging
practicable alternative based on the Applicant's purpose and need for the project. After
weighing favorable and unfavorable effects as discussed in this document, the Corps
finds that issuance of a Department of the Army permit, with conditions, is not contrary
to the public interest.
DISTRICT ENGINEER
GALVESTON DISTRICT
CORPS OF ENGINEERS
Special Public Notice: SWG-2009-00188
3