Home

Galveston District

Run scraper

Texas Energy Development Services

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to create two 250-megawatt, barge-mounted, natural-gas-fired power plants.

Full Public NoticeProject PlansMitigation Plan The applicant proposes to create two 250-megawatt, barge-mounted, natural-gas-fired power plants. Approximately 5.2 acres of estuarine wetlands will be filled, and approximately 5.3 acres of estuarine wetlands will be excavated to create a 2.8-mile-long barge entrance channel from the Matagorda Ship Channel, near the Alcoa plant, to a proposed barge basin. The channel will be dredged to a depth of 10 feet (NGVD-29), and will have a 150-foot-wide bottom and 3:1 side slopes. Channel dredging will impact approximately 97 acres of aquatic bottom. This channel will provide a one-time ingress and egress to install the barge and electric generating facility.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas