Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that the Arkansas Highway and Transportation Department (AHTD) has submitted their completed Bayou Meto Mitigation Bank prospectus. The prospectus outlines the AHTD’s proposal for developing and operating the bank which is known as the banking instrument.

TO WHOM IT MAY CONCERN: Comments are invited on the work described below. Please see the Public Involvement section for details on submitting comments. Point of Contact. If additional information is desired, please contact the project manager, Mr. Johnny McLean, telephone number: (501) 324‑5295, mailing address: Little Rock District Corps of Engineers, Regulatory Division, PO Box 867, Little Rock, Arkansas 72203‑0867, e-mail address: Johnny.L.McLean@usace.army.mil. An electronic copy of the proposed Bayou Meto Mitigation Bank prospectus can be viewed on the Little Rock District’s homepage at http://www.swl.usace.army.mil/regulatory/notices.html or a hard copy can be obtained from the Corps of Engineers through the contact information listed above. Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that the Arkansas Highway and Transportation Department (AHTD) has submitted their completed Bayou Meto Mitigation Bank prospectus. The prospectus outlines the AHTD’s proposal for developing and operating the bank which is known as the banking instrument. After public comments are received and any issues resolved on the prospectus, the AHTD will submit a draft banking instrument to the District Engineer of the Little Rock District. The District Engineer will distribute the draft banking instrument to the Interagency Review Team (IRT), which is made up of the Corps and the pertinent State and Federal resource agencies. The IRT will review the banking instrument and coordinate with the AHTD on any issues until a final banking instrument is completed. Finally, the District Engineer will review the final instrument and make a decision to approve or not approve. The purpose of this bank is to mitigate for stream and wetland impacts resulting from highway construction and maintenance. The bank would be used for unavoidable impacts to wetlands and streams authorized under Section 404 of the Clean Water Act. The stated goal of the bank is to restore, enhance and protect streams and wetlands, and the associated uplands. The proposed project is located just upstream of the confluence of Little Creek and Bridge Creek in section 31, T. 4 N., R. 11 W., approximately 5 miles north of Jacksonville in Pulaski County, Arkansas. The site is approximately 60 acres in size and is bounded by pastureland on the east and west sides, Batesville Pike on the south side and a partially wooded corridor on the north side. Little Creek is a perennial stream with a watershed of approximately 4,000 acres. Bridge Creek is also a perennial stream with a watershed of approximately 8,000 acres at this location. The stream substrates are a mix of clay, silt loam and rock. The reaches of each stream would generally be characterized as pool/run complexes. From the confluence of Bridge Creek and Little Creek, Bridge Creek flows for approximately one more mile and then into Bayou Meto. Bayou Meto flows into the Arkansas River near the town of Gillett. The mitigation site receives its hydrology from rainfall and overtopping of Little Creek and Bridge Creek when Bayou Meto is full. The site is currently used for hay production, and to graze cattle and horses. The natural landform has only been slightly altered with little or no land leveling. The streams show some evidence of incision and bank instability, but very little channelization has occurred. The property has been designated as a Special Flood Hazard Area (Zone A, areas of 100-year flood) by the Federal Emergency Management Agency. Soils on the site are listed as Guthrie-Leadvale and Rexor. Guthrie-Leadvale Complex is described as a complex of Guthrie and Leadvale soils in valleys, depressions, on the top of low mountains, and on the coastal plain. Guthrie soils are found on the level areas between mounds and the Leadvale soils are on low, rounded mounds. Small areas of Amy soils are included in the mapping unit. Guthrie soils are poorly drained and Leadvale soils are moderately well drained. Available water capacity is medium for Guthrie and Leadvale. Rexor soils are frequently flooded and well drained, and are usually found on floodplains of local drainage ways. The flooding hazard is severe, with floods likely to occur several times per year. The available water capacity is high for Rexor soils. Current vegetation on the site is primarily herbaceous except for a narrow strip of woody vegetation along each stream. The vegetation is dominated by perennial ryegrass (Lolium perrene), Bermuda grass (Cynodon dactylon) and fescue (Festuca arundinacea). The AHTD proposes to restore approximately 5 acres of wetlands and approximately 30 acres of riparian buffers by removing all agriculture operations, and reforesting the area with an appropriate mix of bottomland hardwoods. Some minor excavation and berm construction might be performed in order to enhance wetland hydrology. Approximately 6,765 linear feet of stream will be preserved and enhanced by the removal of an at-grade crossing on Little Creek, as well as the removal of cattle, horses and the associated agriculture practices from the property. Non-native vegetation will be removed where appropriate. The site would be monitored for a minimum of five years to ensure hydrologic and revegetation success, and would be perpetually preserved. The proposed bank site lies in the Bayou Meto 8-digit hydrologic unit code (HUC) as classified by the U.S. Geological Survey (USGS). The AHTD proposes that this bank site serve as mitigation for wetland and stream impacts occurring in the following HUC’s: Bayou Meto, Lower Arkansas, Lower Arkansas Maumelle, Cadron and Lake Conway Point Remove. These HUC’s lie within the Arkansas River and Lower Mississippi Alluvial Plain eco-regions. The IRT reviewed the draft prospectus and inspected the site. They agreed that the site was an acceptable area for development of a bank. The location, general plan and photos for the proposed work are shown on the enclosed Sheets 1 through 10 of 10.

Cultural Resources. The National Register of Historic Places has been consulted; and it has been determined that there are no properties currently listed in the Register, or eligible for inclusion therein, which would be affected by the proposed work. A Corps staff archeologist also will review topographic maps and data on reported sites in the area. If it is determined that further review is not warranted, these reviews will constitute the full extent of cultural resources investigation by this office unless we are made aware, as a result of comments received in response to this notice or by other means, of the existence of specific structures or sites which might be affected by the proposed work. Endangered Species. Our preliminary determination is that the proposed activity will not affect listed Endangered Species or their critical habitat. A copy of this notice is being furnished to the U.S. Fish and Wildlife Service (USF&WS) and appropriate state agencies and constitutes a request to those agencies for information on whether any listed or proposed‑to‑be‑listed endangered or threatened species may be present in the area which would be affected by the proposed activity. Flood Plain. We are providing copies of this notice to appropriate flood plain officials in accordance with 44 CFR Part 60 (Flood Plain Management Regulations Criteria for Land Management and Use) and Executive Order 11988 on Flood Plain Management. Section 404(b)(1) Guidelines. Designation of the proposed disposal site for material associated with this Federal project shall be made through the application of guidelines promulgated by the Administrator, Environmental Protection Agency (EPA), in conjunction with the Secretary of the Army. These guidelines are contained in 4O Code of Federal Regulations (CFR) 23O. If these guidelines alone prohibit the designation of the proposed disposal site, any potential impairment to the maintenance of navigation, including any economic impact on navigation and anchorage which would result from the failure to use this disposal site, will also be considered. Public Involvement. Any interested party is invited to submit to the above-listed POC written comments or objections relative to the proposed work on or before 19 November 2012. Substantive comments, both favorable and unfavorable, will be accepted and made part of the record and will receive full consideration in the review of this work. The review will be based on an evaluation of the probable impact, including cumulative impacts of the proposed activity on the public interest. That review will reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing. Any person may request in writing within the comment period specified in this notice that a public hearing be held in regard to this project. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The District Engineer will determine if the issues raised are substantial and whether a hearing is needed for making a decision. NOTE: The mailing list for this Public Notice is arranged by state and county(s) where the project is located, and also includes any addressees who have asked to receive copies of all public notices. Please discard notices that are not of interest to you. If you have no need for any of these notices, please advise us so that your name can be removed from the mailing list. Enclosures Approximate Coordinates of Project Center Latitude: 34.93447 Longitude: -92.21535 UTM Zone: 15 Northing: 3866058 Easting: 571658

Prospectus for the Bayou Meto Drainage Basin Mitigation Bank Pulaski County, Arkansas

Arkansas State Highway and Transportation Department

June 2012

The Arkansas State Highway and Transportation Department (AHTD) proposes the establishment of a stream and wetland mitigation bank in Pulaski County, Arkansas. The mitigation area is located on Batesville Pike Road southwest of the Fortson Road intersection (Figure 1). The 60.95-acre site is located in section 31, Township 4 North, Range 11 West (Figure 2). The property was purchased by AHTD expressly to mitigate stream and wetland impacts resulting from highway construction and maintenance activities. The property would be used for compensatory mitigation for unavoidable impacts resulting from AHTD highway activities authorized under Section 404 of the Clean Water Act. A. Management Goal and Objectives: The management goal for the mitigation bank is the restoration, enhancement, and protection of streams, wetlands and associated uplands. Objectives include the restoration of riparian buffers, preservation of stream channels, and the reforestation of uplands and wetlands. Approximately 6,765 linear feet of stream will be preserved and enhanced by the removal of an at-grade crossing for agricultural equipment as well as the removal of cattle, horses and the associated agricultural practices from the property. The 30.6 acres of riparian buffer restoration and 5.0 acres of wetland restoration will be reforested with bottomland hardwood trees (Figure 3). Nonnative vegetation will be removed in the stream restoration areas to promote the growth of bottomland hardwood trees. B. Establishment and Operation: An Interagency Review Team (IRT) would facilitate the establishment of the mitigation bank or area. The IRT would allow review and seek consensus from Federal, state, and public entities on the Mitigation Banking Instrument (MBI). The US Army Corps of Engineers Little Rock District (SWL) and Vicksburg District (MVK) would serve as Chair of the IRT and will make final decisions regarding the terms and conditions of the MBI. AHTD would be the sponsor of the bank and owner of the mitigation property and would be responsible for all mitigation and monitoring actions. Agencies invited to participate on the IRT include the U.S. Environmental Protection Agency, Region VI (EPA); the U.S. Fish and Wildlife Service, Region IV (FWS); the Federal Highway Administration, Arkansas Division (FHWA); the Natural Resources Conservation Service (NRCS), the Arkansas Department of Environmental Quality (ADEQ); the Arkansas Game and Fish Commission (AGFC); the Arkansas Natural Heritage Commission (ANHC); and the Arkansas Natural Resources Commission (ANRC).

89

Fortson Rd

107

i ke

Faulkner County

Ba t es vil

le P

Pulaski County

Sherwood

Project Location

North Little Rock Jacksonville

0

0.5

1 Mile

AHTD - Environmental GIS - Reed March 21, 2012

Figure 1 Proposed Bayou Meto Mitigation Area

Project Location

Br id ge

Cr ee

k Little

k

Bat e sv ill e P

ike

Fortson Rd

Cr ee

0

125

250 Feet

AHTD - Environmental GIS - Reed March 22, 2012

Figure 2 Topographic Map

Mitigation Area Olmstead 1988 USGS Topographic Map

Br id ge

Cr ee

k

Little

k

Fortson Rd

Cr ee

Bat e sv ill e P

ike

ge id Br

Cre ek

Wetland Restoration 0

125

250 Feet

AHTD - Environmental GIS - Reed April 2, 2012

Figure 3 Restoration Plan

Riparian Buffer Streams

Mitigation Area Photography Date: Summer 2010

C. Proposed Service Area: The geographic service area (Figure 4) would include five sub-basins (8 digit HUCs). This includes the Bayou Meto (08020402), the Lower Arkansas (08020401), the Lake Conway ­ Point Remove (11110203), the Cadron (11110205), and the Lower Arkansas ­ Maumelle (11110207) sub-basins. These subbasins are all tributaries to the Arkansas River. For accounting purposes, the corresponding USGS cataloging codes are listed below in Table 1. Table 1 USGS Hydrologic Unit Codes For Sub-Basins In the Geographic Service Area HUC 08020402 08020401 11110203 11110205 11110207

Sub-basin Name Bayou Meto Lower Arkansas Lake Conway ­ Point Remove Cadron Lower Arkansas ­ Maumelle

Service Area Primary Primary Secondary Secondary Secondary

D. General Need and Feasibility: AHTD is required to mitigate unavoidable losses to streams and wetlands due to highway construction projects in the proposed service area. E. Ownership: AHTD is the owner of the property and has recorded a restriction on the Warranty Deed to the property. The restriction requires that any activity on the property complies with the terms of a mitigation plan or banking instrument. AHTD will manage the property for the operational life of the bank. The operational life of the bank terminates when compensatory mitigation credits have been exhausted and the bank site is self-sustaining. Subsequently, AHTD may deed the property to or enter into a management agreement with an appropriate state or Federal agency provided the agency manages the property in accordance with the provisions of the MBI. F. Long-term management: AHTD is responsible for securing adequate funding to monitor and maintain the mitigation bank throughout its operational life, as well as beyond the operational life if not self-sustaining. AHTD would be responsible for securing sufficient funds to cover contingency actions in the event of default or failure. Additionally, AHTD would be responsible for providing alternative compensatory mitigation if it is determined necessary by the US Army Corps of Engineers.

Cadron (11110205)

Lake Conway Point Remove (11110203)

Bayou Meto (08020402) Lower Arkansas Maumelle (11110207)

Lower Arkansas (08020401)

0

10

20 Miles

AHTD - Environmental GIS - Reed March 22, 2012

Figure 4 Proposed Service Area Watersheds

Proposed Mitigation Area Primary Service Area

Secondary Service Area

G. Qualifications of the sponsor: AHTD is presently the owner and sponsor of five mitigation banks, totaling 1,950 acres of wetland mitigation property managed according to approved banking instruments. H. Ecological Suitability: The primary considerations for site selection were watershed needs, baseline conditions, and habitat connectivity. The proposed mitigation bank is located at the confluence of Bridge Creek and Little Creek. The property has been designated as a Special Flood Hazard Area (Zone A, areas of 100 year flood) by Federal Emergency Management Agency. Currently the site is utilized as pasture for hay production as well as grazing for cattle and horses. Soils on the site are mapped (Figure 5) into three soil units by the USDA (Soil Survey of Pulaski County, Arkansas 1975). Leadvale silt loam, 1 to 3 percent slopes consist of moderately-well drained, nearly level and gently-sloping soils in valleys, on the top of low mountains in the Arkansas River Valley, and on the coastal plain. These soils, formed mainly in loamy sediment, washed from uplands consisting of weathered sandstone and shale. Native vegetation is mixed hardwoods and pines. Permeability is moderately slow, and available water capacity is medium. The firm, brittle layer in the subsoil restricts root penetration and slows movement of water. Included in this soil mapping are a few spots of Amy, Guthrie, Sallisaw, Smithdale and Wrightsville Soils. Guthrie ­ Leadvale Complex, is described as a complex of Guthrie and Leadvale soils in valleys, depressions, on the top of low mountains, and on the coastal plain. Guthrie soils are found on the level areas between mounds and the Leadvale soils are on low, rounded mounds. Small areas of Amy soils are included in the mapping unit. Guthrie soils consist of poorly-drained, level soils formed in loamy sediment. Native vegetation is chiefly mixed hardwoods and pines. Permeability is slow, and available water capacity is medium. The firm brittle fragipan slows the movement of water through the soil. Leadvale soils are described above. Rexor silt loam are frequently flooded soils that consist of well-drained soils on the floodplains of local drainageways. The hazard of flooding is severe, with floods likely to occur several times each year, generally at least once during the growing season. Permeability is moderate, and available water capacity is high. The native vegetation is mixed hardwoods and pines; however, most areas of these soils are cleared and are used for pasture.

Guthrie-Leadvale

Leadvale

Leadvale Guthrie-Leadvale

Leadvale

Rexor

Leadvale

GuthrieLeadvale

Leadvale

GuthrieLeadvale

0

125

250 Feet

AHTD - Environmental GIS - Reed March 22, 2012

Leadvale

Figure 5 Soil Map

Mitigation Area Hydric Not Hydric Photography Date: Summer 2010

Figure 6. Typical view of Little Creek (April 2012).

Figure 7. Typical view of Bridge Creek (April 2012).

Figure 8. View of wetland to be reforested (April 2012).

Figure 9. View of at grade stream crossing (April 2012).

Figure 10. View of eroding stream bank on Little Creek (April 2012).

PUBLIC NOTICE CORPS OF ENGINEERS

Application Number: MVK 2012-01056 Date: 18 October 2012 Comments Due: 19 November 2012

TO WHOM IT MAY CONCERN: Comments are invited on the work described below. Please see the Public Involvement section for details on submitting comments. Point of Contact. If additional information is desired, please contact the project manager, Mr. Johnny McLean, telephone number: (501) 324-5295, mailing address: Little Rock District Corps of Engineers, Regulatory Division, PO Box 867, Little Rock, Arkansas 72203-0867, e-mail address: Johnny.L.McLean@usace.army.mil. An electronic copy of the proposed Bayou Meto Mitigation Bank prospectus can be viewed on the Little Rock District's homepage at http://www.swl.usace.army.mil/regulatory/notices.html or a hard copy can be obtained from the Corps of Engineers through the contact information listed above. Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that the Arkansas Highway and Transportation Department (AHTD) has submitted their completed Bayou Meto Mitigation Bank prospectus. The prospectus outlines the AHTD's proposal for developing and operating the bank which is known as the banking instrument. After public comments are received and any issues resolved on the prospectus, the AHTD will submit a draft banking instrument to the District Engineer of the Little Rock District. The District Engineer will distribute the draft banking instrument to the Interagency Review Team (IRT), which is made up of the Corps and the pertinent State and Federal resource agencies. The IRT will review the banking instrument and coordinate with the AHTD on any issues until a final banking instrument is completed. Finally, the District Engineer will review the final instrument and make a decision to approve or not approve. The purpose of this bank is to mitigate for stream and wetland impacts resulting from highway construction and maintenance. The bank would be used for unavoidable impacts to wetlands and streams authorized under Section 404 of the Clean Water Act. The stated goal of the bank is to restore, enhance and protect streams and wetlands, and the associated uplands. The proposed project is located just upstream of the confluence of Little Creek and Bridge Creek in section 31, T. 4 N., R. 11 W., approximately 5 miles north of Jacksonville in Pulaski County, Arkansas. The site is approximately 60 acres in size and is bounded by pastureland on the east and west sides, Batesville Pike on the south side and a partially wooded corridor on the north side. Little Creek is a perennial stream with a watershed of approximately 4,000 acres. Bridge Creek is also a perennial stream with a watershed of approximately 8,000 acres at this location. The stream substrates are a mix of clay, silt loam and rock. The reaches of each stream would generally be characterized as pool/run complexes. From the confluence of Bridge Creek and Little Creek, Bridge Creek flows for approximately one more mile and then into Bayou Meto. Bayou Meto flows into the Arkansas River near the town of Gillett. The mitigation site receives its hydrology from rainfall and overtopping of Little Creek and Bridge Creek when Bayou Meto is full. The site is currently used for hay production, and to graze cattle and horses. The natural landform has only been slightly altered with little or no land leveling. The streams show some evidence of incision and bank instability, but -1-

very little channelization has occurred. The property has been designated as a Special Flood Hazard Area (Zone A, areas of 100-year flood) by the Federal Emergency Management Agency. Soils on the site are listed as Guthrie-Leadvale and Rexor. Guthrie-Leadvale Complex is described as a complex of Guthrie and Leadvale soils in valleys, depressions, on the top of low mountains, and on the coastal plain. Guthrie soils are found on the level areas between mounds and the Leadvale soils are on low, rounded mounds. Small areas of Amy soils are included in the mapping unit. Guthrie soils are poorly drained and Leadvale soils are moderately well drained. Available water capacity is medium for Guthrie and Leadvale. Rexor soils are frequently flooded and well drained, and are usually found on floodplains of local drainage ways. The flooding hazard is severe, with floods likely to occur several times per year. The available water capacity is high for Rexor soils. Current vegetation on the site is primarily herbaceous except for a narrow strip of woody vegetation along each stream. The vegetation is dominated by perennial ryegrass (Lolium perrene), Bermuda grass (Cynodon dactylon) and fescue (Festuca arundinacea). The AHTD proposes to restore approximately 5 acres of wetlands and approximately 30 acres of riparian buffers by removing all agriculture operations, and reforesting the area with an appropriate mix of bottomland hardwoods. Some minor excavation and berm construction might be performed in order to enhance wetland hydrology. Approximately 6,765 linear feet of stream will be preserved and enhanced by the removal of an at-grade crossing on Little Creek, as well as the removal of cattle, horses and the associated agriculture practices from the property. Non-native vegetation will be removed where appropriate. The site would be monitored for a minimum of five years to ensure hydrologic and revegetation success, and would be perpetually preserved. The proposed bank site lies in the Bayou Meto 8-digit hydrologic unit code (HUC) as classified by the U.S. Geological Survey (USGS). The AHTD proposes that this bank site serve as mitigation for wetland and stream impacts occurring in the following HUC's: Bayou Meto, Lower Arkansas, Lower Arkansas Maumelle, Cadron and Lake Conway Point Remove. These HUC's lie within the Arkansas River and Lower Mississippi Alluvial Plain eco-regions. The IRT reviewed the draft prospectus and inspected the site. They agreed that the site was an acceptable area for development of a bank. The location, general plan and photos for the proposed work are shown on the enclosed Sheets 1 through 10 of 10. Cultural Resources. The National Register of Historic Places has been consulted; and it has been determined that there are no properties currently listed in the Register, or eligible for inclusion therein, which would be affected by the proposed work. A Corps staff archeologist also will review topographic maps and data on reported sites in the area. If it is determined that further review is not warranted, these reviews will constitute the full extent of cultural resources investigation by this office unless we are made aware, as a result of comments received in response to this notice or by other means, of the existence of specific structures or sites which might be affected by the proposed work.

-2-

Endangered Species. Our preliminary determination is that the proposed activity will not affect listed Endangered Species or their critical habitat. A copy of this notice is being furnished to the U.S. Fish and Wildlife Service (USF&WS) and appropriate state agencies and constitutes a request to those agencies for information on whether any listed or proposed-to-be-listed endangered or threatened species may be present in the area which would be affected by the proposed activity. Flood Plain. We are providing copies of this notice to appropriate flood plain officials in accordance with 44 CFR Part 60 (Flood Plain Management Regulations Criteria for Land Management and Use) and Executive Order 11988 on Flood Plain Management. Section 404(b)(1) Guidelines. Designation of the proposed disposal site for material associated with this Federal project shall be made through the application of guidelines promulgated by the Administrator, Environmental Protection Agency (EPA), in conjunction with the Secretary of the Army. These guidelines are contained in 4O Code of Federal Regulations (CFR) 23O. If these guidelines alone prohibit the designation of the proposed disposal site, any potential impairment to the maintenance of navigation, including any economic impact on navigation and anchorage which would result from the failure to use this disposal site, will also be considered. Public Involvement. Any interested party is invited to submit to the above-listed POC written comments or objections relative to the proposed work on or before 19 November 2012. Substantive comments, both favorable and unfavorable, will be accepted and made part of the record and will receive full consideration in the review of this work. The review will be based on an evaluation of the probable impact, including cumulative impacts of the proposed activity on the public interest. That review will reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing. Any person may request in writing within the comment period specified in this notice that a public hearing be held in regard to this project. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The District Engineer will determine if the issues raised are substantial and whether a hearing is needed for making a decision.

-3-

NOTE: The mailing list for this Public Notice is arranged by state and county(s) where the project is located, and also includes any addressees who have asked to receive copies of all public notices. Please discard notices that are not of interest to you. If you have no need for any of these notices, please advise us so that your name can be removed from the mailing list. Enclosures

Approximate Coordinates of Project Center

Latitude: 34.93447 Longitude: -92.21535

UTM Zone: 15 Northing: 3866058 Easting: 571658

-4-

-5-

-6-

-7-

-8-

-9-

Eroding bank on Little Creek (April 2012)

Sheet 6 of 10

- 10 -

Eroding bank on Little Creek (September 2012)

Sheet 7 of 10

- 11 -

Typical view of lower segment of Bridge Creek on the site (April 2012)

Sheet 8 of 10

- 12 -

Eroding bank on upper segment of Bridge Creek (September 2012)

Sheet 9 of 10

- 13 -

Wetland pasture adjacent to the creek (April 2012)

Sheet 10 of 10

- 14 -

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas