Application has been received from TransCanada Pipelines, LTD for the proposed discharge of approximately 9,355 cubic yards of grade AASHTO #1 gradation washed stone, over approximatley 1.53 acres of riverbed to stabilze four (4) exposed portions of the parallel submerged Gas Transmissions Northwest (GTN) natural gas lines A and B. Table 1.1: Mitigation Plan Summary provides proposed mitigation measures. Stabilization must occur prior to November 2013. In-line inspection is required by the United States Department of Transportation (USDOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) Minimum Federal Safety Standards (40 CFR 192) on the A transmission line. Please refer to the public notice for further details. Comments due July 1, 2013.
Interested parties are hereby notified that this District has received an application for a Department of the Army permit for certain work in waters of the United States, including wetlands, as described below and shown on the attached drawings, entitled Crossing of Lake Pend Oreille, 36” GTN Line “A” and “B”-Approx Mile Post 61.4, sheets 1-10.
APPLICANT: TransCanada Pipelines, LTD, 717 Texas Street, Suite 24445B, Houston, Texas 77002.
AGENT: CH2M Hill, 1100 112th Avenue, Suite 500, Bellevue, WA 98004, P.O.C. Ms. Dana West, (425) 233-3309, dana.west@ch2m.com
USACE PM CONTACT: Ms. Beth Reinhart, 2065 W. Riverstone Drive, Suite 201, Coeur d’Alene, Idaho 83814. (208) 765-8971, mary.e.reinhart@usace.army.mil
PURPOSE: Stabilization of four (4) exposed portions of the parallel submerged Gas Transmissions Northwest (GTN) A and B natural gas lines (owned and operated by TransCanada). Stabilization must occur prior to November 2013 in-line inspection required by United States Department of Transportation (USDOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) Minimum Federal Safety Standards (40 CFR 192) on the A transmission line.
WATERWAY: Pend Oreille River
LOCATION: The proposed project would be located on Pend Oreille River within Section(s) 31, Township 57 North, Range 2 West, near latitude 48º 14’ 43.19” N and longitude -116º 37’ 40.77” W, in Bonner County, in Dover, Idaho.
DRIVING DIRECTIONS: South shore access, from Idaho State Highway 95 in Sandpoint, to Lakeshore Drive in Sagle, to Wooded Acres Drive to Boat Club Drive. The north shore right-of-way can be accessed from Idaho State Highway 2 in Sandpoint, head west to Dover, then to O’Donnell St in the Dover Bay Development.
AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344) and of Section 10 of the Rivers & Harbors Act of 1899 (33 U.S.C. 403). Under Section 404 a Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands. Under Section 10 of the Rivers and Harbors Act a Department of the Army permit is required for work or structures waterward of the ordinary high water mark located in or over navigable waters of the United States, including the excavation, dredging or deposition of material in navigable waters, or any alteration obstructing or affecting the course, location, condition, or capacity of the navigable waterway.
WORK: Proposed work includes the discharge of 9,355 cubic yards of grade AASHTO #1 gradation washed stone over 1.53 acres of riverbed. An excavator mounted on a barge outfitted with a mounted rock funnel and tremie tube will be utilized to place the rock on the river bottom. Dive teams with remote operated vehicles (ROV’s) will be used to verify rock placement. Twelve (12) -10 inch steel piles will be driven for temporary riverbank structures to aid project construction and to protect the riverbank, including two piles for a temporary floating dock (size to be determined by the contractor) and 10 piles for temporary dolphins for mooring barges. Two (2) -10 inch steel spud piles will be driven into place when the barge is in shallow water (>40’). Spud piles will be driven approximately 100 times over 25 days. Tug boats will be utilized to position the barges, and to hold the barges in place when working in water deeper than 40 feet. Temporary no wake buoys will be placed around the barge sites.
ADDITIONAL INFORMATION: The aggregate material will be hauled via highway dump trucks and stockpiled on the south side of the river on the existing pipeline ROW. The material will then be loaded via front end loader into rock skiffs (bedding boxes that hold 6-9 cubic yards of rock) for transfer to the barges by a large crane. These skiffs are steel boxes that will be lifted by a large crane onto the transfer barge. The empty skiffs will be removed from the transfer barge, staged for preloading and replaced with loaded skiffs. The transfer barges will not contact the shore during unloading and reloading operations. The transfer barges will move the aggregate to the placing barge. The placing barge will have an excavator (100,000 lb. Cat 345 or similar class) with a mounted rock funnel and tremie tube to place the rock on the river bottom, as well as an excavator (40,000 lbs. Cat 320 or similar class) for loading rock into the funnel from the transfer barges. This barge will be 40 foot by 70 foot minimum.
In shallow areas the placing barge will be held in place by two, ten-inch spud piles driven into the river bottom. In deeper sections of the river the barges will be held in place by tug boat. The transfer barge will be tied to the placing barge while the transfer excavator loads the rock into the funnel. Underwater cameras and lights will be used to facilitate the placement of rock. This will enable the rock funnel excavator to move the funnel to accurately place the rock. Dive teams and remote operated vehicles (ROVs) will also be used to verify placement of rock. This process will be completed in segments and the placing barge will be relocated as work progresses. Temporary pile-supported structures (stairway, floating dock, dolphins) will be installed at the water's edge and riverbank to facilitate access to the river from the upland work area.
CONSTRUCTION PERIOD: Applicant proposes to start construction July 9, 2013 and end October 31, 2013. The permit would authorize construction for a period of 3 years.
PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to Waters of the United States from activities involving discharges of dredged or fill material.
The Pend Oreille River Pipeline Stabilization Project (Project) was designed and will be implemented to avoid and minimize adverse environmental impacts. TransCanada Pipeline, LTD (TransCanada) met or corresponded with the key Federal, State and county environmental agencies early in the project planning phase to identify potential environmental issues and to determine the regulatory requirements and best management strategies required for the Project. Agency guidance on these issues was incorporated into project planning by the various elements of the Project Team including, design/engineering, land, construction, and environmental. As a result, many of the key issues discussed during pre-application agency meetings have been addressed early in the design phase and the construction work planning process.
The Project’s Construction Work Plan is incorporated herein by reference and included within the Joint Application for Permit as Attachment D; it provides construction sequencing as well as the preliminary layout of the construction equipment and mitigation measures. Table 1.1:Proposed Mitigation Plan Summary below lists the proposed mitigation measures prepared for the project. The contents of the table provide a more thorough understanding of the avoidance and minimization steps to be undertaken during project implementation.
Table 1.1: Proposed Mitigation Plan Summary
COMPENSATORY MITIGATION: In addition to the above avoidance and minimization TransCanada is currently working on a mitigation plan to offset unavoidable impacts to aquatic resources. The mitigation plan will be completed prior to issuance of a permit.
OTHER ENVIRONMENTAL DOCUMENTS & DA PERMITS ISSUED TO APPLICANT: Non-Applicable
WATER QUALITY CERTIFICATION: This notice will also serve as public notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived.
Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ, and/or request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Coeur d’Alene Regional Office, 2100 Ironwood Parkway, Coeur d’Alene, Idaho 83814.
AQUATIC RESOURCE DESCRIPTION: The Pend Oreille River is a traditionally navigable water. It is a tributary of the Columbia River, approximately 130 miles long, in northern Idaho and northeastern Washington. The river drains an area of 25,792 sq mi. The Pend Oreille River is regulated by the Albeni Falls Dam in Priest River, Idaho. The project site is approximately 4.25 miles downstream of the Long Bridge and 23 miles upstream of the Albeni Falls Dam. At the project location the River is approximately 70 wide with a maximum depth of 65 feet. The south shore will be used as the base of operations and upland storage site. It has a vertical bank which has been riprapped and there are residences up and down stream of the site. The north shore has a gradual drop off and is located in a residential development; there are no plans for construction activities on the north shore. During construction the water elevation will be at 2062.5’.
ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: Short term impacts include noise construction activities such as from pile driving, barge and crane operation, and the discharge of rock into the river. During the discharge of the rock onto the riverbed there will be localized turbidity. The discharge of rock will cause the loss of some invertebrates. Long term impacts include changes to the riverbed contours and substrate. These changes may alter the species (fish and invertebrate) composition in the vicinity of the rock. See Appendix A for additional information.
OTHER AUTHORIZATIONS: Proposed work may require authorization for Idaho Department of Lands.
CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Office to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register.
TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statues, executive orders and the historical relations between the United States and American Indian Tribes. The Federal Government has a unique trust relationship with federally recognized American Indian Tribes, including the Kalispel Tribe, Kootenai Tribe of Idaho, and the Confederated Salish Kootenai Tribe of the Flathead Lake Reservation. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.
ENDANGERED SPECIES: The project is within the known or historic range of bull trout. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area.
ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.
CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing.
COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision.
Please mail all comments to:
U.S. Army Corps of Engineers
Walla Walla District
Ms. Beth Reinhart
Coeur d’Alene Regulatory Office
2065 W. Riverstone Drive, Suite 201
Coeur d’Alene, Idaho 83814
mary.e.reinhart@usace.army.mil
Comments should be received no later than the comment due date of July 1, 2013, as indicated on this notice, to receive consideration.
Beth Reinhart
Sr. Project Manager, Regulatory
Walla Walla District
Enclosures