US-25 and SC-11 Interchange-
Greenville County, SC
US-25 and SC-11 Interchange-
Greenville County, SC
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: P/N # 2011-00477-DS
June 28, 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Sections 401 and 404 of
the Clean Water Act (33 U.S.C. 1341), an application has been submitted to the Department of the Army and the
South Carolina Department of Health and Environmental Control by
South Carolina Department of Transportation
c/o Mr. Sean Connolly
255 Park Street, P.O. Box 191
Columbia, South Carolina 29202-0191
for a permit to place fill materials in wetland and other waters of the United States in and adjacent to
Sprigg Creek and unnamed tributary to Sprigg Creek
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by both of the above
mentioned offices until
Corps, 15 days from date of this notice
SCDHEC, 30 days from date of this notice
12 O'CLOCK NOON, MONDAY, July 16, 2012
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the placement of fill and structures associated with the construction of an
additional interchange ramp at the US-25 & SC-11 interchange. The project is at the US-25 and SC-11
interchange in the village of Lima (Latitude 35.089468, Longitude -82.447558) in Greenville County, South
Carolina.
Specifically, this project to construct a new interchange ramp will include the following activities within Waters of
REGULATORY DIVISION
Refer to: P/N # 2011-00477-DS
the U.S.; realign (create new stream channel) for a total of 236 linear feet of Sprigg Creek and an unnamed
tributary, place fill 0.046 acres of a wetland area, place a 71 linear foot 6'x4' box culvert in unnamed tributary to
Sprigg Creek, Extend an existing 8'x7' double barrel box culvert by placing a 12.5 linear foot 16'x7' box culvert
extension, Place a total of 199 linear feet of fill in Sprigg Creek and unnamed tributary to Sprigg Creek, and Place a
total of 156.5 linear feet of rock armor in unnamed tributary to Sprigg Creek. For these unavoidable impacts,
SCDOT is proposing to deduct 0.161 acres of wetlands from the Black River Mitigation Bank and purchase 2277
stream credits from Grove Creek Mitigation Bank.
Based upon information in the permit the application, SCDOT proposes this project to improve the existing
interchange which does not meet current design criteria for safety. Currently traffic must cross northbound
traffic on US-25 when utilizing this interchange. This project will result in an additional ramp that will allow
traffic to move from one roadway to the other without having to crossing travel lanes. Based on the information
in this permit application, SCDOT considered two alternatives for this project. The two alternatives considered
were the "no build" alternative and the proposed project. Since the "no build" alternative would not correct the
existing safety issue, SCDOT chose to build the additional interchange ramp in the southwest quadrant of the
existing interchange. SCDOT indicates that one of the early designs for this proposed interchange included
piping of Sprigg Creek; however this design was changed to include bridging to avoid/reduce impacts to
Waters of the United States
NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of
a written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The
request must identify the project of interest by public notice number and a self-addressed stamped
envelope must also be provided for mailing the drawings to you. Your request for drawings should be
addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request,
on behalf of the applicant, for certification that this project will comply with applicable effluent limitations and
water quality standards. The District Engineer will not process this application to a conclusion until such
certification is received. The applicant is hereby advised that supplemental information may be required by the
State to facilitate the review. Persons wishing to comment or object to Water Quality Certification must submit
all comments in writing to the S.C. Department of Health and Environmental Control at the above address
within thirty (30) days of the date of this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. Implementation of the proposed project would impact
( 0.046) acres of estuarine substrates and emergent wetlands utilized by various life stages of species
comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is
that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or
fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the applicant has provided
a protected species survey for the property associated with the activity described above. Based upon
REGULATORY DIVISION
Refer to: P/N # 2011-00477-DS
this report, the District Engineer has determined that the project is not likely to adversely affect any Federally
endangered, threatened, or proposed species or result in the destruction or adverse modification of designated or
proposed critical habitat. This public notice serves as a request for written concurrence from the U.S. Fish and
Wildlife Service and/or the National Marine Fisheries Service on this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing
be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for
holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated by
the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean Water
Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection, Research
and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to accrue from the project must
be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be
considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values,
land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare
of the people. A permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to adjudicate rival
claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this project. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and the other public interest
factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Stephen Brumagin at
803-253-3445.
2,000
1,000
o
2,000
1 inch
=2,000 feet
4,000
,
LEGEND
(FIGURES 3 -15)
---
-
EXISTING R!W BOUNDARYI
PROPERTY BOUNDARY
---
....,
PROPOSED NPDES LINE
PROPOSED R!W BOUNDARY
I7ZLI
STREAM REALIGNMENT
EXCAVATION AREA
ZL
STREAM FILL AREA
PROPOSED PIPE
LIMITS OF CONSTRUCTION
[ffillID
WETLAND FILL AREA
EXISTING EDGE OF PAVEMENT
~
~
PROPOSED RIP RAP
PROPOSED EDGE OF PAVEMENT
PAVEMENT REMOVAL AREA
3
PROJECT IMPACTS TO WATERS OF THE U.S.
WETLAND FILL: 0.046 ACRE
STREAM FILL: 439 LF (0.097 ACRE)
STREAM REALIGNMENT EXCAVATION: 236 LF (0.053 ACRE)
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
INDEX SHEET
US 25 AT SC 11
400
200
APPLICATION BY SCOOT
o
400
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
=400 feet
800
PIN # 37129
FIGURE NO.: 2
DATE: APRIL 2012
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
LEGEND
E2Za
-
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
STREAM FILL AREA
Ill1TIIIIl
WETLAND FILL AREA
~
PROPOSED RIP RAP
~
PAVEMENT REMOVAL AREA
- -
NPDES
RPW2
10
PRESENT IDS' R/W DKT. 2J.515
-----------
----------
PRESENT 75' R/W DKT. 2J.S1S
, R/W F.A.
~E~-
~J. 254~ -
- - ::::::===
----
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
INTERCHANGE IMPROVEMENTS
US 25ATSC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
= 50 feet
100
·
PIN #37129
FIGURE NO.: 3
DATE: APRIL 2012
PROPOSED NPDES LINE
fZZ2I
STREAM REALIGNMENT
EXCAVATION AREA
III1ITIID
WETLAND FILL AREA
~
~
PROPOSED RIP RAP
-
z
PLAN SHEET IMPACTS SUMMARY
WETlAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 146 LF I 0.033 ACRE
LEGEND
- - HFIDES
STREAM FILL AREA
PAVEMENT REMOVAL AREA
STREAM REALIGNMENT EXCAVATION
83 LF IMPACT (0.019 ACRE)
STREAM REALIGNMENT EXCAVATION
63 LF IMPACT (0.014 ACRE)
EXIST. 72" CMP
r---- -
~
+I_---:=:-_
PRESENT 105' R/W DKT. 2J.515
5;:;;1"1"""
......-:...,.-
1-----::;-;"""- -;..~
- !!.foes - - - - -
_ _y~t_ 'CB~ )
//~)
-;.
"f,::~
~
"+
------------
1-___
~
8,
II
ro~~~~
~
· C')
~=>
~ (!)
- - - - F83' - - - -
NEW 24" PIPE
(
o
o
ci
~w
en 0:::
NPOES - - - - - NPOES - - - - - NPOES _
FB2'- - - - - - F83'-
US-25 SOUTHBOUND
12'
co
-------------------------
12'
NEWJ.B.
----~~
~w
en
0:::
a
wllir_----~---~~~----_,r_---~'f~---~~~~~---~-------------~--------_~--------~wu::
~ u::
~
N 40 39' 20" W
=>w
Zen
~
5~
"'"
EXIST. 32' - 18" RCP
(MAINTAIN)
US-25 NORTHBOUND
EXIST. 53' - 15" RCP
REPLACE WITH
EQUAL LENGTH 1B"
12'
-
-
-
-
-
12'
-
-
~~
~
-
5~
-
~
---~-\--,~--~I--~-~~------~-~~~-~/~~~~~~~
I
~
F52'
F50' - - - - - - ---==-'---~~---jr---~I!"!!!!!"'II
- -
C62'
1=56'
B
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
INTERCHANGE IMPROVEMENTS
US 25 AT SC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
=50 feet
100
PIN # 37129
FIGURE NO.: 4
DATE: APRIL 2012
LEGEND
- -
NPOES
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
STREAM FILL AREA
PLAN SHEET IMPACTS SUMMARY
WETlAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 190 LF I 0.038 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 51 LF I 0.012 ACRE
WETLAND FILL AREA
PROPOSED RIP RAP
PAVEMENT REMOVAL AREA
STREAM
REALIGNMENT
EXCAVATION
22 LF IMPACT
(0.005 ACRE)
+
12'
US-25 SOUTHBOUND +
- - - - - - - - - - - - - - - - - - 12'
+
s:
~:I:
12'
<..,.
I-
w
- -
r
-~~~iiiffiF~~I-
mz
mm
mc
R
~~t---------------------------~----------------------~~~~~~
LO::::l
~Cl
~~r----------------------L------~~~~~------~----------~--------~~~
wttl
G)~
....~------------JL--------~~----~ m-l
~~r---------------------------------------------------------~--------'
US-25 NORTHBOUND
12'
:I:
U
::!!m
CUI
........
....
- - - - - - - - - - - - - - - -12'
---
~
;Om
Ol;t>
12'
I\)
0
+
!XI
UI
0
0
NEW24"RCP
F56'
- C70' - - - - -C69'...............
...........
.....
--
..... ~
.....~~~~~~~~~~~~
'--------------
CS7'
CS3'
CS7'
2E?,"='?/;~r
"
------,,.,....,,..1
254-8
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
a
INTERCHANGE IMPROVEMENTS
US 25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
50
1 inch = 50 feet
100
PIN # 37129
FIGURE NO.: 5
DATE: APRIL 2012
MATCH LINE US-25 STA. 23+95.00
SEE FIGURE 7
WETLAND 1
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.046 ACRE
STREAM FILL AREA: 249 LF 10.059 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 39 LF 10.008 ACRE
LEGEND
~
-
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
STREAM FILL AREA
IITITIIIII
WETLAND FILL AREA
I~dil
PROPOSED RIP RAP
~
PAVEMENTREMOVALAREA
- - NPOES
SCi.,
.JACOBS'~
MATCH LINE US-25 STA. 20+85.00
SEE FIGURE 5
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
50
25
50
1 inch
4,2012
= 50 feet
100
·
PIN #37129
FIGURE NO.: 6
DATE: APRIL 2012
~~---
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
25
~
00
0\
ci:,
.....
~
F14'__
NPDES - - I:l., - -
'Co - - - - -
- NPDES
NPDES - - - - -
F71' - - -
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
NPDES
-FIT -::...
CONTRACTOR TO CONVERT
EXIST. J.B. TO GRATE INLET
STREAM FILL AREA
WETLAND FILL AREA
PROPOSED RIP RAP
PAVEMENT REMOVAL AREA
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012
=50 feet
100
PIN # 37129
FIGURE NO.: 7
DATE: APRIL 2012
..-
~
II
EXIST. 303' - 24" CMP 118" RCP
LEGEND
- - NPD(S
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
STREAM FILL AREA
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF 1 0.0 ACRE
STREAM FILL AREA: 0.0 LF 10.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF 10.0 ACRE
SCill'
JACOBS'~
WETLAND FILL AREA
PROPOSED RIP RAP
PAVEMENT REMOVAL AREA
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
o
50
1 inch
NOTE. HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
= 50 feet
,
100
INTERCHANGE IMPROVEMENTS
US 25 AT SC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
PIN #37129
FIGURE NO.: 8
DATE: APRIL 2012
f2'22I
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
STREAM FILL AREA
II1IIITID
WETLAND FILL AREA
@dfj:l
PROPOSED RIP RAP
~
PAVEMENT REMOVAL AREA
-
- - NPDES
(')/
-,
~,
,,
I
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
= 50 feet
,
100
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN #37129
FIGURE NO.: 9
DATE: APRIL 2012
LEGEND
- NPDES
PROPOSED NPDES LINE
~
STREAM REALIGNMENT
EXCAVATION AREA
-
STREAM FILL AREA
IIIITIIIIl
WETLAND FILL AREA
(#j\&iJI
PROPOSED RIP RAP
~
PAVEMENT REMOVAL AREA
/..."
...- "'-Cr
-C57'- - - - C6Jo -
-
-
'"
/
'" c.'O"
'
__ - - 63-;' ...- ...
-C68'
RAMP 1
RAMP 2
....
.... OS.?
'<.........
........
............
.... CS?·
" ... ...... ......
......... C62'
crA' __ - _- - - - __ £~' ________ £62' _ - - - - ---.,..,
......
-
NEW 90' R/W
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF 10.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
INTERCHANGE IMPROVEMENTS
us 25 AT SC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
=50 feet
100
·
PIN #37129
FIGURE NO.: 10
DATE: APRIL 2012
/
/ ..
-.-.-.~--
-..
/
\
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
- - NPDES
~
I
}
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
)
STREAM FILL AREA
WETLAND FILL AREA
PROPOSED RIP RAP
PAVEMENT REMOVAL AREA
MATCH LINE SC-11 STA.224+20.00
SEE FIGURE 12
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
..JACOBS'~
50
25
INTERCHANGE IMPROVEMENTS
US25ATSC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
= 50 feet
100
·
PIN # 37129
FIGURE NO.:11
DATE: APRIL 2012
r -____~P~R~E~S~EN~125' R/W
DKT. 23.583
225
- C46'- - - - - -
-C46;"'"
EXIST. 56' -18" RCP
(MAINTAIN)
PRE [NT BO~ J?JW,,-
~ D~K'i~"
\ - ;_ _.
cc
...
c. . .
23.583
F88'_ _ _
/F------N~13"
F50' / ~<:J
{
::
~
~I
0
LEGEND
PROPOSED NPDES LINE
~
STREAM REALIGNMENT
EXCAVATION AREA
WETLAND FILL AREA
~
~
PROPOSED RIP RAP
~
~I
---~
Z
I
0'1
~\I
.\
\
I
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
MATCH LINE RAMP 1 STA.11+80.00
SEE FIGURE 10
PAVEMENT REMOVAL AREA
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
-
'"
I
STREAM FILL AREA
!ITIIIIJ]]
PRESENT 100' R/W
DKT. 23.583
I~
0\
- - NPDES
-
I :
II
I V>
~
F91'
==-- -- -_NrJoEls- __F98,
25
o
50
1 inch = 50 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012
,
100
INTERCHANGE IMPROVEMENTS
US25ATSC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN # 37129
FIGURE NO.:12
DATE: APRIL 2012
MATCH LINE SC-11 STA. 229+10.00
SEE FIGURE 12
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
EXIST. 127' - 24" RCP
(MAINTAIN)
LEGEND
- - NPDES
PROPOSED NPDES LINE
EZZ2I
STREAM REALIGNMENT
EXCAVATION AREA
-
STREAM FILL AREA
IIIIIDD]
WETLAND FILL AREA
P:g#Attf;1
PROPOSED RIP RAP
~
PAVEMENT REMOVAL AREA
I~
EXIST. 2 x 72" RCP
(MAINTAIN)
EXIST. 24' -18" RCP
(MAINTAIN)
RPW1
II
\1
II"
~~
~
~-:.::: ::-.:- -
-:L
-!:!!?o.a
- :-=:"E..-s:;..;:(l"
--
::::::\::::
/1
z·
;g~
iit:
tl
0""
"\.
~
(
EXIST. 175' - 24" RCP
(MAI~TAIN)
I
~- ~t\'¥.\
5~\
\,
~\
C
\
,,~
;-l~
I\) -t
~ 10
I)J
EXIST. 21' - 60" CMP
(MAINTAIN)
tnO
QlI
t...::o-
:
~
MATCH LINE SC-11 STA. 232+25.00
SEE FIGURE 7
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
INTERCHANGE IMPROVEMENTS
US 25ATSC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BYSCDOT
o
50
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
=50 feet
100
·
PIN # 37129
FIGURE NO.: 13
DATE: APRIL 2012
)
1...,..----...,..---
PRESENT 80' R/W;.;._ _ _ __
240
OKT. 2.3.58.3
\
)
\
\
pR
--=---
· R IW
SENT37.5~
~
~
\
T 23.515
OK·
/'
7f
~~
c§>4'
!
~~~.
q:~~
LEGEND
NPOES
PROPOSED NPDES LINE
ELZ2I
STREAM REALIGNMENT
EXCAVATION AREA
- -
STREAM FILL AREA
IIllIIIIIl
WETLAND FILL AREA
~
~
PROPOSED RIP RAP
~
PAVEMENT REMOVAL AREA
/
PLAN SHEET IMPACTS SUMMARY
WETLAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF I 0.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
JACOBS'"
50
25
o
50
1 inch = 50 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012
.
100
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
PIN #37129
FIGURE NO.: 14
DATE: APRIL 2012
15
.........-====== _
PRESENT 80'
~;?
-----
Rt!!:-.~=~....=----= ~
DKT. 23.583
EXISTING RAMP
EXIST. 18' -15" Rep
(MAINTAIN)
LEGEND
RPW2
- -
NPOES
PROPOSED NPDES LINE
STREAM REALIGNMENT
EXCAVATION AREA
STREAM FILL AREA
PLAN SHEET IMPACTS SUMMARY
WETlAND FILL AREA: 0.0 LF I 0.0 ACRE
STREAM FILL AREA: 0.0 LF 10.0 ACRE
STREAM REALIGNMENT
EXCAVATION AREA: 0.0 LF I 0.0 ACRE
PLAN SHEET - IMPACTS TO WATERS OF THE U.S.
US 25 AT SC 11
50
25
WETLAND FILL AREA
PROPOSED RIP RAP
PAVEMENT REMOVAL AREA
INTERCHANGE IMPROVEMENTS
US 25ATSC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
a
50
1 inch = 50 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012
100
PIN #37129
FIGURE NO.: 15
DATE: APRIL 2012
US25
STA. 12+50
SECTION A-A
EXISTING
STREAM
BOUNDARY
LIMITS
14.0'
12.0'
12.0'
12.0'
12.9'
13.3'
12.0'
1050
PROPOSED:j
GRADE
(0
10.8'
'
~ 12:1
0.021 FT.lFT.
- - - - - - - - _
~~ I "~-------------~
-----<:1
..... ~~ V",.,.--~PROPOSEDGROUND
~
~
_
0
__ C - - - - -
-
-
-
-~ _ _
~
0<'>
---~~S~I::/--:-----
--- ---
GROUND
_
1040
1030
1020
PROPOSED STREAM
REALIGNMENT
83 LF IMPACT
SC':.,
.JACOBS'u
PROPOSED/
CENTERLINE
US25ATSC11
INTERCHANGE IMPROVEMENTS
WATERS OF THE U.S. IMPACTS CROSS SECTION
20
10
o
20
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
=20 feet
,
40
INTERCHANGE IMPROVEMENTS
US 25 AT SC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN # 37129
FIGURE NO.:16
DATE: APRIL 2012
US25
STA. 15+50
SECTION B-B
1070
12.0'
14.0'
12.0'
13.1'
13.4'
12.0'
12.0'
. _.
-5.9'
/
/
PROPOSED'\
GRADE
/
/
1060
/
/
..
9.3'
~ ~A":..,p'
"
....
"
/
/
IP_ 12:1 'O.O~
LIMITS
LOll)
M C')
- - <..,-.l'&....
/
EXISTING
STREAM
BOUNDARY
~
_-
-
-'-EXISTING
--
FT.lFT.
8
oi
8
________
-
-
-
-
-
-
-
_1 -
-
-.::::: f-
_ - -
0.021
_c---------1ILEL......i2:1
- - - -
PROPOSED
GROUND
- - -.----~
/
1040
1020
"'--PROPOSED STREAM
REALIGNMENT
63 LF IMPACT
.JACOBS'Y
/
/
1030
GROUND
SC'.,
~
cO
~
1050
I
PROPOSED/
CENTERLINE
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
WATERS OF THE U.S. IMPACTS CROSS SECTION
20
10
o
20
1 inch = 20 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4,2012
40
·
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN #37129
FIGURE NO.:17
DATE: APRIL 2012
US25
STA. 19+00
SECTION C-C
8.2'
12.0'_
12.0'
13.0'
13.0'
12.0'
12.0'
14.0' ..
PROPOSED
GRADE
1050
PROPOSED
GROUND
0
~
0.021
FT.lFT.
't.~
----
c»
C')
0
~
============================
----~~---.---'--EXISTIN G
~
~
RELOCATED
STREAM
0.021 FT.lFT.
<
1040
1030
STREAM FILL
GROUN D
190 LF IMPACT
1020
~
9.6'
PROPOSED/
CENTERLINE
EXISTING
STREAM
BOUNDARY
LIMITS
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
WATERS OF THE U.S. IMPACTS CROSS SECTION
.JACOBS'~
20
10
o
20
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4.2012
=20 feet
,
40
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN #37129
FIGURE NO.: 18
DATE: APRIL 2012
US25
STA. 21+50
SECTION D-D
EXISTING STREAM
BOUNDARY LIMITS
13.8'
12.0'
12.0'
13.2'
12.5'
12.0'
12.0'
14.0'
PROPOSED
GRADE
STREAM FILL
60 LF IMPACT
1050
__ -
'L _ _ _ _ _ _ _ _ _
0.021 FT.lFT.
12:1 q} ___ _
~
.
/
L~~~:"::"'::3~~~-/~EXISTING
1040
1030
GROUND
RELOCATED
STREAM
PROPOSED
RIP RAP LIMITS
1020
PROPOSED BOX
CULVERT EXTENSION
PROPOSED
CENTERLINE
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
WATERS OF THE U.S. IMPACTS CROSS SECTION
o
20
10
20
40
,
1 inch = 20 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4.2012
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN #37129
FIGURE NO.:19
DATE: APRIL 2012
US25
STA. 23+00
SECTION E-E
EXISTING STREAM
BOUNDARY LIMITS
25.2'
12.0'
12.0'
13.2'
11.0'
PROPOSED
GRADE
1050
1040
0.021 FT.lFT.
- - - - - - - - - - - - STREAM FILL
180 LF IMPACT
PROPOSED
RIP RAP LIMITS
PROPOSED
GROUND
----
6:1
~~XISTING
6:1
1030
GROUND
1020
PROPOSED BOX
CULVERT WING WALL
PROPOSED
CENTERLINE
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
WATERS OF THE U.S. IMPACTS CROSS SECTION
10
20
o
20
40
,
1 inch = 20 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
INTERCHANGE IMPROVEMENTS
US25ATSC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN # 37129
FIGURE NO.:20
DATE: APRIL 2012
RAMP 1
STA. 18+00
SECTION F-F
6.0'
~.O'
EXISTING STREAM
BOUNDARY LIMITS
WETLAND
BOUNDARY
LIMITS
EXISTING STREAM
BOUNDARY LIMITS
US25
SOUTHBOUND
1050
PROPOSED
GROUND
WETLAND FILL
0.046 AC IMPACT
------
I
PROPOSED
GRADE
rp
---=
-~---------
==
~EXISTING
1040
1030
GROUND
STREAM FILL
180 LF IMPACT
PROPOSED BOX
CULVERTS
LEGEND
STREAM IMPACT
IlllJIJI]
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
WATERS OF THE U.S. IMPACTS CROSS SECTION
20
10
o
20
40
,
1 inch
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4, 2012
=20 feet
WETLAND IMPACT
INTERCHANGE IMPROVEMENTS
US 25 AT SC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
PIN #37129
FIGURE NO.:21
DATE: APRIL 2012
US 25
STA. 21+61.10
(SKEW ANGLE: -00 0 13' 09.49")
EXISTING STREAM LIMITS
53.42'
37.3'
14.7'
PROP. STREAM
FILL IMPACT
PROP. I.E.
12:1
12.0'
12.5'
13.2'
12.0'
12.0'
PROPOSED
GRADE
= 1029.37
II
12.0'
~
~
0.021
FT.lFT.
=========r-_
o
~
_--1:::==========------
1040
1030
RELOCATED
STREAM
EXISTING RC BOX
CULVERT
(DOUBLE 8' x 7')
PROPOSED
RIP RAP LIMITS
PROPOSED BOX
CULVERT EXTENSION
PROPOSED STREAM
REALIGNMENT EXCAVATION
EXIST. CULVERT SECTION CHANGE
US 25 STA. 21+61.10
SKEW ANGLE -00· 13' 09.49"
OFFSET 53.42' R
MATCHLINE WITH
US 25 STA. 21+38.08
SKEW ANGLE = 23· 12' 47.69"
OFFSET 58.11' R
1020
=
PROPOSED
CENTERLINE
NOTE: PIPE CROSS LINE SECTION CORRESPONDS TO SECTION ALONG THE CENTERLINE OF THE PIPE
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
.JACOBS'~
20
10
PIPE CROSS LINE SECTION
o
20
1 inch = 20 feet
NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
,
40
INTERCHANGE IMPROVEMENTS
US25ATSC11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
PIN #37129
FIGURE NO.:22
DATE: APRIL 2012
US 25
STA. 21+38.08
(SKEW ANGLE: 23° 12' 47.69")
-
EXISTING
STREAM LIMITS
58.11'
(NO IMPACTS)
~I
EXISTING
GROUND
!!21
~
[
f- -
1040
- - - - - - ~
- -
T.
CHANGE~~======::::;:=========L~- -
PROPOSED/
CENTERLINE
EXIST. CULVERT SECTION
US 25 STA. 21+38.08
SKEW ANGLE = 23· 12' 47.69"
OFFSET 58.11' R
MATCHLINE WITH
US 25 STA. 21+61.10
SKEW ANGLE = -00· 13' 09.49"
OFFSET 53.42' R
- - - - -
EXIST. I.E.
1030
=1029.80
1020
RC BOX CULVERT (15.6' X 6.6')
NOTE: PIPE CROSS LINE SECTION CORRESPONDS TO SECTION ALONG THE CENTERLINE OF THE PIPE
US25ATSC11
INTERCHANGE IMPROVEMENTS
SC':*tJI
.JACOBS'~
PIPE CROSS LINE SECTION
20
10
o
20
1 inch
NOTE. HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4. 2012
= 20 feet
40
INTERCHANGE IMPROVEMENTS
us 25 AT SC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
PIN #37129
FIGURE NO.:23
DATE: APRIL 2012
RAMP 1
STA. 18+08.74
(SKEW ANGLE: 35° 29' 10.84")
I
EXISTING
","-STREAM LIMITS
EXISTING STREAM LIMITS
I
PROP. STREAM
FILL IMPACT
PROP. STREAM
FILL IMPACT
~
PR~POSED
GROUND
EXISTING\
GROUND
.
~ROP'
I.E.
PROPOSED
GRADE..sL
=1031.94
III
1040
<'1
'-
11=
.rJ
-------~- ~
PROPOSED I.E.
------- -----"".. . . .-_""""ioI:IIiI~"=~~="
: :"=""=""~="-~="=~=""-~OlF-=~=""-="
=~"=-=~=="
=-~"~~;;;;;;~'¥~--:;:::<~~=~.~.~~*'=d"j
...
...~o
PROPOSED
RIP RAP LIMITS
PROPOSED
RIP RAP LIMITS
PROPOSED/
CENTERLINE
SC'.,
= 1030.95
1030
1020
PROPOSED RC BOX CULVERT
(DOUBLE 6' x 4')
NOTE: PIPE CROSS LINE SECTION CORRESPONDS TO SECTION ALONG THE CENTERLINE OF THE PIPE
JACOBS'~
US 25 AT SC 11
INTERCHANGE IMPROVEMENTS
20
10
PIPE CROSS LINE SECTION
o
20
1 inch = 20 feet
NOTE. HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012
,
40
INTERCHANGE IMPROVEMENTS
US 25 AT SC 11
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCDOT
PIN # 37129
FIGURE NO.:24
DATE: APRIL 2012
/' , ' /ApproX.
CL Stream Relocation &
Structure Base Line
.....
/
~10
", ,
o
Toe
OfFIII~~ __
--
<"
Horizontal Curve Data
P.I.
19+66.10
o
16° 22' 13"
206.51'
373.13'
56.38'
350.00'
t:l. 61° 04' 59" IRt.)
T
L
E
R
HYDRAULIC DESIGN DATA
Drainage Anea: 2.45 Sq. Miles
50·Year Discharge: 749 CF/Sec.
50-Year Flood Elevation: 1035.4
50·Year Hydraulic Cross Section: 190.2 SF U/S
183.3 SF DIS
50·Year Velocity: 4.0 ftJSec.
10o-Year Discharge: 881 CF/Sec.
l00·Year Flood Elevation: 1035.7
100·Year Hydraulic Cross Section: 205.7 SF U/S
201.0SFD/S
Includes 1.5' Barrier Parapet and
1.5" Extension (Typ. Ea. Side)
Radial Dimension
UIS = Up Stream of Bridge
DIS = Down Stream of Bridge
~ Denotes Area of Channel Excavation
All Bents Are Parallel to CL Stream Relocation
FDenotes Fixed Bearing at Bent
Concrete Barrier Parapet Transition (Typ. Each
~ Three Beam Guardrail Connector (Typ. Each
*
BRIDGE PLAN/PROFILE SHEET
US25ATSC 11
30
15
INTERCHANGE
US25ATSCll
GREENVILLE COUNTY
SOUTH CAROLINA
APPLICATION BY SCOOT
o
30
1 inch
=30 feet
60
·
PIN # 37129
FIGURE NO.:25
DATE: APRIL 2012