Home

Charleston District

Run scraper

US-25 and SC-11 Interchange- Greenville County

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

US-25 and SC-11 Interchange-

Greenville County, SC

US-25 and SC-11 Interchange- Greenville County, SC

JOINT PUBLIC NOTICE CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Environmental Quality Control Water Quality Certification and Wetlands Programs Section 2600 Bull Street Columbia, South Carolina 29201

REGULATORY DIVISION Refer to: P/N # 2011-00477-DS

June 28, 2012

Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1341), an application has been submitted to the Department of the Army and the South Carolina Department of Health and Environmental Control by

South Carolina Department of Transportation c/o Mr. Sean Connolly 255 Park Street, P.O. Box 191 Columbia, South Carolina 29202-0191

for a permit to place fill materials in wetland and other waters of the United States in and adjacent to Sprigg Creek and unnamed tributary to Sprigg Creek

In order to give all interested parties an opportunity to express their views NOTICE is hereby given that written statements regarding the proposed work will be received by both of the above mentioned offices until Corps, 15 days from date of this notice SCDHEC, 30 days from date of this notice 12 O'CLOCK NOON, MONDAY, July 16, 2012 from those interested in the activity and whose interests may be affected by the proposed work. The proposed work consists of the placement of fill and structures associated with the construction of an additional interchange ramp at the US-25 & SC-11 interchange. The project is at the US-25 and SC-11 interchange in the village of Lima (Latitude 35.089468, Longitude -82.447558) in Greenville County, South Carolina. Specifically, this project to construct a new interchange ramp will include the following activities within Waters of

REGULATORY DIVISION Refer to: P/N # 2011-00477-DS the U.S.; realign (create new stream channel) for a total of 236 linear feet of Sprigg Creek and an unnamed tributary, place fill 0.046 acres of a wetland area, place a 71 linear foot 6'x4' box culvert in unnamed tributary to Sprigg Creek, Extend an existing 8'x7' double barrel box culvert by placing a 12.5 linear foot 16'x7' box culvert extension, Place a total of 199 linear feet of fill in Sprigg Creek and unnamed tributary to Sprigg Creek, and Place a total of 156.5 linear feet of rock armor in unnamed tributary to Sprigg Creek. For these unavoidable impacts, SCDOT is proposing to deduct 0.161 acres of wetlands from the Black River Mitigation Bank and purchase 2277 stream credits from Grove Creek Mitigation Bank. Based upon information in the permit the application, SCDOT proposes this project to improve the existing interchange which does not meet current design criteria for safety. Currently traffic must cross northbound traffic on US-25 when utilizing this interchange. This project will result in an additional ramp that will allow traffic to move from one roadway to the other without having to crossing travel lanes. Based on the information in this permit application, SCDOT considered two alternatives for this project. The two alternatives considered were the "no build" alternative and the proposed project. Since the "no build" alternative would not correct the existing safety issue, SCDOT chose to build the additional interchange ramp in the southwest quadrant of the existing interchange. SCDOT indicates that one of the early designs for this proposed interchange included piping of Sprigg Creek; however this design was changed to include bridging to avoid/reduce impacts to Waters of the United States NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of a written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The request must identify the project of interest by public notice number and a self-addressed stamped envelope must also be provided for mailing the drawings to you. Your request for drawings should be addressed to the U.S. Army Corps of Engineers ATTN: REGULATORY DIVISION 69A Hagood Avenue Charleston, South Carolina 29403-5107

The District Engineer has concluded that the discharges associated with this project, both direct and indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water quality standards. The District Engineer will not process this application to a conclusion until such certification is received. The applicant is hereby advised that supplemental information may be required by the State to facilitate the review. Persons wishing to comment or object to Water Quality Certification must submit all comments in writing to the S.C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of this notice. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. Implementation of the proposed project would impact ( 0.046) acres of estuarine substrates and emergent wetlands utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS. Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the applicant has provided a protected species survey for the property associated with the activity described above. Based upon

REGULATORY DIVISION Refer to: P/N # 2011-00477-DS this report, the District Engineer has determined that the project is not likely to adversely affect any Federally endangered, threatened, or proposed species or result in the destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a request for written concurrence from the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service on this determination. Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and cultural significance to them that may be affected by the proposed undertaking. In accordance with the NHPA, the District Engineer has also consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not included as a registered property or property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State Historic Preservation Office to provide any information it may have with regard to historic and cultural resources. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for holding a public hearing. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to adjudicate rival claims. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. If there are any questions concerning this public notice, please contact Stephen Brumagin at 803-253-3445.

2,000

1,000

o

2,000

1 inch

=2,000 feet

4,000 ,

LEGEND (FIGURES 3 -15)

---

-

EXISTING R!W BOUNDARYI PROPERTY BOUNDARY

---

....,

PROPOSED NPDES LINE

PROPOSED R!W BOUNDARY

I7ZLI

STREAM REALIGNMENT EXCAVATION AREA

ZL

STREAM FILL AREA

PROPOSED PIPE LIMITS OF CONSTRUCTION

[ffillID

WETLAND FILL AREA

EXISTING EDGE OF PAVEMENT

~ ~

PROPOSED RIP RAP

PROPOSED EDGE OF PAVEMENT

PAVEMENT REMOVAL AREA

3

PROJECT IMPACTS TO WATERS OF THE U.S. WETLAND FILL: 0.046 ACRE STREAM FILL: 439 LF (0.097 ACRE) STREAM REALIGNMENT EXCAVATION: 236 LF (0.053 ACRE)

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA

INDEX SHEET US 25 AT SC 11 400

200

APPLICATION BY SCOOT

o

400

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

=400 feet

800

PIN # 37129 FIGURE NO.: 2 DATE: APRIL 2012

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

LEGEND

E2Za

-

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA STREAM FILL AREA

Ill1TIIIIl

WETLAND FILL AREA

~

PROPOSED RIP RAP

~

PAVEMENT REMOVAL AREA

- -

NPDES

RPW2

10

PRESENT IDS' R/W DKT. 2J.515

-----------

----------

PRESENT 75' R/W DKT. 2J.S1S

, R/W F.A.

~E~-

~J. 254~ -

- - ::::::=== ----

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

INTERCHANGE IMPROVEMENTS US 25ATSC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

o

50

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

= 50 feet

100

·

PIN #37129 FIGURE NO.: 3 DATE: APRIL 2012

PROPOSED NPDES LINE

fZZ2I

STREAM REALIGNMENT EXCAVATION AREA

III1ITIID

WETLAND FILL AREA

~ ~

PROPOSED RIP RAP

-

z

PLAN SHEET IMPACTS SUMMARY WETlAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 146 LF I 0.033 ACRE

LEGEND - - HFIDES

STREAM FILL AREA

PAVEMENT REMOVAL AREA

STREAM REALIGNMENT EXCAVATION 83 LF IMPACT (0.019 ACRE)

STREAM REALIGNMENT EXCAVATION 63 LF IMPACT (0.014 ACRE)

EXIST. 72" CMP

r---- -

~

+I_---:=:-_ PRESENT 105' R/W DKT. 2J.515

5;:;;1"1"""

......-:...,.-

1-----::;-;"""- -;..~

- !!.foes - - - - -

_ _y~t_ 'CB~ )

//~)

-;.

"f,::~

~

"+

------------

1-___

~

8,

II

ro~~~~

~

· C')

~=> ~ (!)

- - - - F83' - - - -

NEW 24" PIPE

(

o o ci

~w en 0:::

NPOES - - - - - NPOES - - - - - NPOES _

FB2'- - - - - - F83'-

US-25 SOUTHBOUND

12'

co

------------------------- 12'

NEWJ.B.

----~~ ~w en

0:::

a wllir_----~---~~~----_,r_---~'f~---~~~~~---~-------------~--------_~--------~wu::

~ u::

~

N 40 39' 20" W

=>w

Zen

~

5~ "'"

EXIST. 32' - 18" RCP (MAINTAIN)

US-25 NORTHBOUND

EXIST. 53' - 15" RCP REPLACE WITH EQUAL LENGTH 1B"

12' -

-

-

-

-

12'

-

-

~~

~

-

5~

-

~

---~-\--,~--~I--~-~~------~-~~~-~/~~~~~~~ I

~

F52'

F50' - - - - - - ---==-'---~~---jr---~I!"!!!!!"'II

- -

C62'

1=56'

B

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

INTERCHANGE IMPROVEMENTS US 25 AT SC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

o

50

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

=50 feet

100

PIN # 37129 FIGURE NO.: 4 DATE: APRIL 2012

LEGEND - -

NPOES

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA STREAM FILL AREA

PLAN SHEET IMPACTS SUMMARY WETlAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 190 LF I 0.038 ACRE STREAM REALIGNMENT EXCAVATION AREA: 51 LF I 0.012 ACRE

WETLAND FILL AREA PROPOSED RIP RAP PAVEMENT REMOVAL AREA

STREAM REALIGNMENT EXCAVATION 22 LF IMPACT (0.005 ACRE)

+ 12' US-25 SOUTHBOUND + - - - - - - - - - - - - - - - - - - 12' +

s:

~:I:

12'

<..,.

I-

w

- -

r

-~~~iiiffiF~~I-

mz

mm mc

R

~~t---------------------------~----------------------~~~~~~ LO::::l ~Cl ~~r----------------------L------~~~~~------~----------~--------~~~ wttl

G)~

....~------------JL--------~~----~ m-l

~~r---------------------------------------------------------~--------' US-25 NORTHBOUND 12'

:I: U

::!!m CUI

........ ....

- - - - - - - - - - - - - - - -12' ---

~

;Om Ol;t>

12'

I\)

0

+

!XI UI

0 0

NEW24"RCP

F56'

- C70' - - - - -C69'............... ...........

.....

--

..... ~ .....~~~~~~~~~~~~

'-------------- CS7'

CS3'

CS7'

2E?,"='?/;~r

"

------,,.,....,,..1

254-8

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

a

INTERCHANGE IMPROVEMENTS US 25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT

50

1 inch = 50 feet

100

PIN # 37129 FIGURE NO.: 5 DATE: APRIL 2012

MATCH LINE US-25 STA. 23+95.00 SEE FIGURE 7

WETLAND 1

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.046 ACRE STREAM FILL AREA: 249 LF 10.059 ACRE STREAM REALIGNMENT EXCAVATION AREA: 39 LF 10.008 ACRE LEGEND

~

-

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA STREAM FILL AREA

IITITIIIII

WETLAND FILL AREA

I~dil

PROPOSED RIP RAP

~

PAVEMENTREMOVALAREA

- - NPOES

SCi.,

.JACOBS'~

MATCH LINE US-25 STA. 20+85.00 SEE FIGURE 5

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11

US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT

50

25

50

1 inch 4,2012

= 50 feet

100

·

PIN #37129 FIGURE NO.: 6 DATE: APRIL 2012

~~---

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

25

~

00

0\

ci:, ..... ~

F14'__

NPDES - - I:l., - -

'Co - - - - -

- NPDES

NPDES - - - - -

F71' - - -

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA

NPDES

-FIT -::...

CONTRACTOR TO CONVERT EXIST. J.B. TO GRATE INLET

STREAM FILL AREA WETLAND FILL AREA PROPOSED RIP RAP PAVEMENT REMOVAL AREA

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

o

50

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012

=50 feet

100

PIN # 37129 FIGURE NO.: 7 DATE: APRIL 2012

..-

~

II

EXIST. 303' - 24" CMP 118" RCP

LEGEND - - NPD(S

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA STREAM FILL AREA

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF 1 0.0 ACRE STREAM FILL AREA: 0.0 LF 10.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF 10.0 ACRE

SCill'

JACOBS'~

WETLAND FILL AREA PROPOSED RIP RAP PAVEMENT REMOVAL AREA

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

o

50

1 inch

NOTE. HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

= 50 feet

,

100

INTERCHANGE IMPROVEMENTS US 25 AT SC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT

PIN #37129 FIGURE NO.: 8 DATE: APRIL 2012

f2'22I

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA STREAM FILL AREA

II1IIITID

WETLAND FILL AREA

@dfj:l

PROPOSED RIP RAP

~

PAVEMENT REMOVAL AREA

-

- - NPDES

(')/

-,

~,

,, I

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

o

50

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

= 50 feet

,

100

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT PIN #37129 FIGURE NO.: 9 DATE: APRIL 2012

LEGEND - NPDES

PROPOSED NPDES LINE

~

STREAM REALIGNMENT EXCAVATION AREA

-

STREAM FILL AREA

IIIITIIIIl

WETLAND FILL AREA

(#j\&iJI

PROPOSED RIP RAP

~

PAVEMENT REMOVAL AREA

/..."

...- "'-Cr

-C57'- - - - C6Jo -

-

-

'"

/

'" c.'O"

'

__ - - 63-;' ...- ...

-C68'

RAMP 1 RAMP 2 ....

.... OS.?

'<.........

........

............

.... CS?·

" ... ...... ...... ......... C62' crA' __ - _- - - - __ £~' ________ £62' _ - - - - ---.,.., ......

-

NEW 90' R/W

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF 10.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

INTERCHANGE IMPROVEMENTS us 25 AT SC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

o

50

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

=50 feet

100

·

PIN #37129 FIGURE NO.: 10 DATE: APRIL 2012

/ / ..

-.-.-.~--

-..

/

\

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

- - NPDES

~

I }

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA

)

STREAM FILL AREA WETLAND FILL AREA PROPOSED RIP RAP PAVEMENT REMOVAL AREA

MATCH LINE SC-11 STA.224+20.00 SEE FIGURE 12

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11

..JACOBS'~

50

25

INTERCHANGE IMPROVEMENTS US25ATSC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

o

50

1 inch

NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

= 50 feet

100

·

PIN # 37129 FIGURE NO.:11 DATE: APRIL 2012

r -____~P~R~E~S~EN~125' R/W

DKT. 23.583

225

- C46'- - - - - -

-C46;"'"

EXIST. 56' -18" RCP (MAINTAIN)

PRE [NT BO~ J?JW,,- ~ D~K'i~"

\ - ;_ _. cc ... c. . .

23.583

F88'_ _ _

/F------N~13"

F50' / ~<:J {

:: ~

~I 0

LEGEND PROPOSED NPDES LINE

~

STREAM REALIGNMENT EXCAVATION AREA

WETLAND FILL AREA

~ ~

PROPOSED RIP RAP

~

~I

---~

Z

I

0'1

~\I .\ \

I

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

MATCH LINE RAMP 1 STA.11+80.00 SEE FIGURE 10

PAVEMENT REMOVAL AREA

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

-

'"

I

STREAM FILL AREA

!ITIIIIJ]]

PRESENT 100' R/W DKT. 23.583

I~

0\

- - NPDES

-

I : II I V>

~

F91'

==-- -- -_NrJoEls- __F98,

25

o

50

1 inch = 50 feet NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012

,

100

INTERCHANGE IMPROVEMENTS US25ATSC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

PIN # 37129 FIGURE NO.:12 DATE: APRIL 2012

MATCH LINE SC-11 STA. 229+10.00 SEE FIGURE 12

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

EXIST. 127' - 24" RCP (MAINTAIN)

LEGEND - - NPDES

PROPOSED NPDES LINE

EZZ2I

STREAM REALIGNMENT EXCAVATION AREA

-

STREAM FILL AREA

IIIIIDD]

WETLAND FILL AREA

P:g#Attf;1

PROPOSED RIP RAP

~

PAVEMENT REMOVAL AREA

I~

EXIST. 2 x 72" RCP (MAINTAIN)

EXIST. 24' -18" RCP (MAINTAIN)

RPW1

II

\1 II"

~~

~

~-:.::: ::-.:- -

-:L -!:!!?o.a - :-=:"E..-s:;..;:(l" --

::::::\::::

/1

z·

;g~

iit:

tl

0""

"\.

~

(

EXIST. 175' - 24" RCP (MAI~TAIN)

I

~- ~t\'¥.\

5~\

\,

~\

C

\

,,~

;-l~ I\) -t ~ 10

I)J

EXIST. 21' - 60" CMP (MAINTAIN)

tnO

QlI t...::o-

:

~

MATCH LINE SC-11 STA. 232+25.00 SEE FIGURE 7

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

INTERCHANGE IMPROVEMENTS US 25ATSC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BYSCDOT

o

50

1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

=50 feet

100

·

PIN # 37129 FIGURE NO.: 13 DATE: APRIL 2012

) 1...,..----...,..---

PRESENT 80' R/W;.;._ _ _ __

240

OKT. 2.3.58.3

\

)

\

\

pR

--=---

· R IW SENT37.5~

~

~

\

T 23.515

OK·

/'

7f ~~

c§>4'

!

~~~.

q:~~

LEGEND NPOES

PROPOSED NPDES LINE

ELZ2I

STREAM REALIGNMENT EXCAVATION AREA

- -

STREAM FILL AREA

IIllIIIIIl

WETLAND FILL AREA

~ ~

PROPOSED RIP RAP

~

PAVEMENT REMOVAL AREA

/

PLAN SHEET IMPACTS SUMMARY WETLAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF I 0.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11

JACOBS'"

50

25

o

50

1 inch = 50 feet

NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012

.

100

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT

PIN #37129 FIGURE NO.: 14 DATE: APRIL 2012

15 .........-====== _

PRESENT 80'

~;?

----- Rt!!:-.~=~....=----= ~

DKT. 23.583

EXISTING RAMP EXIST. 18' -15" Rep (MAINTAIN)

LEGEND

RPW2

- -

NPOES

PROPOSED NPDES LINE STREAM REALIGNMENT EXCAVATION AREA STREAM FILL AREA

PLAN SHEET IMPACTS SUMMARY WETlAND FILL AREA: 0.0 LF I 0.0 ACRE STREAM FILL AREA: 0.0 LF 10.0 ACRE STREAM REALIGNMENT EXCAVATION AREA: 0.0 LF I 0.0 ACRE

PLAN SHEET - IMPACTS TO WATERS OF THE U.S. US 25 AT SC 11 50

25

WETLAND FILL AREA PROPOSED RIP RAP PAVEMENT REMOVAL AREA

INTERCHANGE IMPROVEMENTS US 25ATSC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

a

50

1 inch = 50 feet NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4,2012

100

PIN #37129 FIGURE NO.: 15 DATE: APRIL 2012

US25 STA. 12+50 SECTION A-A

EXISTING STREAM BOUNDARY LIMITS

14.0'

12.0'

12.0'

12.0'

12.9'

13.3'

12.0'

1050

PROPOSED:j GRADE (0

10.8'

'

~ 12:1

0.021 FT.lFT.

- - - - - - - - _

~~ I "~-------------~ -----<:1 ..... ~~ V",.,.--~PROPOSEDGROUND

~ ~

_

0

__ C - - - - -

-

-

-

-~ _ _

~

0<'>

---~~S~I::/--:-----

--- ---

GROUND

_

1040 1030 1020

PROPOSED STREAM REALIGNMENT 83 LF IMPACT

SC':., .JACOBS'u

PROPOSED/ CENTERLINE

US25ATSC11 INTERCHANGE IMPROVEMENTS WATERS OF THE U.S. IMPACTS CROSS SECTION 20

10

o

20

1 inch

NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

=20 feet

,

40

INTERCHANGE IMPROVEMENTS US 25 AT SC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT PIN # 37129 FIGURE NO.:16 DATE: APRIL 2012

US25 STA. 15+50 SECTION B-B

1070 12.0'

14.0'

12.0'

13.1'

13.4'

12.0'

12.0' . _.

-5.9'

/ /

PROPOSED'\ GRADE

/

/

1060

/ /

.. 9.3'

~ ~A":..,p'

"

.... "

/ /

IP_ 12:1 'O.O~

LIMITS

LOll) M C')

- - <..,-.l'&....

/

EXISTING STREAM BOUNDARY

~

_- -

-'-EXISTING

--

FT.lFT.

8 oi 8

________ -

-

-

-

-

-

-

_1 -

-

-.::::: f-

_ - -

0.021 _c---------1ILEL......i2:1 - - - -

PROPOSED GROUND

- - -.----~

/

1040

1020

"'--PROPOSED STREAM REALIGNMENT 63 LF IMPACT

.JACOBS'Y

/

/

1030

GROUND

SC'.,

~ cO ~

1050

I

PROPOSED/ CENTERLINE

US 25 AT SC 11 INTERCHANGE IMPROVEMENTS WATERS OF THE U.S. IMPACTS CROSS SECTION 20

10

o

20

1 inch = 20 feet

NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4,2012

40

·

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT PIN #37129 FIGURE NO.:17 DATE: APRIL 2012

US25 STA. 19+00 SECTION C-C 8.2'

12.0'_

12.0'

13.0'

13.0'

12.0'

12.0'

14.0' ..

PROPOSED GRADE

1050

PROPOSED GROUND

0 ~

0.021 FT.lFT.

't.~

----

c» C') 0 ~

============================

----~~---.---'--EXISTIN G ~ ~

RELOCATED STREAM

0.021 FT.lFT. <

1040 1030

STREAM FILL GROUN D 190 LF IMPACT

1020

~

9.6'

PROPOSED/ CENTERLINE EXISTING STREAM BOUNDARY LIMITS

US 25 AT SC 11 INTERCHANGE IMPROVEMENTS WATERS OF THE U.S. IMPACTS CROSS SECTION

.JACOBS'~

20

10

o

20

1 inch

NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4.2012

=20 feet

,

40

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT

PIN #37129 FIGURE NO.: 18 DATE: APRIL 2012

US25 STA. 21+50 SECTION D-D EXISTING STREAM BOUNDARY LIMITS

13.8'

12.0'

12.0'

13.2'

12.5'

12.0'

12.0'

14.0'

PROPOSED GRADE

STREAM FILL 60 LF IMPACT

1050 __ -

'L _ _ _ _ _ _ _ _ _

0.021 FT.lFT.

12:1 q} ___ _

~

. /

L~~~:"::"'::3~~~-/~EXISTING

1040 1030

GROUND RELOCATED STREAM PROPOSED RIP RAP LIMITS

1020

PROPOSED BOX CULVERT EXTENSION PROPOSED CENTERLINE

US 25 AT SC 11 INTERCHANGE IMPROVEMENTS WATERS OF THE U.S. IMPACTS CROSS SECTION o 20 10 20 40 , 1 inch = 20 feet NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4.2012

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT PIN #37129 FIGURE NO.:19 DATE: APRIL 2012

US25 STA. 23+00 SECTION E-E

EXISTING STREAM BOUNDARY LIMITS 25.2'

12.0'

12.0'

13.2'

11.0' PROPOSED GRADE

1050 1040

0.021 FT.lFT.

- - - - - - - - - - - - STREAM FILL 180 LF IMPACT PROPOSED RIP RAP LIMITS

PROPOSED GROUND

----

6:1

~~XISTING

6:1

1030

GROUND

1020

PROPOSED BOX CULVERT WING WALL

PROPOSED CENTERLINE

US 25 AT SC 11 INTERCHANGE IMPROVEMENTS WATERS OF THE U.S. IMPACTS CROSS SECTION 10 20 o 20 40 , 1 inch = 20 feet NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

INTERCHANGE IMPROVEMENTS US25ATSC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT PIN # 37129 FIGURE NO.:20 DATE: APRIL 2012

RAMP 1 STA. 18+00 SECTION F-F 6.0'

~.O'

EXISTING STREAM BOUNDARY LIMITS WETLAND BOUNDARY LIMITS

EXISTING STREAM BOUNDARY LIMITS

US25 SOUTHBOUND

1050

PROPOSED GROUND

WETLAND FILL 0.046 AC IMPACT

------

I PROPOSED GRADE

rp ---= -~---------

==

~EXISTING

1040 1030

GROUND

STREAM FILL 180 LF IMPACT

PROPOSED BOX CULVERTS LEGEND STREAM IMPACT

IlllJIJI] US 25 AT SC 11 INTERCHANGE IMPROVEMENTS WATERS OF THE U.S. IMPACTS CROSS SECTION 20 10 o 20 40 , 1 inch NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING. VERSION RECEIVED APRIL 4, 2012

=20 feet

WETLAND IMPACT

INTERCHANGE IMPROVEMENTS US 25 AT SC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT PIN #37129 FIGURE NO.:21 DATE: APRIL 2012

US 25 STA. 21+61.10 (SKEW ANGLE: -00 0 13' 09.49") EXISTING STREAM LIMITS

53.42'

37.3' 14.7'

PROP. STREAM FILL IMPACT

PROP. I.E.

12:1

12.0'

12.5'

13.2'

12.0'

12.0'

PROPOSED GRADE

= 1029.37

II

12.0'

~

~

0.021 FT.lFT.

=========r-_

o ~

_--1:::==========------

1040 1030

RELOCATED STREAM

EXISTING RC BOX CULVERT (DOUBLE 8' x 7')

PROPOSED RIP RAP LIMITS

PROPOSED BOX CULVERT EXTENSION PROPOSED STREAM REALIGNMENT EXCAVATION

EXIST. CULVERT SECTION CHANGE US 25 STA. 21+61.10 SKEW ANGLE -00· 13' 09.49" OFFSET 53.42' R MATCHLINE WITH US 25 STA. 21+38.08 SKEW ANGLE = 23· 12' 47.69" OFFSET 58.11' R

1020

=

PROPOSED CENTERLINE

NOTE: PIPE CROSS LINE SECTION CORRESPONDS TO SECTION ALONG THE CENTERLINE OF THE PIPE

US 25 AT SC 11 INTERCHANGE IMPROVEMENTS

.JACOBS'~

20

10

PIPE CROSS LINE SECTION o 20 1 inch = 20 feet

NOTE: HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

,

40

INTERCHANGE IMPROVEMENTS US25ATSC11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT PIN #37129 FIGURE NO.:22 DATE: APRIL 2012

US 25 STA. 21+38.08 (SKEW ANGLE: 23° 12' 47.69")

-

EXISTING STREAM LIMITS

58.11'

(NO IMPACTS)

~I

EXISTING GROUND

!!21

~

[ f- -

1040

- - - - - - ~

- -

T.

CHANGE~~======::::;:=========L~- -

PROPOSED/ CENTERLINE

EXIST. CULVERT SECTION US 25 STA. 21+38.08 SKEW ANGLE = 23· 12' 47.69" OFFSET 58.11' R MATCHLINE WITH US 25 STA. 21+61.10 SKEW ANGLE = -00· 13' 09.49" OFFSET 53.42' R

- - - - - EXIST. I.E.

1030

=1029.80

1020

RC BOX CULVERT (15.6' X 6.6')

NOTE: PIPE CROSS LINE SECTION CORRESPONDS TO SECTION ALONG THE CENTERLINE OF THE PIPE

US25ATSC11 INTERCHANGE IMPROVEMENTS

SC':*tJI .JACOBS'~

PIPE CROSS LINE SECTION 20

10

o

20

1 inch

NOTE. HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4. 2012

= 20 feet

40

INTERCHANGE IMPROVEMENTS us 25 AT SC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT PIN #37129 FIGURE NO.:23 DATE: APRIL 2012

RAMP 1 STA. 18+08.74 (SKEW ANGLE: 35° 29' 10.84")

I

EXISTING ","-STREAM LIMITS

EXISTING STREAM LIMITS

I

PROP. STREAM FILL IMPACT

PROP. STREAM FILL IMPACT ~

PR~POSED GROUND

EXISTING\ GROUND

.

~ROP'

I.E.

PROPOSED GRADE..sL

=1031.94

III

1040

<'1

'-

11=

.rJ

-------~- ~

PROPOSED I.E.

------- -----"".. . . .-_""""ioI:IIiI~"=~~=" : :"=""=""~="-~="=~=""-~OlF-=~=""-=" =~"=-=~==" =-~"~~;;;;;;~'¥~--:;:::<~~=~.~.~~*'=d"j ... ...~o

PROPOSED RIP RAP LIMITS

PROPOSED RIP RAP LIMITS

PROPOSED/ CENTERLINE

SC'.,

= 1030.95

1030 1020

PROPOSED RC BOX CULVERT (DOUBLE 6' x 4')

NOTE: PIPE CROSS LINE SECTION CORRESPONDS TO SECTION ALONG THE CENTERLINE OF THE PIPE

JACOBS'~

US 25 AT SC 11 INTERCHANGE IMPROVEMENTS 20

10

PIPE CROSS LINE SECTION o 20 1 inch = 20 feet

NOTE. HIGHWAY AND BRIDGE DESIGN PREPARED BY STANTEC CONSULTING, VERSION RECEIVED APRIL 4, 2012

,

40

INTERCHANGE IMPROVEMENTS US 25 AT SC 11 GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCDOT PIN # 37129 FIGURE NO.:24 DATE: APRIL 2012

/' , ' /ApproX.

CL Stream Relocation & Structure Base Line

.....

/

~10

", ,

o

Toe

OfFIII~~ __ --

<"

Horizontal Curve Data

P.I.

19+66.10

o

16° 22' 13" 206.51' 373.13' 56.38' 350.00'

t:l. 61° 04' 59" IRt.) T L E

R

HYDRAULIC DESIGN DATA Drainage Anea: 2.45 Sq. Miles 50·Year Discharge: 749 CF/Sec. 50-Year Flood Elevation: 1035.4 50·Year Hydraulic Cross Section: 190.2 SF U/S 183.3 SF DIS 50·Year Velocity: 4.0 ftJSec. 10o-Year Discharge: 881 CF/Sec. l00·Year Flood Elevation: 1035.7 100·Year Hydraulic Cross Section: 205.7 SF U/S 201.0SFD/S

Includes 1.5' Barrier Parapet and 1.5" Extension (Typ. Ea. Side) Radial Dimension UIS = Up Stream of Bridge DIS = Down Stream of Bridge ~ Denotes Area of Channel Excavation All Bents Are Parallel to CL Stream Relocation FDenotes Fixed Bearing at Bent Concrete Barrier Parapet Transition (Typ. Each ~ Three Beam Guardrail Connector (Typ. Each

*

BRIDGE PLAN/PROFILE SHEET US25ATSC 11 30

15

INTERCHANGE US25ATSCll GREENVILLE COUNTY SOUTH CAROLINA APPLICATION BY SCOOT

o

30

1 inch

=30 feet

60

·

PIN # 37129 FIGURE NO.:25 DATE: APRIL 2012

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas