You can copy from here when filling out the rest of the page.
John Paul II Catholic School-
Jasper County, SC
John Paul II Catholic School-
Jasper County, SC
JO I N T
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Caroli na 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston , South Carolina 29405
REGULATORY DIVISION
Refer to: PIN # SAC 2012-0364-1Q
July 06 , 2012
Pursuant to Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1344) and the South
Carolina Coastal Zone Management Act (48-39-10 et.seg.) an application has been submitted to
the Department of the Army and the S.C. Department of Health and Environmental Control by
BISHOP JOHN BARKER
CATHOLIC DIOCESE OF CHARLESTON
162 INGRAM ROAD
CHARLESTON, SOUTH CAROLINA 29407
for a permit to place fill in wetlands draining to the
OKATIE RIVER
at a location adjacent and north of SC170, about 0.10-mi east of the SC462 intersection, and
adjacent and south of the Beaufort/Jasper Water & Sewer Authority canal.
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 days from the date of this notice
and SCDHEC will receive written statements regarding the proposed work until
30 days from the date of this notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the placement of fill material in 1.40 acres of 'waters of the
United States' to facilitate construction of road crossings, parking facilities and an athletic field
complex for the proposed John Paull! Catholic School (grades 7-12) , on a 70.66-acre campus
project site north and east of the intersection of SC170 and SC462, in the Cherry Point area of
Jasper County, South Carolina. The purpose of the project wetland impacts is to construct the
new parochial school campus.
REGULATORY DIVISION
Refer to: PIN # SAC 2012-0364-1 Q
July 06, 2012
As mitigation for project impacts, the applicant has proposed a conceptual mitigation plan
combining off-site mitigation bank credit purchase and on-site, buffered conservation easements
on all remaining wetlands .
NOTE: Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a copy
of the plans for the specific project. The request must identify the project of interest by
public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you. Your request for drawings should be addressed to the
U.s . Army Corps of Engineers
AnN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such, this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 1.40 acres upstream of estuarine substrates and emergent
wetlands utilized by various life stages of species comprising the red drum , shrimp, and
snapper-grouper management complexes. Our initial determination is that the proposed action
would not have a substantial individual or cumulative adverse impact on EFH or fisheries
managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS) . Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the
District Engineer has consulted the most recently available information and has determined that
the project is not likely to adversely affect any Federally endangered, threatened , or proposed
species or result in the destruction or adverse modification of designated or proposed critical
habitat. This public notice serves as a request for written concurrence from the U.S. Fish and
Wildlife Service andlor the National Marine Fisheries Service on this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
REGULATORY DIVISION
Refer to: PIN # SAC 2012-0364-1Q
July 06, 2012
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties , or properties listed as being eligible for inclusion therein , and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked , this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources .
Any person may request, in writing , within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state ,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the project must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the project will be considered
including the cumulative effects thereof; among those are conservation , economics , aesthetics,
general environmental concerns , wetlands , historic properties, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion , recreation ,
water supply and conservation , water quality, energy needs, safety, food and fiber production and ,
in general, the needs and welfare of the people. A permit will be granted unless the District
Engineer determines that it would be contrary to the public interest. In cases of conflicting
property rights, the Corps of Engineers cannot undertake to adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species , historic
properties , water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Paul Hinchcliff at
843-329-8044 or toll free at 1-866-329-8187.
TCHIE
TO
BEAUFORT
~
\ TO
.. BLUFFTON
VICINITY MAP
N.T.S.
(
c
rs
onCOrp' 01 Engln e ·
l
.
U.S. ",mY
110364-10
SAC ~3
ju\~ 2012
JOHN PAUL II CATHOLIC SCHOOL
I
catholiC SChOO
John paul \I pel County SC
sC 170 - Jas
LOCATION MAP
..._
DATE,
RE'<1SED,
SCALE:
N"IS
PROJECT No. 0402318
)
JASPER COUNTY. SOUlH CAROLINA
03/09/12
SHEET
J... OF ~
--. ---------.. -'"_.----
- -
--
-
~
---- .--- ..
-'
-~__~ -_
1.0:,.- : _
..........
-:--- -
- S'I'lIqmp
·
-· .
-- - - -~------=- ~~~~
--~
;..
--
- ---
--
----_
... ..... .... - - .........-..--.
~-=-~ ~-
.......
-
.
.
-- -.
-
"
'"
.......
\.'
,
TAKEN FROM USGS JASPER QUAD
(
c
e on
of Engineers
U.S. Army COI1"
JOHN PAUL II CATHOLIC SCHOOL
C 2012-0364- 10
SA 03 July 2012
C thOlic SCllOOI
John paul \I a county SC
sC 170 - Jasper
USGS MAP
/
JASPER COUNTY, SOUTH CAROUNA
DATE:
Rr...SED:
SCAL£:
03/09/12
NTS
PROJECT No. 0402319
Wetland AA
0.62 Ac.
Wetland F
3.70 Ac.
Wetland A
3.02Ac.
Wetland B
1.59 Ac.
Wetland I
1.51 Ac.
Wetland G
0.60 Ac.
Wetland 0
/ 0.32AC.
C)
Wetland E
0.20 Ac.
Total Wetlands - 12.46 Acres
II
_.--r~SlsiiilCc:l---=
· onCO"'. 01 engin....
u.s. wmv
2 0364- \0
SAC ~~
~ul'/ 2012
001
cathOliC seh
hn paul \I
r County sC __- Jo
aspe
J
SC 170 -
----
=-.:.--
Existing Delineated Wetlands
JOHN PAUL II CATHOLIC SCHOOL
ClIENT: DIOCESE OF CHARLESTON
LOCAnON: JASPERCOUNTY, SC
SHEET·' .. ~e,
PROJECT '" 0402318
SCALE:
DATE:
03/09/12
......,..
NTS
=-~====~==============~
I
I
lEGEND
fWIiJ
JURISOICTlOHAl WETlANDS TO BE fiLLED
~
JURISOICTlOHAl WETl.AHDS ROAD CROSSING Fl.l
ITII!IlI
TEMPORARY ptPElINE CROSSING
~
~
JURlSOtCT1ONAl WETlANDS TO BE PRESERVED
-
[==:J
WETLAND IMPACT PLAN
JOHN PAUL II CATHOLIC SCHOOl
'jENT: DIOCESE OF CHARLESTON
LOCATION
JASP(I(
DAT[ '
0),109./12
COUNTY, 5C
PROJECT' 04021lB
...'" .q oF'O
SCAU:
1"a.tW
............
...... ......
...... ......
...... .......
.......
............
"
...... ......
.............
.............
..............
...... .......
......
.............
............
...... .......
.......
...... ......
.......
...... ......
JP-02
"
1.59Ac.
"
"
"
"
"
A
"
--+->,..L
0.07 AL.
"
"
"
"
"
"
"
"
"
"
NON.JURISDICnONAL
CONVEYANCE, TYP.
"
'~"---......
"
VIEW
"
"
"
"
I
"-
JOHN PAUL II CATHOLIC SCHOOL
WETLA D MASTER PLA
JASPER COUNTY, SOUTH CAROUNA
"
"
"
OAlB
03/09/12
REVISED:
SCALE:
NTS
PROJECT No. 0<402J1B
SHEET
Sore.
./
./
./
./
./
./
./
./
./
./
./
------
-
,
./
, / '
NON-JURISDICTIONAL
CONVEYANCE , TYP.
B
JP-05
0.18 M..
0.20 "'
JP-04A
s.c.
-~-
-
----
--
-----
VIEW
2
JOHN PAUL II CATHOLIC SCHOOL
WETLA TD MASTER PLAN
)
JASPER COUNTY, SOUTH CAROLINA
DAre
OJ/09/12
RE\1SEO:
SCALE:
NTS
PROJECT No. a.o2318
SHEET
6 of e>
CONVEYANCE,
TYP.
--_.
---
-,.:----
..
C
O.60N;.
\\\
S.C. HIGHWAY 170
VlEW
(_
· OIl
U.S. ,.."'~
c
I EJlgln eers
COf9 s 0
2012_0364-10
SAC 03 )u\,/1.011.
_
hOOI
thO hC SC
Joh" paul" C:" r cou"ty SC
SC170-Jasr-
3
JOHN PAUL II CATHOLIC SCHOOL
WETLA D MASTER PLA
DATE,
RE\1SED:
SCALE:
03/09/'2
NTS
PROJECT No. a.o2319
~~======~)~===J=A=SP=E=R=C=O=U=N=TY=,==SO=U=~==C=A=R=O=U=NA====~~==~========~
7 ~ E>
I
I
\
\
\
\
\
\
\\
\
\
\
I
I
JP-1 1
E
000 Ac.
JP-13
0" .....
ROAD CROSSING E WILllJT1LIZE
RCP CULVERTS. THESE
STRUCTURES WILL BE DESIGNED
TO ACCOMMODATE A 1Q(). YR
STORM EVENT.
\J.._- F
0.27 4l:.
S.C. HIGHWAY 170 -
R/W VARIES-
~~~===±=======-=
--------VIEW
~O ~r=~==~======~~~~====~r=======~
\ JOHN PAUL II CATHOLIC SCHOOL
(____
1""""- _
._= don
··L'O
, '- ,~'
SAC ~3 Jo"l1011
51 C I engin.....
us.:S"'VCO",SO
.
4
.
SChoOl~
DATE:
WETLA D MASTER PLAl
OJ/09/12
~::
NlS
PROJECT No. 0402318
B "'
catholIC
Sc
paUl \I
count'l
John170 Jasper
__ ~====)~===J=A=SP=E=R==C=OU=N=TY==.=S=O=U=TH==C=A=R=O=U=N=A=~~~=U1=====OF==u==~
SC
-
::..----