You can copy from here when filling out the rest of the page.
Old Combahee Plantation Impoundments-
Beaufort County, SC
Old Combahee Plantation Impoundments-
Beaufort County, SC
JOI NT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: PIN # 2012-0737-1T
30 July 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the
Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone Management Act (48-39-10 et.seq.) an
application has been submitted to the Department of the Army and the S.C. Department of Health and
Environmental Control by
OLD COMBAHEE PLANTATION
C/O TRAVIS FOLK
FOLK LAND MANAGEMENT, INC.
3515 WHITE HALL ROAD
GREEN POND, SC 29446
for a permit to place fill material in wetlands of the
COMBAHEE RIVER
At Old Combahee Plantation located at 709 River Road in Yemassee, Beaufort County, South Carolina (Latitude
32.6574191 Longitude -80.791231)
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the placement of fill material and the installation of water control structures
in former non-tidal inland rice fields to create three (3) impoundments. A total 0.142 acres of wetlands and
waters will be impacted as a result of the discharge of fill material. A total of 81.7 acres of wetlands will be
impacted from seasonal flooding and moist soil management practices. In detail, the proposed work consists of
the following:
REGULATORY DIVISION
Refer to: PIN # 2012-0737-1T
30 July 2012
Impoundment #1: The construction of impoundment #1 involves the placement of 5.5 cubic yards of material into
0.001 acres of canal to stop water flow out of the canal and the installation of one water control structure in an
existing road crossing, impacting 0.002 acres of waters of the U.S. The proposed water control structure will be
a 4' wide X 22' long wooden spillway box with a 4.5' tall flash board riser. The proposed work for impoundment #1
will allow for the moist soil management of 22.4 acres of forested wetlands and the management of 1.8 acres of
forested wetlands as a Greentree Reservoir.
Impoundment #2: The construction of impoundment #2 involves the placement of fill material into two canals to
stop flow water flow out of the canals. Each canal fill will require 5.5 cubic yards of fill and will impact 0.001
acres of canal (11 cubic yards and 0.002 acres of canal total). The installation of one water control structure will
occur in an existing road crossing impacting 0.002 acres of waters of the U.S. The proposed water control
structure will be a 4' wide X 22' long wooden spillway box with a 4.5' tall flashboard riser. The proposed work for
impoundment #2 will allow for the management of 17.7 acres of forested wetlands as a Greentree Reservoir.
Impoundment #3: The construction of impoundment #3 involves the placement of 685 cubic yards of material
into 0.135 acres of forested wetlands for the renovation/expansion of an existing remnant field-dike and the
installation of two water control structures that will impact 0.002 acres of wetlands per structure. The existing
remnant field-dike has a top width of 3' and a bottom width of 4' and a height of 3'. The proposed work will
expand the top width of the field-dike by 4' and the bottom width by 5' for a total top width of 7' and a bottom
width of 9'. The proposed work for impoundment #3 will allow for the moist soil management of 15.8 acres of
forested wetlands and the management of 24.0 acres of forested wetlands as a Greentree Reservoir.
All fill material necessary for the proposed work will be obtained from an onsite upland location.
Attachment #1 for the location of the borrow material and travel routes of the material.
Refer to
Project Purpose: The purpose of the proposed project is to restore water control capability to inland rice fields so
they can be managed as Greentree Reservoirs and moist soil units for wildlife.
Avoidance and Minimization:
The applicant stated in the permit application that they avoided and minimized impacts to wetlands and waters in
several ways.
During the construction of impoundments #1 and #2, access for the water control structure
installation points will be from the existing roads. Access to the canal that will be filled will occur by a small
trackhoe. Tree removal will be avoided. During the construction of impoundment #3, access to the field-dike will
occur from a parallel road located on the adjacent Twickenham Plantation. This road is approximately 10-15
yards from the field-dike. A trackhoe will also be used for the work and it will exit the Twickenham Road to reach
the portions of the field-dike that will be renovated. Fill material will only be placed in locations where needed to
create a continuous field-dike. Organic material will be removed when needed and relocated to an upland site.
The removed organic material will be distributed throughout the upland borrow site. During the work, machinery
will avoid removing mature black gum trees on both sides of the remnant field-dike. The two new water control
structures will be installed during the field-dike renovations.
All construction related work will occur during dry periods of the year and all disturbed areas (upland and wetland)
will be revegetated with fast-growing herbaceous species (e.g., browntop millet). Additional avoidance and
minimization occurred during the design of the proposed project. The applicant designed the project to utilize
natural and existing changes in elevation to create the impoundments. For example, rather than consider
developing a new field-dike to completely surround the proposed impoundments, the applicant selected an area
where changes in elevation and existing roadways would provide much of the control needed to develop
Greentree reservoirs and moist soil units. Coincidentally, this area was previously developed for water
impoundment by rice planters in the later 1ih and 18th centuries. With regards to the proposed water control
structure installations, existing road crossings were used where possible to avoid the need of constructing new
field-dikes for impoundments #1 and #2. For the construction of impoundment #3, the applicant chose to
REGULATORY DIVISION
Refer to: PIN # 2012-0737-1T
30 July 2012
renovate/expand the existing remnant field-dike and to do so at a minimum width necessary to allow for water
control to further avoid impacts to wetlands and mature black gum trees. The reduction of the width of the field
dike will prevent normal plantation machinery from traveling across the wetland.
To further minimize impacts associated with the proposed project, the applicant has proposed to place inundated
areas of impoundments #1, #2, and #3 and a 100 ft wide upland buffer surrounding the impoundments under
restrictive covenants. The restrictive covenants will ensure that the impoundments will NOT be used to create a
permanently flooded pond, especially of the type that might be conducive to a housing development.
Management of Impoundments
The applicant has proposed to manage 1.8 acres of impoundment #1, 17.7 acres of impoundment #2, and 24
acres of impoundment #3, for a total of 43.5 acres of the project area, as Greentree Reservoirs. The Greentree
Reservoirs will be managed in accordance with the 1997 Interagency Guidance Concerning Authorization, Siting,
Construction and Management of Greentree Reservoirs. The applicant stated that the proposed impoundments
will be located in an inland, non-tidal rice field that was likely cleared and managed for rice production between
the early 1700's and 1800's. After rice culture, these habitats were flooded during the winter for waterfowl. The
applicant is proposing to manage portions of the impoundment as Greentree reservoirs. With regards to
management of the Greentree Reservoirs, the applicant stated that the boards will be added to the riser in
November and remove din February-March. This will create shallow-water habitats throughout the bottomland
hardoowds during winter. The area is dominated by mature oaks, blackgum, and red maples which will provide
adequate mast for waterfowl and wading birds during the flood period. Water depth will vary between 12" and
18" which will result in up to 35.3 acres of seasonally inundated habitat.
The applicant has proposed to manage 22.4 acres of impoundment #1 and 15.8 acres of impoundment #3 as
moist soil units. The management actions and goals will be as follows: 1) reduce density and coverage of woody
tree species with herbicides; 2) apply repeated prescribed fire to reduce depth of organic content; and 3) flood
periodically to stimulate germination and growth of herbaceous plant species.
Compensatory Mitigation:
The applicant is not proposing compensatory mitigation for impacts associated with the proposed project and
believes mitigation should not be required. The applicant stated that the ratio of wetland impacts to habitat
created is substantial (i.e., 0.17% = 0.142 acres impact / 81.7 acre habitat). The applicant believes that this
demonstrates numerous acres will be able to be managed for the benefit of wildlife with little impacts to wetlands.
The proposed project will also create a diversity of habitat types as some of the acreage will be managed as
Greentree Reservoirs and the remaining acreage will be managed as a moist soil units with a predominance of
wetland herbaceous plant species. This will create habitat for numerous passerine (prothonotary warbler),
waterfowl (wood duck), and wading birds (egret and ibis species). The applicant also stated that the project was
designed to have as little impacts as possible. Avoidance and minimization of project impacts are discussed in a
previous avoidance and minimization section in this public notice. Also discussed in the avoidance and
minimization section, the applicant proposes to place restrictive covenants on the inundation area and uplands
within 100' of this boundary. In addition, the applicant has voluntarily entered into a conservation easement with
The Nature Conservancy and Memorandum of Agreement with South Carolina Department of Natural Resources
The applicant also stated that the
to manage pine stands to the benefit of red cockaded woodpeckers.
proposed project is consistent with the past stewardship of Old Combahee Plantation. The applicant also does
not believe compensatory mitigation is necessary as the proposed project will restore historical earthworks
associated with the area when it was utilized for commercial rice production and the proposed impacts would
restore water control capabilities similar to what would have occurred during rice production. The water
REGULATORY DIVISION
Refer to: PIN # 2012-0737-1T
30 July 2012
management routines will be similar to those during the rice growing era. Finally, the proposed project is under
consideration for funding by the North American Wetland Conservation Act (NAWCA) funding program as the
project is consistent with all of the goals in NAWCA. For all of these reasons, the applicant does not believe that
compensatory mitigation should be required for the project impacts.
NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of a
written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The request
must identify the project of interest by public notice number and a self-addressed stamped envelope must also be
provided for mailing the drawings to you. Your request for drawings should be addressed to the
u.s. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107.
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on
behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water
quality standards. The work shown on this application must also be certified as consistent with applicable
provisions of the South Carolina Coastal Zone Management Act (15 CFR 930). The District Engineer will not
process this application to a conclusion until such certifications are received. The applicant is hereby advised
that supplemental information may be required by the State to facilitate the review. Persons wishing to comment
or object to State certification must submit all comments in writing to the S.C. Department of Health and
Environmental Control at the above address within thirty (30) days of the date of this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson
Stevens Fishery Conservation and Management Act. Implementation of the proposed project would impact
0.142 acres of freshwater wetlands upstream of estuarine substrates and emergent wetlands utilized by
various life stages of species comprising the red drum, shrimp, and snapper-grouper management complexes.
Our initial determination is that the proposed action would not have a substantial individual or cumulative
adverse impact on EFH or fisheries managed by the South Atlantic Fishery Management Council and the
National Marine Fisheries Service (NMFS). Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has determined that the
project will have no effect on any Federally endangered, threatened, or proposed species and will not result in the
destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a
request to the U.S. Fish and Wildlife Service and the National Marine Fisheries Service for any additional
information they may have on whether any listed or proposed endangered or threatened species or designated or
proposed critical habitat may be present in the area which would be affected by the activity, pursuant to Section
7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
REGULATORY DIVISION
Refer to: PIN # 2012-0737-1T
30 July 2012
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the
reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated
by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean
Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection,
Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the project will be considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and
welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary
to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this project. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental Assessment andlor an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Tracy Dotolo Sanders at
843-329-8044 or toll free at 1-866-329-8187.
Project Title: Old Combahee Inland Rice Field
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Applicant: Jessica Loring
.Agel~t::.-'!.!:avis I:!.ayes F~_. ___..__....___...._
Project in County
N
Quad boundaries in black
County boundaries in gray
o__-====:::J_____
2
4
8Miles
A
Drawing Scale
1" : 20,000'
Date
Sheet
of
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
July 30, 2012
Hampton Quad
Cummings Quad
Black Creek Quad
Sheet 1 of 22
Neyles Quad
Hendersonville Quad
HAM PTON lCounty
I
I
,---------
1-------------,
----------1-------------1-------
1
COLLETON County
1
hon:.n"'~lIe
Grays Quad
-1-------------1------
JASP~R
BEAUFOIj{T County
1
Coosawhatchie Quad
-1-------------1-------------1---
1
lillman Quad
--------1-------
County
1
Calfpen Bay Quad
1Fenwick Quad
Quad
Ridgeland Quad
--r------------r----
Project in Quad
o_.:=:=-___
0.5 1
2
Miles
Cummings Quad
t
Project Title: Old Combahee Inland Rice Field
Project Locaton: 709 River Road
Yemassee, SC Beaufort County
32° 39' 26.71" N, 80° 47 28.43" W
Applicant: Jessica Loring
Agent: Tr~is .l:iayes Fok, PhD ______ .__
N
A
Quad boundaries in black
I
Drawing Scale
1" : 7,600'
Date
Sheet .~.!E_~~
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Black Creek Quad
- - - - - - - - -r
- -. ' :"''"'\ - - - . - - - -: - '
~.'-
July 30, 2012
Sheet 2 of 22
I
J"
I
'",-"
,t
1
r,,>'.c
4
.....
,--
-
1
I'·
I
r
"..':-:.! ,
,
,\
n::.u.,."N en
'
.
8I-J\uo<:W':co·~
~
.'
~.",-
I
White Hall Quad
1'-
Yemasse.e
Qua'd.!"
/ ''; .':
.,"
,
McPhersonvilie Quad
~ ~ .
1<
-,y.:.',
"
I"':
)(,::,
<
~~'
:'.,
'r
t·
\'
\ ..
1
,,[
;
\'~
.
;.'1
t,
~'~'
"t
t
,I
-rCoosawhatchie Quad
\
-..;
-
·
J,
L __
I
~.:
...... -
...J...., _'_,._
Sheldon Quad
--.:.r..
'. I
-' r
I
Dale Quad
Project Vicinity
N
A
1.4
o_-=::::J___
0.35 0.7
Miles
Project Title: Old Combahee Inland RK:e Field
Project Location: 709 River Road
Yemassee, SC Beaufort County
32° 39' 26.71" N, 80° 47' 28.43" W
Applicant: Jessica Loring
_ Agent:-.Irav~_Hayes Fok, Ph~.._...___..____...
Drawing Scale
1" : 5,900'
Date
Sheet
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
0~ '?,.t...
1~~
0~t...
July 30, 2012
Colleton County
Sheet 3 of 22
()
c
~
o
0:
()
..,
Cl)
Cl)
COrnbahee River
Beaufort County
Old Combahee Plantation
property boundary
of
"1'
Summary of Project Impoundments
A
N
o___.:======:::::._______
455
910
1,820
Feet
USGS 7.5' Yemassee quadrang
/
~.
'\..
" . "'-.
\ ....
'
\,,_..I.~ ,_.
I
}
I
\\
''-''
~I
'\\
~,
\
..'
~
.... ~-.
...-j'
~
<
.~
~Ir\,
J
c-'
,
I
i
I"
/ I
I
p .'.... ,.
-"".~
....
....,...--~
\
"'LJ
~
....""
Proposed Work at Impoundment #3
- Install two water control structures
(4' wide x 22' long) in a to be renovated dike
~e 685 cy of !ill to renova~e an existing dik~ i
l..
~
....
)
)(3-'1- 38
~- .... '------~
~···~T
-
--'' "'
\
._-
,""",-- - '....
of
~~~~.>.--.~
-:::....
Proposed Work at Impoundment #1
I, ,,/
- Inst~1I ~ne water cont~ol struc~ur~
J//~''''
-~""
(4 Wide x 22' long) In an eXisting road~~~lmpoundment
- Place 5.5 cy of fill to control.#','
~
water at canal
tl"-~
Date
Sheet
",
,,,... -::;,
~/"... <~~-
/ ('
l
..,,~
~~
\
;,
"
~
i.~
'-.
>.
t
g Scale
;raWin
1": 575'
Proposed Work at Impoundment #2
- Install one water control structure
l
(4' wide x 22' long) in an existing road
- Place 5.5 cy of fill in two locations
(11 cy total) to control water at canal
.
"
.0
Sheet 4 of 22
July 30, 2012
\'
c I
::J
o
"0
Rose Hill Plantation
,
---. ~
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
. ..".
#3} .. ~~
, .
.
ITwlckenham Plantation
i
.~~-
-
Project Impacts & Habitat Summary
---,
A
N Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
o
400
1,600
Feet
800
Impact NO.4
Proposed wetland fill in canal ~
(5.5 cy over 0.001 acres)
July 30, 2012
~
Drawing Scale
1": 575'
Date
Sheet
of
Sheet 5 of 22
Habitats to be Managed
. . greentree reservoir
Impoundment #2
17.7 acres of
tree reservoir
moist soil management
Impact No.3 (0.002 acres)
Proposed water control structure
(4' wide x 22' long wooden
spillway box with riser)
Rose Hill Plantation
mpact NO.6
Install 1 water control structure
(4' wide x 15' long) & proposed
wetland fill to renovate dike
(306 cy over 0.060 acres)
Impact NO.1
Proposed wetland fill in canal
(5.5 cy over 0.001 acres)
Impoundment #1
22.4 acres of moist soil
1.8 acres of greentree
Impact No.2 (0.002 acres)
Proposed water control structure
(4' wide x 22' long wooden
spillway box with riser)
Twickenham
Plantation
ceo
'0
c
::::!
o
.0
Impoundment #3
15.8 acres of moist soil
24.0 acres of greentree
Plan View Impoundment #1
N
o
190
380
........
A
760
................ Feet
c=====~
~.
CO
"0
Old canal assocaited with
inland rice culture
L=======-~
C
:::J
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
July 30, 2012
/ !
Sheet 6 of 22
Drawing Scale
1": 225'
Date
Sheet
of
--~-~-.~~
3
Impact No.1
Proposed wetland fill in canal
(5.5 cy over 0.001 acres)
0
.c
£'
Q)
.BI
Iec..
Of;'$.
v~o
I? Or
+-'
co
+-'
C
co
~
Old dikes associated with inland
rice culture ,(thin gray lines)
<9/<9/fi
a...
7o~
.
I
Q)
Upland
en
0
a:::
22.4 acres in
moist soil (light gray)
Existing Road
Ex~ande~ view 21
1.8 acres in greentree
reservoir (dark gray)
"
I
Impoundment #1 inundation
boundary (24.2 acres)
I
Upland
Impact No.2 (0.002 acres)
Proposed water control structure
(4" wide x 22" long wooden
spillway box with riser)
Cross section AA
Illustration of Wetland Fill in Canal
Remnant dike
for canal
Remnant dike
for canal
Remnant perimeter canal
for inland rice field
I 10.0'
Remnant perimeter canal
for inland rice field
Canal Top Width
I
Bed of inland rice field
Bed of inland rice field
5.0'
Maximum
Depth of Canal
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
July 30, 2012
Sheet 7 of 22
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Drawing Scale
1" : 5'
Applicant: Jessica Loring
Date 5-22-12
Agent: Travis Hayes Folk, PhD
Sheet
of
Expanded View 1 for Impoundment #1
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
N
o__
25
50
~====:::::.
A
_____100Feet
,
.'.
.,
........ ,
"
',,'
, ,-
','
'.
,,. ','
,
.
, ,
... '
t
.. ',......
.............." .....
I
.. '
"
I
,
,
Uplan~t.
, .'
,,.
,,
I
"
I
,"
................'
..
"
I....
'.
"
"- .. ... ,'
....
-.
, ,
'\
. . ! ...... -- ...... ~ .... ~
,"'. .. "
,
,,:.'
,,
.
I
,
,,
,.-",
. ~.
,~,
, '.
"
~
," ,
,
I
\
\\
:
"
,
:'
,
.
,,'\
,
,
...... ,..
...
,,' "
' ....... '
"
U: "1"
"
,..>----..-.....
,....... ..
,"::~
,::' ~ ",l--~
,
,
",
-'
1
of
"
........ "",
.....,:: ...... , '
,I
'
·,"
,'
,~~~~'
",.. -..:. . ~ . . . "," tIt~ ,,'
:
'~/O:'
,1'
.... ,-: ..' , ,:,
,,:
,,
....
"
,,
,,.,,
,,-
................... .
,
I
'
I
I'
I":
'
.
:,, ''
.... \
' ..
., .
,, , ,
,
,
,
I
Date
Sheet
Sheet 8 of 22
July 30, 2012
.,
-,
','
, ,
Drawing Scale
1" : 40'
,'. "
P ~Jld""'"
", /': \,,/:: <' ~:-.:::
'I
"
\"
,
~
....,.... I"',
.
..
,
""'\ ' ....
~
......
\
"
........ 1'
\..
, :
" '...
I'
. ..
.... -:::.:
I
, .. " 'i
..
"
I
I
,
,
,/
,
'
,
,,
.,
Impoundment #1
inundation boundary
,~".. ..... '';
..
,
................
.,I""
r614C~k-61
,,
..,,
0'11?i/) ~.
e C'V-?'vr61
I'
'.
,
I
,,
.,
I
"..... §!,"
, :"
.'
...
.. ;::S
V'"
I
" ,,'
n · ...
·
.I'
Impact No.1
Proposed wetland fill in canal
over 0.002 acres)
8
.~
(j
o
#
~
~
Extent of inundation area
defined by topography.
Lidar data below illustrates
the chanae in elevation.
' I,., ......... ....."
... .
\ ,,'...." ," ..... . ,
I,
"
.......
",
,,
'1>
,
,,,
I
I
..
\"
........
,
' .... )...
,
,
'"
,,
",\,
,
,,
,
··
'- "
,,'
:.
..
·
.(
''
........
,'"
,
"
'
.. ... "" .. '
,
.
,
................. ,'
,,
"......
'\
'.. "
.....
,,
I
........... 1
,
,,
,
,·
..: '
,...., ,
......... .... j
.:s
~
"
,:",
~
~
~
.. ' I'
"........
, ,
,, ' " ,
'7C
.
,
. ::, ; ...
,,
., ,,
,, ,,
,
",
,1.. ,1
Ql880C·
i'Q lt61
.. ,..,
...... -
.
.. ,'
,,'
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Cross section BB
Illustration of Typical Wooden Spillway Box and Flashboard Riser
July 30, 2012
Sheet 9 of 22
Proposed moist soil management unit
/'
Existing Road (gray)
Spillway box passes through embankment
4.5'
Height of
Flashboard
Riser
~LII"
'"
Direction of waterflow"
Spillway box placed 6" below grade of wetland
Dimensions
Width of spillway box = 4'
Length of spillway box = 22'
Outside height of spillway box = 2.0'
Inside height of spillway box = 18"
Height offlashboard riser = 4.5'
Project Title: Old Combahee Inland Rice Fields
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Drawing Scale
1" : 4'
Applicant: Jessica Loring
Date 5-15-12
Agent: Travis Hayes Folk, PhD
Sheet
--,
of
Expanded View 2 for Impoundment #1
N
A
10
20
o__-====-____
40Feet
Old Combahee Plantation Impoundments
PIN SAC 2012..Q737-1T
Drawing Scale
1": 20'
July 30, 2012
Date
Sheet
Sheet 10 of 22
,
:
,, ,"
,, , ,,,
,
, ,,
,, ,
,,
,
,,
...
",
..... "
"
;,,,, ,
"
,
"
. ..
'
"
.,
"
",,: b :", ,,"
"
Impoundment #1
,,'
,
"
, ,
I
"
,
~",'
, ,','
,
I
,
' t ,
I
::
1\#
~
:<>:
:' :'
"
OF
~Q>tt91170~
:
~
\
't
~
,,1
,,'
"
O·
,: ,:
O//-t9Ct·
:t01)
of
~
!::
:
:ii!---~--lLiDAR
.
I
i
.~,','
~
,,',,1
~
data delineating existing
road crossing inland rice field.
,,,,,,
: .
.,-' ,/ Ii} ::'
.......
~
,"
,
" "
, ,
, ,
,, ,,
,,
..
I
I
.,.,,,
,, ,,
, ,
,
,, ,,
,, , ,,,
Impoundment #1
inundation boundary
.
,] ,
,, , ,
, ,
,, ,,
,, ,
,:
,,
,
,,
,,
,, ,
,
,
,, ,,,
,
,
... .'
,
"
,,' ".
.... " ,,'
.,,,
""
,
..
,,
,,
,
,,
,,
,
.
.,'.,
'
Impoundment #2
.. ,'
.
, , ,,
..
.
. ,
," "
,, '
, '
: "
,, ' '
,, ' '
..
, ''
,, ,,,
"
"
Impact No.2 (0.002 acres)
Proposed water control structure
(4' wide x 22' long wooden
spillway box with riser)
Plan View Impoundment #2
N
a___ 250
1,000
_______
Feet
500
~======:::JI
A
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Drawing Scale
1": 300'
Date
Sheet 11 of 22
July 30, 2012
Sheet
of
---,-
Impact No.4
Proposed wetland fill in canal
(5.5 cy over 0.001 acres)
~
ro
"0
c
:::l
o
..0
Upland
>
t
Expanded view
41
Q.)
c
......
CO
......
c
o
CO
a..
c..
o
.....
c..
Impoundment #2 inundation
boundary (17.5 acres)
Old canal associated with
inland rice culture
I
Upland
Q)
en
0:::
o
Expanded view 5
Upland
Impact No.5
Proposed wetland fill in canal
(5.5 cy over 0.001 acres)
Old dikes associated with inland
rice culture (thin gray lines)
I
'I
Impact No.3 (0.002 acres)
Proposed water control structure
(4' wide x 22' long wooden
spillway box with riser)
Upland
Cross section CC
Illustration of Typical Wooden Spillway Box and Flashboard Riser
Proposed greentree reservoir
/
Existing Road (gray)
Spillway box passes through embankment
4.5'
Height of
Flashboard
Riser
~I
I
I
.V~~'i?"
......
Direction of waterflow'
Spillway box placed 6" below grade of wetland
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Dimensions
Width of spillway box = 4'
Length of spillway box = 22'
Outside height of spillway box = 2.0'
Inside height of spillway box = 18"
Height offlashboard riser = 4.5'
July 30. 2012
Sheet 12 of 22
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Drawing Scale
1" : 4'
Applicant: Jessica Loring
Date 5-15-12
Agent: Travis Hayes Folk, PhD
Sheet
of
Expanded View 3 for Impoundment #2
N
A
o_ _ _c:::c::::::::J_
12.5
25 _ _ _ _ _
50Feet
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Drawing Scale
1" : 20'
Date
Sheet
Sheet 13 of 22
July 30, 2012
~"~~~.~
of
__" _ o
....... '.;
....
lmpoundment#2·
...
"
~
"//"
" ~O~..--....----....:.,.' "
.
~
· .N
',:;' k"·
/---
.
",
,-
.'./
.... ..
'
."",
,
· 1'
,
...... ' ...... ' .
.. \ .
,
LlDAR data delineating existing
road crossing inland rice field
., " .....,
...
"
.
,
t
...... ~ ...~ ... ~
...
...
.~
·· 1
'...
....
·,·
·,··
··
I
I
,.
'#
""""\.
,:,,,,,
\,
..
,,.,.
~,,,
,,"" "
'-
.......... -.......:...
"
..~~..
'1»400"'"
"
.'
;
"""",
;
,,
_""""O~v
~
-~~"/
'#
"
"'"
"'\.
,
,"
c.
..
n..~ ./
",41'
~
" """..
,
... ..,
,_",' ...:f
...... to..
,
'.
"",
,I'
",
#.
~,t;:,1
~~/I/
,/ ,/
",.' ..'"
..""'
...... " ,
./
Impact No.3
Proposed water control structure
(41 wide x 221 long wooden
spillway box with rise
Impoundment #3
Cross section DO
Illustration of Wetland Fill in Canal
Remnant dike
for canal
Remnant dike
for canal
Remnant perimeter canal
for inland rice field
I 10.0' Canal Top Width I
Remnant perimeter canal
for inland rice field
Bed of inland rice field
Bed of inland rice field
5.0'
Maximum
Depth of Canal
Old Combahee Plantation Impoundments
PIN SAC 2012~737-1T
July 30. 2012
Sheet 14 of 22
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Drawing Scale
1" : 5'
Applicant: Jessica Loring
Date 5-22-12
Agent: Travis Hayes Folk, PhD
Sheet
of
Expanded View 4 for Impoundment #2
A
80Feet
20
40
___c::====______
o
...
'
'"
. .
........
,,
.
.
,
I
,
.... '
"
. .'
~"''''''
..
'
...
"
,,
"
. ,.. . . . :,,1'
,
..... ,'
,. ... .. . .. .. ,,
. . ,;...
",:
............
.......
,
,
"
,
'
........\'.....
'.
;
,..
..
","
.. ,'
..
....
..
I
'",
.........
"
..
"
,
,. '
","
....'>.....
"
)
;
i'
I'
J.
I,~
,
.....
Impoundment #2
:J inundation bounda
"
,..,
i'
,
~
'
,.;.;'
,
....
,....
. ..... "
,
"
..
..
'\.,'
.'
,..
.. .
,
,,
... ,
.
.
,. ..
·
-,:,,'
.
..
...... -'
I ....
i,'
,
,
,:
,,
,
..
·
\\
t
:f
.
I
.!
,,>
'J
.
..
'.'
"
\.,~
,,'i'
i
,
,
,,
~'-
",,~./
..<1'''''''", , '''',
,
J
I,~$/
,,
'
;
'
........ .
..
··· ,, .
..' ,.
,,:"
,I
,
...... ..
: ..... - ..
......~ "''\
,, '. "
,
"
.
,
.. ,." " ~
,
,,
,
,:
~
"'I
,
"
...........
,.1
.;
,
'.'
," ..
....
"
~.;
Impoundment #2
-..: ; ..
....
,,
" , ....
".,','.... ....... . ..
...,.......... ....
,
'_
}
Extent of inundation area
defined by topography.
Lidar data illustrates
the change in elevation.
,
>
I"
.',
.
,,
,
//}
. .. ....
'
... . . "
:
,, .. '.
..
"...
,
1_
:I
\,i
1
,,
,,
", \\,
. ~ ' .........
.
·
,!
,' I,
. ,
, ......
' . . . , ' "'"
,,'
--;
'\.,"
"
, ,'-
,
,.'
,
"
.,,
"
. ''"\
I'
,....
i
,j.
I:
,,
,,
,,
Date
Sheet
"
..
.,
Drawing Scale
1" : 30'
\\;'
," . "
'.
., ..",
,.,.,.
............. '
"
,,
,,
.
,
,
,
"
, .. I' I
\
Sheet 15 of 22
July 30, 2012
": c:~" :,1
,.., :'i
UP·')'a'. "'n d':"..::"':\/:::::>/'. { .-'\.O~"
../1
...... '
'
,..... .'
"",'------_ ..'
, ,'....
,
.
"
,
....... "
,
.. --_ .
..
.. ..... "
,
,
........
. .... '
,'.
.... -_ .. -
, . , .... "
.. ""
... . ' ,
.....
......... -----.....
.
......
,
....... '" "
..... -
"
,
...... __ .
':" ,/"""""":,',:::'/"/
. '" .....
'
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
N
" '.
. ..... ......
,"
I
.
" >.
,
.'
,··
.,·
.
·
t
,,,
..'
"#,'
····
,
.)
,
",
Impact No.4
Proposed wetland fill in canal
(5.5 cy over 0.001 acres)
of
Cross section EE
Illustration of Wetland Fill in Canal
Remnant dike
for canal
Remnant dike
for canal
Remnant perimeter canal
for inland rice field
I
Remnant perimeter canal
for inland rice field
10.0' Canal Top Width
I
Bed of inland rice field
Bed of inland rice field
5.0'
Maximum
Depth of Canal
Old Combahee Plantation Impoundments
PIN SAC 2012"{)737-1T
July 30, 2012
Sheet 16 of 22
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Drawing Scale
1" : 5'
Applicant: Jessica Loring
Date 5-22-12
Agent: Travis Hayes Folk, PhD
Sheet
of
.......·
Expanded View 5 for Impoundment #2
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
N
o
20
A
80
40
Feet
.'
,,
,
Extent of inundation area
defined by topography.
Lidar data illustrates
the change in elevation.
.,,
.,, .,
. ,, ,
.
,
,
"
,,
"
......
.., .,..
.·
--'
,
'\'"
'~,
··
, ,
...··
~
...... <- .......
.,.'.
,
.
-',
'!<"..,
... ... --- ...,
, ,,
\ ..
.
l
\
,,
.
,
.,.
.
..,
,,
I''''''''''
"
,
,,
I'
\
..
.
.... \ '
, '
\
"
,"
.. ........
,
...,,' .........
,
,
"..
..
,
<;/:/--llmpact No.5
",'
Proposed wetland fill in canal
"_,,, 1(5.5 cy over 0.001 acres)
,'.,....
, '~'"
.
_
.. '
',,,
"
,
"
,,
.
....
"
......... 01 ... - '\· ........ , ' l
,
."
,! .....
,,1'....... ..
,
.
I ' ......
'. ,
.... ,
,
.......,
,
,
·
..··
,,
.
,
"
,
\
.." :
'
,
, , '~
.
,',','
,1....
:/
"
"
... :',
'
"
I
''
'
:
",
.·.,.........
....
,
.. ...
.,, ...
'. .
'-...
c
'
...
,.'
......
"
""
' ............. ..
"
·
I
,,
,,
'
,. "\.
\,
......
.. ......
"
.
,,
,
,
& .......
,
,'
;, ......
,
I
.. - ......' ..
'.
,
#~
"':1
.... -. .
\.
.. '
,',
c# , # #
. .
,
",
'
'"
.,<* ......
,,
,,
,
:
"
,
.
,,
"
........
' '.
'
,. "'/--, '. (jItt"",:
\
'
.
!:::
,
,
"
c ....
,
,
.!"
\.~
tit:)
.
,
'..
,.\ (/-~~
,,
,
.
"
,'"
\
,,
':
,
/,
",
'" ,
.
, __
,
'I
"0\..
,
.... .
" ,',"....
.
..
.
.,
"',\
,,
I
·
,,'
","
..··.,
~
,,
.....
"""'-~
,
~
.
",
.............
.. .
, ,
,,'
,
...... :~
Up,l~n~
.... ,/.
of
Impoundment #2
,,
:~
\
"'..
Sheet 17 of 22
July 30, 2012
'
,,##''#.1
,,,
I
Date
Sheet
Impoundment #2
inundation
boundary
,
··,
,·
---
i
Drawhg Scale
1" : 30'
~
..., ..... J<'
#
-
~"'''~-
""
.
.........
\ ......
",
..
\,
Plan View Impoundment #3
Old Combahee Plantation Impoundments
PIN SAC 2012..Q737-1T
N
262.5
1,050
525
____-========-_________
Feet
°
Upland
A
July 30, 2012
Sheet 18 of 22
Drawing Scale
1": 275'
Date
Sheet
of
,---
Old dikes associated with inland
rice culture (thin gray lines)
Upland
q;O
,0
.~~
.~
o~
T"""
=I:t:
.......
c
Q)
E
""0
C
::J
o
Q.
E
Of;.&.
C'qb
:t) Or
~
~I"e_
'.I'IQ~
Upland
15.8 acres in moist
soil (light gray)
Impact No.6
Install 1 water control structure
(4' wide x 1S' long) & proposed
wetland fill to renovate dike
(306 cy over 0.060 acres)
Twickenham Plantation
Expanded view 7
Upland
,. ~
Impact No.7
Install 1 water control structure
1(4' wide x 1S' long) & proposed
wetland fill to renovate dike
(379 cy over 0.075 acres)
Cross section FF
Illustration of Typical Spillway Box and Riser In Renovated Dike
4.0'
Proposed greentree reservoir
/
3.0'
Proposed dike
top width
Existing dike
top width
1-------111
I
5.0'
4.0'
Proposed dike
bottom width
Existing dike
II bottom width I
4.0'
Height of
Flashboard
Riser
1
3.0'
Dike height
)
Direction ofwateiflow
Existing dike
Spillway box placed 6" below grade of wetland
Proposed dike
Spillway box passes through embankment
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Dimensions
Width of spillway box = 4'
Length of spillway box = 15'
Outside height of spillway box = 2.0'
Inside height of spillway box = 18"
Height offlashboard riser = 4.0'
July 30, 2012
Sheet 19 of 22
Project Location: 709 River Road
Yemassee, SC Beaufort County
32 0 39' 26.71" N, 80 0 47' 28.43" W
Drawing Scale
1" : 4'
Applicant: Jessica Loring
Date 5-15-12
Agent: Travis Hayes Folk, PhD
Sheet
of
I
Expnded View 6 for Impoundment #3
N
A
30________
60Feet
o____15c:::::====:::::J
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Dtawing Scale
1" : 15'
July 30, 2012
Date
Sheet
Sheet 20 of 22
of
Impoundment #3 inundation
boundary (40.6 acres)
Older portions of dike exist
and will be incorporated
into newly renovated dike.
Canal
Impact No.6
Proposed wetland fill to renovate
dike (306 cy over 0.060 acres)
Twickenham Plantation
Expnded View 7 for Impoundment #3
N
o
15
~
W
........~======~................ Feet
A
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Sheet 21 of 22
July 30, 2012
.".
15.8 acres in moist
soil (light gray)
-==
===
Drawing Scale
1" : 15'
Date
Sheet
of
J Impoundment #3 inundation
boundary (40.6 acres)
Ider portions of dike exi
and will be incorporated
into newly renovated dike.
Canal
Upland
Impact No.7
Proposed wetland fill to renovate
dike (379 cv over 0.075 acres)
Canal
This wetland fill will allow the WCS shown in this expanded view
to drain into a canal on Twickenham Plantation. The second
WCS for impoundment #3 shown in Expanded view #6 will allow
water to flow into an inland rice field on Twickenham Plantation.
The decision whether to dewater into a canal or inland rice field
will be made in concert with the plantation manager on Twickenham.
Source and travel route for fill material
N
o____ 550
________
1,100
-========~
2,200
Feet
A
Old Combahee Plantation Impoundments
PIN SAC 2012-0737-1T
Sheet 22 of 22
July 30, 2012
Drawing Scale
1" : 590'
Date
Sheet
of
2006 infrared aerial photogl
Impact No.4
5.5 cy
>
.....
ctl
"C
Attachment #1
c
::::J
o
..0
-
>
.....
Fill source
(borrow pit pond)
Impact No.5
5.5 cy
Impact No.1
5.5 cy
c::
o
+-'
CO
+-'
~
··
·
I
c::
CO
a..
I
Q)
en
o
0::
ITwickenham Plantation I