You can copy from here when filling out the rest of the page.
Managed Tidal Impoundment General Permit-
Coastal Zone Area, SC
Managed Tidal Impoundment General Permit-
Coastal Zone Area, SC
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
REGULATORY DIVISION
Refer to: General Permit # 2011-1157
10 JULY 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) , Sections 401 and
404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone Management
Act (48-39-10 et.seq.) a General Permit to perform work in or affecting waters of the United
States has been issued by the
District Commander
U.S. Army Corps of Engineers
Charleston District
69A Hagood Avenue
Charleston, South Carolina 29403
to the General Public authorizing routine and normal maintenance and repair activities within
currently functioning tidal impoundment fields that are located in tidal navigable waters of the
United States (Section 10 Waters) , and/or are adjacent non-tidal fields that rely on the outgoing
tide to drain, where the water regimes of the fields are currently being manipulated for wildlife
management and/or where the fields have ALL of the necessary embankments and structures
in place to allow for the manipulation of the water regimes for wildlife management. This
General Permit is for use only in the Coastal Zone area of Beaufort, Berkeley, Charleston ,
Col/eton , Dorchester, Georgetown, Horry, and Jasper Counties in South Carolina .
This General Permit authorizes specific routine and normal maintenance and repair activities,
as well as certain emergency repairs, as described herein within eligible fields of existing and
currently functioning tidal impoundments.
The South Carolina Department of Health and Environmental Control has issued Water Quality
Certification pursuant to Section 401 of the Clean Water Act, as amended, and the Coastal
Zone Management Act (48-39-10 et. Seq. , and 15 CFR 93) .
*NOTE: A copy of the final General Permit is attached to this Public Notice and contains
the general and special conditions of the authorization.
The General Permit may also be found on the Charleston District Regulatory Website at
http://www.sac.usace.army.mil
General Permit No.: SAC-2011-1157
Name of Permittee: GENERAL PUBLIC
Effective Date: July 10, 2012
Expiration Date: July 10, 2017
DEPARTMENT OF THE ARMY
GENERAL PERMIT
A General Permit to perform work in or affecting waters of the United States , upon the
recommendation of the Chief of Engineers , pursuant to Section 404 of the Clean Water Act (33
U.S.C. 1341) and Section 10 of the Rivers and Harbors Act (33 U.S.C. 403), is hereby issued by
the.authority of the Secretary of the Army by the
District Engineer
U.S. Army Engineer District, Charleston
Corps of Engine~rs
69-A Hagood Avenue
Charleston, South Carolina 29403-5107
to authorize, subject to the following special and general conditions, routine and normal
maintenance and repair activities within currently functioning tidal impoundment fields that are
located in tidal navigable waters of the United States (Section 10 Waters), and/or are adjacent
non-tidal fields that rely on the outgoing tide to drain, where the water regimes of the fields are
currently being manipulated for wildlife management and/or where the fields have ALL of the
necessary embankments and structures in place to allow for the manipulation of the water
regimes for wildlife management. This General Permit is for use only in the Coastal Zone area
of Beaufort, Berkeley, Charleston, Colleton , Dorchester, Georgetown , Horry, and Jasper
Counties in South Carolina.
This General Permit authorizes specific routine and normal maintenance and repair
activities, as well as certain emergency repairs, as described herein within eligible fields of
existing and currently functioning tidal impoundments.
This General Permit does NOT authorize the following activities :
1) The construction of new impoundments and fields.
2) The construction of new embankments (except for contraction embankments as described in
Sections V . H. and VI. A.)
3) The restoration of remnant embankments.
4) The restoration of areas currently not functioning as impoundments or fields.
5) The conversion of forested wetlands to non-forested wetlands.
1
Charleston , S.C. 29403
All work authorized by this General Permit will require an Eligibility Determination prior to
commencing the work. For activities requiring a Pre-Construction Notification (PCN) , the
eligibility request and information may be submitted concurrently with a PCN for work in
accordance with this General Permit, but the property owner, agent, or interested party is
encouraged to submit the required information in advance of anticipated use of the General
Permit. An Eligibility Determination for use of this General Permit is only necessary once and
will remain valid for the life of this General Permit unless the property is sold or management
plans change. An Eligibility Determination for a field or fields may be updated as conditions
warrant, such as if a new embankment and field are constructed in accordance with an issued
Individual Department of the Army permit. The Corps will review the submitted information and
will provide the property owner, agent, or interested party with a Letter of Eligibility for use of this
General Permit. The Corps will maintain a file for each property and will update the file
accordingly. The Eligibility Determination Request Form can be found in Appendix B. of this
General Permit.
For any field(s) located within the managed tidal impoundment that is determined NOT to
be eligible, this General Permit CANNOT be used to authorize work within that field(s),
regardless of the eligibility status of other fields within the same managed tidal
impoundment.
Failure to obtain a Letter of Eligibility from the Corps prior to performing any work in
waters of the U.S. in accordance with this General Permit will be considered a violation of
federal law and will be handled accordingly.
If a property is sold, then the existing Letter of Eligibility is automatically voided. The
new property owner must submit, and receive approval from the COE, a General Permit
Eligibility Determination Request Form and required information prior to performing any
work in waters of the U.S. in accordance with this General Permit.
In the event that management plans and/or management objectives change for a field,
such as a change from wildlife emphasis to crop production emphasis, the interested
party MUST submit an updated Eligibility Request Form and management plan for the
specific field. Failure to obtain an updated Letter of Eligibility from the Corps prior to
performing work in accordance with this General Permit in the specific field will be
considered a violation of federal law and will be handled accordingly.
II. PRE-CONSTRUCTION NOTIFICATION (PCN) PROCEDURES AND REQUIRED
INFORMATION
For the activities described in this General Permit that require a Pre-Construction Notice (PCN)
PRIOR to conducting work in accordance with this General Permit, the following notification
procedures and required information must be submitted to the Corps:
1) Completed Joint Federal/State Application form (available at
www.sac.usace.army.mil).
3
, ,
2) Location map of overall property, with property boundaries shown . (A county road
map and the USGS Topographic Quadrangle map may be used).
3) Location map of the managed tidal impoundment and the specific field(s) where the
work is proposed.
4) Plan view and cross-section drawings of existing conditions and proposed work
All drawings must be legible and 8 ~ x 11 , with black & white ink only.
Each location map and drawing must have a title block.
5) Copy of the Corps' issued Letter of Eligibility or an Eligibility Determination Request
Form and required information . Refer to Section I. of the MTI GP.
6) Please note that compensatory mitigation may be required for projects requiring a
PCN. A compensatory mitigation plan or a statement of why compensatory mitigation
should not be required must be included with each PCN .
7) If any listed threatened or endangered species or critical habitat might be affected or
is in the vicinity of the project, or if the project is located in designated critical habitat, the
PCN must include the name(s) of those endangered or threatened species that may be
affected by the proposed work. (See the US Fish and Wildlife Service website at
www.usfws.gov for a current list of threatened and endangered species and critical
habitat by county).
**The submittal of one PCN may be used for multiple projects requiring PCNs that are
DEPENDENT on each other, such as the installation of more than one new water control
structure (WCS) per 60 acres of field, the excavation of new inlet canals associated with the
new water control structures, and the construction of bulkheads on either side of the new water
control structures that exceed 40 linear feet. One set of project drawings may be used to show
the entire proposed project. For projects that are NOT dependent on each other, such as the
installation of more than one WCS per 60 acres of field and the construction of a bulkhead for
field-dike stabilization in a separate field , a separate peN with the required information should
be submitted for each proposed activity that requires a PCN .
III. POST CONSTRUCTION NOTIFICATION AND CERTIFICATION FORM
The permittee is required to submit a Post Construction Notification and Certification Form
(PCNCF) to the Corps for ALL activities constructed in accordance with this General Permit.
The PCNCF must be submitted within 30 days following completion of the authorized work. The
purpose of the PCNCF is for the Charleston District to track the use of this General Permit and
to ensure that activities were constructed in accordance with the conditions of this General
Permit. The permittee need only fill out the PCNCF and mail it to the Charleston District
Regulatory Division at the address provided in Section I. No additional information or
coordination is required . The PCNCF can be found in Appendix C of this General Permit.
IV. DEFINITIONS
Note: The definitions listed below appear italicized throughout Sections V . and VI. of this
General Permit.
Contraction Embankment: A contraction embankment is a new embankment built to replace
a section of failed or failing outer/perimeter embankment of a managed tidal impoundment. The
contraction embankment is typically constructed to the interior of the failed or failing
4
outer/perimeter embankment with the same height and width of the original and connecting
embankments. Refer to Appendix A, Figure 3.
Embankment: An embankment is an earthen mound constructed to hold back water. For the
purpose of this General Permit, an embankment in managed tidal impoundments consist of
three parts : a field-dike , which is the elevated portion of the embankment constructed above
the water level ; a berm, or maintenance shelf that is located to the interior of the field-dike ,
which helps to stabilize the field-dike ; and a canal, which is located to the interior of the field
dike and berm , that provides for water circulation . Refer to Appendix A , Figure 2.
Emergency Repair: For the purpose of this General Permit, the term emergency repair refers
to actions in response to situations or events that are unforeseen, such as a storm event,
unusually high tides , or wildlife activity, which require immediate repair or reconstruction of an
outer/perimeter embankment to either prevent the imminent collapse or failure of the
embankment, or to repair or reconstruct the embankment already collapsed or failed as a result
of the unforeseen event and situation.
Field: For the purpose of this General Permit, a field is an individual management cell located
within the managed tidal impoundment. Typically a series of fields make up a managed tidal
impoundment.
Footprint: For the purpose of this General Permit, footprint refers to the area or limits of the
existing fill , canal, and/or structure.
Forested: For the purpose of this General Permit, an area is considered to be forested if the
area has 5% or more tree cover. Refer to the definition Tree Stratum. (Consistent with the
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf
Coastal Plain Region (Version 2.0))
Inlet Canal: An inlet canal is an excavated canal that directs water from the exterior of the
managed tidal impoundment into a field through a water control structure. An inlet canal differs
from the canal that is associated with the embankment. Refer to the definition of embankment.
Managed Tidal Impoundments (MTls): Managed Tidal Impoundments are impounded tidal
wetlands and waters that have a system of function ing embankments, canals , and water control
structures that create a series of fields where the water regimes of the fields are currently being
manipulated for wildlife management and/or where the fields have ALL of the necessary
embankments and structures in place to allow for the manipulation of the water regimes for
wildlife management.
Non-Emergency Repair: For the purpose of this General Permit, the term non-emergency
repair refers to routine and normal maintenance and repair activities that are foreseen and can
be planned for in advance .
No Pre-Construction Notification (PCN) Required: No Pre-Construction Notification
Required refers to the activities specified in this General Permit that DO NOT require the
submittal of a PCN and DO NOT require additional authorization from the Corps prior to
beginning work. However, the permittee must submit an Elig ibility Request and receive a
5
determination of eligibility prior to beginning work in accordance with this General Permit, even
for activities that do not require a PCN. The permittee must also obtain all necessary
authorizations from other federal , state, and local agencies prior to beginning work whether the
work does or does not require a PCN .
Pre-Construction Notification (PCN): A Pre-Construction Notification refers to a notification
that is submitted to the Corps prior to beginning work. Refer to Section II . of the General Permit
for a list of the PCN procedures and required information.
Pre-Construction Notification (PCN) Required: Pre-Construction Notification Required refers
to activities specified in this General Permit that DO require submittal of a PCN and DO require
authorization from the Corps PRIOR to beginning any work. Please refer to Section II . of the
General Permit for a list of the PCN procedures and required information. The permittee must
obtain all necessary authorizations from other federal , state, and local agencies prior to
beginning work whether the work does or does not require a PCN .
Quarter/Interior Field Drains: Quarter/interior field drains are linear ditches, typically about 2
feet wide x 2 feet deep (2' X 2'), located within the fields and excavated for the purpose of
facilitating field drainage and circulating water throughout the fields .
Routine/Normal Maintenance: Routine/normal maintenance refers to the required routine
maintenance activities that are predictable, necessary, and that may occur frequently, to
maintain the functional integrity of the existing managed tidal impoundments and fields , as well
as their enclosing field-dikes, berms, canals, and structures.
Splash-apron: For the purpose of this General Permit, a splash-apron is a horizontal platform
located at the openings of a water control structures to prevent erosion . The splash apron may
consist of a wooden platform , rip rap, etc.
Tree stratum: A tree stratum consists of woody plants , excluding woody vines , approximately
20 feet (6 m) or more in height and 3 inches (7.6 cm) or larger DBH (diameter at breast height ).
(Consistent with the Regional Supplement to the Corps of Engineers Wetland Delineation
Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0))
Trunk: A trunk is a mechanized water control structure set into an embankment. There are
several types of trunks that are commonly used in managed tidal impoundments. A traditional
wood 'Combahee Style ' box trunk is depicted in Appendix A, Figure 1.
Water Control Structure (WCS): For the purpose of this General Permit, a water control
structure is a structure in a managed tidal impoundment that conveys water, controls the
direction or rate of flow, and maintains a water surface elevation . WCS in managed tidal
impoundments typically consist of trunks and/or spillway boxes .
Wing-wall: For the purpose of th is General Permit, a wing-wall is a vertical bulkhead extending
laterally from the ends of the water control structure to help prevent erosion of the field-dike at
the water control structure . Refer to Appendix A, Figure 1.
6
V. NORMAL AND ROUTINE MAINTENANCE AND REPAIR ACTIVITIES AUTHORIZED BY
THE GENERAL PERMIT
A.
Water Control Structures
This General Permit authorizes the replacement, relocation, and/or installation of Water
Control Structures (WCS) and includes the construction of associated splash-aprons and
wing-walls in an existing embankment provided the following conditions are met:
1) The footprint of a WCS and any associated splash-apron and wing-walls that do NOT
exceed 240 square feet in size are authorized by this General Permit. Activities that
exceed 240 square feet are not authorized by this General Permit. (rhe construction of
an inlet canal and/or bulkhead beyond the wing-walls is not counted towards the 240 sf
threshold. Details of constructing an inlet canal and/or bulkhead can be found in
Sections V. B. and C. of the General Permit.)
and
2) No PCN is required for the installation of one (1) WCS per every 60 acres of field.
or
3) A PCN is required for more than one (1) WCS per every 60 acres of field.
Note: If a WCS is removed and/or abandoned-in-place, this General Permit authorizes the
placement of fill material to close the resulting breach in the field-dike and/or to fill in the
abandoned structure in place, as long as the material remains within the existing footprint of
the field-dike.
B. Inlet Canals Associated With Water Control Structures (WCS):
This General Permit authorizes the excavation of new inlet canals and/or the maintenance
of existing inlet canals DIRECTLY associated with an existing, relocated, and/or new Water
Control Structure (WCS) provided the. following conditions are met:
1) The excavation of the inlet canal (new and/or maintenance) does NOT exceed 40
cubic yards of material per inlet canal. Activities that exceed the excavation of 40 cubic
yards of material are not authorized by this General Permit.
and
2) The excavated material is disposed of and stabilized in an upland location,
which may include the top of an existing functioning field-dike , as long as the material
remains within the existing footprint of the field-dike.
and
7
3) No PCN is required for the excavation of one (1) inlet canal per every 60 acres of
field (one WCS per 60 acres of field as described in Section A.).
or
4) A PCN is required for the excavation of more than one (1) inlet canal per every 60
acres of field (more than one WCS per 60 acres of field as described in Section V. A.).
C. Bulkheads Associated With Water Control Structures (WCS):
This General Permit authorizes the construction and maintenance of bulkheads DIRECTLY
associated with an existing, relocated , and/or new Water Control Structure (WCS) provided
the following conditions are met:
1) No PCN is required if the bulkhead does NOT exceed a maximum of 40 linear feet on
either side of the edges of the wing-wall or WCS. (The construction of wing-walls , as
described in Section V. A . and shown in Figure 1, are not counted towards the 40 If
threshold).
or
2) A PCN is required if the bulkhead exceeds a maximum of 40 linear feet on either side
of the edges of the wing-wall or WCS.
or
3) No Permit is required from the Corps if the bulkhead is constructed above the high
tide line in tidal fields and ordinary high water mark in non-tidal fields.
D. Re-topping of Existing and Functional Field-Dikes:
This General Permit authorizes the re-topping of existing and functional field-dikes provided
the following conditions are met:
1) No Permit is required from the Corps if the re-topping material is placed within the
footprint of the existing functional field-dike AND above the high tide line in tidal fields
and ordinary high water mark in non-tidal fields.
or
2) A PCN is required if re-topping material is placed outside of the footprint of the
existing functional field-dike AND below the high tide line in tidal fields and ordinary high
water mark in non-tidal fields . A maximum of 2 cubic yards of fill material per linear foot
of field-dike AND less than a total of 0.1 acre of impacts to waters of the U.S., including
wetlands , are authorized . Impacts exceeding 2 cubic yards per linear foot and a total of
0.1 acre or more are NOT authorized by this General Permit.
8
E. Excavation of Material for Re-topping Field-Dikes:
This General Permit authorizes the excavation of material for purposes of re-topping existing
and functional field-dikes. No PCN is required for the excavation of re-topping material
provided the following conditions are met:
1) The excavation of material is limited to the existing interior canal that is adjacent to
the field-dike that is to be re-topped. There is no limit to the amount of material
excavated so long as the purpose of the excavation is to obtain material for re-topping of
existing field-dike (refer to Section II. definition of embankment and Appendix A , Figure
2.
and
2) The excavation of material from the canal and temporary side-casting of material
onto the adjacent interior berm is only authorized after the field has been dewatered or
drawn down to bed level.
and
3) The excavated material can be temporarily side-cast on the adjacent interior berm
until the material dries and is suitable for use in re-topping .
and
4) Once the side-cast material has sufficiently dried , it must be removed from the interior
berm and the area restored to pre-disturbance conditions.
F. Bulkheads Associated with Field-Dike Stabilization :
This General Permit authorizes the construction and maintenance of bulkheads on one or
both sides of any field-dike and the placement of associated backfill material for the purpose
of stabilizing the field-dike provided the following conditions are met:
1) No peN is required if the bulkhead does not exceed 500 linear feet on either side of
the field-dike (1000 linear feet total for the activity) AND the associated backfill does not
exceed an average of one cubic yard per linear foot placed along the bank below the
high tide line in tidal fields and ordinary high water mark in non-tidal fields.
or
2) A PCN is required if the bulkhead exceeds 500 linear feet total on either side of the
field-dike (more than 1000 linear feet total for the activity) AND the associated backfill
exceeds an average of one cubic yard per linear foot placed along the bank below the
high tide line in tidal fields and ordinary high water mark in non-tidal fields .
9
G. Re-Establishment of Berm for Embankment Stabilization :
This General Permit authorizes the re-establishment of interior berms by relocating and
filling the existing interior canal for embankment stabilization provided the work is performed
after the fie/drs) is dewatered or drawn-down to bed-level. The submittal of a PCN is
required and must include the following information, in addition to the information found in
the Notification Procedures Section" . of this General Permit:
1) Plan view and cross-section view drawings of the existing embankments (field-dike ,
berm, and canal complex) , to include dimensions and locations.
2) Plan view and cross-section view drawings of the embankment complex with the
proposed re-Iocated berm and canal, to include dimensions and locations.
3) The fill impacts for the berm and the excavation impacts for the canal (volume and
acreage).
4) A narrative describing construction techniques , equipment, and scheduling of work.
5) Stabilization plan for the re-established berm , which should include vegetation
plantings and other stabilization techniques, scheduling of stabilization , and target plant
community.
6) Best management practices to be used.
H. Non-Emergency Contraction Embankment:
This General Permit authorizes the construction of non-emergency contraction
embankments. Refer to Appendix A, Figure 3. For the purpose of this General Permit, the
term non-emergency repairs refers to routine and normal maintenance and repair activities
that are foreseen and can be planned for in advance . Contraction embankments not
meeting the below conditions will require a Standard Permit. The construction of non
emergency contraction embankments will requ ire submittal of a PCN and are authorized
provided that the following conditions are met:
1) The contraction embankment is limited to a maximum impact of 0.75 acre and 1100
linear feet.
and
2) The contraction embankment must be built to the interior of the existing/failing
embankment and must be no longer than required to by-pass and/or isolate the unstable
or failing embankment section(s) . The height and width' of the contraction embankment
must be the same as the original embankment, although minor deviations for
embankment stability are authorized.
and
3) The use of temporary cofferdams is authorized during the construction of the
contraction embankment provided that the cofferdams are removed once construction is
completed and the area restored to pre-disturbance conditions. If the cofferdam is
constructed from local material, the material must be obtained from within the managed
tidal impoundment. Excavation of tidal marshes and tidal waters outside of the managed
10
tidal impoundment to obtain material for construction of the cofferdam is not authorized
by this General Permit.
I. Quarter/lnterior Field Drain Construction and Maintenance Excavation :
This General Permit authorizes the excavation for construction and/or maintenance of new
and existing quarter/interior field drains to improve field drainage provided the following
conditions are met:
1) All excavated material may be disposed of in an upland area (including field-dikes) ,
spread thinly across the interior of the field in a manner that does not alter existing
grade, or side-cast within the interior of the field in a manner not to impede water flow.
There is no limit to the amount of material excavated during maintenance activities.
Any excavated material disposed of outside of the managed tidal impoundment must be
placed in upland area and stabilized.
and
2) No peN is required if the excavation of the new or existing quarter/interior field drains
total less than 500 linear feet, are a maximum of 2 feet deep by 2 feet wide (2 ' X 2') ,
AND have less than 0.02 acre of excavation impact per 60 acres of field.
or
3) A peN is required for the excavation of new or existing quarter/interior field drains
that total 500-1000 linear feet, are a maximum of 2 feet deep by 2 feet wide (2' X 2') ,
AND have less than 0.04 acre of excavation impact per 60 acres of field. The
construction or maintenance of new and existing quarter/interior field drains that exceed
conditions I. 1 and I. 2 are not authorized by this General Permit.
J. Construction of Road Crossings Across Canals or Drains within an Existing Managed
Tidal Impoundment:
This General Permit authorizes the construction of road crossings across canals and drains
within existing managed tidal impoundments provided the following conditions are met:
1) No peN is required for road crossings that do not exceed 0.10 acre per crossing
AND are properly culverted or designed so as not to impede flow.
or
2) A peN is required for road crossings between 0.1-0.3 acre per crossing . All road
crossings must be properly culverted or designed so as not to impede flow. Road
crOSSings that exceed 0.3 acre in impacts are not authorized by this General Permit.
11
K. Moist Soil Management:
This General Permit authorizes the moist soil management activities within managed tidal
impoundments. No peN is required provided following conditions are met:
1) The periodic or annual soil disturbances associated with disking and/or rotovating,
prescribed burning, bush-hogging , and/or water level manipulation for the purpose of
maintaining and promoting early-successional grasses and forbs and/or treating invasive
species , is authorized as long as the activities do not alter existing surface elevations.
and/or
2) Agricultural practices in fields to manage habitat and feeding areas for wildlife are
authorized as long as the activities do not alter existing surface elevations.
and
3) The conversion of forested wetlands to non-forested wetlands is not authorized by this
General Permit.
VI. EMERGENCY ACTIVITIES AND PROCEDURES AUTHORIZED BY THIS GENERAL
PERMIT:
This General Permit authorizes the construction of contraction embankments in emergency
situations provided that specific notification procedures and conditions are followed. For the
purpose of this General Permit, the term emergency repair refers to actions in response to
situations or events that are unforeseen, such as a storm event, unusually high tides, or wildlife
activity, which require immediate repair or reconstruction of an outer/perimeter embankment to
either prevent the imminent collapse or failure of the embankment, or to repair or reconstruct the
embankment already collapsed or failed as a result of the unforeseen event and situation.
These emergency activities and procedures are not intended to be used for normal
embankment maintenance activities. This General Permit authorizes the construction of
emergency contraction embankments provided the conditions in the following Sections A . AND
B. are met.
**A Letter of Eligibility is required PRIOR to performing emergency work in accordance
with this General Permit.
A. Emergency Construction of Contraction Embankments:
This General Permit authorizes the construction of contraction embankments in emergency
situations provided the following conditions are met:
1) Emergency contraction embankments are limited to impacts of 0.75 acre AND a
maximum of 1100 linear feet per emergency repair.
and
12
2) The contraction embankment must be built to the interior of the existing/failed
embankment and must be no longer than required to by-pass and/or isolate the unstable
or failing embankment section(s). The height and width of the contraction embankment
must be the same as the original embankment, although minor deviations for
embankment stability are authorized .
and
3) The use of temporary cofferdams is authorized during the construction of the
contraction embankment provided that the cofferdams are removed once construction is
completed and the area restored to pre-disturbance conditions. If the cofferdam is
constructed from local material, the material must be obtained from within the managed
tidal impoundment. Excavation of tidal marshes and tidal waters outside of the managed
tidal impoundment to obtain material for construction of the cofferdam is not authorized
by this General Permit.
B. Emergency Notification Procedures:
This General Permit authorizes the construction of contraction embankments in emergency
situations provided the following emergency notification procedures are met:
1) The permittee must call AND fax the Corps within 72 hours of the emergency repairs
OR on the first business day after emergency construction activities have commenced.
The fax and phone notification should include property name, contact person name and
phone number, brief statement of work, and date emergency work began. The permittee
must also speak to the Branch Chief, Watershed Manager, or designee of the respective
watershed. Permittees must also notify the South Carolina Department of Health and
Environmental Control , Office of Ocean and Coastal Resource Management for State
authorization.
Contact Charleston District Regulatory at:
Phone : (843) 329-8044, or toll free at 1- (866) 329-8187
Fax: (843) 329-2332
and
2) The permittee must submit a PCN to the Corps within 14 days of initial notification.
The application must also include pre and post repair photographs of the area . Refer to
Section II. of the General Permit for notification requirements.
and
3) Compensatory mitigation may be required for projects requiring a peN. A
compensatory mitigation plan or a statement of why compensatory mitigation should
not be required must be included with each PCN.
13
VII. GENERAL CONDITIONS:
The activities authorized by this General Permit must comply with ALL of the following
general conditions:
A. This General Permit authorizes only those activities specifically addressed above . The
permittee must obtain Department of the Army authorization , such as issuance of an
individual permit, for all other activities that are regulated pursuant to 404 of the Clean Water
Act and/or Section 10 of the Rivers and Harbors Act within waters of the United States.
B. All activities identified and authorized herein shall be consistent with the terms and
conditions of this General Permit; any variance not specifically identified and authorized
herein shall constitute a violation of the terms and conditions of this permit and may result in
the modification , suspension , or revocation of the authorization , as set forth more
specifically in General Condition F. below and in the institution of such legal proceedings as
the United States Government may consider appropriate.
C. The permittee must make every reasonable effort to conduct the work authorized herein
in a manner so as to minimize any adverse impact to fish , wildlife, and other environmental
resources.
D. The permittee must make every reasonable effort to conduct the work authorized herein
in a manner so as to avoid and minimize degradation of water quality.
E. The permittee shall allow the District Engineer or his authorized representative(s) to
make periodic inspections at any time deemed necessary in order to assure that the activity
being performed under authority of this permit is in accordance with the terms and
conditions prescribed herein .
F. Authorization of a specific work or structure authorized herein may be summarily
suspended in whole or in part upon finding by the District Engineer that immediate
suspension would be in the general public interest or there has been violation of any terms
or conditions of this permit. Such suspension shall be effective upon receipt by the
permittee of a written notice thereof which shall indicate 1) the extent of the suspension , 2)
the reasons for this action , and 3) any corrective or preventative measures to be taken by a
permittee which are deemed necessary by the District Engineer to abate imminent hazards
to the general public interest. A permittee shall take immediate action to comply with the
provisions of this notice. Within ten (10) days following the receipt of this notice of
suspension , the permittee may request a meeting with the District Engineer or public
hearing to present information relevant to a decision whether their permit should be
reinstated , modified, or revoked . If a public hearing is requested , it shall be conducted
pursuant to procedures prescribed by the Chief of Engineers. After completion of the public
hearing or within a reasonable time after issuance of the suspension notice to the permittee
if no hearing is requested , the authorization of the specific work or structure will be
re instated, modified, or revoked . Any modification , suspension , or revocation under this
General Permit shall not be the basis for any claim for damages against the United States.
14
G . The permittee shall sign and subm it the attached Managed Tidal Impoundment General
Permit Post Construction Notification and Certification Form in Appendix C . to the Corps
within 30 days following completion of the authorized work .
H. Upon receipt of a notice from the District Engineer for failure to comply with the terms ,
conditions , or standards of this General Permit, the project owner must within sixty (60) days
without expense to the United States and in such a manner as directed by the District
Engineer of his authorized representative(s) , effect compliance with the terms , conditions ,
and standards or remove the previously authorized work or structure.
I. This General Permit does not convey any property rights, either in real estate or material ,
or any exclusive privileges; it does not authorize any injury to property or invasion of rights
or any infringement of Federal , State, or local laws, nor does it obviate the requirement to
obtain other Federal State, or local assent or to comply with any applicable standards
required by ordinance for the activities authorized herein . Other Federal , State, or local
agencies are not limited by this document and may impose more stringent requirements
than those stated herein as they see fit.
J . Any activity that may adversely affect any federally listed threatened or endangered
species , a species for proposed listing, or designated critical habitat is NOT authorized by
this General Permit. These activities will be evaluated under the individual permit review
process as specified in 33 CFR 325.
K. Any activity that may adversely affect any historic properties listed , or which may be
eligible for listing on the National Register of Historic Places is NOT authorized by this
General Permit. These activities will be evaluated under the individual permit review
process as specified in 33 CFR 325.
L. If the permittee, prior to or during the performance of the work authorized herein ,
encounters previously unidentified archeological remains or cultural resources within the
area subject to the Department of the Army authorization , the permittee agrees to cease
work and contact the District Engineer, so that further coordination with the South Carolina
Institute of Archaeology and Anthropology and the South Carolina Department of Archives
and History may be conducted .
M. The District Engineer, at his discretion, may determine that this General Permit will not
be applicable to a specific construction proposal. I n such case the procedure for processing
an individual permit in accordance with 33 CFR 325 will be available .
VII. PROHIBITED ACTIVITIES:
All work that exceeds the terms and conditions specified herein is prohibited unless an Individual or
Nationwide Department of the Army Permit has been obtained from the Corps of Engineers. All
work for purposes other than those specified herein is expressly not authorized by this document.
15
VIII. REQUIRED AUTHORIZATIONS:
Prior to performing any of the work authorized herein, the permittee shall obtain all necessary state
permits from the South Carolina Department of Health and Environmental Control and any other
required Federal State or local authorizations.
IX. PENALTIES FOR VIOLATIONS:
Authorization obtained under this General Permit limits the size, length and use of structures. Any
deviation from the specifications , .or other terms or conditions of the General Permit shall constitute
a violation of Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean
Water Act, and may result in the District Engineer seeking judicial relief to have the permittee
remove the structure or work and/or restore the project area to its former condition, as well as the
imposition of penalties as provided by law.
X. LIMITS OF FEDERAL LIABILITY:
In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or
unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
XI. REVOCATION OF THE GENERAL PERMIT:
This permit may be revoked by issuance of a public notice at any time the District Engineer
determines that the cumulative effects of the activities authorized herein have an adverse effect on
the public interest. Following such revocation , any future activities in areas covered by this General
Permit will be processed as Individual or Nationwide Permits.
XII. DURATION OF THE GENERAL PERMIT.
This General Permit will cover activities started within five (5) years and completed within six (6)
years after the date of issuance unless this permit is revoked in the interim. At the end of the first
year and every succeeding year, the Corps of Engineers and the Federal and State regulatory and
resource agencies will jointly review activities authorized by this General Permit to determine if
significant cumulative impacts have resulted. If the District Engineer determines revocation of this
permit, in whole or in part, may be in order due to cumulative impacts, a public notice of the
intention will be issued and after a review of all additional data submitted, action will be taken to
amend , modify or revoke this permit as appropriate. Revocation of the General Permit will not
16
affect the work that had been authorized when the General Permit was in effect if such work is in
accordance with the provisions contained herein.
This permit becomes effective when the Federal official, designated to act for the Secretary of the
Army, has signed below.
This permit shall become effective on the date of the District Engineer's signature.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
,
Edward P. hamberlayne P. E.
Lieutenan Colonel, U.S. Army
Commander and District Engineer
or his Designee
Tina B. Hadden
Chief, Regulatory Division
17
I
Date
Appendix A
Three Figures:
Figure 1: Typical "Combahee-Style" Rice Trunk Water Control Structure
Figure 2: Typical Embankment Cross-Section
Figure 3: Typical Contraction Embankment
18
FIELD-DIKE BULKHEAD
NOT TO EXCEED 40 LINEAR FT
EITHER SIDE OF WINe-WALL
(l-AS
tlf3
o-A~O
~IS£~
'W
OLINO
~,"1/
/I~
FIGURE 1: TYPICAL (COMBAHEE-STYLE)
RICE TRUNK
WATER CONTROL STRUCTURE eWCS)
I
Z
W
~
~
z
~z
~o
WI
U
--.J W
«U1
UI
(LU1
>-U1
1-0
0:::
.. U
N
~~ /
. o~t: ?-IO?-
-'.ilJL
FA/LEO ffATER
CONTROL
STRUCTURE
AT BREACH
?00~ I~~t:
/I~I~~
~
~
NEff ffATER
CONTROL
STRUCTURE
~
~
~~'v
G~
~
~
~
/
//
/~O~
.
/~901l
~
~
/
~ WI
/~0 . ~
/ ~i~~ ,,5'
/~~~"
/
//
W
~
/:
~~~
//
.
/ (0
1
~i\O~
~f I
,,~~
G"~
tF
FIGURE 3: TYPICAL CONTRACTION
EMBANKMENT
Appendix B.
Managed Tidal Impoundment Eligibility Determination Request Form
19
U.S. Army Corps of Engineers - Charleston District - Regulatory Division
Managed Tidal Impoundment General Permit SAC # 2011-1157
Eligibility Determination Request Form
Property Name:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Date:_ _ _ _ _ __
County of Property:_ _ _ _ _ _ _ _ _ _ _ Total Acreage of Managed Tidal Impoundment: _ _ _ __
Property Owner:_ _ _ _ _ _ _ _ _ _ __
Agent:_ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address:_ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address:_ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address:_ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Phone :_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Phone:_ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Email:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Emai1:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Infonnation Required to Accompany Request
1) Managed Tidal Impoundment General Permit Eligibility Determination Request Form .
2) Location map of overall property.
3) Map/drawing of the managed tidal impoundment and the fields being included in this eligibility request with each water
Control structure and field identified by name/number.
4) Description of the existing site conditions for each field that is being considered for use of the General Permit. The
description should include the vegetation present, water regime, and acreages of the tidal impoundment and each field .
5) A management plan or description of current management practices for each field.
6) To comply with Section 106 of the National Historic Preservation Act, the following information must be provided:
a) A map with the Eligibility Review Area clearly defined. An Eligibility Review Area includes the managed tidal
impoundments and other eligible fields and the immediately adjacent uplands within 500 feet of the tidal
impoundments.
b) The location of any known historic structures and archaeological sites within the defined Eligibility Review Area
clearly labeled on the map. To assist with determining if any archaeological structures or sites are present, refer to the
State Historic Preservation Office (SHPO) guidance document Rice Fields and Section 106: SHPO Guidance for
Federal Agencies and Applicants that can be found online at
http://shpo.sc.gov/programs/revcomp/Pages/guidance.aspx and ArchSite found at http://archsite .cas.sc.edu/ArchSite.
c) Photographs of any known historic structures and archaeological sites, keyed to the map/drawing of the managed
tidal impoundment and fields prepared for #3 above.
7) To comply with Section 7 of the Endangered Species Act, the following information must be provided:
a) The name(s) of those endangered or threatened species that may be affected by the proposed work or are in the
vicinity of the project. (See the US Fish and Wildlife Service website at www.usfws.gov for a current list of threatened
and endangered species and critical habitat by county).
b} A statement if critical habitat might be affected or if the project is located in designated critical habitat.
8) Photographs of the fields proposed for the Eligibility Determination . Locations and directions of the photos should be
marked on the map/drawing of the managed tidal impoundment and fields prepared for #3 above.
--- -------.------.- ---- --- . --. --- -
- - - - - - - - - - _.. -
- --..----- -.----.-- - ....- --- - - - I
IMPORTANT NOTE: Legible printed name and signature required. The person signing this form must be the
, present property owner or have the specific authority of the property owner to authorize Corps of Engineers
employees or their agents to enter onto the property for on-site investigations if such is deemed necessary.
Do not sign this form unless you are the owner, or have the specific authority of the property owner.
PRINTED NAME of person signing this form, below: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Signature of Property Owner or Authorized Person: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Mail to: U.S . Army Corps of Engineers
Regulatory Division
69-A Hagood Avenue
Charleston , S.C. 29403
!
!
Appendix C.
Managed Tidal Impoundment Post Construction Notification and Certification Form
20
U.S. Army Corps of Engineers - Charleston District - Regulatory Division
Managed Tidal Impoundment General Permit SAC # 2011-1157
Post Construction Notification and Certification Form
Project SAC # _ _ _ _ _ _ _ _ _ __
Note: Provide the SAC # for your specific project if a PCN was required (refer to the General Permit verification letter
for SAC #) . If no PCN was required , leave blank.
Property Name:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
County of Property:_ _ _ _ __
Date:_ _ _ _ _ _ _ __
Latitude/Longitude of Property:_ _ _ _ _ _ _ __
Permittee Name:,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _----'_ _
Permittee Address :_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Phone : _______________ Email: _ _ _ _ _ _ _ _ _ _ _ __
Location of Work: (Include field number/name and Latitude and Longitude of where the work occurred .)
Description of Work: (Description may include references to the applicable sections of the General Permit)
Date of Completion of Work:_ _ _ _ _ _ __
i
I hereby certify the work authorized by the Managed Tidal Impoundment General Permit SAC # 2011-1157 has
been completed in accordance with the terms and conditions of said permit.
Signature of Permittee
_...
Mail to : U.S. Army Corps of Engineers
Regulatory Division
69-A Hagood Avenue
Charleston . S.C. 29403
-------- -
- - --
-.--- .. - ..
~'.-
----
~.~----.
_.